Loading...
HomeMy WebLinkAboutDaily -91436 Waterline 9-20-18 1 1 9/20/2018 07:00:00 15:00:00 9 9 9 9 9 9 9 9 9 1 1 8 1 9 1 9 2 9 2 9 1 9 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - RESIDENT ENGINEER'S DAILY INSPECTION REPORT Men LOCATION AND DESCRIPTION OF OPERATION: Start Stop Diary: Signature: Title: Engineer Inspector Materials: Weather: Dry/Clear </ Date Curley Labor James Y Foremen James D Labor John M Operator Jano Y Labor Manuel B Labor JD -50 MINI EX 350SG BACKHOE BOBTAIL CREW TRUCKS CONCRETE SAW POTSAWTR Specification 91436 D-Kal Engineering Chorro street Bobtail rental Jose Labor Mike Labor Jake Labor 7:00 AM Contractor is on site working installing 8" pipe on Chorro. 9:00 started excavating for fire hydrant lateral found 8" abandoned gas crossing fire lateral trench. contractor contacted gas co. 12:00 contractor drilled and cut window into existing pipe and removed a section to install 6'' 3:30 pm Contractoe is still backfilling trench in stalled 120' today.