ARCHITECTURAL REVIEW COMMISSION AGENDA REPORT
SUBJECT: Continued review of a new 50-foot tall, five-story project that includes 3,392 square feet of
commercial/retail space, 65 hotel rooms, a 9.5% parking reduction, and a subterranean valet parking lot
within the Downtown Historic District.
PROJECT ADDRESS: 1027 Nipomo Street BY: Rachel Cohen, Associate Planner
Phone Number: (805) 781-7574
e-mail: rcohen@slocity.org
FILE NUMBER: ARCH-3216-2016 FROM: Shawna Scott, Senior Planner
RECOMMENDATION: Adopt the Draft Resolution (Attachment 1) approving the project, based on
specific findings and conditions.
SITE DATA
Applicant Creekside Lofts, L.P.
Representative Scott Martin, RRM - Architect
Zoning C-D-H (Downtown Historic District)
General Plan General Retail
Net Site Area 16,940 square feet (0.39 acres)
Environmental
Status
Categorically exempt from environmental
review under Section 15332, Class 32, In-
fill Development Projects, of the CEQA
Guidelines.
1.0 SUMMARY
The applicant has submitted revised plans for the construction of a new 50-foot, five-story, 65-room
hotel with 3,392 square feet of retail/commercial space, and a 35-space subterranean valet parking garage
in the Downtown Historic District. The site is currently used as a surface parking lot for the Creamery
and Ciopinot’s Restaurant.
2.0 COMMISSION’S PURVIEW
The ARC’s role is to review the project in terms of its consistency with the Community Design
Guidelines, the Historic Preservation Program Guidelines for compatible development in Historic
Districts, and applicable City policies and standards.
Packet Page 7
ARCH-3216-2016
1027 Nipomo
Page 2
3.0 BACKGROUND
September 26, 2016: The CHC reviewed a 4-story, mixed-use project that included 8,131 square-feet of
commercial/retail space, 23 residential units and a 7-room hotel. The CHC continued the item to a date
uncertain with direction to re-evaluate the height, scale, massing & detailing for greater consistency with
neighboring historic structures within the Downtown Historic District.
August 14, 2017: The CHC reviewed a new, 50-foot tall, four-story 47-room hotel project that included
6,698 square-feet of commercial/retail space and a 22-space subterranean parking garage. The CHC
voted 4-2-1 to recommend the ARC deny the project based on Historic Preservation Program Guidelines
Section 3.2.1 and provided direction that the project reduce the height of the building to three-stories
with the third story setback.
September 18, 2017: The ARC reviewed the 50-foot tall, four-story 47-room hotel project that included
6,698 square-feet of commercial/retail space and a 22-space subterranean parking garage and continued
the item with direction.
July 23, 2018: The CHC reviewed the 50-foot tall, five-story 67-room hotel project that included 3,392
square-feet of commercial/retail space and a subterranean parking garage. The CHC voted 5-1-1 to
recommend the ARC deny the project because the building is not compatible in scale and massing with
the Downtown Historic District structures and provided direction that the project reduce the height of
the building to three-stories with the third story setback.
September 17, 2018: The ARC reviewed the proposed project and provided a list of directional items to
be included in the final plan submittal (Attachment 2, ARC Minutes).
September 2018 – January 2019: The ARC and the CHC formed a subcommittee to work with the
applicant on revisions to the project. On January 11, 2019, the subcommittee found the applicant’s
project revisions fully responsive to comments.
February 25, 2019: The CHC reviewed the proposed project and voted 4-2-1 to recommend the ARC
deny the project because the building is not compatible in scale and massing with the Downtown Historic
District structures and provided direction that the project reduce the height of the building to three-
stories with the third story setback.
Packet Page 8
ARCH-3216-2016
1027 Nipomo
Page 3
4.0 PROJECT INFORMATION
4.1 Site Information/Setting
The proposed project consists of a 16,940 (net) square-foot site located at 1027 Nipomo Street within
the Downtown Commercial zone with a Historic Overlay (C-D-H). The project site is currently used as
a surface parking lot for the adjacent properties (the Creamery and Ciopinot) (see Figure 1).
Table 1: Site information and setting
4.2 Project Description
The project proposes to construct a new 50-foot, five-story structure within the Downtown Historic
District. The structure is blend of architectural styles with retail storefronts along the street and south
side of the first floor and the hotel units on the north side of the first floor and on all the upper floors
(Attachment 3, Project Plans).
The project includes:
• 3,392 square feet of ground floor retail/commercial space;
• 65 hotel rooms on all floors;
• 35-space subterranean valet parking garage;
• A 20-foot wide pedestrian pathway/seating area between the neighboring buildings and the
Zoning C-D-H
Net Site Size 20,731 s.f. – 3,791 s.f. (Creek setback) = 16,940 s.f.
Present Use & Development Surface Parking Lot
Topography Relatively Flat
Access Nipomo
Surrounding Use/Zoning
(see Figure 1)
North: C-D-H-PD
East: C-D-H and PF-H
South: C-D-H
West: C-D-H and R-3-H
Figure 1: Subject site and surrounding structures
Residential
Soda
Water
Works
Children’s
Museum
Ciopinot’s
Restaurant
Creamery
Sandy’s
Liquor
Packet Page 9
ARCH-3216-2016
1027 Nipomo
Page 4
project; and
• Preservation of the existing creek walk along San Luis Creek;
Materials in the project include: brick, fiber cement siding and trim, smooth stucco, metal paneling,
aluminum storefronts, precast concrete cornices, bulkheads, metal railings, and metal awnings
(Attachment 3, Project Plans, Sheet A14).
Table 2: Project Statistics
Item Proposed 1 Standard 2
Setback
Front Yard 0 feet 0 feet
Other Yard 20 feet 0 feet
Max. Height of Structure(s) 50 feet 50-75 feet
Max. Building Coverage (footprint) 53% 100%
Density Units (DU) 0 DU 36 DU per acre
Parking Spaces
Vehicle 36 423
Motorcycle 2 2
Bicycle 6 6
Bicycle Parking for 9.5% reduction (4
vehicle spaces)
20 20
Notes:
1. Applicant’s project plans submitted
2. Zoning Regulations
3. The applicant may pay an in-lieu fee in place of providing parking spaces
5.0 PROJECT ANALYSIS
At the July 23, 2018 hearing, the CHC provided direction that the project be reduced in massing and
scale, particularly that the project be reduced in height to three-stories with the third story setback. The
ARC also provided direction at the September 17, 2018 meeting regarding the massing and scale of the
structure. Based on the feedback, the CHC and the ARC formed a subcommittee. The subcommittee
held a preliminary site meeting on November 9, 2018 including the applicant team and met two more
times to review changes presented by the applicant until a final design was found fully responsive to
subcommittee feedback on January 11, 2019. More detail regarding the subcommittee’s feedback is
provided under Section 5.2, #6 below.
5.1 CHC Recommendation: On February 25, 2019 the CHC reviewed the revised design for the project
and heard an update from the subcommittee regarding the applicant’s project modifications in response
to direction. Several members expressed that they liked the overall design changes that had been made
to the project, but shared that the scale and massing of the project was incompatible with the
neighborhood. After discussion and a vote of 4:2, the CHC recommended that the ARC find the proposed
new building inconsistent with Historic Preservation Program Guidelines Section 3.2.11 because the
1 Historic Preservation Program Guidelines 3.2.1 Architecturally compatible development within Historic Districts . New
structures in historic districts shall be designed to be architecturally compatible with the district’s prevailing historic
character as measured by their consistency with the scale, massing, rhythm, signature architectural elements, exterior
Packet Page 10
ARCH-3216-2016
1027 Nipomo
Page 5
building is not compatible in scale and massing with the adjacent Downtown Historic District’s
structures.
5.2 ARC Direction: On September 17, 2018 (prior to the ARC and CHC subcommittee meetings) the
ARC reviewed a building design for the site and provided 12 directional items. How the applicant has
responded to the ARC direction and modified the project in response to subcommittee direction is
provided in the itemized list below.
1. Address the mass and scale of the side of the structure adjacent to the Creamery. The revised project
has stepped back the upper stories along the west elevation adjacent to the Creamery (Figure 2, see
below).
2. Provide additional step backs on the third and fourth floors, similar to how the building is set back
above the brick portion along Nipomo Street. The upper two floors along Nipomo Street have been
setback 18 feet and 23 feet (see Figure 2, above).
3. Reconsider including the arch/gateway sign. Is this feature necessary? The applicant has maintained
the gateway sign as part of the project because they want to pay homage to the historic use of the site
and provide a bookend element to the project’s entry on Higuera Street (Attachment 3, Project Plans,
Sheet A20).
materials, siting and street yard setbacks of the district's historic structures. New structures are not required to copy or
imitate historic structures, or seek to create the illusion that a new building is historic.
Figure 2: (Top) North elevation of the previous project; (Bottom) North elevation of the project showing the setbacks
along the east elevation and the west elevation and the setback of the elevator tower.
Packet Page 11
ARCH-3216-2016
1027 Nipomo
Page 6
➢ The ARC should discuss if the sign should be retained. The archway sign would be required to
come back to the ARC as part of a public art review.
4. Review the materials proposed for the project and their compatibility. The revised design no longer
uses horizontal wood screening and corrugated metal material for the exterior material of the elevator
tower. Instead, the revised design includes metal paneling for the exterior material of the tower.
Additionally, the applicant has reduced the use of siding on th e project and incorporated smooth
stucco as an exterior finish (Attachment 3, Project Plans, Sheet A14).
5. Provide additional documentation verifying how the valet parking will work. The applicant has
included a letter and diagram of a similar valet parking scenario that is used in another local hotel
for valet parking (Attachment 3, Project Plans).
➢ Staff is recommending Condition of Approval No. 11 which states, “No public parking shall be
accommodated in the subterranean garage. The applicant shall provide verification from the valet
parking operator that the subterranean parking garage will park 36 vehicles and 2 motorcycles
prior to the issuance of the building permit. In the event that 36 vehicles cannot be parked all at
one time in the garage, and all spaces can be accessed by the valet operator, the applicant shall
pay in-lieu parking fees for the difference.”
6. Work with the CHC and the ARC to refine design. Revisions to the project will require CHC review
before returning to the ARC. As discussed above, the CHC and the ARC formed a subcommittee that
worked with the applicant team to explore changes to the project until a final design was found fully
responsive to subcommittee feedback. The subcommittee focused specifically on 1) modifying
setbacks, floor heights, massing, and 2) views towards the project. The direction provided by the
subcommittee led to the following changes in the project:
• An increased setback of the third floor along Nipomo Street by 12 feet (overall setback is
now 18 feet from the second floor).
• Fourth floor has been setback an additional 5 feet along Nipomo Street (overall setback is
now 23 feet from the face of the second floor).
• Additional setbacks along the west elevation nearest the Creamery.
• Parapets have been reduced by 1-2 feet and an iron railing has been added.
• Cornice details have been simplified to reduce bulkiness to the upper floors.
Packet Page 12
ARCH-3216-2016
1027 Nipomo
Page 7
7. Address the noise concerns regarding the balconies and windows that face the creek. Eliminate
balconies and include inoperable windows. The balconies that face the creek have been converted
into window seats that have one operable window that faces towards Nipomo Street (see Figure 3).
➢ The project includes first floor patios on the ground floor and decks along the top floor of the
building along the creek side (see floor plans, Attachment 3, Project Plans, Sheets A6 & A7).
The ARC should discuss if these should be modified, removed or left as designed.
8. Internalize and/or diminish the visibility of the elevator tower. The elevator tower has been set into
the building. See Figure 4 below and Figure 2 above. This revision appears to significantly reduce
the apparent mass of the building.
Figure 3: Detail drawing of the window seats that replace the balconies on the north elevation of the project, facing
San Luis Creek.
Packet Page 13
ARCH-3216-2016
1027 Nipomo
Page 8
9. Provide loading and unloading areas for the hotel. The project does not include a loading zone and
staff is recommending Condition of Approval No. 33 which requires the project include a loading
zone to the north of the subterranean parking garage entrance driveway along Nipomo Street.
10. Provide a visual analysis of the project within the block. Show views from all the streets surrounding
the project, especially from Nipomo Street and from Higuera Street over the lower story structures.
The applicant has provided various views towards the project and also views of the project as it might
appear from nearby streets (Attachment 3, Project Plans).
11. Review the paseo and provide more information on how the paseo connects to the Creamery
entrance. The site plan shows the dimensions of the paseo and the project plans include a rendering
on sheet A16 that conveys more information about how the split-level paseo will look and function.
12. Reconsider the color of the dark colored cornice. The cornice detailing on the front façade of the
building has been lightened in color and lowered to the second story level (see Figure 4).
Figure 4: Front elevation along Nipomo. (Top) Previous project design with the highly
visible elevator tower; (Bottom) Revised design with the elevator tower set into the
building.
Packet Page 14
ARCH-3216-2016
1027 Nipomo
Page 9
5.3 Sign program: The applicant has included a sign program as part of the project. Sign programs are
an effective way to establish ongoing requirements to ensure signage is coordinated and compatible with
the development and surrounding area in projects with multiple tenants and buildings. The applicant is
proposing 10 new signs for the project as follows:
Location Sign Type Size per sign Total sign size Quantity Lighting
Hotel Wall sign with raised
channel letters
18 s.f. 36 s.f. 2 Gooseneck
Hotel Projecting sign 28 s.f. 28 s.f. 1 Neon
Restaurant Wall sign with raised
channel letters
32 s.f. 96 s.f. 3 Gooseneck
Retail Awning sign with
raised channel letters
30 s.f. 90 s.f. 3 None
Retail Wall sign with raised
channel letters
45 s.f. 45 s.f. 1 Gooseneck
Total 295 s.f. 10
The applicant’s proposed sign program appears appropriate in scale, placement, number, and type. Staff
is supportive of the sign program. The placement and type of signs appears appropriate for the project
in terms of providing an appropriate level of visibility at the pedestrian scale in the downtown setting
(Attachment 2, Project Plans, Sheets A21, A22 & A24).
5.4 Parking: The proposed parking reduction is consistent with 2015 Zoning Regulations Section
17.16.060.G(2) which states in part that “Projects which provide more bicycle and/or motorcycle spaces
than required may reduce the required car spaces at the rate of one car space for each five bicycle spaces,
up to a 10% reduction, subject to the approval of the Community Development Director.” The project
requires 42 vehicle parking spaces and provides 20 additional bicycle parking spaces for a 4 space
(9.5%) parking reduction. The project site is located Downtown and within close proximity to
restaurants, entertainment, employment, and bus stops allowing for alternative modes of transportation
such as walking, biking or taking public transportation.
6.0 ENVIRONMENTAL REVIEW
The project is categorically exempt from environmental review under the California Environmental
Quality Act (CEQA) because the project is a Class 32 “In-Fill Development Project” within the meaning
of Section 15332 of the CEQA Guidelines. The project is consistent with General Plan policies for the
land use designation for the site, conforms to all applicable zoning requirements (height, scale, setbacks,
density, etc.) and designed to be compatible with the surrounding neighborhood and would not have an
adverse impact on a historic resource. The project site occurs on a property of no more than five acres
in size, is substantially surrounded by urban uses, has no value as habitat for endangered, rare or
threatened species, is located on an existing developed property, and is served by required utilities and
public services. Approval of the project would not result in any significant effects relating to traffic,
noise, air quality, or water quality.
Packet Page 15
ARCH-3216-2016
1027 Nipomo
Page 10
7.0 ALTERNATIVE
1. Continue the project with direction to the applicant and staff on pertinent issues.
2. Deny the project based on findings of inconsistency with the General Plan, Zoning Regulations,
Community Design Guidelines, or the Historic Preservation Program Guidelines.
8.0 ATTACHMENTS
1. Resolution
2. ARC Minutes
3. Project Plans
Packet Page 16
RESOLUTION NO. ARC-XXXX-2019
A RESOLUTION OF THE SAN LUIS OBISPO ARCHITECTURAL
REVIEW COMMISSION GRANTING FINAL ARCHITECTURAL
REVIEW APPROVAL OF A NEW 50-FOOT TALL, FIVE-STORY
PROJECT THAT INCLUDES 3,392 SQUARE FEET OF
COMMERCIAL/RETAIL SPACE, 65 HOTEL ROOMS, AND A
SUBTERRANEAN VALET PARKING LOT WITHIN THE DOWNTOWN
HISTORIC DISTRICT, WITH A CATEGORICAL EXEMPTION FROM
ENVIRONMENTAL REVIEW AS REPRESENTED IN THE STAFF
REPORT AND ATTACHMENTS DATED APRIL 1, 2019; 1027 NIPOMO
STREET (C-D-H ZONE; ARCH-3216-2016)
WHEREAS, the Architectural Review Commission of the City of San Luis Obispo
conducted a public hearing in the Council Hearing Room of City Hall, 990 Palm Street, San Luis
Obispo, California, on April 1, 2019, pursuant to a proceeding instituted under ARCH-3216-2016,
Creekside Lofts, L.P., applicant; and
WHEREAS, the Architectural Review Commission of the City of San Luis Obispo has
duly considered all evidence, including the testimony of the applicant, interested parties, and
evaluation and recommendations by staff, presented at said hearing.
WHEREAS, notices of said public hearing were made at the time and in the manner
required by law; and
NOW, THEREFORE, BE IT RESOLVED by the Architectural Review Commission of
the City of San Luis Obispo as follows:
SECTION 1. Findings. The Architectural Review Commission hereby grants final
approval to the project (ARCH-3216-2016), based on the following findings:
1. The project will not be detrimental to the health, safety, or welfare of those working or
residing in the vicinity since the proposed project is consistent with the site’s Downtown
Commercial zoning designation and will be subject to conformance with all applicable
building, fire, and safety codes.
2. The proposed new building is consistent with Historic Preservation Program Guidelines
Section 3.2.1 and Chapter 4 of the Community Design Guidelines because the building is
designed to be architecturally compatible in scale, massing, rhythm, signature architectural
elements, exterior materials, and siting with Downtown Historic District structures.
3. The project design maintains consistency with the Community Design Guidelines Section
4.2.B by providing: a building located at the back of the sidewalk, setting back the upper
two floors along Nipomo Street, human scale and proportion, architectural design that
complements the character of the surrounding neighborhood, horizontal lines that reinforce
the lines of the established facades in adjacent buildings, distinction between the first and
ATTACHMENT 1
Packet Page 17
Resolution No. ARC-XXXX-2019
1027 Nipomo, ARCH-3216-2019
Page 2
upper floors by having a more transparent ground floor, windows and other architectural
features that reinforce the typical rhythm of upper story windows found on other
commercial buildings in the Downtown and provides architectural interest on all four sides
of the building.
4. The project is consistent with the Community Design Guidelines Section 4.2.C because it
provides storefront windows, doors, entries, transoms, awnings, cornice treatments and
other architectural features that complement existing structures, without copying their
architectural style.
5. The proposed parking reduction is consistent with 2015 Zoning Regulations Section
17.16.060.G(2) which states in part that “Projects which provide more bicycle and/or
motorcycle spaces than required may reduce the required car spaces at the rate of one car
space for each five bicycle spaces, up to a 10% reduction, subject to the approval of the
Community Development Director.” The project requires 42 vehicle parking spaces and
provides 20 additional bicycle parking spaces for a 4 space (9.5%) parking reduction.
6. That the proposed parking reduction will safe, and will not be detrimental to the
surrounding area or cause a decline in quality of life because project is located within close
proximity to restaurants, entertainment, employment, and bus stops allowing for alternative
modes of transportation such as walking, biking or taking public transportation.
SECTION 2. Environmental Review. The Architectural Review Commission hereby determines
that approval of the design of the project is categorically exempt from environmental review under
the California Environmental Quality Act because the project is a Class 32 “In -Fill Development
Project” within the meaning of Section 15332 of the CEQA Guidelines. The project is consistent
with General Plan policies for the land use designation for the site, conforms to all applicable
zoning requirements (height, scale, setbacks, density, etc.) and designed to be compatible with the
surrounding neighborhood and would not have an adverse impact on a historic resource. The
project site occurs on a property of no more than five acres in size, is substantially surrounded by
urban uses, has no value as habitat for endangered, rare or threatened species, is located on an
existing developed property, and is served by required utilities and public services. Approval of
the project would not result in any significant effects relating to traffic, noise, air quality, or water
quality.
SECTION 3. Action. The Architectural Review Commission (ARC) hereby grants final
approval to the project with incorporation of the following conditions:
Planning Division - Community Development Department
1. Final project design and construction drawings submitted for a building permit shall be in
substantial compliance with the project description and plans approved by the ARC. A
separate, full-size sheet shall be included in working drawings submitted for a building
permit that lists all conditions of project approvals listed as sheet number 2.
ATTACHMENT 1
Packet Page 18
Resolution No. ARC-XXXX-2019
1027 Nipomo, ARCH-3216-2019
Page 3
2. Reference shall be made in the margin of listed items as to where in plans requirements are
addressed. Any change to approved design, colors, materials, landscaping, or other
conditions of approval must be approved by the Director or Architectural Review
Commission, as deemed appropriate.
3. Plans submitted for a building permit shall call out the colors and materials of all proposed
building surfaces and other improvements.
4. The locations of all exterior lighting, including bollard style landscaping or path/parking
lighting, shall be included in plans submitted for a building permit. All wall-mounted
lighting fixtures shall be clearly called out on building elevations included as part of
working drawings. All wall-mounted lighting shall complement building architecture,
subject to the approval of the Community Development Director. The lighting schedule for
the building shall include a graphic representation of the proposed lighting fixtures and cut-
sheets on the submitted building plans. The selected fixture(s) shall be shielded to ensure
that light is directed downward consistent with the requirements of the City’s Night Sky
Preservation standards contained in Chapter 17.23 of the 2015 Zoning Regulations.
5. Plans submitted for a building permit shall clearly state the type/model of bicycle racks
proposed, location and dimensions of all 26 short and long-term bicycle parking spaces.
All long-term bicycle parking spaces shall be located within the building. Sufficient detail
shall be provided about the placement and design of bike racks to demonstrate compliance
with relevant Engineering Standards and Community Design Guidelines, to the satisfaction
of the Public Works and Community Development Directors.
6. Plans submitted for a building permit shall include window details indicating the type of
materials for the window frames and mullions, their dimensions, and colors. Plans shall
include the materials and dimensions of all lintels, sills, surrounds recesses and other
related window features. Plans shall demonstrate the use of high quality materials for the
windows that reflect the architectural style of the project and are compatible with the
neighborhood character, to the approval of the Community Development Director.
7. Mechanical and electrical equipment shall be located internally. With submittal of working
drawings, the applicant shall include sectional views of the building, which clearly show
the sizes of any proposed condensers and other mechanical equipment. If any condens ers
or other mechanical equipment is to be placed on the roof, plans submitted for a building
permit shall confirm that parapets and other roof features will adequately screen them. A
line-of-sight diagram may be required to confirm that proposed screening will be adequate.
This condition applies to initial construction and later improvements.
8. The location of any required backflow preventer and double-check assembly shall be
shown on all site plans submitted for a building permit, including the landscaping plan.
Construction plans shall also include a scaled diagram of the equipment proposed. Where
possible, as determined by the Utilities Director, equipment shall be located inside the
building within 20 feet of the front property line. Where this is not possible, as determined
ATTACHMENT 1
Packet Page 19
Resolution No. ARC-XXXX-2019
1027 Nipomo, ARCH-3216-2019
Page 4
by the Utilities Director, the back-flow preventer and double-check assembly shall be
located in the street yard and screened using a combination of paint color, landscaping and,
if deemed appropriate by the Community Development Director, a low wall. The size and
configuration of such equipment shall be subject to review and approval by the Utilities
and Community Development Directors.
9. A final landscaping plan, including irrigation details and plans, shall be submitted to the
Community Development Department along with working drawings. The legend for the
landscaping plan shall include the sizes and species of all groundcovers, shrubs, and trees
with corresponding symbols for each plant material showing their specific locations on
plans. Street trees species shall comply with City standards.
10. The applicant shall pay parking in-lieu fees for two parking spaces prior to building permit
issuance.
11. No public parking shall be accommodated in the subterranean garage. The applicant shall
provide verification from the valet parking operator that the subterranean parking garage
will park 36 vehicles and 2 motorcycles prior to the issuance of the building permit. In the
event that 36 vehicles cannot be parked all at one time in the garage, and all spaces can be
accessed by the valet operator, the applicant shall pay in-lieu parking fees for the
difference.
12. The sign program for the project shall be as follows:
Location Sign Type Size per sign Total sign size Quantity Lighting
Hotel Wall sign with
raised channel
letters
18 s.f. 36 s.f. 2 Gooseneck
Hotel Projecting sign 28 s.f. 28 s.f. 1 Neon
Restaurant Wall sign with
raised channel
letters
32 s.f. 96 s.f. 3 Gooseneck
Retail Awning sign
with raised
channel letters
30 s.f. 90 s.f. 3 None
Retail Wall sign with
raised channel
letters
45 s.f. 45 s.f. 1 Gooseneck
Total 295 s.f. 10
Engineering Division - Community Development Department
13. Projects involving the construction of new structures requires that complete frontage
improvements be installed or that existing improvements be upgraded per city standards.
MC 12.16.050
ATTACHMENT 1
Packet Page 20
Resolution No. ARC-XXXX-2019
1027 Nipomo, ARCH-3216-2019
Page 5
14. The project is located in the Mission Style Sidewalk District of downtown. The building
plan submittal shall show the Nipomo Street frontage to be upgraded in accordance with
the Mission Sidewalk District of downtown per city engineering standards.
15. The building plan submittal shall show an 8’ clear pedestrian path of travel void of all
sidewalk obstructions along the Nipomo Street sidewalk in order to meet pedestrian level
of service thresholds required for this area.
16. The building plan submittal shall show the existing bus stop, area of red curb, and parallel
metered parking spaces to remain. Any change to existing street parking shall be processed
and approved by separate action by the City in accordance with the Parking Conversion
Ordinance.
17. Development of the driveway and parking areas shall comply with the Parking and
Driveway Standards for dimension, maneuverability, slopes, drainage, and materials.
Parking-in-Lieu fees shall be paid prior to building permit issuance or map recordation.
18. The building plan submittal shall include a complete parking management plan to the
satisfaction of the Planning Division, Transportation Division, Transit, and Engineering
Development Review Division. The parking management plan shall include operational
features to clarify how the single vehicle width driveway will function.
19. Drainage from the trash enclosure shall comply with City Engineering Standard 1010.B.
regarding water quality treatment prior to discharge to the storm drain system or gutter.
20. The building plan submittal shall include a complete site utility plan. All existing and
proposed utilities along with utility company meters shall be shown along with any
proposed upgrades. All work in the public right-of-way including off-site work shall be
shown or noted. Transformer pad location and screening shall be approved to the
satisfaction of the Planning Division if applicable.
21. The building plan submittal shall include a complete grading and drainage plan for this
project. The plan shall show the existing and proposed contours and/or spot elevations to
clearly depict the proposed grading and drainage. Show and label the neighboring high
point elevation or grade break at the yard areas and drainage arrows to show historic
drainage and any run-on. Show all existing and proposed drainage courses, pipes and
structures; indicate the size, type and material.
22. The building plan submittal shall include a complete drainage report in accordance with
the Floodplain Management Regulations, Drainage Design Manual, and Post Construction
Stormwater Regulations. The drainage report shall include a summary of the bulleted items
found in Section 2.3.1 of the Drainage Design Manual. The report shall include a review
of the existing off-site roof and/or site watersheds for any run-on. The water quality
treatment BMP per performance requirement 2 shall include the treatment of and/or
ATTACHMENT 1
Packet Page 21
Resolution No. ARC-XXXX-2019
1027 Nipomo, ARCH-3216-2019
Page 6
separation of any run-on. Limited treatment of run-on is preferred over collection and tight
piping to the proposed outlet(s).
23. The building plan submittal shall show and note trash containment or screening at all
existing or proposed outlets to the creek in accordance with water quality standards to the
satisfaction of the Public Works Department.
24. The building plan submittal shall show compliance with the Post Construction Stormwater
Requirements as promulgated by the Regional Water Quality Control Board for
redeveloped sites. Include a complete Post Construction Stormwater Control Plan
Template as available on the City’s Website. The building plan submittal shall include a
detailed area exhibit to document compliance.
25. An operations and maintenance manual will be required for the post construction
stormwater improvements. The manual shall be provided at the time of building permit
application and shall be accepted by the City prior to building permit issuance. A private
stormwater conveyance agreement will be required and shall be recorded prior to final
inspection approvals.
26. This property is located within a designated flood zone as shown on the Flood Insurance
Rate Map (FIRM) for the City of San Luis Obispo. As such, any new structures shall
comply with all Federal Emergency Management Agency (FEMA) requirements and the
city’s Floodplain Management Regulations per Municipal Code Chapter 17.84.
27. This property is located in an AE flood zone. The buildings and building service equipment
shall be elevated or flood-proofed to at least one foot above the Base Flood Elevation
(BFE). The final BFE determination shall be based on the most upstream building face.
Additional freeboard to 2’ above the BFE may result in additional savings on flood
insurance and is encouraged.
28. The elevator construction shall be detailed in the building permit plan submittal in
accordance with the Floodplain Management Regulations and FEMA Technical Bulletin
TB4-2010.
29. The owner shall process a LOMA or LOMR-F to revise the flood zone, if applicable to the
proposed building, prior to building permit issuance.
30. The building plan submittal shall show all existing trees on the property with a trunk
diameter of 3" or greater. Offsite trees along the adjoining property lines with canopies
and/or root systems that extend onto the property shall be shown to remain and be
protected. The plan shall note which trees are to remain and which trees are proposed for
removal. Include the diameter and species of all trees. Tree canopies should generally be
shown to scale for reference. The plan shall show all existing street trees.
ATTACHMENT 1
Packet Page 22
Resolution No. ARC-XXXX-2019
1027 Nipomo, ARCH-3216-2019
Page 7
31. The City Arborist supports the proposed removals of the 5 existing on-site trees in the
parking lot as shown on the plans. Compensatory tree plantings shall be a minimum 15-
gallon and provided in accordance with the proposed landscape plan.
32. Tree protection measures shall be required for the existing trees to remain. Tree protection
measures may include canopy pruning, root pruning, specialized construction for utility
trenching, and/or special foundation design for the new structure. The City Arborist shall
review and approve the proposed tree protection measures in accordance with the
applicable provisions of City’s Standard Specification 77-1.03A(2) prior to commencing
with any demolition, grading, or construction. The City Arborist shall approve any safety
pruning, the cutting of substantial roots, or grading within the dripline of trees. A city-
approved arborist shall complete safety pruning. Any required tree protection measures
shall be shown or noted on the building plans.
Building Division - Community Development Department
33. Building plans shall show the means of permanent roof access for buildings four stories or
more in height.
34. Building plans shall specify location of mechanical ventilation unit and location of exhaust
discharge as required for enclosed parking garages.
Transportation Division - Public Works Department
35. The building plans shall show removal of one metered parking space. The building plans
shall show a 41’ foot passenger loading zone to the north of the subterranean parking
garage entrance driveway. The bus stop and all remaining metered parking spaces shall
remain in existing locations and be shown on plans, including bus stop signage and
furniture. The applicant shall follow the City process for the single parking space
conversion.
36. Applicant shall provide a total of 10 short term bicycle parking spaces in proposed location,
using Peak Racks Campus Rack or equal approved by City Engineer.
Utilities Department
37. Existing sewer and water facilities impacted by the proposed project will need to be
removed and replaced per the current edition of the Engineering Design Standards. Refer
to the Uniform Design Criteria of the Engineering Design Standards for guidance on sewer
and water infrastructure requirements; See Section 6 and 7.
38. Separate water meters shall be provided for each new parcel within an area accessible by
the city.
ATTACHMENT 1
Packet Page 23
Resolution No. ARC-XXXX-2019
1027 Nipomo, ARCH-3216-2019
Page 8
39. A new HDPE sewer lateral shall be installed per the engineering design standards into the
existing 30” sewer main at a point along Nipomo and south of the creek crossing.
40. The project must connect to the existing water main on Nipomo Street, and shall provide
private fire pumps, booster pumps, and pressure reducing valves required for the proposed
use permit.
41. Underground dewatering systems in the proposed parking basement shall discharge to an
on-site retention system, or shall obtain an environmental compliance permit prior to
issuance of occupancy permit.
42. Business generating more than two cubic yards of waste shall comply with state law per
AB 1826, and local waste management plan to reduce greenhouse gas emissions, which
requires trash enclosures to have the capacity to store trash bin sizes for waste, recycling,
and organics. The trash enclosure location and size shall be reviewed and approved by the
Utilities Director during the building permit process.
Indemnification
43. The applicant shall defend, indemnify and hold harmless the City and/or its agents, officers
and employees from any claim, action or proceeding against the City and/or its agents,
officers or employees to attack, set aside, void or annul, the approval by the City of this
project, and all actions relating thereto, including but not limited to environmental review
(“Indemnified Claims”). The City shall promptly notify the applicant of any Indemnified
Claim upon being presented with the Indemnified Claim and the City shall fully cooperate
in the defense against an Indemnified Claim.
On motion by ______________, seconded by _______________, and on the following roll
call vote:
AYES:
NOES:
REFRAIN:
ABSENT:
The foregoing resolution was passed and adopted this 1st day of April 2019.
_____________________________
Shawna Scott, Secretary
Architectural Review Commission
ATTACHMENT 1
Packet Page 24
Minutes
ARCHITECTURAL REVIEW COMMISSION
Monday, September 17, 2018
Regular Meeting of the Architectural Review Commission
CALL TO ORDER
A Regular Meeting of the Architectural Review Commission was called to order on Monday,
September 17, 2018 at 5:01 p.m. in the Council Hearing Room, located at 990 Palm Street, San
Luis Obispo, California, by Chair Root.
ROLL CALL
Present: Commissioners Richard Beller, Brian Rolph, Micah Smith, Angela Soll, Christie
Withers, and Chair Allen Root
Absent: Vice-Chair Amy Nemcik
Staff: Deputy Director Doug Davidson, Associate Planner Rachel Cohen, Associate Planner
Kyle Bell, and Recording Secretary Summer Aburashed. Other staff members
presented reports or responded to questions as indicated in the minutes.
PUBLIC COMMENT ON ITEMS NOT ON THE AGENDA
None
End of Public Comment--
PUBLIC HEARINGS
1. 1027 Nipomo Street. Review of a new 50-foot tall, five-story project that includes 3,392
square feet of commercial/retail space, 67 hotel rooms, and a 35-space subterranean valet
parking lot within the Downtown Historic District. Case #: ARCH-3216-2016, C-D-H
Zone; Creekside Lofts, L.P., applicant.
Associate Planner Rachel Cohen presented the staff report with the use of a PowerPoint
presentation and responded to Commissioner inquiries.
Applicant representatives, Scott Martin, Rob Rossi, and Damien Mavis provided a
presentation and responded to Commissioner inquiries.
Public Comments:
ATTACHMENT 2
Packet Page 25
Minutes – Architectural Review Commission Meeting of September 17, 2018 Page 2
James Papp
David Hannings
Steve Delmartini
Mark Johnson
Ursula Bishop
Pierre Rademaker
Steve Snyder
End of Public Comment--
ACTION: MOTION BY COMMISSIONER ROLPH, SECOND BY COMMISSIONER
SMITH, CARRIED 5-1-1 to continue with following direction:
1. Address the mass and scale of the side of the structure adjacent to the Creamery.
2. Provide additional step backs on the third and fourth floors, similar to how the building is
set back above the brick portion along Nipomo Street.
3. Reconsider including the arch/gateway sign. Is this feature necessary?
4. Review the materials proposed for the project and their compatibility.
5. Provide additional documentation verifying how the valet parking will work.
6. Work with the CHC and the ARC to refine design. Revisions to the project will require
CHC review before returning to the ARC.
7. Address the noise concerns regarding the balconies and windows that face the creek.
Eliminate balconies and include inoperable windows.
8. Internalize and/or diminish the visibility of the elevator tower.
9. Provide loading and unloading areas for the hotel.
10. Provide a visual analysis of the project within the block. Show views from all the streets
surrounding the project, especially from Nipomo Street and from Higuera Street over the
lower story structures.
11. Review the paseo and provide more information on how the paseo connects to the
Creamery entrance.
12. Reconsider the color of the dark colored cornice.
RECESS:
ATTACHMENT 2
Packet Page 26
THE HOTEL AT THE CREAMERYPROJECT STATISTICSPARKINGPROJECT DIRECTORYPROJECT DESCRIPTIONSHEET INDEXOWNER: CREEKSIDE LOFTS, L.P. P.O. BOX 12910 SAN LUIS OBISPO, CA 93401 CONTACT: DAMIEN MAVIS PHONE: (805) 781-3133 EMAIL: DMAVIS@COVELOP.NETARCHITECT: RRM DESIGN GROUP 3765 S.HIGUERA STREET, SUITE 102 SAN LUIS OBISPO, CA 93401 CONTACT: SCOTT MARTIN PHONE: (805) 543-1794 EMAIL: SAMARTIN@RRMDESIGN GROUPCIVIL ENGINEER: ABOVE GRADE ENGINEERING 1304 BROAD STREET SAN LUIS OBISPO, CA 93401 CONTACT: SCOTT STOKES PHONE: (805) 545-5115 EMAIL: SCOTT@ABOVEGRADEENGINEERING.COMLANDSCAPE: SUMMERS|MURPHY & PARTNERS, INC. 34197 PACIFIC COAST HWY, SUITE 200 DANA POINT, CA 92629 CONTACT: JIM BURROWS PHONE: (949) 443-1631 EMAIL: JBURROWS@SMPINC.NETSURVEYOR: MBS LAND SURVEYS, INC. 3563 SUELDO STREET, UNIT Q SAN LUIS OBISPO, CA 93401 CONTACT: MICHAEL B. STANTON PHONE: (805) 594-1960 EMAIL: MIKE@MBSLANDSURVEYS.COMTHE PROJECT CONSISTS OF A 4 STORY HOTEL AND RETAIL BUILDING. THE GROUND FLOOR WILLL INCLUDE RETAIL SPACE, RESTAURANT, AND HOTEL LOBBY ALONG WITH HOTEL ROOMS. ADDITIONAL HOTEL ROOMS WILL BE LOCATED IN THE MEZZANINE LEVEL AS WELL AS ON THE SECOND, THIRD, AND FOURTH FLOORS. THE STREET SIDE, AS WELL AS THE PASEO SIDE ARE ENHANCED WITH PEDESTRIAN FRIENDLY ENTRIES AND INVITING STOREFRONT SYSTEMS.PROJECT ADDRESS: 1027 NIPOMO STREET SAN LUIS OBISPO, CA 93401APN NUMBERS: 002-402-046 ZONING: C-DEXISTING USE: PARKING LOTPROPOSED USE: RETAIL/HOTEL/ RESTAURANT/PARKINGPROPOSED OCCUPANCY: M, R-1, A-2, S-2NET SITE AREA: 0.389 ACRES (16,940 SF) EXISTING GROSS SITE AREA 0.476 ACRES (20,731 SF) GROSS CREEK SITE AREA 0.087 ACRES (-3,791 SF)MAX. LOT COVERAGE: 100% (16,940 SF)PROPOSED COVERAGE.: 53% (8,974 SF)MAX. F.A.R: 3.0 (50,820 SF)(FOR BLDGS UP TO 50'-0" TALL ) PROPOSED F.A.R: 1.99 (33,671 SF/16,940 SF) LANDSCAPE AREA: 1,871 SFIMPERVIOUS SURFACE: 8,979 SFMAX HEIGHT ALLOWED: 50 FT. MAX. PROPOSED HEIGHT: 50 FT.CONSTRUCTION TYPE: TYPE IA (GARAGE, 1ST, MEZZANINE) TYPE VA (2ND, 3RD, AND 4TH LEVELS)AUTO PARKINGPARKING REQUIRED:GENERAL RETAIL (2000 SF OR LESS @ 1/300 SF)PROPOSED: 1,080 SF/500 = 2.5 PER C-D ZONING 2.16 SPACESRESTAURANT - GROSS SQUARE FOOTAGE(@ 1/350 GSF PER C-D ZONING) PROPOSED: 2,312 SF/350 = 6.61 6.61 SPACESHOTEL - (@1/ROOM + 1 (FOR RES. MANAGER): 65 UNITS/1= 65 (*.5) PER C-D ZONING 32.5 SPACESTOTAL REQUIRED FOR PROPOSED: 41.27 ROUNDS DOWN TO: 41 SPACES BICYCLE PARKING REDUCTION- (1 CAR SPACE REDUCTION PER 5 ADDITIONALBICYCLE PARKING SPACES UP TO A 10% REDUCTION): 10 SHORT TERM +10 LONG TERM SPACES= 4 CAR SPACE REDUCTION (4 SPACES)PARKING REQUIRED: (41 - 4) 37 SPACESPARKING PROVIDED: 36 SPACES PERSPECTIVE VIEW - East Corner of Building on Nipomo Street MOTORCYCLE PARKINGMOTORCYCLE PARKING REQUIRED: 2 SPACES(1/20 AUTOSPACES = 37/20)MOTORCYCLE PARKING PROVIDED: 2 SPACESBICYCLE PARKINGBICYCLE SPACES REQUIRED: 6 SPACES(C-D ZONE - 15% OF AUTO SPACES 37*0.15)SHORT TERM SPACES PROVIDED: 13 SPACES(MIN SHORT TERM SPACE - 50%)LONG TERM SPACES PROVIDED: 13 SPACES(MIN LONG TERM SPACE - 40%)TOTAL PROVIDED: 26 SPACESSITENIPO
M
O
ZONING MAPHIGUERAT1 TITLE SHEETA1 PROJECT CONTEXT IMAGESA2 PROJECTS IN THE WORKSA3 SITE AIR PHOTOA4 EXISTING SITE SURVEYA5 PROPOSED SITE PLANA6 FLOOR PLANSA7 UPPER FLOOR PLANSA8 ELEVATIONSA9 ELEVATIONSA10 ELEVATIONSA11 ELEVATIONSA12 HEIGHT AND SETBACK STUDYA13 SITE SECTIONSA14 COLOR & MATERIALSA15 ENTRY TO PASEOA16 PASEO PERSPECTIVEA17 PERSPECTIVE A18 PERSPECTIVE A19 AERIAL PHOTOA20 PASEO SIGN ELEVATION & DETAILA21 DETAIL VIGNETTESA22 DETAIL VIGNETTESA23 SHADING PLANA24 PROPOSED SIGNSC1 PRELIMINARY CIVIL GRADING & DRAINAGE PLANC2 PRELIMINARY UTILITY PLANL1 LANDSCAPE SITE PLANVICINITY MAPMarch 12, 2019#1160-01-CO17T1TITLE SHEETATTACHMENT 3Packet Page 27
March 12, 2019#1160-01-CO17A1THE HOTEL AT THE CREAMERYPROJECT CONTEXT IMAGESATTACHMENT 3Packet Page 28
March 12, 2019#1160-01-CO17A2THE HOTEL AT THE CREAMERYPROJECTS IN THE WORKSATTACHMENT 3Packet Page 29
PROPOSED PARKINGSTRUCTUREMONTEREY PLACECREAMERYSOUTHTOWNPROJECT SITEADJACENT RESIDENTIALMarch 12, 2019#1160-01-CO17A3THE HOTEL AT THE CREAMERYSITE AIR PHOTOATTACHMENT 3Packet Page 30
March 12, 2019#1160-01-CO17A4THE HOTEL AT THE CREAMERY0208040402010SCALE: 1'-0" = 40’-0" (12x18 sheet)SCALE: 1'-0" = 20’-0" (24X36 sheet)0EXISTING SITE SURVEYATTACHMENT 3Packet Page 31
CREAMERYBUILDING 2TAQUERIABUILDINGCIOPINOTBUILDINGEXISTING BUS STOP TO REMAIN ADDITONAL VALET LOADING AREAVALETFIRE RISER CLOSETCREAMERYBUILDING 3SAN LUIS OBISPO CREEKNIPOMO STREET2A131A13March 12, 2019#1160-01-CO17A5THE HOTEL AT THE CREAMERY0208040402010SCALE: 1'-0" = 40’-0" (12x18 sheet)SCALE: 1'-0" = 20’-0" (24X36 sheet)0PROPOSED SITE PLANPROPOSEDBUILDINGATTACHMENT 3Packet Page 32
$'$9$167$//$'$ 6)6725$*(6)(/(9$7250$&+,1(52206)(/0RWRUF\OH
67$1'$5'67$//:,//),767$1'$5'9(+,&/(6
5
0RWRUF\FOH
23(1725(7$,/%(/2:23(1725(67%$5%(/2:23(1725$03%(/2:23(172/2%%<%(/2:/$5*(68,7(+.
&251(568,7(6)75$6+6)5(67$85$176)+27(//2%%<6)5(7$,/$&&(6672&5((.+27(/5$03
6).,7&+(16)2)),&(%2+6):20(165(6752206)0(165(672206+2577(50%,.(3$5.,1*63$&(66)6725$*(6)&2/'/21*7(50%,.(63$&(6725$*(&/26(79(57,&$/<67$&.('\UG&RQWDLQHU\UG&RQWDLQHU&DUW&DUW&DUW&DUW&DUW&DUW
&251(568,7(FLOOR PLANSGROUND FLOOR PLAN3/32" = 1'-0" (24 X 36 SHEET)1BELOW GRADE PARKING GARAGE3/32" = 1'-0" (24 X 36 SHEET)0PARTIAL SECOND FLOOR PLAN - WITHIN STANDARD & HISTORIC STREET RETAIL & RESTAURANT PLATE HEIGHT3/32" = 1'-0" (24 X 36 SHEET)1.5March 12, 2019#1160-01-CO17A6THE HOTEL AT THE CREAMERYSCALE: 3/64” = 1’-0" (12X18 sheet)SCALE: 3/32” = 1’-0" (24X36 sheet)00 1286432166432ATTACHMENT 3Packet Page 33
&251(568,7(
/$5*(68,7(
/$5*(68,7(&251(568,7(
'(&.'(&./$5*(68,7(35,9$7('(&./$5*(68,7('(&.'(&.(1'68,7(&251(568,7((1'68,7(
UPPER FLOOR PLANSSECOND FLOOR PLAN - CORRESPONDING WITH STREET FRONTAGE PLATE HEIGHTS FOR CLARITY3/32" = 1'-0" (24 X 36 SHEET)2THIRD FLOOR PLAN - CORRESPONDING WITH STREET FRONTAGE PLATE HEIGHTS FOR CLARITY3/32" = 1'-0" (24 X 36 SHEET)3FOURTH FLOOR PLAN - CORRESPONDING WITH STREET FRONTAGE PLATE HEIGHTS FOR CLARITY3/32" = 1'-0" (24 X 36 SHEET)4March 12, 2019#1160-01-CO17A7THE HOTEL AT THE CREAMERY00SCALE: 3/64” = 1’-0" (12X18 sheet)SCALE: 3/32” = 1’-0" (24X36 sheet)1286432166432ATTACHMENT 3Packet Page 34
CIOPINOT193' FF212 FF232 FFGROUND LEVELSECOND FLOORFOURTH FLOORMAX HEIGHTAVG. NATURAL GRADE = 192.1'222 FFTHIRD FLOOR181' FFPARKING GARAGE202 FFMEZZANINE242.1' FFMAX ALLOWABLE HEIGHT 50' +10' = 60'-0"= 252.1'ELEV. PENTHOUSE & MECH. SCREENEAST ELEVATION REVISED1/8" = 1'-0" (24 x 36 SHEET)1EAST ELEVATION INITIAL SUBMITTAL1/8" = 1'-0" (24 x 36 SHEET)2CIOPINOT193' FF212 FF232 FFGROUND LEVELSECOND FLOORFOURTH FLOORMAX HEIGHTAVG. NATURAL GRADE = 192.1'222 FFTHIRD FLOOR181' FFPARKING GARAGE202 FFMEZZANINE242.1' FFMAX ALLOWABLE HEIGHT 50' +10' = 60'-0"= 252.1'ELEV. PENTHOUSE & MECH. SCREENHEIGHT CALC:LOW POINT OF SITE: 191'HIGH POINT OF SITE: 193.2' AVG. NATURAL GRADE: (191' + 193') / 2 = 192.1'MAX HEIGHT= 50'-0"192.1' + (50)' = 242.1'REMOVED PORTION OF TOWERREMOVED MASS AT STREETPUSH BACKED UPPER FLOOR STORIESMarch 12, 2019#1160-01-CO17A8THE HOTEL AT THE CREAMERYSCALE: 1/16” = 1’-0" (12X18 sheet)00841683216SCALE: 1/8” = 1’-0" (24X36 sheet)ELEVATIONSATTACHMENT 3Packet Page 35
SOUTH ELEVATION1/8" = 1'-0" (24 x 36 SHEET)2GOSHI193' FF212 FF232 FFGROUND LEVELSECOND FLOORFOURTH FLOORMAX HEIGHTAVG. NATURAL GRADE = 192.1'222 FFTHIRD FLOOR181' FFPARKING GARAGE202 FFMEZZANINE242.1' FFMAX ALLOWABLE HEIGHT 50' +10' = 60'-0"= 252.1'ELEV. PENTHOUSE & MECH. SCREENSOUTH ELEVATION REVISED1/8" = 1'-0" (24 x 36 SHEET)2HEIGHT CALC:LOW POINT OF SITE: 191'HIGH POINT OF SITE: 193.2' AVG. NATURAL GRADE: (191' + 193') / 2 = 192.1'MAX HEIGHT= 50'-0"192.1' + (50)' = 242.1'GOSHI193' FF212 FF232 FFGROUND LEVELSECOND FLOORFOURTH FLOORMAX HEIGHTAVG. NATURAL GRADE = 192.1'222 FFTHIRD FLOOR181' FFPARKING GARAGE202 FFMEZZANINE242.1' FFMAX ALLOWABLE HEIGHT 50' +10' = 60'-0"= 252.1'ELEV. PENTHOUSE & MECH. SCREENREDUCTION OF MASS AT BUILDING FACEELIMINIATION OF MASSSOUTH ELEVATION INITIAL SUBMITTALELIMINATION OF MASSPUSHED TOWER INTO BUILDING MASSMarch 12, 2019#1160-01-CO17A9THE HOTEL AT THE CREAMERYSCALE: 1/16” = 1’-0" (12X18 sheet)00841683216SCALE: 1/8” = 1’-0" (24X36 sheet)ELEVATIONSATTACHMENT 3Packet Page 36
WEST ELEVATION191' FFLOWER GROUND LEVEL193' FF212 FF232 FFGROUND LEVELSECOND FLOORFOURTH FLOORMAX HEIGHTAVG. NATURAL GRADE = 192.1'222 FFTHIRD FLOOR181' FFPARKING GARAGE202 FFMEZZANINE242.1' FFMAX ALLOWABLE HEIGHT 50' +10' = 60'-0"= 252.1'ELEV. PENTHOUSE & MECH. SCREENWEST ELEVATION REVISED1/8" = 1'-0" (24 x 36 SHEET)1WEST ELEVATION INITIAL SUBMITTAL1/8" = 1'-0" (24 x 36 SHEET)2HEIGHT CALC:LOW POINT OF SITE: 191'HIGH POINT OF SITE: 193.2' AVG. NATURAL GRADE: (191' + 193') / 2 = 192.1'MAX HEIGHT= 50'-0"192.1' + (50)' = 242.1'191' FFLOWER GROUND LEVEL193' FF212 FF232 FFGROUND LEVELSECOND FLOORFOURTH FLOORMAX HEIGHTAVG. NATURAL GRADE = 192.1'222 FFTHIRD FLOOR181' FFPARKING GARAGE202 FFMEZZANINE242.1' FFMAX ALLOWABLE HEIGHT 50' +10' = 60'-0"= 252.1'ELEV. PENTHOUSE & MECH. SCREENUPPER FLOORS PUSHED BACKREMOVED TOWER ELEMENT MASSMarch 12, 2019#1160-01-CO17A10THE HOTEL AT THE CREAMERYSCALE: 1/16” = 1’-0" (12X18 sheet)00841683216SCALE: 1/8” = 1’-0" (24X36 sheet)ELEVATIONSATTACHMENT 3Packet Page 37
NORTH ELEVATION1/8" = 1'-0" (24 x 36 SHEET)2193.2' FFGROUND LEVEL193' FF212 FF232 FFGROUND LEVELSECOND FLOORFOURTH FLOORMAX HEIGHTAVG. NATURAL GRADE = 192.1'222 FFTHIRD FLOOR181' FFPARKING GARAGE202 FFMEZZANINE242.1' FFNORTH ELEVATION REVISED1/8" = 1'-0" (24 x 36 SHEET)2NORTH ELEVATION INITIAL SUBMITTAL1/8" = 1'-0" (24 x 36 SHEET)2HEIGHT CALC:LOW POINT OF SITE: 191'HIGH POINT OF SITE: 193.2' AVG. NATURAL GRADE: (191' + 193') / 2 = 192.1'MAX HEIGHT= 50'-0"192.1' + (50)' = 242.1'193.2' FFGROUND LEVEL193' FF212 FF232 FFGROUND LEVELSECOND FLOORFOURTH FLOORMAX HEIGHTAVG. NATURAL GRADE = 192.1'222 FFTHIRD FLOOR181' FFPARKING GARAGE202 FFMEZZANINE242.1' FFMAX ALLOWABLE HEIGHT 50' +10' = 60'-0"= 252.1'ELEV. PENTHOUSE & MECH. SCREENINITIAL SUBMITTAL BUILDING AT PASEO OUTLINEHEIGHT REDUCTION & STEPBACK AREAINTERNALIZED STAIR TOWERELIMINATED BUILDING MASSMarch 12, 2019#1160-01-CO17A11THE HOTEL AT THE CREAMERYSCALE: 1/16” = 1’-0" (12X18 sheet)00841683216SCALE: 1/8” = 1’-0" (24X36 sheet)ELEVATIONSATTACHMENT 3Packet Page 38
31’-2”41’-6”32’-6”43’-6”ARC/CHC PRESENTATIONDEC.STUDY18’-0”6’-0”5’-0”12’-0”DEC. STUDY w/ RAILS31’-2”41’-6”SOUTH (PASEO) ELEVATION STUDYN.T.S.1EAST (NIPOMO STREET) ELEVATION STUDYN.T.S.2(INITIAL SUBMITTAL)March 12, 2019#1160-01-CO17A12THE HOTEL AT THE CREAMERYHEIGHT AND SETBACK STUDYATTACHMENT 3Packet Page 39
INITIAL SUBMITTAL BUILDING OUTLINEINITIAL SUBMITTAL BUILDING OUTLINESCALE: 1/16” = 1’-0" (24X36 sheet)0816 32NIPOMO SECTION 1/8" = 1'-0" (24 x 36 SHEET)1PASEO SECTION 1/8" = 1'-0" (24 x 36 SHEET)2RETAILRESTAURANTHOTEL HOTELHOTEL HOTELHOTEL HOTELPARKINGPARKINGGOSHICIOPINOTPLPLPLPLPLPLPLPLNIPOMO ST.RESTAURANTPARKINGHOTELLOBBYRESTROOMSMEZZANINEHOTELHOTELHOTELHOTELPASEOHOTELHOTELHOTEL HOTELHOTELHOTELHOTELHOTELHOTELHOTELHOTEL HOTELHOTEL HOTELHOTEL HOTEL HOTEL193' FF212 FF232 FFGROUND LEVELSECOND FLOORFOURTH FLOORMAX HEIGHTAVG. NATURAL GRADE = 192.1'222 FFTHIRD FLOOR181' FFPARKING GARAGE202 FFMEZZANINE242.1' FFMAX ALLOWABLE HEIGHT 50' +10' = 60'-0"= 252.1'ELEV. PENTHOUSE & MECH. SCREEN191' FFLOWER GROUND LEVELCREEK SETBACKHOTELHOTEL193' FF212 FF232 FFGROUND LEVELSECOND FLOORFOURTH FLOORMAX HEIGHTAVG. NATURAL GRADE = 192.1'222 FFTHIRD FLOOR181' FFPARKING GARAGE202 FFMEZZANINE242.1' FFMAX ALLOWABLE HEIGHT 50' +10' = 60'-0"= 252.1'ELEV. PENTHOUSE & MECH. SCREENMarch 12, 2019#1160-01-CO17A13THE HOTEL AT THE CREAMERYSITE SECTIONSATTACHMENT 3Packet Page 40
DFDFPAINTED SMOOTH STUCCOPAINTED FIBER CEMENT SIDINGSW 7757 HIGH REFLECTIVE WHITEPAINTED SMOOTH STUCCOSW 7071 GRAY SCREENPAINTED PRECAST CORNICESW 7066 GRAY MATTERSTHIN BRICK VENEERGENERAL SHALE FORT PORTSMOUTHUPPER WINDOWSMILGARD CLEAR ANODIZEDPRECAST COLUMN BASE FACECDI GP30 PEBBLEPRECAST SURROUNDCDI WI10 LIMESTONEMETAL CANOPYBRONZE COLOR FINISHANODIZED STOREFRONTBRONZEMETAL PANELINGBRONZE COLOR FINISHPAINTED PRE-CAST CORNICE SW 7063 NEBULOUS WHITEUPPER WINDOWSMILGARD GRAY ALUMINUMANODIZED STOREFRONTBLACKMETAL CANOPYDARK STEEL FINISHPAINTED FIBER CEMENTSW 9162 AFRICAN GRAYAABCEEHNDJPAINTED FIBER CEMENT TRIMSW 7076 CYBERSPACEBGKKMLFPIIIFOCEDFHJIGLKMOPNMarch 12, 2019#1160-01-CO17A14THE HOTEL AT THE CREAMERYCOLOR & MATERIALSATTACHMENT 3Packet Page 41
March 12, 2019#1160-01-CO17A15THE HOTEL AT THE CREAMERYENTRY TO PASEOATTACHMENT 3Packet Page 42
March 12, 2019#1160-01-CO17A16THE HOTEL AT THE CREAMERYPASEO PERSPECTIVEATTACHMENT 3Packet Page 43
March 12, 2019#1160-01-CO17A17THE HOTEL AT THE CREAMERYPERSPECTIVE AT CORNER OF MONTEREY & NIPOMOATTACHMENT 3Packet Page 44
March 12, 2019#1160-01-CO17A18THE HOTEL AT THE CREAMERYPERSPECTIVE FROM NIPOMO STREETATTACHMENT 3Packet Page 45
PROPOSED PARKINGSTRUCTUREMONTEREY PLACECREAMERYPROPOSEDSAN LUIS SQUARESOUTHTOWNMarch 12, 2019#1160-01-CO17A19THE HOTEL AT THE CREAMERYAERIAL PHOTOATTACHMENT 3Packet Page 46
SIGN ELEVATION1/2" = 1'-0" (24 x 36 SHEET)1metal silhouette roosters metal silhouette of dairy cow with calfmetal place titlemetal industrial feature trussdecorative metal bracket connectionsPLONSDLOOLJKWÀ[WXUHV20' - 0"6' - 8"March 12, 2019#1160-01-CO17A20THE HOTEL AT THE CREAMERY0842SCALE: 1/4” = 1’-0" (12X18 sheet)SCALE: 1/2” = 1’-0" (24X36 sheet)PASEO SIGN ELEVATION & DETAIL0421ATTACHMENT 3Packet Page 47
NIPOMO STREET AND PASEO BUILDING CORNER ARTICULATION DETAILPARAPET AND CORNICE DETAIL IIPARAPET AND CORNICE DETAIL Imetal sign/public artprecast concrete cornicewall sconceVPRRWKSODVWHUÀQLVKprecast concrete parapetÀEHUFHPHQWSDQHODUWLFXODWLRQwith metal accent panels PLONSDLOOLJKWÀ[WXUHVbronze metal awningbrick detailingJRRVHQHFNZDOOOLJKWÀ[WXUHprecast concrete parapet capbronze metal guardrailwindow surroundsprecast concrete corniceprecast concrete corniceprecast concrete cornice with decorative dentilstransom windowsoldier course above windowbrick detailingdecorative metal bracket blade signprecast concrete bandZDOOVFRQFHJRRVHQHFNVLJQOLJKWÀ[WXUHVconcrete surroundsconcrete bulkheadMarch 12, 2019#1160-01-CO17A21THE HOTEL AT THE CREAMERYDETAIL VIGNETTESATTACHMENT 3Packet Page 48
GREEN WALL DETAIL HOTEL LOBBY AWNING DETAIL "TOWER" DETAIL decroative metal panelingilluminated hotel entry canopyGHFRUDWLYHPHWDOVRIÀWJRRVHQHFNZDOOOLJKWÀ[WXUHVvalet parking garage entranceaccent trellisbronze metal panel accent wallguest patio wallgreen wallaccent metal railingfeature decorative windowsbronze metal guardrailsmetal sign bracketilluminated hotel signageMarch 12, 2019#1160-01-CO17A22THE HOTEL AT THE CREAMERYDETAIL VIGNETTESATTACHMENT 3Packet Page 49
March 12, 2019#1160-01-CO17A23THE HOTEL AT THE CREAMERYSHADING PLANat Noon on Dec 21stATTACHMENT 3Packet Page 50
hotel sign 2 (6'x3' = 18sfretail sign 4 (15'x3' = 45sf)hotel sign 1 (6'x3' = 18sf)restaurant sign 1 (16'x2' = 32sf)public art sign 1 (12'x6' = 72sf)retail sign 3 (10'x3' = 30sf)retail sign 2 (10'x3' = 30sf)retail sign 1 (10'x3' = 30sf)restaurant sign 2 (16x2' = 32sf)hotel sign 3 (7'x4' = 28sf)restaurant sign 3 (16x2' = 32sf)RETAILMarch 12, 2019#1160-01-CO17A24THE HOTEL AT THE CREAMERYProposed Sign StatisticsTenant 1 (HOTEL)Raised Channel Signs 2 = 36 S.F.Wall Blade Signs 1 = 28 S.F. Cumulative Area of Sign: 64 S.F. < 200 S.F.Tenant 2 (RESTAURANT)Raised Channel Signs 3 = 96 S.F.Cumulative Area of Sign: 96 S.F. < 200 S.F.Tenant 3 (RETAILRaised Channel Signs 3 = 90 S.F.Wall Signs 1 = 45 S.F.Cumulative Area of Sign: 135 S.F. < 200 S.F.PUBLIC ART SIGN (See Sheet A20)Cumulative Area of 1 Sign: 133 S.F. < no req. min.PROPOSED SIGNSATTACHMENT 3Packet Page 51
(E)FF=190.40(E)FF=190.35NIPOMOSTREET(193.2 FS)MATCH (E)193.0 FS(192.9 FS)MATCH (E)190.30 FS190.30FS190.10TGFF=193.0SAN LUIS OBISPO CREEK(E) BUILDING(NOT A PART)2%MAX(191.00 FS)(E) DOOR(E) FF=191.02%MAX 5%MAX(193.0 FS)MATCH (E)190.50 TG190.20TG(190.80 FS)MATCH (E)(192.00 FS)(E) PATIO192.90FS190.10 FS(190.94 FS)(E) PATIO190.00 TW(189.7 ES)2%MAX2%MAX(190.25 TG)EXIST. DIFF=193.0192.80 TC192.30 FL193.0 FS190.30 FS(190.35 FS)MATCH (E)2%MAX191.0FS193.0FS193.00 TW192.8 FS190.10 TG192.85TG190.30 FS193.0 FS192.85TG192.75 TG193.0 FS192.75FS193.0 FS192.85TG190.40 FS190.10FS2%
MAX193.00 TW193.00 FS193.0 FS193.0 FS192.80 TC192.20 FL192.9 FS192.80 TC192.25 FL2%MAX8%MAX192.72FS(190.82 FS)MATCH (E)190.80 FS191.80FS191.76FS190.76FS192.80FS192.80FS190.80 FS 5%MAX(189.53 ES)MATCH (E)189.50TG(190.35 FS)MATCH (E)190.55 FS5%MAX 190.40 FS2%MAX2%
MAX
190.70 FS192.90 FS2%
MAX5%MAX192.75TG2%MAX190.25 FLSTORM DRAININLET W/ SUMP(E) BUILDINGMATCH (E) BACKOF SIDEWALK (TYP)(E) 8" STORMDRAIN PIPETO CREEK(N) HOTEL BUILDINGMATCH (E) BACKOF SIDEWALK (TYP)(E) BUILDINGREMOVE & REPLACE CURB,GUTTER & SIDEWALKTREE WELL &TREATMENTBASIN (TYP)RETAININGWALL (TYP)LANDSCAPEAREA (TYP)PAVERS (TYP)PAVERS (TYP)NEW TRASH RAMP(E) CREEKFLOWLINETREE WELL &TREATMENTBASIN (TYP)TREATMENTBASIN (TYP)NEW DRIVEWAY RAMPPROTECT (E)TREES (TYP)BUILDING SETBACKDRAIN INLET W/ATRIUM GRATETREATMENTBASIN (TYP)PRELIMINARY GRADING PLANC-1( IN FEET )1 INCH = FT.5101010200March 12, 2019#1160-01-CO17THE HOTEL AT THE CREAMERY00C18040201020 40SCALE: 1'-0" = 40’-0" (12x18 sheet)SCALE: 1'-0" = 20’-0" (24X36 sheet)PRELIMINARY CIVIL GRADING & DRAINAGE PLANATTACHMENT 3Packet Page 52
(E)FF=190.5(E)FF=190.40(E)FF=190.35NIPOMOSTREETSAN LUIS OBISPO CREEK(E) BUILDING(NOT A PART)(E) FF=191.0STORM DRAINBASIN W/ SUMPNEW 4" FIRE WATERSERVICE LINECONNECT TOEXISTING 8" STORMDRAIN PIPE(N) HOTEL BUILDINGPROTECT EXISTINGWATER SERVICE(E) BUILDINGSTORM 8" DRAINPIPE (TYP)NEW 4" SEWER LATERALNEW 2" 'DOMESTIC'WATER METER &SERVICE LATERALRAINWATERTREATMENTBASIN (TYP)TREE WELL &TREATMENTBASIN (TYP)(E) BUILDING(NOT A PART)(E) BUILDING(NOT A PART)NEW 8" STORMDRAIN PIPE(E) SEWER LINE(E) WATER LINEPROTECT(E) GAS LINENEW GAS LINE(E) GAS LINEPROTECT EXISTINGCATCH BASINPROTECT EXISTINGCATCH BASIN(E) CREEKFLOWLINEEXISTING DRAIN INLETNEW 1" 'COMMERCIAL'WATER METER &SERVICE LATERALRAINWATERTREATMENTBASINFIRE RISERROOMTREE WELL &TREATMENTBASIN (TYP)BUILDING SETBACKDRAIN INLET W/ATRIUM GRATETREE WELL &TREATMENTBASIN (TYP)REMOVE EXISTING TRENCH DRAINSTORM DRAINCLEANOUTSTORM DRAINCLEANOUTNEW 8" STORMDRAIN PIPECONNECTTO EXISTINGSTORM DRAINPROTECT EXISTINGTRENCH DRAINPRELIMINARY UTILITY PLANC-2UTILITY PLAN GENERAL NOTES:1. EXISTING SEWER MAIN IN NIPOMO STREET IS A 30-INCH MAIN AND MAY BE 20 FEET DEEP. A DOUBLE BARRELED 12" SEWERSIPHON IS PRESENT UPSTREAM OF THE SITE UNDER THE CREEK.2. PRIVATELY OWNED SUB-METERS MAY BE PROVIDE FOR RESIDENTIAL PORTION OF THE PROJECT UPON APPROVAL OF THEUTILITIES DIRECTOR OR HER/HIS DEIGNEE. THE CCR'S FOR THE PROPERTY ASSCOIATION SHALL REQUIRE THAT THESUB-METERS BE READ BY THE ASSOCIATION AND EACH CONDOMINIUM BILLED ACCORDING TO WATER USE.3. FIRE SPRINKLER SYSTEMS MAY ONLY BE DESIGNED BY A REGISTERED PROFESSIONAL ENGINEER.( IN FEET )1 INCH = FT.5101010200BACKFLOW DEVICE LOCATIONFIRE DEPARTMENT CONNECTIONSMarch 12, 2019#1160-01-CO17THE HOTEL AT THE CREAMERY00C28040201020 40SCALE: 1'-0" = 40’-0" (12x18 sheet)SCALE: 1'-0" = 20’-0" (24X36 sheet)PRELIMINARY UTILITY PLANATTACHMENT 3Packet Page 53
March 12, 2019#1160-01-CO17THE HOTEL AT THE CREAMERY0SCALE: 1”-0" = 20’-0" (24X36 sheet)SCALE: 1'-0" = 40’-0" (12x18 sheet)L18040204020100LANDSCAPE SITE PLANATTACHMENT 3Packet Page 54
THE HOTEL AT THE CREAMERY659 HIGUERA STREET MASSING ANALYSISEXISTINGPROPOSED WITH TREES FADEDPROPOSED MASSINGATTACHMENT 3Packet Page 55
THE HOTEL AT THE CREAMERYNIPOMO/HIGUERA INTERSECTION MASSING ANALYSISEXISTINGPROPOSED WITH TREES FADEDPROPOSED MASSINGATTACHMENT 3Packet Page 56
THE HOTEL AT THE CREAMERY569 HIGUERA MASSING ANALYSISEXISTINGPROPOSED WITH TREES FADEDPROPOSED MASSINGATTACHMENT 3Packet Page 57
THE HOTEL AT THE CREAMERY553A HIGUERA MASSING ANALYSISEXISTINGPROPOSED MASSINGATTACHMENT 3Packet Page 58
THE HOTEL AT THE CREAMERY581 DANA STREET MASSING ANALYSISEXISTINGPROPOSED WITH TREES FADEDPROPOSED MASSINGATTACHMENT 3Packet Page 59
THE HOTEL AT THE CREAMERYEXISTINGPROPOSED WITH TREES FADED549 DANA STREET MASSING ANALYSISPROPOSED MASSINGATTACHMENT 3Packet Page 60
THE HOTEL AT THE CREAMERYNORTH OF DANA/NIPOMO INTERSECTION MASSING ANALYSISEXISTINGPROPOSED WITH TREES FADEDPROPOSED MASSINGATTACHMENT 3Packet Page 61
Valet Parking AnalysisPismo Parking Standards:2. Special parking provisions: such as tandem valet parking, for major hotels and motels may be considered by the plan-ning commission with conditional use permit, provided sufficient guarantees for enforcement are made to ensure that (i) the valet system will continue to operate with the use; (ii) the valet activity is in a controlled area and (iii) the total num-ber of spaces required with the development will be accommodated at all times.8383$%&'()*+,,-
6)0$,176)/$81'5<6)(/(&75,&$/6)0(&+6)67$))/281*(6)%2,/(538036)06):6)3$5.,1*%%%&6)7(/'$7$6)(/(9$725/2%%<
-.
&203$&7
&203$&7
$,6/(
7<3,&$/3$5.,1*:,'7+6
$,6/(
)8//6,=(
7<3,&$/3$5.,1*:,'7+6
)8//6,=(
$,6/(
)8//6,=(
&203$&7
$,6/(
)8//6,=(
)8//6,=(
&203$&7
7<37<3
7<37<3
*(1(5$/127(6.(<('127(63$5.,1*&2817)8//6,=(63$&(667$1'$5'7$1'(0$,6/(68%727$/&203$&763$&(667$1'$5'7$1'(0$,6/(68%727$/81'(5*281'727$/685)$&(727$/727$/3$5.,1*5(48,5('3(581,73(581,763(56)2)',1,1*0((7,1* 6),1352-(&73(56)2)5(7$,/6),1352-(&7727$/5(48,5('Basement Level PlanThe Inn @ The Pier14 May 201416
3523(57</,1(/2&$7,21
5,*+72):$<'(',&$7,21 6(59,&()5(,*+7(/(9$725'5,9(:$<5$03 7$1'(067$//9$/(73$5.,1*$5($ 9$/(7$,6/(3$5.,1*63$&(6)8//6,=( 9$/(7$,6/(3$5.,1*63$&(6&203$&7,6)0$,176)(/(&75,&$/6)38036)3$5.,1*
&203$&7
&203$&7
$,6/(
3$&7$,6/(
)8//6,=(
)8//6,=(
&203$&7
ATTACHMENT 3Packet Page 62
74' - 10"1 2
3
45
6 78
9 10 11
12 13 14
15 16 17 18
19
20
21
22 23 24 25 26
27 28 29 30 31
3233
34
333 SF
STORAGE
127 SF
ELEVATOR
MACHINE
ROOM
95 SF
EL
1 M
13 MOTORCYCLE PARKING 4'X8' SPACES
PROVIDED. DESIGNATED BY "#M"
2 M 3 M
4 M
5 M
6 M
7 M
8 M
18 M
10 M9' - 0"STANDARD STALL
18' - 0"
R
2
0'-
0"
35
11 M
12 M
9 M
13 M
OPEN TO RETAIL
BELOW
OPEN TO REST/BAR
BELOW
OPEN TO
RAMP
BELOW
OPEN TO
LOBBY
BELOW
LARGE
SUITE
HK
HK
169 SFTRASH 1400 SFRESTAURANT 3798 SFHOTELLOBBY1080 SFRETAIL ACCESS TO CREEKHOTEL RAMP147' - 0"73' - 0"29' - 6"489 SFKITCHEN 162 SFOFFICE/BOH 145 SFWOMENSRESTROOM144 SFMENSRESTOOM13 SHORT TERM BIKE PARKING SPACES82 SFSTORAGE87 SFCOLD 13 LONG TERM BIKE SPACE STORAGE CLOSET (4 VERTICALY STACKED)
FLOOR PLANS
GROUND FLOOR PLAN
3/32" = 1'-0" (24 X 36 SHEET)1
BELOW GRADE PARKING GARAGE
3/32" = 1'-0" (24 X 36 SHEET)0 MEZZANINE FLOOR PLAN
3/32" = 1'-0" (24 X 36 SHEET)1.5
March 8, 2018
#1160-01-CO17 A6THE HOTEL AT THE CREAMERY
SCALE: 3/64” = 1’-0" (12X18 sheet)
SCALE: 3/32” = 1’-0" (24X36 sheet)
320816
74' - 10"1 2
3
45
6 78
9 10 11
12 13 14
15 16 17 18
19
20
21
22 23 24 25 26
27 28 29 30 31
3233
34
333 SF
STORAGE
127 SF
ELEVATOR
MACHINE
ROOM
95 SF
EL
1 M
13 MOTORCYCLE PARKING 4'X8' SPACES
PROVIDED. DESIGNATED BY "#M"
2 M 3 M
4 M
5 M
6 M
7 M
8 M
18 M
10 M9' - 0"STANDARD STALL
18' - 0"
R
2
0'-
0"
35
11 M
12 M
9 M
13 M
OPEN TO RETAIL
BELOW
OPEN TO REST/BAR
BELOW
OPEN TO
RAMP
BELOW
OPEN TO
LOBBY
BELOW
LARGE
SUITE
HK
HK
169 SF
TRASH
1400 SF
RESTAURANT
3798 SF
HOTEL
LOBBY
1080 SF
RETAIL ACCESS TO CREEKHOTEL
RAMP
147' - 0"73' - 0"29' - 6"489 SF
KITCHEN
162 SF
OFFICE/BOH
145 SF
WOMENS
RESTROOM
144 SF
MENS
RESTOOM
13 SHORT TERM BIKE
PARKING SPACES
82 SF
STORAGE
87 SF
COLD
13 LONG TERM BIKE SPACE STORAGE CLOSET
(4 VERTICALY STACKED)
FLOOR PLANS
GROUND FLOOR PLAN
3/32" = 1'-0" (24 X 36 SHEET)1
BELOW GRADE PARKING GARAGE
3/32" = 1'-0" (24 X 36 SHEET)0 MEZZANINE FLOOR PLAN
3/32" = 1'-0" (24 X 36 SHEET)1.5
March 8, 2018
#1160-01-CO17 A6THE HOTEL AT THE CREAMERY
SCALE: 3/64” = 1’-0" (12X18 sheet)
SCALE: 3/32” = 1’-0" (24X36 sheet)
320816
CAR A
open
open open open openopen
open
open
CAR A
16
16
17
17
14
14
18
18
19
19
20
20
ATTACHMENT 3
Packet Page 63
74' - 10"1 2
3
45
6 78
9 10 11
12 13 14
15 16 17 18
19
20
21
22 23 24 25 26
27 28 29 30 31
3233
34
333 SF
STORAGE
127 SF
ELEVATOR
MACHINE
ROOM
95 SF
EL
1 M
13 MOTORCYCLE PARKING 4'X8' SPACES
PROVIDED. DESIGNATED BY "#M"
2 M 3 M
4 M
5 M
6 M
7 M
8 M
18 M
10 M9' - 0"STANDARD STALL
18' - 0"
R
2
0'-
0"
35
11 M
12 M
9 M
13 M
OPEN TO RETAIL
BELOW
OPEN TO REST/BAR
BELOW
OPEN TO
RAMP
BELOW
OPEN TO
LOBBY
BELOW
LARGE
SUITE
HK
HK
169 SFTRASH 1400 SFRESTAURANT 3798 SFHOTELLOBBY1080 SFRETAIL ACCESS TO CREEKHOTEL RAMP147' - 0"73' - 0"29' - 6"489 SFKITCHEN 162 SFOFFICE/BOH 145 SFWOMENSRESTROOM144 SFMENSRESTOOM13 SHORT TERM BIKE PARKING SPACES82 SFSTORAGE87 SFCOLD 13 LONG TERM BIKE SPACE STORAGE CLOSET (4 VERTICALY STACKED)
FLOOR PLANS
GROUND FLOOR PLAN
3/32" = 1'-0" (24 X 36 SHEET)1
BELOW GRADE PARKING GARAGE
3/32" = 1'-0" (24 X 36 SHEET)0 MEZZANINE FLOOR PLAN
3/32" = 1'-0" (24 X 36 SHEET)1.5
March 8, 2018
#1160-01-CO17 A6THE HOTEL AT THE CREAMERY
SCALE: 3/64” = 1’-0" (12X18 sheet)
SCALE: 3/32” = 1’-0" (24X36 sheet)
320816
74' - 10"1 2
3
45
6 78
9 10 11
12 13 14
15 16 17 18
19
20
21
22 23 24 25 26
27 28 29 30 31
3233
34
333 SF
STORAGE
127 SF
ELEVATOR
MACHINE
ROOM
95 SF
EL
1 M
13 MOTORCYCLE PARKING 4'X8' SPACES
PROVIDED. DESIGNATED BY "#M"
2 M 3 M
4 M
5 M
6 M
7 M
8 M
18 M
10 M9' - 0"STANDARD STALL
18' - 0"
R
2
0'-
0"
35
11 M
12 M
9 M
13 M
OPEN TO RETAIL
BELOW
OPEN TO REST/BAR
BELOW
OPEN TO
RAMP
BELOW
OPEN TO
LOBBY
BELOW
LARGE
SUITE
HK
HK
169 SF
TRASH
1400 SF
RESTAURANT
3798 SF
HOTEL
LOBBY
1080 SF
RETAIL ACCESS TO CREEKHOTEL
RAMP
147' - 0"73' - 0"29' - 6"489 SF
KITCHEN
162 SF
OFFICE/BOH
145 SF
WOMENS
RESTROOM
144 SF
MENS
RESTOOM
13 SHORT TERM BIKE
PARKING SPACES
82 SF
STORAGE
87 SF
COLD
13 LONG TERM BIKE SPACE STORAGE CLOSET
(4 VERTICALY STACKED)
FLOOR PLANS
GROUND FLOOR PLAN
3/32" = 1'-0" (24 X 36 SHEET)1
BELOW GRADE PARKING GARAGE
3/32" = 1'-0" (24 X 36 SHEET)0 MEZZANINE FLOOR PLAN
3/32" = 1'-0" (24 X 36 SHEET)1.5
March 8, 2018
#1160-01-CO17 A6THE HOTEL AT THE CREAMERY
SCALE: 3/64” = 1’-0" (12X18 sheet)
SCALE: 3/32” = 1’-0" (24X36 sheet)
320816CAR ACAR A
CAR A
16
16
17
17
14
14
18
18
19
19
20
20
open
open openopenATTACHMENT 3
Packet Page 64