Loading...
HomeMy WebLinkAboutDaily -91436 Waterline 12-10-18 1 1 12/10/2018 07:00:00 15:30:00 1 0 1 8 1 4 4 1 8 1 8 1 0 8 1 8 1 8 1 0 1 0 8 1 8 1 8 1 8 1 8 1 8 1 8 1 1 0 1 2 1 8 8 1 8 1 8 8 2 0 1 0 1 1 0 1 8 1 1 0 8 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - RESIDENT ENGINEER'S DAILY INSPECTION REPORT Men LOCATION AND DESCRIPTION OF OPERATION: Start Stop Diary: Signature: Title: Engineer Inspector Materials: Weather: Dry/Clear </ Date Curley Labor James Y Foremen James D Labor Jano Y Labor Manuel B Labor JD -50 MINI EX 350SG BACKHOE BOBTAIL CREW TRUCKS CONCRETE SAW Specification 91436 D-Kal Engineering Jose Labor Jake Labor 10 wheeler Dump Truck 5 to 7 ton roller Cat mini sweeper Anthony L Labor Sierra Track Excavaror George Operator Cole trucking AC Water Truck Rental Bryce Mason Ronny Operator Mason Phil Mason Earth Systems on site 10:30 am Mason from the hall way Todd Labor Trench Paving Boysen Clayton Operator 7:00 am Contractor is paving trench & placing concrete on Sierra Way. Jame informed me D-Kal plans to pave trenches all the way up instead of leaving AC down 2" to overlay. On that note I will not recomend overlay in that area. Contractor will need to true up edges now over lay will not be done. Contractor is potholing and laying out on Boysen. 10:00 am Truck driver drove through the work area and damaged the trenches and made a mess of the site. Could not test compaction today no tech. available.