Loading...
HomeMy WebLinkAboutDaily -91436 Waterline 10-5-18 1 1 10/5/2018 07:00:00 17:00:00 1 8 1 8 1 8 1 1 4 6 1 10 1 10 1 10 1 8 1 10 1 10 1 10 1 10 10 2 8 1 10 1 1 10 2 8 10 1 4 1 1 8 1 1 8 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - RESIDENT ENGINEER'S DAILY INSPECTION REPORT Men LOCATION AND DESCRIPTION OF OPERATION: Start Stop Diary: Signature: Title: Engineer Inspector Materials: Weather: Dry/Clear </ Date Curley Labor James Y Foremen James D Labor Jano Y Labor Manuel B Labor JD -50 MINI EX 350SG BACKHOE BOBTAIL CREW TRUCKS CONCRETE SAW Specification 91436 D-Kal Engineering rental Jose Labor Jake Labor Elliot Labor 10 wheeler Dump Truck Jim Douglas Operator 5 to 7 ton roller Cat mini sweeper Tim Operator Anthony L Labor Sierra Way Track Excavaror Chorro George Operator Golding Cole trucking AC Paving on Chorro Installing main line on Sierra 7:00 am Contarctor is working on trench paving on Chorro and installing 10" water main on Sierra way. 3:00 pm Contractor installed 200' today. 5:00 pm Contractor completed paving on Chorro. .