Loading...
HomeMy WebLinkAboutDaily -91436 Waterline 10-30-18 1 1 10/29/2018 07:00:00 17:00:00 1 8 1 8 1 8 1 8 1 8 1 8 1 1 8 1 1 8 1 8 1 8 1 8 1 2 1 8 1 8 1 8 2 8 1 0 2 2 1 8 1 1 8 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - RESIDENT ENGINEER'S DAILY INSPECTION REPORT Men LOCATION AND DESCRIPTION OF OPERATION: Start Stop Diary: Signature: Title: Engineer Inspector Materials: Weather: Dry/Clear </ Date Curley Labor James Y Foremen James D Labor Jano Y Labor Manuel B Labor JD -50 MINI EX 350SG BACKHOE BOBTAIL CREW TRUCKS CONCRETE SAW Specification 91436 D-Kal Engineering Jose Labor Jake Labor 10 wheeler Dump Truck Jim Douglas Operator 5 to 7 ton roller Cat mini sweeper Tim Operator Anthony L Labor Sierra Way Track Excavaror George Operator Cole trucking AC Water Truck Rental Installing main line on Sierra < Bryce Mason 9:30 am Contractor is flushing the water main on upper Sierra Way. and tying over water services on lower sierra way. Contractor is working on SD manhole at S turn on Sierra way. Issy is on site installing 1 pressure regulater behind meter.