Loading...
HomeMy WebLinkAboutItem 3 - ARCH-0077-2019 (487 Leff) Agenda Report PLANNING COMMISSION AGENDA REPORT SUBJECT: Conceptual review of a new two-story office development for the Housing Authority Headquarters consisting of 13,113 square feet and associated site improvements. The project includes an amendment to the Planned Development Precise Plan to address street yard setback reductions and parking lot orientation. PROJECT ADDRESS: 487 Leff Street BY: Kyle Bell, Associate Planner Phone Number: (805) 781-7524 E-mail: kbell@slocity.org FILE NUMBER: ARCH-0077-2019 FROM: Xzandrea Fowler, Deputy Director RECOMMENDATION Provide direction to the applicant on items to be addressed in plans submitted for final review. SITE DATA SUMMARY The applicant has submitted plans for conceptual review for the subject site located at 487 Leff Street. The project will include demolishing the existing 5,444 square foot offices, redevelopment of the site, and development of a new, two-story, 13,114-square foot office building. The project proposes an amendment to the Planned Development Precise Plan (see Section 2.0) to address requests for a 30 percent parking reduction, and reconfiguration of street parking, providing 17 parking spaces on-site where 44 parking spaces would normally be required, (Attachment 1, Project Narrative). The subject property is located in the Medium-Density Residential (R-2-PD) zone with a Planned Development Overlay (Attachment 3, Ordinance No. 506 (1970 Series)). The Planned Development Overlay included a Planned Development Precise Plan (Development Plan) that was approved by the City Council which included the 20 residential units and the existing office development (Attachment 4, Council Resolution No. 2249 (1971 Series)). Applicant SLO Housing Authority Representative Pam Ricci, RRM Design Group Zoning R-2-PD (Medium Density Residential with Planned Development Overlay) General Plan Medium Density Residential Site Area ~16,712 square feet Environmental Status Final plans for the proposed project will require further environmental analysis. Meeting Date: April 10, 2019 Item Number: 3 Packet Page 155 ARCH-0077-2019 (Conceptual) 487 Leff Street Page 2 1.0 COMMISSION’S PURVIEW The purpose of conceptual review before the Planning Commission is to offer feedback to the applicant and staff as to whether the project’s conceptual site layout and building design is headed in the right direction before plans are further refined; to specifically discuss concerns and questions related to land use consistency; and to identify the appropriate application submittal process. The Commission’s purview is to review the project in terms of its consistency with the General Plan, Zoning Regulations, and applicable City development standards and guidelines. 2.0 BACKGROUND The PD Overlay included development of 20 affordable residential units located at 468 Leff Street, and the Housing Authority offices located at 487 Leff Street. The existing Development Plan authorized a street setback reduction for the office development from 20 feet to 10 feet, and a parking reduction to provide 40 parking spaces where 55 parking spaces would have normally been required (Attachment 4, Sheet A1, Existing Site Plan). The applicant proposes to amend the Development Plan to provide for a larger office development with a reduced setback for vehicle parking within the street yard along Leff Street, and a new vehicle parking reduction (Attachment 4, Sheet A2, Proposed Site Plan). Zoning Regulations Section 17.48.090 (Amendments to Final Development Plans) stipulates that amendments to final development plans may be approved by the Planning Commission when limited to changes in the size and position of buildings, landscape treatment, or the like. 3.0 DISCUSSION The conceptual review application is not intended to provide the necessary materials (supplemental studies) needed to provide a detailed environmental review or analysis of the project. Staff has identified a set of specific discussion items for Commission’s consideration. The following discussion items highlight the key concerns that the Commission should discuss and provide direction to the applicant and staff: 1. Site Layout and Building Design: The proposed project provides an office development within the residential zone. The project will be reviewed for consistency with Community Design Guidelines Chapter 3.4 (Guidelines for Specific Commercial and Industrial Uses) for Office development projects. Office structures differ from other commercial buildings in that their Figure 1: Project Rendering as seen from High Street. Packet Page 156 ARCH-0077-2019 (Conceptual) 487 Leff Street Page 3 intensity of use is lower while building scale is typically larger, without careful attention in design to building form and mass, and street level features, these structures can impair the pedestrian orientation of a streetscape. Discussion Item #1: The Commission should discuss whether the conceptual site layout and building design is compatible with adjacent uses. Specifically, the Commission should discuss and provide direction to the applicant, staff, and the Architectural Review Commission regarding the building orientation along the street frontages, parking within the street yard setback, and building designs adjacent to existing residential developments. 2. Parking Requirements. The existing Development Plan, which was approved in the 1970s included a 27 percent parking reduction to allow for 40 parking spaces for the residential units, where 55 were normally required. In total the project provided 47 parking spaces for all proposed uses at the time of development (37 spaces at 468 Leff Street and 10 spaces at 487 Leff Street). Since the 1970s, parking requirements have changed for low-income residential units, and the parking requirement under the standards that are in place today would require only 21 spaces for the 20 units. See the table below for a breakdown of the parking requirements from the original approval compared to the parking requirements under the proposed project. Table 1: Comparative Parking Requirements Original Parking Requirement Parking Spaces Proposed Parking Requirement Parking Spaces Residential (20 units) 55 Residential (20 units) 21 Office (2,000 sq. ft.) 7 Office (13,114 sq. ft.) 44 Parking Reduction (27%) -15 Parking Reduction (29%) -19 Total: 47 Total: 46 The applicant is requesting a parking reduction similar to the original project; however, the reduction would be for the office uses rather than the residential units. The proposed project would provide 29 parking spaces at 468 Leff Street and 17 spaces at 487 Leff Street, with a total of 46 parking spaces for the overall development, where 65 spaces would normally be required. Discussion Item #2: The Commission should discuss whether the parking reduction is consistent with the original Development Plan. The Commission may provide comments, suggestions, or questions regarding the submittal of a parking study for features or programs to be included or addressed, such as: excess bicycle parking or motorcycle parking, shower facilities, and other programmatic opportunities or incentives. 3. Street Parking Re-configuration. The proposed project includes reconfiguration of street access and parking along Leff Street and Beach Street, providing an additional 5 public parking spaces along the street frontages. The applicant has been working with the City’s Transportation and Engineering Divisions related to the public improvements; however, a more detailed review of the changes will occur upon submittal of the Major Development Review application. Discussion Item #3: The Commission may provide comments, suggestions, or questions related to the reconfiguration of Leff Street and the orientation of public and private parking for the applicant and staff to address upon submittal of the Major Development Review application. Packet Page 157 ARCH-0077-2019 (Conceptual) 487 Leff Street Page 4 4.0 NEXT STEPS Pending direction from the Commission, the applicant will apply for the appropriate entitlement applications which are anticipated to include: Final Development Plan Amendment, and Development Review (Major). After the entitlement applications have been deemed complete, the project will be reviewed by Architectural Review Commission (ARC) to evaluate consistency with the City’s Community Design Guidelines, with a recommendation to the Planning Commission for final review. 5.0 PROJECT STATISTICS Site Details Proposed1 Required2 Setbacks Front Yard (Leff St.) Corner Street Yard (High St.) Corner Street Yard (Beach St.) 30 feet 10 feet 10 feet 20 feet 10 feet 10 feet Height of Structures Not Available 35 Max Building Coverage (footprint) 44% 60% Floor Area Ratio (FAR) 0.78 No requirement Density Units 29 DU3 16.79 DU Vehicle Parking 17 spaces 44 spaces 1 Project Plans (Attachment 2) 22019 Zoning Regulations 3Approved through Council Resolution No. 2249 (1971 Series) 6.0 OTHER DEPARTMENT COMMENTS A pre-application meeting was held on September 6, 2018, and comments from other City Departments including Engineering, Transportation, Utilities, Fire, and Building have been provided to the applicant team outlining the necessity of the supplemental studies and materials requested in conjunction with the entitlement application submittal. 7.0 ATTACHMENTS 1. Project Narrative 2. Ordinance No. 506 (1970 Series) 3. Council Resolution No. 2249 (1971 Series) 4. Project Plans Packet Page 158 HASLO Headquarters Expansion City of San Luis Obispo Planning Commission – Conceptual Review February 19, 2019 Applicant: Housing Authority of San Luis Obispo (HASLO) Representative: RRM Design Group Main Address: 487 Leff Street Existing Zoning: R-2-PD, Medium-Density Residential Planned Development; PD included both sites described below. Planned Development: PD approved 12-7-70; follow-up Precise Plan approved 11-15-71. Existing Site Description: Offices Address: 487 Leff Street APN: 003-623-001 Site Area: 16,642 square feet (0.38-acre) Existing Development: •5,444 square-foot offices in two buildings, one is two-stories •Architectural character has elements of the Central Coast’s public housing vernacular of the 60’s and 70’s •18 parking spaces required by code; 10 on-site automobile parking spaces provided •11 bicycle spaces •Employees use High and Beach on-street parking; clients use Leff Street on-street parking Attachment 1 Packet Page 159 HASLO Conceptual Summary Page 2  Affordable Housing (Apartments) Addresses: 456-492 Leff Street APN: 003-622-016 Site Area: 1.02 acres Existing Development: • 20 apartments (accounting for 2 units to be added); 20 spaces required • 37 parking spaces originally; now 24 spaces (basketball court & play area added) • 4 extra parking spaces Proposed Development (487 Leff) • Rebuild two apartments across the street to replace two apartments converted to office space in the past at site • Demolish existing development • Rebuild new, two-story office building with 13,114 square feet of floor area. • Provide 17 on-site parking spaces, with one van-accessible ADA space. Office Parking Location Floor Area Parking Ratio Parking Requirement First Floor 7,353 square feet Second Floor 5,761 square feet Total 13,114 square feet 1 space/300 sq.ft. 43.7 or 44 spaces Parking Reduction Parking for the proposed office building will need certain available City Zoning Ordinance reductions and includes a request for off-site parking. The premise of the parking proposal is that it will meet HASLO’s needs since the office expansion does not result in a major change in the number of employees but rather provides more offices, meeting rooms, and other facilities for the existing staff. In addition, HASLO will have on-site management and oversight of how its employees use the available parking avoiding problems with the surrounding neighborhood. • 30% parking reduction 44 x .30 = 13.2; 44-13.2 = 30.8 spaces or 31 spaces • 20 additional bike spaces allow for a reduction in the number of auto space by 4 31-4 = 27 spaces • Four Off-Site Spaces 27-4 = 23 spaces With four off-site parking spaces across street, 30% parking reduction, & extra bike spaces, project parking of 17 spaces is 6 spaces short of requirement of 23 spaces. Attachment 1 Packet Page 160 HASLO Conceptual Summary Page 3 For the remaining parking deficit of 6 spaces, HASLO would prepare a Transportation Demand Management Plan (TDMP) and pursue Planning Commission approval per 17.72.050 of the Zoning Regulations. The TDMP would further define what programs would be implemented to minimize the need for onsite parking and prevent cars from spilling over onto the neighborhood streets. To provide documentation on existing parking demand generated by HASLO with its current offices, City of San Luis Obispo Transportation Division staff have conducted surveys and will complete a parking demand study. As previously noted, part of HASLO’s case for a parking reduction is that the new office space will help them to operate more efficiently and have common office functions like break areas and meeting rooms rather than significantly add new employees that increase parking demand. Attachment 1 Packet Page 161 Attachment 2 Packet Page 162 Attachment 2 Packet Page 163 Attachment 2 Packet Page 164 Attachment 3 Packet Page 165 ',67$1&()520$3521  ',67$1&(72,17(56(&7,21 ',67$1&()520$3521      ',67$1&(72,17(56(&7,21 ',67$1&(72,17(56(&7,21      ',67$1&(72$3521  ',67$1&(72,17(56(&7,21          ',67$1&(72,17(56(&7,21 38%/,&3$5.,1*63$&(638%/,&3$5.,1*63$&(638%/,&3$5.,1*63$&(6           38%/,&3$5.,1*63$&(6EXISTING SITE PLANHASLO OFFICE - 487 LEFF STREETA1#0256-02-UR1821 FEBRUARY 20191” = 10’-0” (24X36 SHEET)0 5 10 2001020 401” = 20’-0” (12X18 SHEET)Attachment 4Packet Page 166 6)'.6LGH6HWEDFN )U RQW6HWE D F N   6LGH6HWEDFN  6)56#+4$'$9$167$//6)64#5*('0%''0%.1574'00006)$+-'5614#)'23(172$%29(6)/'%*411/),567)/225+,*+675((7/())675((7(;,67,1*52:,1&/8',1*6,'(:$/.6   %($&+675((7   352326('3$9(':,'7+   &/($5'5,9($6,/(  38%/,&$57/2&$7,2121(:$<21(:$<21(:$<(;,67,1*&(17(5/,1(2)/())675((7672338%/,&3$5.,1*63$&(6216,7(3$5.,1*63$&(667236723',67$1&(72,17(56(&7,21          ',67$1&(72,17(56(&7,21 ',67$1&(72,17(56(&7,21         38%/,&3$5.,1*63$&(638%/,&3$5.,1*63$&(62)),&(%8,/',1*$5($6&RPPHQWV $UHD67)/225 6)1')/2256)6)3$5.,1*67$7,67,&6352-(&73$5.,1*5(48,5('2)),&(63$&(6)6)  63$&(63529,'('216,7(6+$5('63$&(6  63$&(638%/,&675((73$5.,1*(;,67,1*21/())21%($&+21+,*+ 63$&(6352326('21/())21%($&+21+,*+ 63$&(6'(/7$$'',7,21$/63$&(6PROPOSED SITE PLAN AND GROUND FLOORHASLO OFFICE - 487 LEFF STREETA2#0256-02-UR1821 FEBRUARY 20191” = 10’-0” (24X36 SHEET)0 5 10 2001020 401” = 20’-0” (12X18 SHEET)Attachment 4Packet Page 167     6)'.6)&'%-6)&'%-6)&'%-23(172$%29(%(/2:6(&21')/225   6(&21')/225PROPOSED SECOND FLOOR 2)),&(%8,/',1*$5($6&RPPHQWV $UHD67)/225 6)1')/225 6)6)HASLO OFFICE - 487 LEFF STREETA3#0256-02-UR1821 FEBRUARY 20191” = 10’-0” (24X36 SHEET)0 5 10 2001020 401” = 20’-0” (12X18 SHEET)Attachment 4Packet Page 168 CONCEPT HIGH STREET PERSPECTI E LOO ING EASTHASLO OFFICE - 487 LEFF STREETA4#0256-02-UR1821 FEBRUARY 20191” = 10’-0” (24X36 SHEET)0 5 10 2001020 401” = 20’-0” (12X18 SHEET)Attachment 4Packet Page 169 CONCEPT HIGH STREET PERSPECTI E LOO ING ESTHASLO OFFICE - 487 LEFF STREETA5#0256-02-UR1821 FEBRUARY 20191” = 10’-0” (24X36 SHEET)0 5 10 2001020 401” = 20’-0” (12X18 SHEET)Attachment 4Packet Page 170 CONTE T I AGESINSPIRATIONAL I AGESHASLO OFFICE - 487 LEFF STREETA6#0256-02-UR1821 FEBRUARY 20191” = 10’-0” (24X36 SHEET)0 5 10 2001020 401” = 20’-0” (12X18 SHEET)CONTE T AND INSPIRATIONAL I AGESAttachment 4Packet Page 171