HomeMy WebLinkAbout04-02-2019 Item 11 - Farmers Market Safety Bollard Project Department Name: Public Works Cost Center: 5010 For Agenda of: April 2, 2019 Placement: Consent Estimated Time: N/A FROM: Daryl Grigsby, Director of Public Works Prepared By: Jake Hudson, Interim Deputy Public Works Director Matt Crisp, Transportation Planner/Engineer III SUBJECT: FARMERS MARKET SAFETY BOLLARD PROJECT SPECIFICATION NO. 91673 RECOMMENDATION 1. Approve the devices and locations for the “Farmer’s Market Safety Bollard Project, Specification No. 91673,” and authorize staff to advertise for construction bids; and 2. Authorize the City Manager to award a contract if the total of the bid plus contingency is within the available project estimate of $850,000. DISCUSSION Background In the February 2018 Mid-Year Budget Review, a project was identified to improve security at the downtown Thursday Night Farmers Market, Mission Plaza, and other downtown special events. Ten locations were identified for increased protection at all the vehicular points of entry into the streets used for Thursday Night Farmers Market and to the entrance into Mission Plaza from Broad Street. After extensive research, staff determined that the most cost-effective solution is a shallow retractable barricade system, as shown in Figure 1 below. Other systems and options require foundations that would require extensive relocation of underground utilities and were cost prohibitive. Figure 1: Example Retractable Barricade Packet Pg. 91 Item 11 To determine the phasing, Staff reviewed locations with the Police and Fire Departments, and the leadership of Downtown Association, and decided the highest priority locations were on both ends of Higuera, both ends of Chorro, and the entrances to Mission Plaza from Broad and Monterey Streets. The remaining Farmers Market approaches, which include Broad, Garden, & Morro Street will be proposed as a second phase at a later time. Device locations are illustrated in Figure 2 below. Figure 2: Location Map * Future Locations As shown in the in Figure 2; the Safety Bollard project includes the following features: 1. Retractable barricades at locations A, B, C, & D 2. Removable, lockable bollards at location E 3. Additional improvements to facilitate installation at locations A and C: a. Location A i. Installing a bulb-out on the northeast corner of Higuera/Nipomo to protect one of the oldest and largest street trees in Downtown. ii. Replacing the substandard storm drain infrastructure at this location, includes two drainage inlets with drop basins to be connected with the trunk line under Nipomo Street. iii. Replacing an old wooden utility box which will be added to the City’s Public Art Program. b. Location C i. The San Luis Creek bridge deck is directly under the third lane on Higuera Street near Osos Street without enough cover to install a barricade in the roadway. For this single lane, an impact attenuator will be purchased and installed on an existing City truck used for Farmer’s Market. The attenuator will be placed on the truck and parked adjacent to the barricades. An example of this attenuator is shown below in Figure 3. Packet Pg. 92 Item 11 ii. An alternative solution was explored at this location, which included locating a retractable barricade further towards Morro Street to avoid conflicts with the bridge deck; however, this would result in the elimination of vendor booth spaces during the Farmers Market, therefore this option was not selected. Figure 3: Attenuator The barricades present an opportunity for public art installation similar to the City’s Utility Box art program. Once installed, Lindsey Stephenson, the City’s Parks and Recreation and Public Art Manager will seek proposals for public art for the barricades and begin the juried selection process. Policy Context The Downtown Security project is consistent with the General Plan Safety Element Policy 9.1: Emergency Preparedness and Response, City of San Luis Obispo Municipal Code Title 10 Vehicles & Traffic, and the City of San Luis Obispo Fire Department Strategic Plan Section 1.3.1 enhance safety and preparedness at Farmers’ Market. This project is also consistent with the National Transportation Safety Board findings and recommendations for safety in public venues and events such as the Downtown Farmers Market. Public Engagement Public Engagement for this project primarily took place during the 2017-19 Financial Plan Supplement process. Further engagement occurred with targeted groups such as the Downtown Association. CONCURRENCES Public Works Staff developed this plan in close coordination with the Fire, Police, Community Development, and Parks and Recreation Departments. The City also coordinated with the Downtown Association to find an effective product that worked for both emergency services and maintained the spirit of the Downtown. All of which provided concurrence on the proposed plan. Packet Pg. 93 Item 11 ENVIRONMENTAL REVIEW This project is located within one of the City’s archeologically sensitive sites and will follow the mitigation measures identified in the initial study performed by the City and the resulting negative declaration related to street excavation projects in sensitive areas. These measures include the presence of a historical archaeologist who will monitor the site during excavation and trenching. The initial study, which contains the specific mitigation measures, is included in the bid documents as well as Attachment C. FISCAL IMPACT Budgeted: Yes Budget Year: 2018-2019 (CON) Funding Identified: Yes Fiscal Analysis: As shown in the table below the Farmer’s Market Safety Bollard Project was approved during the adoption of the 2018-19 Financial Plan Supplement, as a capital improvement project under Infrastructure & Transportation. The Council budgeted $1,132,000 for FY 2017-19 and $4,000 has been spent to date on Survey & Design. The Proposed project is estimated at $850,000 leaving an anticipated balance of $278,000. Of that remaining $278,000; $107,000 is proposed for other anticipated costs such as fleet acquisition and on-going deployment costs leaving a total remaining balance of $171,000 that is proposed to be reserved for later phases of the project or contingency if construction bids are higher than anticipated. Funding FY 2017-19 2017-19 Budget $1,132,000 Total Funding: $1,132,000 Expenditures to Date FY 2017-19 Survey & Design ($4,000) Total Current Balance: $1,128,000 Proposed Project Costs FY 2017-19 Project Construction Estimate ($850,000) Total Balance After Proposed Project: $278,000 Other Anticipated Costs FY 2017-19 Fleet Acquisition ($75,000) On-Going Deployment Costs ($32,000) Total Remaining Balance for Next Phase / Contingency $171,000 Packet Pg. 94 Item 11 ALTERNATIVES 1. Deny authorization to advertise. The City Council may choose not to authorize the project advertisement. This is not recommended since the project has been identified as necessary to meet the National Transportation Safety Board’s findings. 2. Direct Staff to increase or reduce the number of locations to be installed with this phase. Staff does not recommend increasing the locations to be installed with this phase as plans have been developed and any additions would cause potentially extensive delays and can be completed in a future phase. Staff also does not recommend reducing the locations as they were strategically chosen to cover the major entrances into the Farmer’s Market. Attachments: a - Financial Plan Entry b - Plan set c - Archeologically sensitive area initial study Packet Pg. 95 Item 11 CAPITAL IMPROVEMENT PLAN - INFRASTRUCTURE & TRANSPORTATION Farmers Market Security Bollards - FY 2017-18 Project Description Community Priority New Project Major City Goal & Other Important Objectives Measure G Priority Purpose and Need There has been growing concern regarding farmers market security in the wake of incidents at public gatherings around the country and abroad that have resulted in serious injuries and deaths. In 2014 a motorist drove thru barricades at the Hawthorne Farmers Market in New Jersey striking and killing one pedestrian and injuring two others. Again in 2014 a motorist drove thru barricades at a music festival on Red River Street in Austin Texas striking and killing four pedestrians and injuring 21 others. In 2013 a motorist drove around barricades onto the Venice beach oceanfront walk striking and killing one pedestrian and injuring 11 others. In 2003 a motorist drove thru barricades at the Santa Monica Farmers Market striking and killing ten pedestrians and injuring 63 others. The Santa Monica Farmers Market incident was investigated by the National Transportation Safety Board (NTSB), which made findings rrier system might have arrested or ating or greatly reducing the number d several civil lawsuits totaling $21 million. As a result of the initial NTSB finding the City updated and upgraded our Farmer's Market traffic control to have better signage on all approaches as well as additional upgraded barricades on each street approach. Due to the recent increase in vehicle intrusions into crowded public events, staff is recommending that we upgrade protection for the approaches to the Farmer's Market event to improve barrier between attendees and vehicles. Staff is proposing to the City of Santa Monica by installing a combination of manual/removeable and automatic/retractable bollards across the two street entrances of the Mission Plaza and nine street entrances to the Farmers Market as shown in the figure to the right. Manual/removeable bollards have a lower installation cost than automatic/retractable bollards but require higher ongoing operational costs due to an additional vehicle to transport them, additional personnel to install and remove them, and longer setup times which will require earlier street closures and parking restrictions. Automatic/retractable bollards will be considered for the wider, higher volume approaches such as Chorro/Monterey and Higuera/Osos whereas the manual/removable bollards will be prioritized for other, narrower lower volume approaches such as Monterey/Broad and Garden/Higuera. The bollard type (manual or automatic) to be used at each location will be determined in consultation with the San Luis Obispo Police & Fire Departments as well as the Downtown Association. Staff also is recommending in placing high priority on implementaiton of this project due to the continued exposure of event participants and referring other, less critical projects until it is completed. Packet Pg. 96Item 11 CAPITAL IMPROVEMENT PLAN - INFRASTRUCTURE & TRANSPORTATION Augmentation & Reprioritization of ResourcesThis is an unanticipated new mid-budget cycle project therefore there is inadequate staff and resources to implement the project at this time. To address this resource shortfall staff is proposing several measures: 1. One-time augmentation of Transportation Temporary Staff Hours 2. Postponement of work of the Neighborhood Traffic Management (NTM) Program until June of 2019 3. On-going augmentation of Farmers Market Temporary Staff hours 4. Fleet Expansion of one Vehicle The augmentation of temporary Transportation Staff Hours and postponement of the Neighborhood Traffic Calming program will allow for project implementation to occur quickly and start construction for at least part of the work within the next 12 months. The augmentation of temporary Farmers Market Staff hours and addition of a truck to haul bollards will allow for ongoing operations and occur a little later in the implementation of the project. The primary program that will be affected by this new project is deferral of the Neighborhood Traffic Management (NTM) Capital Project (CIP) proposed as part of the 2017-19 Financial Plan. This work included focus in three neighborhoods; Chorro Street, High Street, & Buchon Street. Under this proposal work on the NTM CIP is to be postponed until June of 2019. Staff is recommending postponement of the NTM capital project as opposed to other Capital Projects primarily for 3 reasons; 1) The NTM CIP is currently underfunded and postponing work may allow for annual funding allocations to catch up with anticipated costs, 2) Unlike most other projects, the NTM CIP does not have external time constraints such as grant deadlines, contractually memorialized schedules, or are prerequisites for other projects, and 3) The NTM CIP has an unusually high ratio of staff time to implement physical improvements for the community, and thereby postponement of the NTM program would have one of the lowest impacts to project delivery and would free up staff time that is proposed to be augmented with temporary staff hours to implement the Farmers Market Bollard Project. Status This is a new project proposed to be added as part of the Mid-Year 2017-18 budget. Project Team Lead Department: Public Works, Transportation Planning & Engineering Operating Program Numbers & Titles: 50500 Transportation Planning & Engineering, 50330 Signals & Street Lighting, 50300 Streets Maintenance Assignment Program/Work Group Estimated Hours Project Manager Transportation Engineering 600 Contract Management Transportation Engineering 40 Construction Management CIP Engineering Construction 100 Farmers Market Setup Streets 40 Hours Monthly On-Going Operations & Maintenance Transportation Eng. & Signals 2 Hours Monthly On-Going Anticipated Facility Life Span: Service Life of Bollards are anticipated to 20-30 years. Packet Pg. 97Item 11 CAPITAL IMPROVEMENT PLAN - INFRASTRUCTURE & TRANSPORTATION NOTE: The total extent of public and private utility conflicts with bollard foundations is unknown at this time, there is potential for the time frame and cost to escalate significantly. After survey work is completed the project schedule and cost estimates will be updated. Packet Pg. 98Item 11 Packet Pg. 99 Item 11 Packet Pg. 100Item 11 Packet Pg. 101Item 11 Packet Pg. 102Item 11 Packet Pg. 103Item 11 Packet Pg. 104Item 11 Packet Pg. 105Item 11 Packet Pg. 106 Item 11 Packet Pg. 107 Item 11 Packet Pg. 108 Item 11 Packet Pg. 109 Item 11 Packet Pg. 110 Item 11 Packet Pg. 111 Item 11 Packet Pg. 112 Item 11 Packet Pg. 113 Item 11 Packet Pg. 114 Item 11 Packet Pg. 115 Item 11 Packet Pg. 116 Item 11 Packet Pg. 117 Item 11 Packet Pg. 118 Item 11 Packet Pg. 119 Item 11 Packet Pg. 120 Item 11 Packet Pg. 121 Item 11 Packet Pg. 122 Item 11 Packet Pg. 123 Item 11 Packet Pg. 124 Item 11 Packet Pg. 125 Item 11 Packet Pg. 126 Item 11 Packet Pg. 127 Item 11 Packet Pg. 128 Item 11 Packet Pg. 129 Item 11 Packet Pg. 130 Item 11 Packet Pg. 131 Item 11 Packet Pg. 132 Item 11 Packet Pg. 133 Item 11 Packet Pg. 134 Item 11 Packet Pg. 135 Item 11 Packet Pg. 136 Item 11 Packet Pg. 137 Item 11 Packet Pg. 138 Item 11 Packet Pg. 139 Item 11 Packet Pg. 140 Item 11 Packet Pg. 141 Item 11 Packet Pg. 142 Item 11 Packet Pg. 143 Item 11 Packet Pg. 144 Item 11 Packet Pg. 145 Item 11 Packet Pg. 146 Item 11 Packet Pg. 147 Item 11 Packet Pg. 148 Item 11 Packet Pg. 149 Item 11 Packet Pg. 150 Item 11 Packet Pg. 151 Item 11 Packet Pg. 152 Item 11 Packet Pg. 153 Item 11 Packet Pg. 154 Item 11 Packet Pg. 155 Item 11 Packet Pg. 156 Item 11 Packet Pg. 157 Item 11 Packet Pg. 158 Item 11 Packet Pg. 159 Item 11 Packet Pg. 160 Item 11 Packet Pg. 161 Item 11 Packet Pg. 162 Item 11 Packet Pg. 163 Item 11 Packet Pg. 164 Item 11 Packet Pg. 165 Item 11 Packet Pg. 166 Item 11 Packet Pg. 167 Item 11 Packet Pg. 168 Item 11 Packet Pg. 169 Item 11 Packet Pg. 170 Item 11 Packet Pg. 171 Item 11 Packet Pg. 172 Item 11 Packet Pg. 173 Item 11 Packet Pg. 174 Item 11 Packet Pg. 175 Item 11 Packet Pg. 176 Item 11 Packet Pg. 177 Item 11 Packet Pg. 178 Item 11 Packet Pg. 179 Item 11 Packet Pg. 180 Item 11 Packet Pg. 181 Item 11 Packet Pg. 182 Item 11 Packet Pg. 183 Item 11 Packet Pg. 184 Item 11 Packet Pg. 185 Item 11 Packet Pg. 186 Item 11 Packet Pg. 187 Item 11 Page intentionally left blank. Packet Pg. 188 Item 11