HomeMy WebLinkAboutDaily -91436 Waterline 10-19-18
1
1
10/19/2018
07:00:00
17:00:00
1
8
1
8
1
8
1
1
1
1
8
1
1
8
1
8
1
8
1
1
8
1
2
1
8
1
8
1
8
2
8
1
0
2
2
8
1
8
1
1
8
EQUIPMENT AND/OR LABOR:
HOURS – ITEM No.
Equip.
No.
Idle
Remarks
(Reason for idleness or other remarks)
Description (Of Equipment or Labor)</
Report No.
Page
of
M
T
W
F
S
Circle Day
Shift Hours -
RESIDENT ENGINEER'S DAILY INSPECTION REPORT
Men
LOCATION AND DESCRIPTION OF OPERATION:
Start
Stop
Diary:
Signature:
Title: Engineer Inspector
Materials:
Weather: Dry/Clear </
Date
Curley Labor
James Y Foremen
James D Labor
Jano Y Labor
Manuel B Labor
JD -50 MINI EX
350SG BACKHOE
BOBTAIL
CREW TRUCKS
CONCRETE SAW
Specification 91436
D-Kal Engineering
Jose Labor
Jake Labor
10 wheeler Dump Truck
Jim Douglas Operator
5 to 7 ton roller
Cat mini sweeper
Tim Operator
Anthony L Labor
Sierra
Way
Track Excavaror
George Operator
Cole trucking
AC
Water Truck
Rental
Installing main line on Sierra <
Bryce Mason
7:00 am Contarctor is working on installing 10" watermain on Sierra Way
installing blow off at bottom of S turn.
11:30 am contractor placed thrust blocks
1:30 pm Water guys Jerry and Rayn loaded line from Ella. we tested water pressure it was 105lbs.
Crew is back filling trench installed 80' of waterline today.