HomeMy WebLinkAboutAmendment to Agreement No 6 - AEOCOM engineering services - Calle Joaquin Siphon and Lift StationAMENDMENT TO AGREEMENT NO.6 THIS AMENDMENT TO AGREEMENT is made and entered in the City of San Luis Obispo on by and between the CITY OF SAN LUIS OBISPO, a municipal corporation, hereinafter referred to as ity, and AECOM Technical Services, Inc., hereinafter referred to as Contractor. WITNESSETH: WHEREAS, on November 15, 2011 the City entered into an Agreement with Contractor for Engineering Design Services per Specification No. 91133 and WHEREAS, the City desires to amend the scope of services to include additional Engineering Design Services and Contractor has submitted a proposal for this purpose that is acceptable to the City. NOW THEREFORE, in consideration of their mutual promises, obligations and covenants hereinafter contained, the parties hereto agree as follows: The scope of services and related compensation is hereby amended as set forth in Exhibit A attached hereto for additional engineering design work for the Calle Joaquin Lift Station Replacement, at cost not to exceed $175,827 per memorandum dated November 8, 2018. 2. All other terms and conditions of the Agreement remain in full force and effect. IN WITNESS WHEREOF, the parties hereto have caused this instrument to be executed the day and year fust written above. ATTEST: Teresa Purrington, City ClerI CITY OF SAN LUIS OBISPO By: AL eidi Harmon a r CONTRA T¢R Ben Horn, AECOM Technical Services, Inc. AcoM November 9, 2018 Jennifer Metz City of San Luis Obispo 879 Morro Street San Luis Obispo, CA 93401 Dear Jennifer, AECOM 661 2832323 tel 5001 E Commercenter Drive, Suite 100 661 3950359 fax Bakersfield, CA 93309 www.aecom corn Calle Joaquin Lift Station Replacement Scope Amendment No. 6 Background The City of San Luis Obispo (City) has requested AECOM amend our currently authorized Scope of Work to develop design details and specifications to remove the existing siphon and restore the creek channel, confirm and finalize the design documents, develop a recommended sequence of construction, and revise the efforts for construction phase services commensurate with the level necessary to construct the design. SCOPE OF WORK This Scope Amendment includes the following tasks: TASK GROUP 1: Project Management and Coordination Task 1.1: Project Meetings AECOM will attend three (3) progress and coordination meetings during the final design of the project. Additional meetings for other tasks are included in their respective task. Task 1.2: Project Management AECOM will provide additional project management and coordination with the City's Project Manager. Task 1.3: CEQA and Permitting Support AECOM will provide additional CEQA and Permitting coordination with the City and their subconsultant. TASK GROUP 2: Siphon Removal and Restoration Task 2.1: Existing Siphon Removal and Creek Restoration Design In order to comply with a request from the National Marine Fisheries Service (NMFS), AECOM will provide plans, specifications, and opinion of probable cost (OPC) to remove the existing siphon from AZCOM the channel of San Luis Obispo Creek and restore the channel. The design is based on the following parameters from the City: • Removal of an approximately 15-20 foot section of the existing sewer pipeline and concrete encasement from the center of the channel; • Installation of a water diversion to isolate the instream work area including dewatering; • Construction of a roughened channel. For NMFS review purposes, separate set of bid documents will be prepared for Task 2.1 Subtasks include the following: Channel Design o Background Review, Hydrologic Data Collection o Site Reconnaissance, Sampling and Analysis o Determine Design Flows, Criteria and Constraints o Hydraulic Modeling (Existing and Iterative Design) o Fish Passage Assessment and Design o Grade Control, Channel Substrate and/or Bank Design o Material Balance Iterations Revegetation Design o Planting plan, details, and schedule o Irrigation plan, details and schedule o Planting preparation plan o Seeding and mulching plan o Willow pole cuttings installation plan o Container plant and tree seed installation plan o Plant establishment plan (1 -Year) o Long term maintenance and monitoring plan (Year 2-5) o Propagule collection plan Deliverables: 60% Submittal consisting of the following (7 hard copies): o Draft half-size (11" x 17") drawings o Draft technical specifications o Draft opinion of probable construction costs (OPC) 90% Submittal consisting of the following (7 hard copies) o Revised half-size (11"x 17") drawings o Revised technical specifications o Revised OPC Once the design documents are approved by the NMFS, the design will be incorporated into Project's final design documents as part of Task 3.2. 2 AL OM TASK GROUP 3: Finalize 100% Design Documents for Bid Task 3.1: Develop Recommended Sequence of Construction AECOM will conduct two meetings with City staff and the City's construction inspector (Filippin Engineering) to determine a recommended sequence of construction for the project. The meetings will allow all parties to evaluate the various permit schedule requirements alongside standard construction practices and continued sewer service requirements to determine the optimum timing for bidding, construction, and duration of the project. The conclusions from these meetings will be summarized in an email and incorporated into the Project specifications as part of Task 3.2. Deliverables: • Recommended Sequence of Construction email Task 3.2: Finalize Design Documents for Bid AECOM will finalize the 100% Design Documents for bid including the plans, specifications, and OPC. This task includes the following subtasks: Incorporate approved siphon removal and creek restoration design documents developed in Task 2; Y Revise specifications to include the sequence of construction developed in Task 3.1; O Update design documents based on final permit requirements from all agencies; • Update design documents based on final agreement with Motel 6; • Reduce the size of the Highway 101 crossing casing to 24 -inch diameter and revise the construction method; Due to the delays in design, review specifications to identify changes in manufacturer product lines, design standards, and environmental laws that effect the specifications. Update specifications as necessary; Incorporate recommended revisions based on the survey consultant review of the project survey; • Incorporate recommended revisions based on the geotechnical engineering consultant review of the project geotechnical report; • Conduct a constructability review of the design documents; 0 Final QA/QC of the design documents. AXOM Deliverables: Final Submittal consisting of the following (7 hard copies and electronic copy in PDF format) o Final half-size (11" x 17") drawings o Final technical specifications o Final OPC Additional Engineering Services If requested by City, AECOM will provide the following additional services, beyond the services included in our Scope of Work, on a time and materials basis based on the current rate schedule: A. Attendance to additional meetings beyond those specifically identified. B. Planning, analysis or design of additional or alternative facilities, including facilities offsite from the proposed project site. C. Services associated with prequalification of contractors other than as specifically defined herein. D. Any additional project -related services not specifically included in Scope of Work. Client Furnished Services The following services or information will be provided by City or its consultants: A. Information for inclusion in the cost opinion and/or bid item descriptions on project components not being prepared by AECOM. B. Copies of all relevant reports, studies, drawings, correspondence, and other relevant project information or data. We have assumed that the City will provide all relevant planning information identifying existing and future design flows for the lift station. Schedule The preliminary schedule for this scope of work assumes a notice -to -proceed (NTP) date of December 21, 2018 and bidding for the project to commence June 28, 2019. Budget AECOM's budget for the scope items described above is $175,827, and will not be exceeded unless additional authorization is requested and granted by the City in writing. AECOM's fee and costs will be invoiced on a Time and Materials basis. These services will be provided according to the terms and conditions defined in the Agreement between the City and AECOM for Design Services for the Calle Joaquin and Laguna Lift Station Replacement project, dated November 15, 2011. Scope and deliverables for this work will be as described above. 4 AZCOM We anticipate this proposed scope of work meets your expectations. Please indicate your authorization by signing in the space provided below, and return this request, or contact me if the City requires revisions to the proposed scope of work. Sincerely, o_ Daniel S. Cronquist, PE, PLS Project Manager ' r 1, 2' Ben Horn, PE Managing Engineer Enclosed: Scope Amendment Budget Date: 5 O IM .O 7 m T O E as E Q d O_ O 0 cn M w O Of o 0 Oq JBIO.L Joqu'7-uom Ju;OZ ;uu;lnsuoagnS wwas V ^ 69 o0 r w as as waswwwwwsawwwwww N Q+ ' w w w N N N N w to o0 �O N� w w 7 M�� w w h 7 h w v� 00 • w w l� V h M w w w wwwwwwwwvn 00 N O N r VI w w w a ✓I w V O N w w O z N� w w o0 of O D\ w 'Al O�M joqu'I-uON ww 'n ww ww�nw w wwww•www w ww w wwwwww 000 00 V 0 7 000000000 V k P M 00 00 7 �O .--• • 000 O •-. 0 0 N �O 00000 ' 00 00 vl vl DD ono N r .joqu7 — wwas w ww win ,nww www wwww w ww �nwww www N- N O of 7 sinoH lulo,L is!d,fy iva!ugaay .iOSI-JdnS QQV3 O N M CG O 00 00 00 00 00 — N L )SI21010a'3 uO!JuJojsaa _ x c aaaulSu:j ajl3pOssv N N a 0 Jaau!3ug saainosag .13181" dOivaS N N C er M a0 a, LL aaau!tug .1O!uaS O O O '� a N b O N N S •D W N gajV/bug judiaupd r Papua -I aaiaauad•gaay V vl O\ ry v c a >r is w _ � L v _ C Q d o m C y .� o N o> m v G C. • 0. L ._ � .� y oO Q O N G. O. C P. V] �.�i •� W � p � Y N� C b U •O C Q 'C U C O O O O S O N N � O N N v.� yww pni! (C U .=% m ya>i > .4. Y ea W 5 coi N > •v L •e X c c W N M 7 :A L W 0 0 0 0 0 0 0 c�00000000 0 0 0 0 0 0 vi fiN9 6NA Vi V3 b9 b9 69 � tI ONi m N /r M ONO Ig;O,L fig 'fig to fA fA U9 Yi Joqu'[-uoN lu;oy Q N cn rn +n v3 fia rn vi �p ;ue;lnsuoagnS 0 Oq Joqu-uON M � M M lM0 � ONO d N vi cn 000 �o �0 rn ss 0o 0 0o ss s9 of in v� a in o Joqu 0 0o a r oo mar a`, a o .. ri o JI f/� 69 fA 69 Yi 69 unog ju;oy N N M f•l � ;s!d,f,L iva!uyaay N N 7 N Jos!-;)dnS QQVD C ;SI201032[ uo!;uJo;SaiH N a JaauBug a;u!aossd c 0 m Jaam%ug saaJnosag JajoA JoivaS e CL II Jaau!aug Jo!uas yaJV/tug �udiamid 7 N a0 7 7 n Japeag aa!;aeJd•yaay N N D C O a �L U 40 Q d � b R y ��au> m > a c .o uw��o rn 0 0 0 0 0 0 0 c�00000000 0 0 0 0 0 0 vi fiN9 6NA Vi V3 b9 b9 69 �