Loading...
HomeMy WebLinkAboutDaily -91436 Waterline 1-24-19 1 1 1/24/2019 07:00:00 15:30:00 1 8 1 8 1 8 1 8 1 8 1 8 1 0 1 0 1 8 1 1 0 1 8 1 0 1 0 1 1 8 1 0 1 1 1 0 2 0 1 8 1 8 1 8 4 8 1 0 1 1 0 1 8 1 1 8 8 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - RESIDENT ENGINEER'S DAILY INSPECTION REPORT Men LOCATION AND DESCRIPTION OF OPERATION: Start Stop Diary: Signature: Title: Engineer Inspector Materials: Weather: Dry/Clear </ Date Curley Labor James Y Foremen James D Labor Jano Y Labor Manuel B Labor JD -50 MINI EX 350SG BACKHOE BOBTAIL CREW TRUCKS CONCRETE SAW Specification 91436 D-Kal Engineering Jose Labor Jake Labor 10 wheeler Dump Truck 5 to 7 ton roller Cat mini sweeper Anthony L Labor Sierra Track Excavaror George Operator Cole trucking AC Water Truck Rental Bryce Mason Ronny Operator Phil Mason Earth Systems on site 10:30 am way Todd Labor Clayton Operator Golding saw cutting iran Nieves Flagger Luis Labor Boysen services chorro 9:00 am Contractor is working tying in Ferinni & Chorro. 9:20 am water is shut down contractor is cutting pipe to start tie-in. 10:00 am water is being restored. I mentioned to Jerry & Ryan checking to see if valve on 18" ia broken shut. Contractor is starting to install pipe across ferrinni. 3:00 pm Contractor installed 100' of 8" today