HomeMy WebLinkAboutDaily -91436 Waterline 2-24-19 1 1 2/24/2019 19:00:00 07:00:00 1 8 1 8 1 8 1 8 1 8 1 8 1 8 1 1 8 1 1 1 0 1 8 1 1 1 1 1 1 1 8 2 8 1 8 1 8 1 8 4 8 1 2 1 1 1 8 1 1 8 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - RESIDENT ENGINEER'S DAILY INSPECTION REPORT Men LOCATION AND DESCRIPTION OF OPERATION: Start Stop Diary: Signature: Title: Engineer Inspector Materials: Weather: Dry/Clear </ Date Curley Labor James Y Foremen James D Labor Jano Y Labor Manuel B Labor JD -50 MINI EX 350SG BACKHOE BOBTAIL CREW TRUCKS CONCRETE SAW Specification 91436 D-Kal Engineering Jose Labor Jake Labor 10 wheeler Dump Truck 5 to 7 ton roller Cat mini sweeper Anthony L Labor Sierra Track Excavaror George Operator Cole trucking AC Water Truck Bryce Mason Ronny Operator Phil Mason Earth Systems on site 10:30 am way Todd Labor Clayton Operator Golding saw cutting iran Nieves Flagger Luis Labor boysen trench paving Chorro Pacific 7:00 pm Contractor is on site prepairing for shut down at Higuera & Pacific and capping 8" on Pacific. 9:00 pm Water Dept. is on site shutting down mains. water is shut down on Higuera but having trouble shutting down Pacific. 10:30 pm Higuera tie-in is complete crew is taking lunch. water crew is still working on shuting down main on Pacific. 12:00 am water dept shut down main on Pacific as best as they can. I asked them if they would consider using a hand valve key to work the valves. The water crew replied it's bad for your back and the mechine does the same thing. D-Kal did not want to perform the tie-in with the amount of water still comming out of the hydrant. Concrete is on site for thrust blocks. 12:20 am I took Jake from D-Kal and hand worked the valve at Carmel and shut down main on Pacific. Talking with James D-Kal did not want to start installing more pipe due to the time it would talke to remove the existing and didn't want to be on street after 7 am. contractor installed 40' of 12" pipe. 1:30 am Contractor completed cap on Pacific and water is starting to be restored. 4:00 am Contractor cleaned up site and removed equipment from site.