Loading...
HomeMy WebLinkAboutItem #2 - ARCH-3216-2016 (1027 Nipomo Street)CULTURAL HERITAGE COMMITTEE AGENDA REPORT SUBJECT: Review of a new 50-foot tall, five-story project that includes 3,392 square feet of commercial/retail space, 65 hotel rooms, and a subterranean valet parking lot within the Downtown Historic District. ADDRESS: 1027 Nipomo Street BY: Rachel Cohen, Associate Planner FILE NUMBER: ARCH-3216-2016 FROM: Brian Leveille, Senior Planner 1.0 RECOMMENDATION Make a recommendation to the Architectural Review Commission (ARC) regarding the project’s consistency with the City’s Historic Preservation Program Guidelines. Applicant Creekside Lofts, L.P. Representative Scott Martin, RRM - Architect Zoning C-D-H (Downtown Historic District General Plan General Retail Site Area 20,731 square feet (0.39 acres) 2.0 SUMMARY The applicant has submitted revised plans for a new 50-foot, five-story, 65-room hotel with 3,392 square feet of retail/commercial space, and a subterranean valet parking garage in the Downtown Historic District. The plans have been revised to reduce the overall massing of the structure in response to previous CHC direction and with feedback from the CHC/ARC subcommittee. Following CHC review, the project will be reviewed by the ARC. 3.0 CHC PURVIEW The CHC’s role is to review the proposed new project in terms of its consistency with the Historic Preservation Program Guidelines for compatible development in Historic Districts. 4.0 BACKGROUND September 26, 2016: The CHC reviewed a 4-story, mixed-use project that included 8,131 square- feet of commercial/retail space, 23 residential units and a 7-room hotel. The CHC continued the item to a date uncertain with direction to re-evaluate the height, scale, massing & detailing for greater consistency with neighboring historic structures within the Downtown Historic District. August 14, 2017: The CHC reviewed a new, 50-foot tall, four-story 47-room hotel project that included 6,698 square-feet of commercial/retail space and a 22-space subterranean parking garage. The CHC voted 4-2-1 to recommend the ARC deny the project based on Historic Preservation Meeting Date: February 25, 2019 Item Number: 1 CHC ARCH-3216-2016 (1027 Nipomo Street) Page 2 Program Guidelines Section 3.2.1 and provided direction that the project reduce the height of the building to three-stories with the third story setback. September 18, 2017: The ARC reviewed the 50-foot tall, four-story 47-room hotel project that included 6,698 square-feet of commercial/retail space and a 22-space subterranean parking garage and continued the item with direction. July 23, 2018: The CHC reviewed the 50-foot tall, five-story 67-room hotel project that included 3,392 square-feet of commercial/retail space and a subterranean parking garage. The CHC voted 5-1-1 to recommend the ARC deny the project because the building is not compatible in scale and massing with the Downtown Historic District structures and provided direction that the project reduce the height of the building to three-stories with the third story setback. September 17, 2018: The ARC reviewed the proposed project and provided a list of directional items to be included in the final plan submittal (Attachment 2, ARC Minutes). September 2018 – January 2019: The ARC and the CHC formed a subcommittee to work with the applicant on revisions to the project. 5.0 PROJECT INFORMATION Project details are provided in the attached July 23, 2018 Staff Report (Attachment 1). Modifications from the July 23, 2018 are described in detail below. 6.0 EVALUATION/DISCUSSION At the July 2018 hearing, the CHC provided direction that the project be reduced in massing and scale, particularly that the project be reduced in height to three-stories with the third story setback. The ARC also provided direction regarding the massing and scale of the structure. Based on the feedback, the CHC and the ARC formed a subcommittee. The subcommittee held a preliminary site meeting including the applicant team and met two more times to review changes presented by the applicant until a final design was found fully responsive to subcommittee feedback. 6.1 Project Revisions The proposed project includes the following changes: 1.An increased setback of the third floor along Nipomo Street by 12 feet (overall setback is now 18 feet from the second floor). 2.Fourth floor has been setback an additional 5 feet along Nipomo Street (overall setback is now 23 feet from the face of the second floor). 3.Additional setbacks along the west elevation nearest the Creamery. 4.Parapets have been reduced by 1-2 feet and an iron railing has been added. 5.Cornice details have been simplified to reduce bulkiness to the upper floors. CHC ARCH-3216-2016 (1027 Nipomo Street) Page 3 Figure 1: North elevation view showing the increased setbacks along Nipomo Street and near the Creamery (Top image revised design; bottom image previous design). CHC ARCH-3216-2016 (1027 Nipomo Street) Page 4 6.2 Sign program The applicant has included a conceptual sign program for review. Sign programs are an effective way to establish ongoing requirements to ensure signage is coordinated and compatible with the development and surrounding area in projects with multiple tenants and buildings. The proposed sign program appears appropriate in scale, placement, number, and type for the project in terms of providing an appropriate level of visibility at the pedestrian scale in the downtown setting (Attachment 3, Project Plans, Sheets A20 & A24). 7.0 RECOMMENDATION The CHC representation on the subcommittee consisted of Chair Papp and Committee Member Larrabee. The CHC should consider subcommittee feedback and discuss the extent to which previous concerns over massing and scale have been sufficiently addressed and make a recommendation to the Architectural Review Commission (ARC) regarding the project’s consistency with the City’s Historic Preservation Program Guidelines. 8.0 ALTERNATIVES 1.Recommend that the project be approved based on consistency with the City’s Historic Preservation Program Guidelines. 2.Recommend that the project be denied based on inconsistency with the City’s Historic Preservation Program Guidelines. ATTACHMENTS 1.CHC Staff Report - July 23, 2018 2. Project Plans3. ARC Minutes - September 17, 2018 Figure 2: Perspective view of the project; (Top) revised project and (Bottom) previous project. CULTURAL HERITAGE COMMITTEE AGENDA REPORT SUBJECT: Review of a new 50-foot tall, five-story project that includes 3,392 square feet of commercial/retail space, 67 hotel rooms, and a subterranean valet parking lot within the Downtown Historic District with a categorical exemption from environmental review. ADDRESS: 1027 Nipomo Street BY: Rachel Cohen, Associate Planner FILE NUMBER: ARCH-3216-2016 FROM: Brian Leveille, Senior Planner 1.0 SUMMARY RECOMMENDATION Make a recommendation to the Architectural Review Commission (ARC) regarding the project’s consistency with the City’s Historic Preservation Program Guidelines. Applicant Creekside Lofts, L.P. Representative Scott Martin, RRM - Architect Zoning C-D-H (Downtown Historic District General Plan General Retail Site Area 20,731 square feet (0.39 acres) Environmental Status Categorically Exempt from environmental review under Section 15332, Class 32, In-fill Development Projects, of the CEQA Guidelines. 2.0 SUMMARY The applicant has submitted plans for the construction of a new 50-foot, five-story, 67-room hotel with 3,392 square feet of retail/commercial space, and a subterranean valet parking garage in the Downtown Historic District. The site is currently used as a surface parking lot for the Creamery and Ciopinot’s Restaurant. Following CHC review, the project will be reviewed by the ARC. 3.0 CHC PURVIEW The CHC’s role is to review the proposed new project in terms of its consistency with the Historic Preservation Program Guidelines for compatible development in Historic Districts. 4.0 BACKGROUND September 26, 2016: The CHC reviewed a mixed-use project that included 8,131 square-feet of commercial/retail space, 23 residential units and a 7-room hotel. The CHC continued the item to a Meeting Date: July 23, 2018 Item Number: 2 ATTACHMENT 1 CHC ARCH-3216-2016 (1027 Nipomo Street) Page 2 date uncertain with direction to re-evaluate the height, scale, massing & detailing for greater consistency with neighboring historic structures within the Downtown Historic District. August 14, 2017: The CHC reviewed a new, 50-foot tall, four-story 47-room hotel project that included 6,698 square-feet of commercial/retail space and a 22-space subterranean parking garage. The CHC voted 4-2-1 to recommend the ARC deny the project based on the finding that the proposed new building is inconsistent with the Historic Preservation Program Guidelines Section 3.2.1 because the building is not compatible in scale and massing with the Downtown Historic District structures and provided direction that the project reduce the height of the building to three- stories with the third story setback (Attachment 2, Previous Project Plans & Attachment 3, CHC Resolution). September 18, 2017: The ARC reviewed the 50-foot tall, four-story 47-room hotel project that included 6,698 square-feet of commercial/retail space and a 22-space subterranean parking garage and continued the item with eleven (11) directional items (Attachment 4, ARC Minutes 9-18- 2017). 5.0 PROJECT INFORMATION 5.1 Site Information/Setting The proposed project consists of a 0.39 acre (20,731 square-foot) site located at 1027 Nipomo Street within the Downtown Commercial zone with a Historic Overlay (C-D-H). The project site is currently used as a surface parking lot for the adjacent properties (the Creamery and Ciopinot’s) and accessed from Nipomo Street. Neighboring buildings and uses include the Master List Historic Golden State Creamery (C-D-H) to the west, Ciopinot’s restaurant (C-D-H) to the south, the Soda Figure 1: Vicinity map and surrounding uses Creamery Residential Soda Water Works Children’s Museum Ciopinot’s Restaurant ATTACHMENT 1 CHC ARCH-3216-2016 (1027 Nipomo Street) Page 3 Water Works building (C-D-H-PD) and residential (R-3-H) to the north and the Children’s Museum (PF) and Tonita’s Mexican restaurant (C-D-H) to the west (see Figure 1 above). 5.2 Project Description The project proposes to construct a new 50-foot, five-story structure within the Downtown Historic District. The structure is blend of architectural styles with retail storefronts along the street and south side of the first floor and the hotel units on the north side of the first floor and on all the upper floors. The project includes: • 3,392 square feet of ground floor retail/commercial space; • 67 hotel rooms on all floors; • Subterranean valet parking garage; • 26 bicycle parking spaces (13 short-term and 13 long-term); • A 20-foot wide pedestrian pathway/seating area between the neighboring buildings and the project; • Preservation of the creek walk along San Luis Creek; • Proposed landscaping includes the removal of five parking lot trees and planting 10 new trees (Revised Attachment 1, Revised Project Plans, Sheets A2.2 and A2.3); • Materials included in the project are: brick, fiber cement siding and trim, composite wood screening, corrugated metal, aluminum storefronts, precast concrete cornices, bulkheads, metal railings, and metal awnings (Attachment 1, Revised Project Plans, Sheet A11). Figure 2: East elevation facing Nipomo Street ATTACHMENT 1 CHC ARCH-3216-2016 (1027 Nipomo Street) Page 4 6.0 EVALUATION/DISCUSSION The CHC’s purview is to review the project in terms of its consistency with the Historic Preservation Program Guidelines (HPPG) for compatible development in a Historic District and provide a recommendation to Architectural Review Commission (ARC). 6.1 Historic Preservation Program Guidelines and Analysis The Historic Preservation Guidelines provide criteria to evaluate the compatibility of new development within Historic Districts. Historic Preservation Program Guidelines 3.2.1 Architecturally compatible development within Historic Districts. New structures in historic districts shall be designed to be architecturally compatible with the district’s prevailing historic character as measured by their consistency with the scale, massing, rhythm, signature architectural elements, exterior materials, siting and street yard setbacks of the district's historic structures. New structures are not required to copy or imitate historic structures, or seek to create the illusion that a new building is historic. Staff Analysis: The project is proposing a new 50-foot tall structure that incorporates common Downtown Historic District characteristics1 such as: 1) Structure is located at back of sidewalk; 2) First floor at grade; 3) Recessed front entries oriented toward the street; 4) Front facades oriented toward the street; and 5) Street trees will remain and are placed at regular intervals along the street. The site is located on the west edge of the Downtown Historic District and is surrounded by a mix of structures that range in architectural style, form, scale and height. Nearby buildings include: • Ciopinot’s Restaurant – single story brick rectilinear structure with brick gable end parapets 1 Historic Preservation Program Guidelines, Section 5.2.2. Downtown Historic District Figure 3: North elevation facing San Luis Creek ATTACHMENT 1 CHC ARCH-3216-2016 (1027 Nipomo Street) Page 5 • Creamery – single and two-story structures with an agrarian style architecture that includes the use of metal, wood and terra cotta siding • Soda Water Works – two-story rectilinear false front building with wood siding • Children’s Museum – three-story modern asymmetrical structure with metal siding and large windows. The proposed design incorporates architectural elements that are commonly found in the Downtown Historic District such as a flat roof design with a parapet, projecting cornice with dentil detailing, use of transom windows above the storefronts, masonry walls with contrasting bulkheads and the use of awnings and canopies.2 As noted previously, the CHC reviewed the previous project plans for this site on August 2017 and recommended denial of the project with direction to the ARC that the fourth floor be removed with the third story setback so that it would be compatible in scale and massing with the adjacent Downtown Historic District structures. The applicant has submitted a project that has been modified in the following main ways: 1) The applicant has added a mezzanine floor (Attachment 1, Revised Project Plans, Sheet A6). The overall building height is 50 feet - the same height of the previous design. 2) The architectural style of the structure, including materials and colors, has been revised. The revised project has a similar form, but has added more detailing in areas such as cornices, window fenestration and trim, brick detailing and concrete surrounds and bulkheads (see Attachment 1, Revised Project Plans, Sheets A16 & A17). Previously the project proposed to use a stucco finish on the structure. The revised plans now call for the use of fiber cement siding which is used horizontally in the project, similar to the nearby Soda Water Works building (see Attachment 1, Revised Project Plans, Sheet A13). Overall the colors proposed for the revised project are lighter with darker colors being used for trim and other architectural elements. Previously shown fabric awnings along the south side of the structure have been replaced with metal awnings. Corrugated metal is also used as one 2 Historic Preservation Program Guidelines. 3.2.2 Architectural Compatibility & 5.2.2 Downtown Historic District. Figure 4: Front elevation views of (left) previous plans and (right) revised plans ATTACHMENT 1 CHC ARCH-3216-2016 (1027 Nipomo Street) Page 6 of the exterior materials of the elevator tower. This ties into corrugated metal that used as one of the materials within the adjacent Creamery buildings. 3) The third3 floor has been modified to include a change in building shape and setbacks. The northwest corner jogs in a bit and the southeast corner includes a setback that forms a balcony towards Nipomo Street and the new alley way. Figure 8 highlights these modifications in the revised plans. Figure 7 is a reference to the previous project third floor plans. 3 References in this staff report utilize the floor naming used in the applicant’s project plans even though the third floor for instance is actually the fourth floor. Figure 6: Previous plans south elevation Figure 6: Revised plans south elevation ATTACHMENT 1 CHC ARCH-3216-2016 (1027 Nipomo Street) Page 7 Figure 7: Previous project third floor plan Figure 8: Revised project third floor plan; red dashed lines indicate where the project has been modified. ATTACHMENT 1 CHC ARCH-3216-2016 (1027 Nipomo Street) Page 8 4) The fourth floor has been modified to also include additional setbacks. The northwest corner has been setback significantly to create a large deck area and the northeast corner includes setback that forms another large a balcony area that faces towards Nipomo Street (see Figure 10). Figure 9: Previous project fourth floor plans Figure 10: Revised project fourth floor plan; red dashed lines indicate where the project has been modified. ATTACHMENT 1 CHC ARCH-3216-2016 (1027 Nipomo Street) Page 9 6.2 Sign program The applicant has included a conceptual sign program for review. Sign programs are an effective way to establish ongoing requirements to ensure signage is coordinated and compatible with the development and surrounding area in projects with multiple tenants and buildings. For the most part the applicant’s proposed sign program appears appropriate in scale, placement, number, and type. The sign types of concern are internally illuminated channel letters. Staff recommends the sign program expressly prohibit internally illuminated cabinet signs and internally illuminated channel letters. The placement and type of signs appears appropriate for the project in terms of providing an appropriate level of visibility at the pedestrian scale in the downtown setting (Attachment 1, Revised Project Plans, Sheets A19 & A20). 7.0 ENVIRONMENTAL REVIEW The project is exempt from environmental review under Class 32 (Section 15332) In-fill Development Projects of the CEQA Guidelines because the project is consistent with the applicable general plan designation and applicable zoning designation and regulations. The project will not result in significant effects relating to traffic, noise, air quality or water quality. 8.0 RECOMMENDATION The CHC should discuss the extent to which previous concerns over massing and scale have been sufficiently addressed with the architectural treatment modifications and additional step backs in the revised design and make a recommendation to the Architectural Review Commission (ARC) regarding the project’s consistency with the City’s Historic Preservation Program Guidelines 9.0 ALTERNATIVES 1. Recommend that the project be approved based on consistency with the City’s Historic Preservation Program Guidelines. 2. Recommend that the project be denied based on inconsistency with the City’s Historic Preservation Program Guidelines. ATTACHMENTS 1. Revised Project Plans 2. Previous Project Plans 3. CHC Resolution – August 14, 2017 4. ARC Meeting minutes – September 18, 2017 ATTACHMENT 1 Minutes ARCHITECTURAL REVIEW COMMISSION Monday, September 17, 2018 Regular Meeting of the Architectural Review Commission CALL TO ORDER A Regular Meeting of the Architectural Review Commission was called to order on Monday, September 17, 2018 at 5:01 p.m. in the Council Hearing Room, located at 990 Palm Street, San Luis Obispo, California, by Chair Root. ROLL CALL Present: Commissioners Richard Beller, Brian Rolph, Micah Smith, Angela Soll, Christie Withers, and Chair Allen Root Absent: Vice-Chair Amy Nemcik Staff: Deputy Director Doug Davidson, Associate Planner Rachel Cohen, Associate Planner Kyle Bell, and Recording Secretary Summer Aburashed. Other staff members presented reports or responded to questions as indicated in the minutes. PUBLIC COMMENT ON ITEMS NOT ON THE AGENDA None End of Public Comment-- PUBLIC HEARINGS 1. 1027 Nipomo Street. Review of a new 50-foot tall, five-story project that includes 3,392 square feet of commercial/retail space, 67 hotel rooms, and a 35-space subterranean valet parking lot within the Downtown Historic District. Case #: ARCH-3216-2016, C-D-H Zone; Creekside Lofts, L.P., applicant. Associate Planner Rachel Cohen presented the staff report with the use of a PowerPoint presentation and responded to Commissioner inquiries. Applicant representatives, Scott Martin, Rob Rossi, and Damien Mavis provided a presentation and responded to Commissioner inquiries. Public Comments: ATTACHMENT 2 Minutes – Architectural Review Commission Meeting of September 17, 2018 Page 2 James Papp David Hannings Steve Delmartini Mark Johnson Ursula Bishop Pierre Rademaker Steve Snyder End of Public Comment-- ACTION: MOTION BY COMMISSIONER ROLPH, SECOND BY COMMISSIONER SMITH, CARRIED 5-1-1 to continue with following direction: 1. Address the mass and scale of the side of the structure adjacent to the Creamery. 2. Provide additional step backs on the third and fourth floors, similar to how the building is set back above the brick portion along Nipomo Street. 3. Reconsider including the arch/gateway sign. Is this feature necessary? 4. Review the materials proposed for the project and their compatibility. 5. Provide additional documentation verifying how the valet parking will work. 6. Work with the CHC and the ARC to refine design. Revisions to the project will require CHC review before returning to the ARC. 7. Address the noise concerns regarding the balconies and windows that face the creek. Eliminate balconies and include inoperable windows. 8. Internalize and/or diminish the visibility of the elevator tower. 9. Provide loading and unloading areas for the hotel. 10. Provide a visual analysis of the project within the block. Show views from all the streets surrounding the project, especially from Nipomo Street and from Higuera Street over the lower story structures. 11. Review the paseo and provide more information on how the paseo connects to the Creamery entrance. 12. Reconsider the color of the dark colored cornice. RECESS: ATTACHMENT 2 THE HOTEL AT THE CREAMERYPROJECT STATISTICSPARKINGPROJECT DIRECTORYPROJECT DESCRIPTIONSHEET INDEXOWNER: CREEKSIDE LOFTS, L.P. P.O. BOX 12910 SAN LUIS OBISPO, CA 93401 CONTACT: DAMIEN MAVIS PHONE: (805) 781-3133 EMAIL: DMAVIS@COVELOP.NETARCHITECT: RRM DESIGN GROUP 3765 S.HIGUERA STREET, SUITE 102 SAN LUIS OBISPO, CA 93401 CONTACT: SCOTT MARTIN PHONE: (805) 543-1794 EMAIL: SAMARTIN@RRMDESIGN GROUPCIVIL ENGINEER: ABOVE GRADE ENGINEERING 1304 BROAD STREET SAN LUIS OBISPO, CA 93401 CONTACT: SCOTT STOKES PHONE: (805) 545-5115 EMAIL: SCOTT@ABOVEGRADEENGINEERING.COMLANDSCAPE: SUMMERS|MURPHY & PARTNERS, INC. 34197 PACIFIC COAST HWY, SUITE 200 DANA POINT, CA 92629 CONTACT: JIM BURROWS PHONE: (949) 443-1631 EMAIL: JBURROWS@SMPINC.NETSURVEYOR: MBS LAND SURVEYS, INC. 3563 SUELDO STREET, UNIT Q SAN LUIS OBISPO, CA 93401 CONTACT: MICHAEL B. STANTON PHONE: (805) 594-1960 EMAIL: MIKE@MBSLANDSURVEYS.COMTHE PROJECT CONSISTS OF A 4 STORY HOTEL AND RETAIL BUILDING. THE GROUND FLOOR WILLL INCLUDE RETAIL SPACE, RESTAURANT, AND HOTEL LOBBY ALONG WITH HOTEL ROOMS. ADDITIONAL HOTEL ROOMS WILL BE LOCATED IN THE MEZZANINE LEVEL AS WELL AS ON THE SECOND, THIRD, AND FOURTH FLOORS. THE STREET SIDE, AS WELL AS THE PASEO SIDE ARE ENHANCED WITH PEDESTRIAN FRIENDLY ENTRIES AND INVITING STOREFRONT SYSTEMS.PROJECT ADDRESS: 1027 NIPOMO STREET SAN LUIS OBISPO, CA 93401APN NUMBERS: 002-402-046 ZONING: C-DEXISTING USE: PARKING LOTPROPOSED USE: RETAIL/HOTEL/ RESTAURANT/PARKINGPROPOSED OCCUPANCY: M, R-1, A-2, S-2NET SITE AREA: 0.389 ACRES (16,940 SF) EXISTING GROSS SITE AREA 0.476 ACRES (20,731 SF) GROSS CREEK SITE AREA 0.087 ACRES (-3,791 SF)MAX. LOT COVERAGE: 100% (16,940 SF)PROPOSED COVERAGE.: 53% (8,974 SF)MAX. F.A.R: 3.0 (50,820 SF)(FOR BLDGS UP TO 50'-0" TALL PROPOSED F.A.R: 2.2 (37,469 SF/16,940 SF) LANDSCAPE AREA: 1,871 SFIMPERVIOUS SURFACE: 8,979 SFMAX HEIGHT ALLOWED: 50 FT. MAX. PROPOSED HEIGHT: 50 FT.CONSTRUCTION TYPE: TYPE IA (GARAGE, 1ST, MEZZANINE) TYPE VA (2ND, 3RD, AND 4TH LEVELS)AUTO PARKINGPARKING REQUIRED:GENERAL RETAIL (2000 SF OR LESS @ 1/300 SF)PROPOSED: 1,080 SF/500 = 2.5 PER C-D ZONING 2.16 SPACESRESTAURANT - GROSS SQUARE FOOTAGE(@ 1/350 GSF PER C-D ZONING) PROPOSED: 2,312 SF/350 = 6.61 6.61 SPACESHOTEL - (@1/ROOM + 1 (FOR RES. MANAGER): 65 UNITS/1= 65 (*.5) PER C-D ZONING 32.5 SPACESTOTAL REQUIRED FOR PROPOSED: 41.27 ROUNDS DOWN TO: 41 SPACES BICYCLE PARKING REDUCTION- (1 CAR SPACE REDUCTION PER 5 ADDITIONALBICYCLE PARKING SPACES UP TO A 10% REDUCTION): 10 SHORT TERM +10 LONG TERM SPACES= 4 CAR SPACE REDUCTION (4 SPACES)PARKING REQUIRED: (41 - 4) 37 SPACESPARKING PROVIDED: 36 SPACES PERSPECTIVE VIEW - East Corner of Building on Nipomo Street MOTORCYCLE PARKINGMOTORCYCLE PARKING REQUIRED: 2 SPACES(1/20 AUTOSPACES = 37/20)MOTORCYCLE PARKING PROVIDED: 2 SPACESBICYCLE PARKINGBICYCLE SPACES REQUIRED: 6 SPACES(C-D ZONE - 15% OF AUTO SPACES 37*0.15)SHORT TERM SPACES PROVIDED: 13 SPACES(MIN SHORT TERM SPACE - 50%)LONG TERM SPACES PROVIDED: 13 SPACES(MIN LONG TERM SPACE - 40%)TOTAL PROVIDED: 26 SPACESSITENIPO M O ZONING MAPHIGUERAT1 TITLE SHEETA1 PROJECT CONTEXT IMAGESA2 PROJECTS IN THE WORKSA3 SITE AIR PHOTOA4 EXISTING SITE SURVEYA5 PROPOSED SITE PLANA6 FLOOR PLANSA7 UPPER FLOOR PLANSA8 ELEVATIONSA9 ELEVATIONSA10 ELEVATIONSA11 ELEVATIONSA12 HEIGHT AND SETBACK STUDYA13 SITE SECTIONSA14 COLOR & MATERIALSA15 ENTRY TO PASEOA16 PASEO PERSPECTIVEA17 PERSPECTIVE A18 PERSPECTIVE A19 AERIAL PHOTOA20 DETAIL VIGNETTESA21 PASEO SIGN ELEVATION & DETAILA22 DETAIL VIGNETTESA23 SHADING PLANA24 PROPOSED SIGNSC1 PRELIMINARY CIVIL GRADING & DRAINAGE PLANC2 PRELIMINARY UTILITY PLANL1 LANDSCAPE SITE PLANVICINITY MAPFebruary 1, 2019#1160-01-CO17T1TITLE SHEETATTACHMENT 3 February 1, 2019#1160-01-CO17A1THE HOTEL AT THE CREAMERYPROJECT CONTEXT IMAGESATTACHMENT 3 February 1, 2019#1160-01-CO17A2THE HOTEL AT THE CREAMERYPROJECTS IN THE WORKSATTACHMENT 3 PROPOSED PARKINGSTRUCTUREMONTEREY PLACECREAMERYSOUTHTOWNPROJECT SITEADJACENT RESIDENTIALFebruary 1, 2019#1160-01-CO17A3THE HOTEL AT THE CREAMERYSITE AIR PHOTOATTACHMENT 3 February 1, 2019#1160-01-CO17A4THE HOTEL AT THE CREAMERY0208040402010SCALE: 1'-0" = 40’-0" (12x18 sheet)SCALE: 1'-0" = 20’-0" (24X36 sheet)0EXISTING SITE SURVEYATTACHMENT 3 CREAMERYBUILDING 2TAQUERIABUILDINGCIOPINOTBUILDINGEXISTING BUS STOP TO REMAINCREAMERYBUILDING 3SAN LUIS OBISPO CREEKNIPOMO STREET2A131A13February 1, 2019#1160-01-CO17A5THE HOTEL AT THE CREAMERY0208040402010SCALE: 1'-0" = 40’-0" (12x18 sheet)SCALE: 1'-0" = 20’-0" (24X36 sheet)0PROPOSED SITE PLANPROPOSEDBUILDINGATTACHMENT 3      $'$9$167$//$'$ 6)6725$*(6)(/(9$7250$&+,1(52206)(/0RWRUF\OH 67$1'$5'67$//:,//),767$1'$5'9(+,&/(6 5  0RWRUF\FOH     23(1725(7$,/%(/2:23(1725(67%$5%(/2:23(1725$03%(/2:23(172/2%%<%(/2:/$5*(68,7(+.     &251(568,7(6)75$6+6)5(67$85$176)+27(//2%%<6)5(7$,/$&&(6672&5((.+27(/5$03   6).,7&+(16)2)),&(%2+6):20(165(6752206)0(165(672206+2577(50%,.(3$5.,1*63$&(66)6725$*(6)&2/'/21*7(50%,.(63$&(6725$*(&/26(7 9(57,&$/<67$&.(' \UG&RQWDLQHU\UG&RQWDLQHU&DUW&DUW&DUW&DUW&DUW&DUW          &251(568,7(FLOOR PLANSGROUND FLOOR PLAN3/32" = 1'-0" (24 X 36 SHEET)1BELOW GRADE PARKING GARAGE3/32" = 1'-0" (24 X 36 SHEET)0MEZZANINE FLOOR PLAN3/32" = 1'-0" (24 X 36 SHEET)1.5February 1, 2019#1160-01-CO17A6THE HOTEL AT THE CREAMERYSCALE: 3/64” = 1’-0" (12X18 sheet)SCALE: 3/32” = 1’-0" (24X36 sheet)00 1286432166432ATTACHMENT 3  &251(568,7(  /$5*(68,7(            /$5*(68,7(&251(568,7( '(&.'(&./$5*(68,7(35,9$7('(&./$5*(68,7('(&.'(&.(1'68,7(&251(568,7((1'68,7((1&/26(''(&. (1&/26(''(&. (1&/26(''(&.(1&/26(''(&.         UPPER FLOOR PLANSSECOND FLOOR PLAN3/32" = 1'-0" (24 X 36 SHEET)2THIRD FLOOR PLAN3/32" = 1'-0" (24 X 36 SHEET)3FOURTH FLOOR PLAN3/32" = 1'-0" (24 X 36 SHEET)4February 1, 2019#1160-01-CO17A7THE HOTEL AT THE CREAMERY00SCALE: 3/64” = 1’-0" (12X18 sheet)SCALE: 3/32” = 1’-0" (24X36 sheet)1286432166432ATTACHMENT 3 CIOPINOT193' FF212 FF232 FFGROUND LEVELSECOND FLOORFOURTH FLOORMAX HEIGHTAVG. NATURAL GRADE = 192.1'222 FFTHIRD FLOOR181' FFPARKING GARAGE202 FFMEZZANINE242.1' FFMAX ALLOWABLE HEIGHT 50' +10' = 60'-0"= 252.1'ELEV. PENTHOUSE & MECH. SCREENEAST ELEVATION REVISED1/8" = 1'-0" (24 x 36 SHEET)1EAST ELEVATION INITIAL SUBMITTAL1/8" = 1'-0" (24 x 36 SHEET)2CIOPINOT193' FF212 FF232 FFGROUND LEVELSECOND FLOORFOURTH FLOORMAX HEIGHTAVG. NATURAL GRADE = 192.1'222 FFTHIRD FLOOR181' FFPARKING GARAGE202 FFMEZZANINE242.1' FFMAX ALLOWABLE HEIGHT 50' +10' = 60'-0"= 252.1'ELEV. PENTHOUSE & MECH. SCREENHEIGHT CALC:LOW POINT OF SITE: 191'HIGH POINT OF SITE: 193.2' AVG. NATURAL GRADE: (191' + 193') / 2 = 192.1'MAX HEIGHT= 50'-0"192.1' + (50)' = 242.1'REMOVED PORTION OF TOWERREMOVED MASS AT STREETPUSH BACKED UPPER FLOOR STORIESFebruary 1, 2019#1160-01-CO17A8THE HOTEL AT THE CREAMERYSCALE: 1/16” = 1’-0" (12X18 sheet)00841683216SCALE: 1/8” = 1’-0" (24X36 sheet)ELEVATIONSATTACHMENT 3 SOUTH ELEVATION1/8" = 1'-0" (24 x 36 SHEET)2GOSHI193' FF212 FF232 FFGROUND LEVELSECOND FLOORFOURTH FLOORMAX HEIGHTAVG. NATURAL GRADE = 192.1'222 FFTHIRD FLOOR181' FFPARKING GARAGE202 FFMEZZANINE242.1' FFMAX ALLOWABLE HEIGHT 50' +10' = 60'-0"= 252.1'ELEV. PENTHOUSE & MECH. SCREENSOUTH ELEVATION REVISED1/8" = 1'-0" (24 x 36 SHEET)2HEIGHT CALC:LOW POINT OF SITE: 191'HIGH POINT OF SITE: 193.2' AVG. NATURAL GRADE: (191' + 193') / 2 = 192.1'MAX HEIGHT= 50'-0"192.1' + (50)' = 242.1'GOSHI193' FF212 FF232 FFGROUND LEVELSECOND FLOORFOURTH FLOORMAX HEIGHTAVG. NATURAL GRADE = 192.1'222 FFTHIRD FLOOR181' FFPARKING GARAGE202 FFMEZZANINE242.1' FFMAX ALLOWABLE HEIGHT 50' +10' = 60'-0"= 252.1'ELEV. PENTHOUSE & MECH. SCREENREDUCTION OF MASS AT BUILDING FACEELIMINIATION OF MASSSOUTH ELEVATION INITIAL SUBMITTALELIMINATION OF MASSPUSHED TOWER INTO BUILDING MASSFebruary 1, 2019#1160-01-CO17A9THE HOTEL AT THE CREAMERYSCALE: 1/16” = 1’-0" (12X18 sheet)00841683216SCALE: 1/8” = 1’-0" (24X36 sheet)ELEVATIONSATTACHMENT 3 WEST ELEVATION191' FFLOWER GROUND LEVEL193' FF212 FF232 FFGROUND LEVELSECOND FLOORFOURTH FLOORMAX HEIGHTAVG. NATURAL GRADE = 192.1'222 FFTHIRD FLOOR181' FFPARKING GARAGE202 FFMEZZANINE242.1' FFMAX ALLOWABLE HEIGHT 50' +10' = 60'-0"= 252.1'ELEV. PENTHOUSE & MECH. SCREENWEST ELEVATION REVISED1/8" = 1'-0" (24 x 36 SHEET)1WEST ELEVATION INITIAL SUBMITTAL1/8" = 1'-0" (24 x 36 SHEET)2HEIGHT CALC:LOW POINT OF SITE: 191'HIGH POINT OF SITE: 193.2' AVG. NATURAL GRADE: (191' + 193') / 2 = 192.1'MAX HEIGHT= 50'-0"192.1' + (50)' = 242.1'191' FFLOWER GROUND LEVEL193' FF212 FF232 FFGROUND LEVELSECOND FLOORFOURTH FLOORMAX HEIGHTAVG. NATURAL GRADE = 192.1'222 FFTHIRD FLOOR181' FFPARKING GARAGE202 FFMEZZANINE242.1' FFMAX ALLOWABLE HEIGHT 50' +10' = 60'-0"= 252.1'ELEV. PENTHOUSE & MECH. SCREENUPPER FLOORS PUSHED BACKREMOVED TOWER ELEMENT MASSFebruary 1, 2019#1160-01-CO17A10THE HOTEL AT THE CREAMERYSCALE: 1/16” = 1’-0" (12X18 sheet)00841683216SCALE: 1/8” = 1’-0" (24X36 sheet)ELEVATIONSATTACHMENT 3 NORTH ELEVATION1/8" = 1'-0" (24 x 36 SHEET)2193.2' FFGROUND LEVEL193' FF212 FF232 FFGROUND LEVELSECOND FLOORFOURTH FLOORMAX HEIGHTAVG. NATURAL GRADE = 192.1'222 FFTHIRD FLOOR181' FFPARKING GARAGE202 FFMEZZANINE242.1' FFNORTH ELEVATION REVISED1/8" = 1'-0" (24 x 36 SHEET)2NORTH ELEVATION INITIAL SUBMITTAL1/8" = 1'-0" (24 x 36 SHEET)2HEIGHT CALC:LOW POINT OF SITE: 191'HIGH POINT OF SITE: 193.2' AVG. NATURAL GRADE: (191' + 193') / 2 = 192.1'MAX HEIGHT= 50'-0"192.1' + (50)' = 242.1'193.2' FFGROUND LEVEL193' FF212 FF232 FFGROUND LEVELSECOND FLOORFOURTH FLOORMAX HEIGHTAVG. NATURAL GRADE = 192.1'222 FFTHIRD FLOOR181' FFPARKING GARAGE202 FFMEZZANINE242.1' FFMAX ALLOWABLE HEIGHT 50' +10' = 60'-0"= 252.1'ELEV. PENTHOUSE & MECH. SCREENINITIAL SUBMITTAL BUILDING AT PASEO OUTLINEHEIGHT REDUCTION & STEPBACK AREAINTERNALIZED STAIR TOWERELIMINATED BUILDING MASSFebruary 1, 2019#1160-01-CO17A11THE HOTEL AT THE CREAMERYSCALE: 1/16” = 1’-0" (12X18 sheet)00841683216SCALE: 1/8” = 1’-0" (24X36 sheet)ELEVATIONSATTACHMENT 3 31’-2”41’-6”32’-6”43’-6”ARC/CHC PRESENTATIONDEC.STUDY18’-0”6’-0”5’-0”12’-0”DEC. STUDY w/ RAILS31’-2”41’-6”SOUTH (PASEO) ELEVATION STUDYN.T.S.1EAST (NIPOMO STREET) ELEVATION STUDYN.T.S.2(INITIAL SUBMITTAL)February 1, 2019#1160-01-CO17A12THE HOTEL AT THE CREAMERYHEIGHT AND SETBACK STUDYATTACHMENT 3 INITIAL SUBMITTAL BUILDING OUTLINEINITIAL SUBMITTAL BUILDING OUTLINESCALE: 1/16” = 1’-0" (24X36 sheet)0816 32NIPOMO SECTION 1/8" = 1'-0" (24 x 36 SHEET)1PASEO SECTION 1/8" = 1'-0" (24 x 36 SHEET)2RETAILRESTAURANTHOTEL HOTELHOTEL HOTELHOTEL HOTELPARKINGPARKINGGOSHICIOPINOTPLPLPLPLPLPLPLPLNIPOMO ST.RESTAURANTPARKINGHOTELLOBBYRESTROOMSMEZZANINEHOTELHOTELHOTELHOTELPASEOHOTELHOTELHOTEL HOTELHOTELHOTELHOTELHOTELHOTELHOTELHOTEL HOTELHOTEL HOTELHOTEL HOTEL HOTEL193' FF212 FF232 FFGROUND LEVELSECOND FLOORFOURTH FLOORMAX HEIGHTAVG. NATURAL GRADE = 192.1'222 FFTHIRD FLOOR181' FFPARKING GARAGE202 FFMEZZANINE242.1' FFMAX ALLOWABLE HEIGHT 50' +10' = 60'-0"= 252.1'ELEV. PENTHOUSE & MECH. SCREEN191' FFLOWER GROUND LEVELCREEK SETBACKHOTELHOTEL193' FF212 FF232 FFGROUND LEVELSECOND FLOORFOURTH FLOORMAX HEIGHTAVG. NATURAL GRADE = 192.1'222 FFTHIRD FLOOR181' FFPARKING GARAGE202 FFMEZZANINE242.1' FFMAX ALLOWABLE HEIGHT 50' +10' = 60'-0"= 252.1'ELEV. PENTHOUSE & MECH. SCREENFebruary 1, 2019#1160-01-CO17A13THE HOTEL AT THE CREAMERYSITE SECTIONSATTACHMENT 3 DFDFPAINTED SMOOTH STUCCOPAINTED FIBER CEMENT SIDINGSW 7757 HIGH REFLECTIVE WHITEPAINTED SMOOTH STUCCOSW 7071 GRAY SCREENPAINTED PRECAST CORNICESW 7066 GRAY MATTERSTHIN BRICK VENEERGENERAL SHALE FORT PORTSMOUTHUPPER WINDOWSMILGARD CLEAR ANODIZEDPRECAST COLUMN BASE FACECDI GP30 PEBBLEPRECAST SURROUNDCDI WI10 LIMESTONEMETAL CANOPYBRONZE COLOR FINISHANODIZED STOREFRONTBRONZEMETAL PANELINGBRONZE COLOR FINISHPAINTED PRE-CAST CORNICE SW 7063 NEBULOUS WHITEUPPER WINDOWSMILGARD GRAY ALUMINUMANODIZED STOREFRONTBLACKMETAL CANOPYDARK STEEL FINISHPAINTED FIBER CEMENTSW 9162 AFRICAN GRAYAABCEEHNDJPAINTED FIBER CEMENT TRIMSW 7076 CYBERSPACEBGKKMLFPIIIFOCEDFHJIGLKMOPNFebruary 1, 2019#1160-01-CO17A14THE HOTEL AT THE CREAMERYCOLOR & MATERIALSATTACHMENT 3 February 1, 2019#1160-01-CO17A15THE HOTEL AT THE CREAMERYENTRY TO PASEOATTACHMENT 3 February 1, 2019#1160-01-CO17A16THE HOTEL AT THE CREAMERYPASEO PERSPECTIVEATTACHMENT 3 February 1, 2019#1160-01-CO17A17THE HOTEL AT THE CREAMERYPERSPECTIVE AT CORNER OF MONTEREY & NIPOMOATTACHMENT 3 February 1, 2019#1160-01-CO17A18THE HOTEL AT THE CREAMERYPERSPECTIVE FROM NIPOMO STREETATTACHMENT 3 PROPOSED PARKINGSTRUCTUREMONTEREY PLACECREAMERYPROPOSEDSAN LUIS SQUARESOUTHTOWNFebruary 1, 2019#1160-01-CO17A19THE HOTEL AT THE CREAMERYAERIAL PHOTOATTACHMENT 3 SIGN ELEVATION1/2" = 1'-0" (24 x 36 SHEET)1metal silhouette roosters metal silhouette of dairy cow with calfmetal place titlemetal industrial feature trussdecorative metal bracket connectionsPLONSDLOOLJKWÀ[WXUHV20' - 0"6' - 8"February 1, 2019#1160-01-CO17A20THE HOTEL AT THE CREAMERY0842SCALE: 1/4” = 1’-0" (12X18 sheet)SCALE: 1/2” = 1’-0" (24X36 sheet)PASEO SIGN ELEVATION & DETAIL0421ATTACHMENT 3 NIPOMO STREET AND PASEO BUILDING CORNER ARTICULATION DETAILPARAPET AND CORNICE DETAIL IIPARAPET AND CORNICE DETAIL Imetal sign/public artprecast concrete cornicewall sconceVPRRWKSODVWHUÀQLVKprecast concrete parapetÀEHUFHPHQWSDQHODUWLFXODWLRQwith metal accent panels PLONSDLOOLJKWÀ[WXUHVbronze metal awningbrick detailingJRRVHQHFNZDOOOLJKWÀ[WXUHprecast concrete parapet capbronze metal guardrailwindow surroundsprecast concrete corniceprecast concrete corniceprecast concrete cornice with decorative dentilstransom windowsoldier course above windowbrick detailingdecorative metal bracket blade signprecast concrete bandZDOOVFRQFHJRRVHQHFNVLJQOLJKWÀ[WXUHVconcrete surroundsconcrete bulkheadFebruary 1, 2019#1160-01-CO17A21THE HOTEL AT THE CREAMERYDETAIL VIGNETTESATTACHMENT 3 GREEN WALL DETAIL HOTEL LOBBY AWNING DETAIL "TOWER" DETAIL decroative metal panelingilluminated hotel entry canopyGHFRUDWLYHPHWDOVRIÀWJRRVHQHFNZDOOOLJKWÀ[WXUHVvalet parking garage entranceaccent trellisbronze metal panel accent wallguest patio wallgreen wallaccent metal railingfeature decorative windowsbronze metal guardrailsmetal sign bracketilluminated hotel signageFebruary 1, 2019#1160-01-CO17A22THE HOTEL AT THE CREAMERYDETAIL VIGNETTESATTACHMENT 3 February 1, 2019#1160-01-CO17A23THE HOTEL AT THE CREAMERYSHADING PLANat Noon on Dec 21stATTACHMENT 3 hotel sign 2 (6'x3' = 18sfretail sign 4 (15'x3' = 45sf)hotel sign 1 (6'x3' = 18sf)restaurant sign 1 (16'x2' = 32sf)public art sign 1 (12'x6' = 72sf)retail sign 3 (10'x3' = 30sf)retail sign 2 (10'x3' = 30sf)retail sign 1 (10'x3' = 30sf)restaurant sign 2 (16x2' = 32sf)hotel sign 3 (7'x4' = 28sf)restaurant sign 3 (16x2' = 32sf)RETAILFebruary 1, 2019#1160-01-CO17A24THE HOTEL AT THE CREAMERYProposed Sign StatisticsTenant 1 (HOTEL)Raised Channel Signs 2 = 36 S.F.Wall Blade Signs 1 = 28 S.F. Cumulative Area of Sign: 64 S.F. < 200 S.F.Tenant 2 (RESTAURANT)Raised Channel Signs 3 = 96 S.F.Cumulative Area of Sign: 96 S.F. < 200 S.F.Tenant 3 (RETAILRaised Channel Signs 3 = 90 S.F.Wall Signs 1 = 45 S.F.Cumulative Area of Sign: 135 S.F. < 200 S.F.PUBLIC ART SIGN (See Sheet A20)Cumulative Area of 1 Sign: 133 S.F. < no req. min.PROPOSED SIGNSATTACHMENT 3 (E)FF=190.40(E)FF=190.35NIPOMOSTREET(193.2 FS)MATCH (E)193.0 FS(192.9 FS)MATCH (E)190.30 FS190.30FS190.10TGFF=193.0SAN LUIS OBISPO CREEK(E) BUILDING(NOT A PART)2%MAX(191.00 FS)(E) DOOR(E) FF=191.02%MAX 5%MAX(193.0 FS)MATCH (E)190.50 TG190.20TG(190.80 FS)MATCH (E)(192.00 FS)(E) PATIO192.90FS190.10 FS(190.94 FS)(E) PATIO190.00 TW(189.7 ES)2%MAX2%MAX(190.25 TG)EXIST. DIFF=193.0192.80 TC192.30 FL193.0 FS190.30 FS(190.35 FS)MATCH (E)2%MAX191.0FS193.0FS193.00 TW192.8 FS190.10 TG192.85TG190.30 FS193.0 FS192.85TG192.75 TG193.0 FS192.75FS193.0 FS192.85TG190.40 FS190.10FS2% MAX193.00 TW193.00 FS193.0 FS193.0 FS192.80 TC192.20 FL192.9 FS192.80 TC192.25 FL2%MAX8%MAX192.72FS(190.82 FS)MATCH (E)190.80 FS191.80FS191.76FS190.76FS192.80FS192.80FS190.80 FS 5%MAX(189.53 ES)MATCH (E)189.50TG(190.35 FS)MATCH (E)190.55 FS5%MAX 190.40 FS2%MAX2% MAX 190.70 FS192.90 FS2% MAX5%MAX192.75TG2%MAX190.25 FLSTORM DRAININLET W/ SUMP(E) BUILDINGMATCH (E) BACKOF SIDEWALK (TYP)(E) 8" STORMDRAIN PIPETO CREEK(N) HOTEL BUILDINGMATCH (E) BACKOF SIDEWALK (TYP)(E) BUILDINGREMOVE & REPLACE CURB,GUTTER & SIDEWALKTREE WELL &TREATMENTBASIN (TYP)RETAININGWALL (TYP)LANDSCAPEAREA (TYP)PAVERS (TYP)PAVERS (TYP)NEW TRASH RAMP(E) CREEKFLOWLINETREE WELL &TREATMENTBASIN (TYP)TREATMENTBASIN (TYP)NEW DRIVEWAY RAMPPROTECT (E)TREES (TYP)BUILDING SETBACKDRAIN INLET W/ATRIUM GRATETREATMENTBASIN (TYP)PRELIMINARY GRADING PLANC-1( IN FEET )1 INCH = FT.5101010200February 1, 2019#1160-01-CO17THE HOTEL AT THE CREAMERY00CC18040201020 40SCALE: 1'-0" = 40’-0" (12x18 sheet)SCALE: 1'-0" = 20’-0" (24X36 sheet)PRELIMINARY CIVIL GRADING & DRAINAGE PLANATTACHMENT 3 (E)FF=190.5(E)FF=190.40(E)FF=190.35NIPOMOSTREETSAN LUIS OBISPO CREEK(E) BUILDING(NOT A PART)(E) FF=191.0STORM DRAINBASIN W/ SUMPNEW 4" FIRE WATERSERVICE LINECONNECT TOEXISTING 8" STORMDRAIN PIPE(N) HOTEL BUILDINGPROTECT EXISTINGWATER SERVICE(E) BUILDINGSTORM 8" DRAINPIPE (TYP)NEW 4" SEWER LATERALNEW 2" 'DOMESTIC'WATER METER &SERVICE LATERALRAINWATERTREATMENTBASIN (TYP)TREE WELL &TREATMENTBASIN (TYP)(E) BUILDING(NOT A PART)(E) BUILDING(NOT A PART)NEW 8" STORMDRAIN PIPE(E) SEWER LINE(E) WATER LINEPROTECT(E) GAS LINENEW GAS LINE(E) GAS LINEPROTECT EXISTINGCATCH BASINPROTECT EXISTINGCATCH BASIN(E) CREEKFLOWLINEEXISTING DRAIN INLETNEW 1" 'COMMERCIAL'WATER METER &SERVICE LATERALRAINWATERTREATMENTBASINFIRE RISERROOMTREE WELL &TREATMENTBASIN (TYP)BUILDING SETBACKDRAIN INLET W/ATRIUM GRATETREE WELL &TREATMENTBASIN (TYP)REMOVE EXISTING TRENCH DRAINSTORM DRAINCLEANOUTSTORM DRAINCLEANOUTNEW 8" STORMDRAIN PIPECONNECTTO EXISTINGSTORM DRAINPROTECT EXISTINGTRENCH DRAINPRELIMINARY UTILITY PLANC-2UTILITY PLAN GENERAL NOTES:1. EXISTING SEWER MAIN IN NIPOMO STREET IS A 30-INCH MAIN AND MAY BE 20 FEET DEEP. A DOUBLE BARRELED 12" SEWERSIPHON IS PRESENT UPSTREAM OF THE SITE UNDER THE CREEK.2. PRIVATELY OWNED SUB-METERS MAY BE PROVIDE FOR RESIDENTIAL PORTION OF THE PROJECT UPON APPROVAL OF THEUTILITIES DIRECTOR OR HER/HIS DEIGNEE. THE CCR'S FOR THE PROPERTY ASSCOIATION SHALL REQUIRE THAT THESUB-METERS BE READ BY THE ASSOCIATION AND EACH CONDOMINIUM BILLED ACCORDING TO WATER USE.3. FIRE SPRINKLER SYSTEMS MAY ONLY BE DESIGNED BY A REGISTERED PROFESSIONAL ENGINEER.( IN FEET )1 INCH = FT.5101010200February 1, 2019#1160-01-CO17THE HOTEL AT THE CREAMERY00CC28040201020 40SCALE: 1'-0" = 40’-0" (12x18 sheet)SCALE: 1'-0" = 20’-0" (24X36 sheet)PRELIMINARY UTILITY PLANATTACHMENT 3 February 1, 2019#1160-01-CO17THE HOTEL AT THE CREAMERY0SCALE: 1”-0" = 20’-0" (24X36 sheet)SCALE: 1'-0" = 40’-0" (12x18 sheet)L18040204020100LANDSCAPE SITE PLANATTACHMENT 3