EQUIPMENT AND/OR LABOR:
HOURS – ITEM No.
Equip.
No.
Idle
Remarks
(Reason for idleness or other remarks)
Description (Of Equipment or Labor)</
Report No.
Page
of
M
T
W
F
S
Circle Day
Shift Hours -
RESIDENT ENGINEER'S DAILY INSPECTION REPORT
Men
LOCATION AND DESCRIPTION OF OPERATION:
Start
Stop
Diary:
Signature:
Title: Engineer Inspector
Materials:
Weather: Dry/Clear </
Date
Curley Labor
James Y Foremen
James D Labor
Jano Y Labor
Manuel B Labor
JD -50 MINI EX
350SG BACKHOE
BOBTAIL
CREW TRUCKS
CONCRETE SAW
Specification 91436
D-Kal Engineering
Jose Labor
Jake Labor
10 wheeler Dump Truck
5 to 7 ton roller
Cat mini sweeper
Anthony L Labor
Sierra
Track Excavaror
George Operator
Cole trucking
AC
Water Truck
Rental
Bryce Mason
Ronny Operator
Phil Mason
Earth Systems
on site 10:30 am
way
Todd Labor
Clayton Operator
Golding saw cutting
iran Nieves Flagger
Luis Labor
boysen
trench paving Chorro
Pacific
7:00 am Contractor is prepairing for trench paving today. Trench was to wet from ground water contractor is paving hoping the 10" section will bridge the wet spots. Contractor plans
on working on Higuera tonite at 7:00 pm
7:00pm Contractor is pot holing Higuera && Pacific .
1:00 am Contractor completed potholing and backfilled and plated tie-ins.