Loading...
HomeMy WebLinkAbout03-05-2019 Item 07 - Terrance Hill PRV Project Department Name: Public Works Cost Center: 6004 For Agenda of: March 5, 2019 Placement: Consent Estimated Time: N/A FROM: Daryl Grigsby, Public Works Director Prepared By: Shelsie Kloepper, Engineer II SUBJECT: TERRACE HILL PIPELINE AND PRESSURE REGULATING VALVE REHABILITATION PROJECT, SPECIFICATION NO. 91425 RECOMMENDATION 1. Approve the Project Plans (Attachment A) and Special Provisions (Attachment B) for the Terrace Hill Pipeline and Pressure Regulating Valve Rehabilitation Project, Specification Number 91425; 2. Authorize staff to advertise for bids; and 3. Authorize the City Manager to award the construction contract for the bid total if the lowest responsible bid is within the Engineer’s Estimate of $420,000. DISCUSSION Background The City has over 180 miles of pipeline providing potable water to the community. These pipelines are connected to water storage tanks around the City. The City’s water storage is provided in 11 tanks and two reservoirs in various locations. The tanks range in size from 40,000 gallons to 7.5 million gallons. The two reservoirs are a combination of above -grade steel tanks and underground concrete reservoirs with a total combined storage capacity of approximately 26 million gallons. Regular maintenance of water storage tanks is important for economic, environmental, and health reasons. This project will install a new Pressure Regulating Valve (PRV) at the northeast corner of the Terrace Hill tank site. The PRV will be connected to the existing 16-inch diameter pipe fro m the High-Pressure Zone in Bishop Street. A new 16-inch pipe will be constructed to connect the PRV to the Terrace Hill Zone, traversing Bishop Street and tying into the existing 16 -inch diameter pipe line in Boulevard del Campo. This project will improve water quality in this zone by providing connectivity. Previous Council or Advisory Body Action This project was identified in the 2017-19 Financial Plans that were approved by Council. Policy Context Per the October 2018 Financial Management Manual, Council approval is required for Public Projects that cost over $175,000. Packet Pg. 33 Item 7 Public Engagement Public Engagement for this project was done during the initial identification as part of the 2015- 17 Financial Plan. CONCURRENCE There is concurrence from the Utilities Department through the review of the project plans and special provisions. ENVIRONMENTAL REVIEW Staff recommends finding t his project is exempt from environmental review under Section 1530 2 Class 2 (Replacement or Reconstruction) of the California Environmental Quality Act (CEQA) Guidelines because the project proposes minor changes to existing utility infrastructure. The project is consistent with the applicable General Plan policies as well as with applicable City Regulation. A Notice of Exempt ion will be filed through the Community Development Department upon Council approval of the project . FISCAL IMPACT Budgeted: Yes Budget Years: 2015-2017 Funding Identified: Yes Fiscal Analysis: Funding Sources Total Budget Available Current Funding Request Remaining Balance Annual Ongoing Cost General Fund State Federal Fees Other: Water Fund $888,610.65 $510,000 $378,610.65 N/A Total $888,610.65 $510,000 $378,610.65 Project Cost Estimate Construction Estimate $420,000 Contingency (20%) $84,000 Materials Testing $6,000 Total for Project $510,000 The Terrace Hill Pipeline and PRV Rehabilitation project was originally identified in the 2015- 17 Financial Plan, Appendix F – Capital Improvements Plan, pages F-3-50 through F-3-53. The remaining balance of this account (Award 91425) will be used to fund the Wash Water Packet Pg. 34 Item 7 Supply Tank Recoating Project that has an estimated project cost of $125,000. ALTERNATIVE The Council could choose to deny authorization to advertise this project. This is not recommended since the project was identified in the 2015-17 Financial Plan and will help improve the water quality for the community. Attachments: a - Council Reading File - Project Plans b - Council Reading File - Special Provision s Packet Pg. 35 Item 7 Page intentionally left blank. Packet Pg. 36 Item 7