Loading...
HomeMy WebLinkAboutDaily -91436 Waterline 2-6-19 1 1 2/6/2019 07:00:00 15:30:00 1 14 1 14 1 14 1 14 1 14 1 14 1 14 1 1 14 1 1 1 14 1 1 8 1 1 0 1 0 1 1 1 14 2 14 1 8 1 8 1 14 4 14 1 0 1 1 0 1 14 1 1 14 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - RESIDENT ENGINEER'S DAILY INSPECTION REPORT Men LOCATION AND DESCRIPTION OF OPERATION: Start Stop Diary: Signature: Title: Engineer Inspector Materials: Weather: Dry/Clear </ Date Curley Labor James Y Foremen James D Labor Jano Y Labor Manuel B Labor JD -50 MINI EX 350SG BACKHOE BOBTAIL CREW TRUCKS CONCRETE SAW Specification 91436 D-Kal Engineering Jose Labor Jake Labor 10 wheeler Dump Truck 5 to 7 ton roller Cat mini sweeper Anthony L Labor Sierra Track Excavaror George Operator Cole trucking AC Water Truck Rental Bryce Mason Ronny Operator Phil Mason Earth Systems on site 10:30 am way Todd Labor Clayton Operator Golding saw cutting iran Nieves Flagger Luis Labor boysen testing 3:30 am Contractor is on site getting ready to tie-in Boysen and Chorro, N. Chorro. 4:00 am Water is shut down on Chorro at Foothill to Boysen. 6:30 am Water is restored on Chorro at Foothill to Boysen. Contractor is excavating CCO work on N Chorro for second tie-in. The existing gas line was unmarked and caused some problems for tie-in. I gave contractor a off set fitting to make tie-in. 1:00 pm Water is rerstored to the upper N Chorro, however contractor still needs to tie over one 2" service line that was installed out of spec. for clearance. Contractor also installed FH on Boysen and backfilled. 5:00 pm contractor left site.