HomeMy WebLinkAboutDaily -91436 Waterline 2-24-19
1
1
2/24/2019
19:00:00
07:00:00
1
8
1
8
1
8
1
8
1
8
1
8
1
8
1
1
8
1
1
1
0
1
8
1
1
1
1
1
1
1
8
2
8
1
8
1
8
1
8
4
8
1
2
1
1
1
8
1
1
8
EQUIPMENT AND/OR LABOR:
HOURS – ITEM No.
Equip.
No.
Idle
Remarks
(Reason for idleness or other remarks)
Description (Of Equipment or Labor)</
Report No.
Page
of
M
T
W
F
S
Circle Day
Shift Hours -
RESIDENT ENGINEER'S DAILY INSPECTION REPORT
Men
LOCATION AND DESCRIPTION OF OPERATION:
Start
Stop
Diary:
Signature:
Title: Engineer Inspector
Materials:
Weather: Dry/Clear </
Date
Curley Labor
James Y Foremen
James D Labor
Jano Y Labor
Manuel B Labor
JD -50 MINI EX
350SG BACKHOE
BOBTAIL
CREW TRUCKS
CONCRETE SAW
Specification 91436
D-Kal Engineering
Jose Labor
Jake Labor
10 wheeler Dump Truck
5 to 7 ton roller
Cat mini sweeper
Anthony L Labor
Sierra
Track Excavaror
George Operator
Cole trucking
AC
Water Truck
Bryce Mason
Ronny Operator
Phil Mason
Earth Systems
on site 10:30 am
way
Todd Labor
Clayton Operator
Golding saw cutting
iran Nieves Flagger
Luis Labor
boysen
trench paving Chorro
Pacific
7:00 pm Contractor is on site prepairing for shut down at Higuera & Pacific and capping 8" on Pacific.
9:00 pm Water Dept. is on site shutting down mains. water is shut down on Higuera but having trouble shutting down Pacific.
10:30 pm Higuera tie-in is complete crew is taking lunch. water crew is still working on shuting down main on Pacific.
12:00 am water dept shut down main on Pacific as best as they can. I asked them if they would consider using a hand valve key to work the valves. The water crew replied it's bad for
your back and the mechine does the same thing. D-Kal did not want to perform the tie-in with the amount of water still comming out of the hydrant. Concrete is on site for thrust blocks.
12:20 am I took Jake from D-Kal and hand worked the valve at Carmel and shut down main on Pacific. Talking with James D-Kal did not want to start installing more pipe due to the time
it would talke to remove the existing and didn't want to be on street after 7 am. contractor installed 40' of 12" pipe.
1:30 am Contractor completed cap on Pacific and water is starting to be restored.
4:00 am Contractor cleaned up site and removed equipment from site.