SPECIAL PROVISIONS
FOR
CITY OF SAN LUIS OBISPO
RAILROAD DISTRICT BOARDWALK REPLACEMENT
Specification No. 91615
SEPTEMBER 2018
PUBLIC WORKS DEPARTMENT
ENGINEERING DIVISION
919 Palm Street
San Luis Obispo, CA 93401
(805) 781-7200
RAILROAD DISTRICT BOARDWALK REPLACEMENT
Specification No. 91615
Approval Date: <<date of CM or CAR Report Authorizing Advertisement>>
<<Signature Date>>
TABLE OF CONTENTS
NOTICE TO BIDDERS ..................................................................................................... I
BID SUBMISSION ...................................................................................................................................... I
BID DOCUMENTS .................................................................................................................................... II
PROJECT INFORMATION........................................................................................................................ II
QUALIFICATIONS .................................................................................................................................... III
AWARD .................................................................................................................................................... IV
ACCOMMODATION .................................................................................................................................. V
BID FORMS .................................................................................................................... A
BID ITEM LIST FOR RAILROAD DISTRICT BOARDWALK REPLACEMENT, SPECIFICATION NO.
91615 ..................................................................................................................................................... A
LIST OF SUBCONTRACTORS ................................................................................................................. B
PUBLIC CONTRACT CODE SECTION 10285.1 STATEMENT .............................................................. C
PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE ......................................................... C
PUBLIC CONTRACT CODE SECTION 10232 STATEMENT ................................................................. C
LABOR CODE SECTION 1725.5 STATEMENTS ................................................................................... C
NON-COLLUSION DECLARATION .......................................................................................................... E
BIDDER ACKNOWLEDGEMENTS ........................................................................................................... F
QUALIFICATIONS .................................................................................................................................... G
ATTACH BIDDER'S BOND TO ACCOMPANY BID ................................................................................. H
SPECIAL PROVISIONS .................................................................................................. 1
DIVISION I GENERAL PROVISIONS ....................................................................................................... 1
1 GENERAL ........................................................................................................................................... 1
2 BIDDING ............................................................................................................................................. 1
4 SCOPE OF WORK ............................................................................................................................. 1
5 CONTROL OF WORK ........................................................................................................................ 2
7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC ....................................................... 2
8 PROSECUTION AND PROGRESS ................................................................................................... 3
9 PAYMENT ........................................................................................................................................... 3
DIVISION II GENERAL CONSTRUCTION ............................................................................................... 3
15 EXISTING FACILITIES ..................................................................................................................... 3
DIVISION VIII MISCELLANEOUS CONSTRUCTION .............................................................................. 3
73 CONCRETE CURBS AND SIDEWALKS ......................................................................................... 3
DIVISION XI MATERIALS ......................................................................................................................... 4
90 CONCRETE ...................................................................................................................................... 4
ADD TO SECTION 90-1.01B .................................................................................................................... 4
DIVISION XIII APPENDICIES ................................................................................................................... 4
APPENDIX A - FORM OF AGREEMENT ....................................................................... 0
NOTICE TO BIDDERS
i
NOTICE TO BIDDERS
BID SUBMISSION
Sealed bids will be received by the City of San Luis Obispo at the Public Works
Administration Office located at 919 Palm Street, California 93401, until
2:00 p.m. on <<January 1, 2016>>
at which time they will be publicly opened and read aloud. Submit bid in a sealed envelope
plainly marked:
Railroad District Boardwalk Replacement, Specification No. 91615
Any bid received after the time and date specified will not be considered and will be
returned to the bidder unopened. Bids received by Fax or Email will not be considered.
By submission of bid you agree to comply with all instruction and requirements in this
notice and the contract documents.
All bids must be submitted on the Bid Item List form(s) provided and submitted with all
other Bid Forms included in these Special Provisions.
Each bid must be accompanied by either a:
1. certified check
2. cashier's check
3. bidder's bond
made payable to the City of San Luis Obispo for an amount equal to ten percent of the
bid amount as a guaranty. Guaranty will be forfeited to the City San Luis Obispo if the
bidder, to whom the contract is awarded, fails to enter into the contract.
The City of San Luis Obispo reserves the right to accept or reject any or all bids or waive
any informality in a bid.
All bids are to be compared based on the City Engineer's estimate of the quantities of
work to be done, as shown on the Bid Item List.
Bids will only be accepted from bidders that are licensed in compliance with the provisions
of Chapter 9, Division III of Business and Professions Code.
The award of the contract, if awarded, will be to the lowest responsive bid submitted by a
responsible contractor whose bid complies with the requirements prescribed. If the
contract is awarded, the contract will be awarded within 60 calendar days after the
opening of the bids.
Failure to raise defects in the notice to bidders or bid forms prior to bid opening constitute
a waiver of those defects.
NOTICE TO BIDDERS
NOTICE TO BIDDERS
ii
BID DOCUMENTS
A copy of the plans and special provisions may be downloaded, free of charge, from the
City’s website at:
www.slocity.org/government/department-directory/public-works/public-works-bids-
proposals
A printed copy may be obtained at the office of the City Engineer by paying a non-
refundable fee of:
1. $15.00 if picked up in person, or
2. $25.00 if by mailing to the office of the City Engineer
Request must include Specification Number. The office of the City Engineer is located at:
919 Palm Street
San Luis Obispo, CA 93401
Standard Specifications and Engineering Standards referenced in the Special Provisions
may be downloaded, free of charge, from the City’s website at:
www.slocity.org/government/department-directory/public-works/documents-
online/construction-documents
A printed copy may be obtained by paying a non-refundable fee of:
1. $16.00 if picked up in person, or
2. $21.00 if by mailing to the office of the City Engineer
You are responsible to obtain all issued addenda prior to bid opening. Addenda will be
available to download at the City’s website listed above or at the office of the City
Engineer.
Contact the project manager, Manny Guzman at 805-781-7423 or the Public Works
Department at (805) 781-7200 prior to bid opening to verify the number of addenda
issued.
You are responsible to verify your contact information is correct on the plan holders list
located on the City’s website at:
www.slocity.org/government/department-directory/public-works/public-works-bids-
proposals.
PROJECT INFORMATION
In general, the project will remove the Railroad District boardwalk and replace it with brick
sidewalk.
NOTICE TO BIDDERS
NOTICE TO BIDDERS
iii
The project estimated construction cost is $331,000.
Contract time is established as 50 working days.
The fixed liquidated damages amount is established at $500 per day for failure to
complete the work within the contract time.
In compliance with section 1773 of the Labor Code, the State of California Department of
Industrial Relations has established prevailing hourly wage rates for each type of
workman. Current wage rates may be obtained from the Division of Labor at:
https://www.dir.ca.gov/oprl/DPreWageDetermination.htm
This project is subject to compliance monitoring and enforcement by the Department of
Industrial Relations.
QUALIFICATIONS
You must possess a valid Class A Contractor's License at the time of the bid opening.
You and any subcontractors required to pay prevailing wage must be registered
with the Department of Industrial Relations pursuant to Section 1725.5 of the Labor
Code.
You must have experience constructing projects similar to the work specified for this
project. Provide three similar reference projects completed as either the prime or
subcontractor. All referenced projects must have been completed within the last five years
from this project’s bid opening date.
One of the three reference projects must have been completed under contract with
a city, county, state or federal government agency as the prime contractor.
All the referenced projects must be for concrete and paver installation work.
Failure to provide reference projects as specified in this section and as required on the
qualification form is cause to reject a bid as being non-responsive.
The City reserves the right to reject any bid based on non-responsiveness if a bidder fails
to provide a bid that complies with all bidding instructions.
The City reserves the right to reject a responsive bid based on the non-responsibility of
the bidder if the Director of Public Works or Designee finds, after providing notice and a
hearing to the bidder, that the bidder lacks the
1. knowledge
2. experience,
3. or is otherwise not responsible
NOTICE TO BIDDERS
NOTICE TO BIDDERS
iv
as defined in Section 3.24 of the San Luis Obispo Municipal Code to complete the project
in the best interest of the City.
Rejected bidders may appeal this determination. Appeal must comply with the
requirements in this Notice to Bidders.
It is the City of San Luis Obispo’s intent to award the contract to the lowest responsive
bid submitted by a responsible bidder. If in the bidder’s opinion the contract has been or
may be improperly awarded, the bidder may protest the contract award.
Protests must be filed no later than five working days after either:
1. bid opening date
2. notification of rejected bid.
Protest must be in writing and received by the project manager located at:
919 Palm Street
San Luis Obispo, CA 93401.
Valid protests must contain the following information:
1. the reasons for the protest
2. any supporting documentation
3. the ruling expected by the City to remedy the protest.
Any protest not containing all required information will be deemed invalid and rejected.
The City will consider additional documentation or other supporting information regarding
the protest if submitted in compliance to the specified time limits. Anything submitted after
the specified time limit will be rejected and not be considered.
The Director of Public Works or Designee may request additional information to be
submitted within three days of the request, unless otherwise specified, and will notify the
protester of ruling within ten days of determination.
If the protester is not satisfied with ruling, the protester may appeal the ruling to the City
Council in compliance with Chapter 1.20 of the City of San Luis Obispo Municipal Code.
Pursuant to the Public Records Act (Government Code, § 6250, et seq.), the City will
make public records available upon request.
AWARD
The lowest bidder will be determined using the TOTAL PROJECT BID.
As a condition to executing a contract with the City, two bonds each equal to one hundred
percent of the total contract price are required in compliance with Section 3-1.05 of the
Standard Specifications.
NOTICE TO BIDDERS
NOTICE TO BIDDERS
v
You may substitute securities for moneys withheld under the contract in compliance with
the provisions of the Public Contract Code, Section 10263.
ACCOMMODATION
If any accommodations are needed to participate in the bid process, please contact
Kathryn Stanley at (805) 781-7200 or by Telecommunications Device for the Deaf at (805)
781-7107. Requests should be made as early as possible in the bidding process to allow
time for accommodation.
BID FORMS
A
BID FORMS
All bid forms must be completed and submitted with your bid. Failure to submit these
forms and required bid bond is cause to reject the bid as nonresponsive. Staple all bid
forms together.
THE UNDERSIGNED, agrees that they have carefully examined:
1. the location of the proposed work
2. the plans and specifications
3. read the accompanying instructions to bidders
and propose to furnish all:
4. materials
5. labor
to complete all the required work satisfactorily in compliance with
6. plans
7. specifications
8. special provisions
for the prices set forth in the bid item list:
BID ITEM LIST FOR RAILROAD DISTRICT BOARDWALK REPLACEMENT,
SPECIFICATION NO. 91615
Item Item Unit of Estimated Item Price Total
No. SS(1) Description Measure Quantity (in figures) (in figures)
1 15, 73
Remove Existing Board Walk and
Install Pavers SQFT 11,560
2
15,
20, 90 Install Tree Wells EA 17
3
9, 15,
90
Remove Existing Curb and Install
New Curb LF 75
4 15, 90 Install New Curb LF 275
5 15, 90
Remove Existing Sleeve and
Install New Post Sleeve EA 7
6 15, 90 Install New Concrete Collars EA 33
Total Project Bid $
Company Name:
(1) refers to section in the Standard Specifications, with modifications in the Special Provisions, that describe required
work.
BID FORMS
BID FORMS
B
LIST OF SUBCONTRACTORS
Pursuant to Section 4100 of the Public Contracts Code and section 2-1.33C of the
standard specifications, the Bidder is required to furnish the following information for each
Subcontractor performing more than 1/2 percent (0.5%) of the total base bid. Do not list
alternative subcontractors for the same work. Subcontracting must not total more than
fifty percent (50%) of the submitted bid except as allowed in section 5-1.13 of the standard
specifications.
For Streets & Highways projects, subcontractors performing less than ten thousand dollars
($10,000) worth of work need not be mentioned. Subcontractors required to pay
prevailing wage, must be registered with the Department of Industrial Relations
pursuant to Labor Code section 1725.5 to be listed.
NOTE: If there are no subcontractors, write “NONE” and submit with bid.
Name Under Which
Subcontractor is Licensed License Number
DIR Public
Works
Registration
Number
Address and Phone
Number of Office, Mill or
Shop
Specific
Description of
Subcontract
% of
Total
Base
Bid
Attach additional sheets as needed.
BID FORMS
BID FORMS
C
PUBLIC CONTRACT CODE SECTION 10285.1 STATEMENT
In compliance with Public Contract Code Section 10285.1 (Chapter 376, Stats. 1985), the
bidder hereby declares under penalty of perjury under the laws of the State of California
that the bidder, or any subcontractor to be engaged by the bidder, has ____, has not
____ been convicted within the preceding three years of any offenses referred to in that
section, including any charge of fraud, bribery, collusion, conspiracy, or any other act in
violation of any state or federal antitrust law in connection with the bidding upon, award
of, or performance of, any public works contract, as defined in Public Contract Code
Section 1101, with any public entity, as defined in Public Contract Code Section 1100,
including the Regents of the University of California or the Trustees of the California State
University. The term "bidder" is understood to include any partner, member, officer,
director, responsible managing officer, or responsible managing employee thereof, as
referred to in Section 10285.1.
NOTE: The bidder must place a check mark after "has" or "has not" in one of the blank
spaces provided. The above Statement is part of the Bid. Signing this Bid on the signature
portion constitute signature of this Statement. Bidders are cautioned that making a false
certification may subject the certifier to criminal prosecution.
PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE
In compliance with Public Contract Code Section 10162, the Bidder must complete, under
penalty of perjury, the following questionnaire:
Has the bidder, any officer of the bidder, or any employee of the bidder who has a
proprietary interest in the bidder, ever been disqualified, removed, or otherwise prevented
from bidding on, or completing a federal, state, or local government project because of a
violation of law or a safety regulation?
Yes No
If the answer is yes, attach a letter explaining the circumstances
PUBLIC CONTRACT CODE SECTION 10232 STATEMENT
In compliance with Public Contract Code Section 10232, you hereby state under penalty of
perjury, that no more than one final unappealable finding of contempt of court by a federal
court has been issued against you within the immediately preceding two-year period
because of your failure to comply with an order of a federal court which orders you to comply
with an order of the National Labor Relations Board.
LABOR CODE SECTION 1725.5 STATEMENTS
The bidder has delinquent liability to an employee or the state for any assessment of back
wages or related damages, interest, fines, or penalties pursuant to any final judgment,
order, or determination by a court or any federal, state, or local administrative agency,
including a confirmed arbitration award. Any judgment, order, or determination that is
BID FORMS
BID FORMS
D
under appeal is excluded, provided that the contractor has secured the payment of any
amount eventually found due through a bond or other appropriate means.
Yes No
The bidder is currently debarred under Section 1777.1 or under any other federal or state
law providing for the debarment of contractors from public works.
Yes No
NOTE: The above Statements and Questionnaire are part of the Bid. Signing this Bid on
the signature portion constitute signature of this Statement and Questionnaire. Bidders are
cautioned that making a false certification may subject the certifier to criminal prosecution.
BID FORMS
BID FORMS
E
NON-COLLUSION DECLARATION
I, , declare that
I am of ,
the party making the foregoing bid that the bid is not made in the interest of, or on behalf
of, any undisclosed person, partnership, company, association, organization, or
corporation; that the bid is genuine and not collusive or sham; that the bidder has not
directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and
has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or
anyone else to put in a sham bid, or that anyone refrained from bidding; that the bidder has
not in any manner, directly or indirectly, sought by agreement, communication, or
conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any
overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure
any advantage against the public body awarding the contract of anyone interested in the
proposed contract; that all statements contained in the bid are true; and, further, that the
bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof,
or the contents thereof, or divulged information or data relative thereto, or paid, and will not
pay, any fee to any corporation, partnership, company association, organization, bid
depository, or to any member or agent thereof to effectuate a collusive or sham bid.
Executed on , 20 , in __
I declare under penalty of perjury under the laws of the State of California that the foregoing
is true and correct.
(Signature and Title of Declarant)
(SEAL)
Subscribed and sworn to before me
this _______day of _________, 20_____
Notary Public
Company Name:____________________
BID FORMS
BID FORMS
F
BIDDER ACKNOWLEDGEMENTS
By signing below, the bidder acknowledges and confirms that this bid is based on the information contained
in all contract documents, including the notice to bidders, plans, specifications, special provisions, and
addendum number(s) . (Note: You are responsible to verify the number of
addenda prior to the bid opening.)
The undersigned further agrees that in case of default in executing the required contract, with necessary
bonds, within eight days, (not including Saturdays, Sundays, and legal holidays), after having received a
mailed notice that the contract is ready for signature, the proceeds of the check or bond accompanying his
bid will become the property of the City of San Luis Obispo.
Licensed in accordance with an act providing for the registration of contractors, License No. , Expiration
Date .
The above statement is made under penalty of perjury, and any bid not containing this information "will be
considered non-responsive and will be rejected” by the City.
Signature of Bidder
(Print Name and Title of Bidder)
DIR– Public Works
Registration No:
Business Name (DBA):
Owner/Legal Name:
Indicate One: Sole-proprietor Partnership Corporation
List Partners/Corporate Officers:
Name Title
Name Title
Name Title
Business Address
Street Address
Mailing Address
City, State, Zip Code
Phone Number
Fax Number
Email Address
Date
BID FORMS
BID FORMS
G
QUALIFICATIONS
Failure to furnish complete reference information ON THIS FORM, as specified in this
project’s Notice to Bidders and indicated below, is cause to reject the bid. Additional
information may be attached but is not a substitute for this form.
Reference Number 1
Customer Name & Contact Individual
Telephone & Email
Project Name (Site Address):
Is this similar to the project being bid
or did this project include concrete or
paver installation? Yes □ No □
Describe the services provided and how this project is similar to
that which is being bid:
Date project completed:
Was this contract for a public agency?
Yes □ No □
Reference Number 2
Customer Name & Contact Individual
Telephone & Email
Project Name (Site Address):
Is this similar to the project being bid
or did this project include concrete or
paver installation? Yes □ No □
Describe the services provided and how this project is similar to
that which is being bid:
Date project completed:
Was this contract for a public agency?
Yes □ No □
Reference Number 3
Customer Name & Contact Individual
Telephone & Email
Project Name (Site Address):
Is this similar to the project being bid
or did this project include concrete or
paver installation? Yes □ No □
Describe the services provided and how this project is similar to
that which is being bid:
Date project completed:
Was this contract for a public agency?
Yes □ No □
BID FORMS
BID FORMS
H
ATTACH BIDDER'S BOND TO ACCOMPANY BID
Know all men by these presents:
That we ____________________________________________, AS PRINCIPAL, and
_______________________________________________________, AS SURETY, are held and firmly
bound unto the City of San Luis Obispo in the sum of:
____________________________________________________ Dollars (_____________) to be paid to
said City or its certain attorney, its successors and assigns; for which payment, well and truly to be made, we
bind ourselves, our heirs, executors and administrators, successors or assigns, jointly and severally, firmly by
these presents:
THE CONDITION OF THIS OBLIGATION IS SUCH, that if the certain bid of the above
bounden ______________________________________________________________________
to construct ___________________________________________________________________
(insert name of street and limits to be improved or project)
dated _____________________ is accepted by the City of San Luis Obispo, and if the above
bounden _______________________________________________________, his heirs, executors,
administrators, successors, and assigns shall duly enter into and execute a contract for such construction and
shall execute and deliver the two bonds described within ten (10) days (not including Saturdays, Sundays, or
legal holidays) after the above bounden,
______________________________________________________, has received notice by and from the
said City of San Luis Obispo that said contract is ready for execution, then this obligation shall become null
and void; otherwise, it shall be and remain in full force and virtue.
IN WITNESS WHEREOF, we hereunto set our hands and seals this ___ day of ______, 20____.
Bidder Principal:
Signature Date
Title:
Surety:
Bidder's signature is not required to be notarized. Surety's signature must be notarized.
Equivalent form may be substituted
(Rev. 6-30-14)
SPECIAL PROVISIONS
1
SPECIAL PROVISIONS
ORGANIZATION
Special provisions are under headings that correspond with the main section heading of
the Standard Specifications. Each special provision begins with a revision clause that
describes or introduces a revision to the Standard Specifications. Any paragraph added
or deleted by a revision clause does not change the paragraph number of the Standard
Specifications for any other reference to a paragraph of the Standard Specifications.
DIVISION I GENERAL PROVISIONS
1 GENERAL
Add to Section 1-1.01 GENERAL:
The work must be done in compliance with the City of San Luis Obispo, Department of
Public Works:
1. Railroad District Boardwalk Replacement, Specification No. 91615 Special
Provisions
2. City of San Luis Obispo Standard Specifications and Engineering Standards –
2018 edition
3. State of California, Department of Transportation Standard Specifications and
Standard Plans – 2015 edition
In case of conflict between documents, governing ranking must comply with section 5-
1.02 of the City of San Luis Obispo’s Standard Specifications.
Failure to comply with the provisions of these sections is a material breach of contract:
1. Sections 5 through 8 of the Standard Specifications
2. Section 12 through 15 of the Standard Specifications
3. Section 77-1 of the Standard Specifications
4. Section 81 of the Standard Specifications
5. authorized working hours
6. OSHA compliance
2 BIDDING
Replace Section 2-1.33A BID DOCUMENT COMPLETION AND SUBMITTAL, General
with:
Furnish bid using blank forms provided in the Special Provisions. Bid must include all
forms and must be signed by the bidder.
4 SCOPE OF WORK
Add to Section 4-1.03 WORK DESCRIPTION:
Comply with the provisions of Section(s) 9, 15, 20, 73 and 90 for general, material,
construction, and payment specifics.
SPECIAL PROVISIONS
SPECIAL PROVISIONS
2
5 CONTROL OF WORK
Add to Section 5-1.02 D Sequencing
Contractor will not be allowed to work in both sides of Santa Barbara Avenue at the same
time. All work must be completed in each phase (see appendix for phasing plan) before
moving to the next, unless approved by the Engineer. The Contractor must start in phase
one and complete the work following the phasing plan numerical sequential order.
7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
Add to Section 7-1.03B PUBLIC CONVENIENCE, Traffic Control Plan
Work hours are restricted to 7:00 a.m. to 4:00 p.m. on the entire project.
One week before the start of any work the Contractor must install one changeable
message sign (CMS) board on each direction of travel on Santa Barbara Avenue. CMS
boards must be installed for the duration of the project. The CMS language must be
approved by the Engineer prior to installation on the right of way.
Jack hammering, sawcutting, grinding, or any other type of demolition work producing
similar noise levels is prohibited between the hours or 11 AM to 1 PM within 500 feet of
a food service establishment.
A lane of travel on each direction for vehicles must be provided during the entire project.
Before any work on any of the phases is done the Contractor must install signs, 36” x 36”
minimum on a type 3 barricade indicating that the businesses are open. Business open
signs must be red in color with white letters, installed at each end of the phase limits or
as approved by the Engineer.
At the end of each work day, during the work on Osos Street the Contractor must leave
the public right of way in a condition that it provides entrance to all businesses and its to
the satisfaction of the Engineer.
Provide traffic control plan and traffic control application at or before the preconstruction
meeting. Traffic control plan must be drawn to scale. Traffic control application may be
obtained on the City’s website:
www.slocity.org/government/department-directory/public-works/documents-
online/construction-documents
Upon approval of the traffic control plan, the City will issue a no-fee Encroachment Permit.
Permittee is responsible to comply with all conditions of the traffic control plan. Complete
work using due diligence to restore free flowing of traffic.
SPECIAL PROVISIONS
SPECIAL PROVISIONS
3
8 PROSECUTION AND PROGRESS
Replace the 1st paragraph in Section 8-1.02A SCHEDULE, General with:
Provide a Level 1 schedule for this work.
9 PAYMENT
Add to section 9-1.06A General
Section 9-1.06B and 9-1.06C do not apply to bid item 3, Remove existing curb and install
new curb.
DIVISION II GENERAL CONSTRUCTION
15 EXISTING FACILITIES
Add Section 15-1.03A
Before removing any sign sleeves the Contractor must contact the Engineer for approval.
New sleeves must be installed per Engineering Standard 7210. Existing sleeves are on
existing sidewalk and must be chipped or cored for removal.
Add to Section 15-1.03B
Before any back curb is removed for not having positive slope (1% min. 2% max.) and
draining into the street the Contractor must contact the Engineer. Limits of curb removal
to be approved by the Engineer prior to the start of work.
DIVISION VIII MISCELLANEOUS CONSTRUCTION
73 CONCRETE CURBS AND SIDEWALKS
Add Section 73 CONCRETE CURBS AND SIDEWALKS
73-5 CONCRETE PAVERS
73-5.01 GENERAL
Section 73-5 includes specifications for the installation of pavers.
73-5.02 MATERIALS
73-5.02A Surface
Pavers must be:
1. Air Vol Block Holland Pavers or Approved Equal
2. Type 1 and meet ASTM C936
73-5.02B Sand
Bedding sand must be in compliance with ASTM C33 specifications.
73-5.02C Fabric
Fabric used to wrap the sand around the drain pipes must be Mirafi 1120N Nonwoven
Polypropylene Geotextile or approved equal. Geotextile fabric must comply with the
following properties when tested by the appropriate test method:
SPECIAL PROVISIONS
SPECIAL PROVISIONS
4
Property Test Method Requirement
Elongation ASTM D 4632 < 50% > 50%
Grab Strength a ASTM D 4632 315 lb 202 lb
Sewn Seam Strength a, b ASTM D 4632 283 lb 182 lb
Tear Strength a ASTM D 4533 112 lb 79 lb
Puncture Strength a ASTM D 6241 618 lb 433 lb
Permittivity a, c ASTM D 4491 0.02 sec -1
Apparent Opening Size ASTM D 4751 0.24 inches max. average roll value
Ultraviolet Stability ASTM D 4355 > 50% after 500 hr exposure
a. All numeric values represent MARV in the weaker principal direction.
b. When sewn seams are required.
c. Default Value. Permittivity of the geotextile should be greater than the soil.
73-5.03 CONSTRUCTION
All existing facilities, sign posts, fire hydrants, poles and as directed by the Engineer must
have a concrete collar installed, per the concrete collar detail on the appendix, prior to the
installation of pavers. Pavers must always be restrained by concrete curbs or building
foundations concrete. All new curb installation is in phase 5 of the project.
The final surface tolerance of compacted pavers must not deviate more than ±3/8 inches
under a 10 feet long straightedge. No lippage greater than 1/8 of an inch will be allowed
in between adjacent pavers.
Bond lines for paver courses must not exceed ±½ inch over a 50 feet string line.
DIVISION XI MATERIALS
90 CONCRETE
Add to Section 90-1.01A Summary
Volumetric mobile concrete mixers may be used for concrete installation up to 2 cubic
yards per day.
Do not use bagged concrete or bagged cement within public right of way.
Add to Section 90-1.01C(6) Mix Design
Concrete must contain a maximum of 15% pozolone or fly ash. Course aggregate for
concrete must comply with the gradation specifications for the 1 inch x No. 4 primary
aggregate nominal size.
DIVISION XIII APPENDICIES
Additional project details and instruction may be found on:
A. Appendix 1 – Phasing Map
B. Appendix 2 – Project Details
APPENDIX
APPENDIX
0
APPENDIX A - FORM OF AGREEMENT
THIS AGREEMENT, made on this ______ day of ___________, 20__, by and between
the City of San Luis Obispo, a municipal corporation and charter city, San Luis Obispo
County, California (hereinafter called the Owner) and COMPANY NAME (hereinafter called
the Contractor).
WITNESSETH:
That the Owner and the Contractor for the consideration stated herein agree as follows:
ARTICLE 1, SCOPE OF WORK: The Contractor shall perform everything required to be
performed, shall provide and furnish all of the labor, materials, necessary tools,
expendable equipment, and all utility and transportation services required to complete all
the work of construction of
NAME OF PROJECT, SPEC NO.
in strict compliance with the plans and specifications therefor, including any and all
Addenda, adopted by the Owner, in strict compliance with the Contract Documents
hereinafter enumerated.
It is agreed that said labor, materials, tools, equipment, and services shall be furnished and
said work performed and completed under the direction and supervision and subject to the
approval of the Owner or its authorized representatives.
ARTICLE II, CONTRACT PRICE: The Owner shall pay the Contractor as full consideration
for the faithful performance of this Contract, subject to any additions or deductions as
provided in the Contract Documents, the contract prices as follows:
Item
No.
Item Unit of
Measure
Estimated
Quantity
Item Price
(in figures)
Total
(in figures)
1.
2.
3.
BID TOTAL: $ .00
Payments are to be made to the Contractor in compliance with and subject to the provisions
embodied in the documents made a part of this Contract.
Should any dispute arise respecting the true value of any work omitted, or of any extra work
which the Contractor may be required to do, or respecting the size of any payment to the
Contractor, during the performance of this Contract, said dispute shall be decided by the
Owner and its decision shall be final, and conclusive.
APPENDIX
APPENDIX
1
ARTICLE III, COMPONENT PARTS OF THIS CONTRACT: The Contract consists of the
following documents, all of which are as fully a part thereof as if herein set out in full, and if
not attached, as if hereto attached:
1. Notice to Bidders and Information for Bidders
2. Standard Specifications and Engineering Standards
3. Special Provisions, any Addenda, Plans and Contract Change Orders
4. Caltrans Standard Specifications and Standard Plans 2015
5. Accepted Bid and Bid Bond
6. List of Subcontractors
7. Public Contract Code Sections 10285.1 Statement
8. Public Contract Code Section 10162 Questionnaire
9. Public Contract Code Section 10232 Statement
10. Labor Code Section 1725.5 Statements
11. Bidder Acknowledgements
12. Qualifications
13. Non-collusion Declaration
14. Agreement and Bonds
15. Insurance Requirements and Forms
ARTICLE IV INDEMNIFICATION: The Contractor shall indemnify, defend with legal
counsel approved by City, and hold harmless City, its officers, officials, employees and
volunteers from and against all liability, loss, damage, expense, cost (including without
limitation reasonable legal counsel fees, expert fees and all other costs and fees of
litigation) of every nature arising out of or in connection with the Contractor’s negligence,
recklessness or willful misconduct in the performance of work hereunder or its failure to
comply with any of its obligations contained in this Agreement, except such loss or damage
which is caused by the sole or active negligence or willful misconduct of the City. Should
conflict of interest principles preclude a single legal counsel from representing both the City
and the Contractor, or should the City otherwise find the Contractor’s legal counsel
unacceptable, then the Contractor shall reimburse the City its costs of defense, including
without limitation reasonable legal counsel fees, expert fees and all other costs and fees of
litigation. The Contractor shall promptly pay any final judgment rendered against the City
(and its officers, officials, employees and volunteers) with respect to claims determined by
a trier of fact to have been the result of the Contractor’s negligent, reckless or wrongful
performance. It is expressly understood and agreed that the foregoing provisions are
intended to be as broad and inclusive as is permitted by the law of the State of California
and will survive termination of this Agreement.
The Contractor obligations under this section apply regardless of whether such claim,
charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment,
civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee.
However, without affecting the rights of the City under any provision of this agreement, the
Contractor shall not be required to indemnify and hold harmless the City for liability
attributable to the active negligence of AGENCY, provided such active negligence is
APPENDIX
APPENDIX
2
determined by agreement between the parties or by the findings of a court of competent
jurisdiction. In instances where the City is shown to have been actively negligent and where
the City’s active negligence accounts for only a percentage of the liability involved, the
obligation of the Contractor will be for that entire portion or percentage of liability not
attributable to the active negligence of the City.
ARTICLE V. It is further expressly agreed by and between the parties hereto that should
there be any conflict between the terms of this instrument and the bid of said Contractor,
then this instrument shall control and nothing herein shall be considered as an acceptance
of the said terms of said bid conflicting herewith.
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands this
year and date first above written.
CITY OF SAN LUIS OBISPO
A Municipal Corporation
__________________________________
Derek Johnson, City Manager
APPROVED AS TO FORM CONTRACTOR:
Name of Company
________________________________
By:________________________________
J. Christine Dietrick
City Attorney
Name of CAO/President
Its: CAO/PRESIDENT