HomeMy WebLinkAbout05-16-2019 ATC Agenda PacketCity of San Luis Obispo, Agenda, Planning Commission
Agenda
ACTIVE TRANSPORTATION COMMITTEE
Thursday, May 16, 2019
6:00 p.m. REGULAR MEETING Council Hearing Room
990 Palm Street
San Luis Obispo, CA
MISSION: The purpose of the Active Transportation Committee (ATC) is to provide oversight
and policy direction on matters related to bicycle and pedestrian transportation in San Luis Obispo
and its relationship to bicycling and walking outside the City.
CALL TO ORDER Chair Lea Brooks
ROLL CALL : Committee Members Thomas Arndt, Lea Brooks (chair), Jenna Espinosa,
Timothy Jouet, Ken Kienow (vice chair), Briana Martenies, Jonathan Roberts
PUBLIC COMMENT: At this time, people may address the Committee about items not on the
agenda. Persons wishing to speak should come forward and state their name and address.
Comments are limited to three minutes per person. Items raised at this time are generally referred
to staff and, if action by the Committee is necessary, may be scheduled for a future meeting.
CONSIDERATION OF MINUTES
1. Minutes of the March 21, 2019 Regular Meeting
2. Minutes of the April 17, 2019 Special Meeting
PRESENTATION ITEMS
3. PARKS AND RECREATION ELEMENT/MASTER PLAN UPDATE
(SCOTT – 30 MINUTES)
Receive an update on the Parks and Recreation Master Plan and General Plan Element Update.
Active Transportation Committee Agenda May 16, 2019 Page 2
ACTION ITEMS
4. BOB JONES TRAIL: OCEANAIRE TO CALLE JOAQUIN CONNECTOR
(FUKUSHIMA –45 MINUTES)
City Staff will give a presentation on a new alternative of the Bob Jones Trail Oceanaire to Calle
Joaquin Connector. At a Study Session on December 4, 2018 the City Council concurred with the
Active Transportation Committee’s recommendation to explore a new alternative alignment for
the project. The consultant has now completed a conceptual design layout and preliminary cost
estimate for the new alternative. Staff will present this new information and ask the ATC to
consider the new alternative in relation to the three other alternatives and make a recommendation
for an upcoming City Council Study Session, currently scheduled for September 3, 2019.
Background
The Bob Jones Trail Oceanaire to Calle Joaquin Connector is a project identified in the Bicycle
Transportation Plan and the Calle Joaquin Agricultural Master Plan. The facility is intended as
part of the bicycle and pedestrian network to connect the County portion of the Bob Jones Trail
to residential and commercial uses in the vicinity of Madonna and Dalidio Roads. The project is
also centrally located to the San Luis Ranch, Froom Ranch, and Avila Ranch Plan areas and thus
has potential as a key link for bicycle and pedestrian transportation. In the 2017-19 Financial
Plan, funding for project development work was allocated to begin study of the project. On
November 15, 2018, the ATC considered three viable route alternatives and recommended that
of the three, Alternative 1 is the most preferred but that another alternative should be explored
that is more direct and has more potential to increase active transportation. At the December 4th
Study Session, the City Council agreed with the ATC recommendation and gave direction to
explore a new alternative. Now that a fourth alternative has been identified the next step is to
consider a preference of the alternatives that will undergo more rigorous environmental review.
Alternative Assessment
Alternative 4 (New Alternative)
Estimated Cost: $2,890,600
Route Length: Cycle Track (.44 Miles)
Bike Lane (.03 Miles)
Total (.47 miles)
This alignment features a cycle track (Class IV) facility along both
sides of Los Osos Valley Road between Calle Joaquin and Froom
Ranch Road for the majority of the length except for a small portion
near the intersection at Calle Joaquin. The 7-foot wide cycle track
would be constructed at curb level and would be aligned between
the sidewalk and a buffered curb area.
PROS: Compared to the other three, this alternative is the shortest and most direct and has the
highest potential for increasing active transportation. With most of the improvements on street, it
has the lowest potential for wetland or creek impacts. It would not require the necessity of a
bridge and would not have any agricultural impacts. The alignment would provide access to
Active Transportation Committee Agenda May 16, 2019 Page 3
more commercial services and the security concern would be least of all the alternatives given
the proximity away from the creek. The cost is also lower than two of the other alternatives.
CONS: Given the on-street nature of the facility, this alternative would require interface with 16
driveways and an intersection at Auto Park Way. To accommodate a widened curb area, right of
way would be needed in several locations especially in areas that may have wetland potential
(right of way has not been included in the cost estimate). There may also be potential
engineering challenges with realigning the curb face through the Los Osos Valley Road corridor
to accommodate drainage, which may increase cost.
Alternative 1:
Estimated Cost: $2,911,500
Route Length: Multi-use Path (.48 Miles)
Bike Lane (.23 Miles)
Bike Route (.14 Miles)
Total (.85 Miles)
This alignment includes an on-street bike lane & shared street
facility along Calle Joaquin Road. The alignment then
continues north parallel to Highway 101, turns west through
the Agricultural Reserve Area, then crosses Prefumo Creek
behind Target and connects with Froom Ranch Road at
Oceanaire.
Alternative 2:
Estimated Cost: $2,270,200
Route Length: Multi-use Path (.52 Miles)
Bike Lane (.23 Miles)
Bike Route (.14 Miles)
Total (.89 Miles)
This alignment is indicated in the Calle Joaquin Agricultural
Master Plan for the Calle Joaquin Agricultural Reserve. From
Froom Ranch Way, it crosses Prefumo Creek and parallels the
creek for 1,100 ft before crossing the agricultural reserve and
wraps around the BMW dealership before connecting to Calle
Joaquin Road.
Active Transportation Committee Agenda May 16, 2019 Page 4
Alternative 3:
Estimated Cost: $4,137,300
Route Length: Bike Path / Cycle Track (.7 Miles)
Total (.7 Miles)
This alternative follows the same alignment as Alt 2 for the
first 1,100 feet but then continues along the creek and crosses
the creek again before joining with Calle Joaquin behind the
AAA building.
Next Steps
The new alternative including the ATC recommendation will be provided to the City Council at
a study session on September 3, 2019.
Staff Recommendation: The ATC should select a preferred alternative. And, if a preferred
alternative is selected, it should recommend including it as an amendment to the Bicycle
Transportation Plan.
Attachment 3: Bob Jones Trail Alternative 4 Layout
Attachment 4: Bob Jones Trail Alternative 4 Cost Estimate
Attachment 5: Project Study Report Bob Jones Trail Oceanaire to Calle Joaquin Connection
5. OFFICER ELECTIONS
(FUKUSHIMA –20 MINUTES)
Article 3 of the Active Transportation Committee Bylaws (updated February 6, 2018), states that,
“The officers will consist of a Chairperson and Vice-Chairperson who will be elected annually at
a regular Committee meeting in each calendar year. The Chairperson will preside over all
meetings of the Committee and perform such duties as directed by the Committee. The Vice-
Chairperson will serve in the absence or incapacity of the Chairperson.” Additional officer duties
include writing quarterly progress reports, representing the Committee at the Mayor’s quarterly
luncheon, and representing the Committee at relevant Advisory Body and City Council meetings.
The term of office is for one year. No person shall serve in the office of chairperson or vice
chairperson for more than two consecutive terms. CM Brooks has completed two terms as Chair
and therefore cannot be reappointed to that office again. CM Kienow has completed two terms as
Vice Chair and therefore cannot be reappointed to that office again.
The Chair should open the floor for nominations for the office of Chairperson, close the floor for
nominations, and ask members to vote for one of the nominees. If only one nominee is offered,
then a voice vote can be taken. However, if more than one person is nominated, the ATC may
want to cast a secret ballot. The same process should be followed for the office of Vice Chair.
Active Transportation Committee Agenda May 16, 2019 Page 5
COMMENT AND DISCUSSION
6. Committee Member Updates (5 minutes)
7. Staff Updates (15 minutes)
a. Active Transportation Plan Update
b. Railroad Safety Trail Update
c. Bike Month Events
d. Budget Update
e. Agenda Forecast
ADJOURNMENT
The next Regular Meeting of the Active Transportation Commi ttee is scheduled for
Thursday, July 18 , 201 9, at 6:00 p.m., in the Council Hearing Room, 990 Palm Street, San Luis
Obispo, California.
ATTACHMENTS
1. Draft Minutes March 21, 2019 Regular Meeting
2. Draft Minutes April 17, 2019 Special Meeting
3. Bob Jones Trail Alternative 4 Layout
4. Bob Jones Trail Alternative 4 Cost Estimate
5. Project Study Report Bob Jones Trail Oceanaire to Calle Joaquin Connection
6. Minor Bikeway Improvements List
The City of San Luis Obispo wishes to make all of its public meetings accessible to the
public. Upon request, this agenda will be made available in appropriate alternative formats to
persons with disabilities. Any person with a disability who requires a modification or
accommodation in order to participate in a meeting should direct such requ est to the City Clerk’s
Office at (805) 781-7100 at least 48 hours before the meeting, if possible. Telecommunications
Device for the Deaf (805) 781-7107.
Agenda related writings and documents are available online or for public inspection at the Public
Works Department, 919 Palm Street, SLO. Meeting audio recordings can be found at the following
web address:
http://opengov.slocity.org/WebLink/1/fol/60965/Row1.aspx
DRAFT Minutes – Active Transportation Committee Meeting of March 21, 2019 Page 1
Minutes - DRAFT
ACTIVE TRANSPORTATION COMMITTEE
Thursday, March 21, 2019 1
Regular Meeting of the Active Transportation Committee 2
3
CALL TO ORDER 4
5
A Regular Meeting of the San Luis Obispo Active Transportation Committee was called to order 6
on Thursday, March 21, 2019 at 6:00 p.m. in the Council Hearing Room, located at 990 Palm 7
Street, San Luis Obispo, California, by Chair Brooks. 8
9
ROLL CALL 10
11
Present: Committee Members Timothy Jouet, Briana Martenies, Paul Orton, Jonathan 12
Roberts, and Chair Leah Brooks 13
14
Absent: Committee Members Jenna Espinosa and Vice Chair Ken Kienow 15
16
Staff: Active Transportation Manager Adam Fukushima, and Recording Secretary Lareina 17
Gamboa 18
19
PUBLIC COMMENT ITEMS NOT ON THE AGENDA 20
None. 21
22
--End of Public Comment-- 23
24
APPROVAL OF MINUTES 25
26
1.Review Minutes of the Active Transportation Committee Meeting of January 17, 2019:27
28
ACTION: UPON MOTION BY COMMITTEE MEMBER JOUET, SECONDED BY 29
COMMITTEE MEMBER ORTON, CARRIED 5-0-2 (COMMITTEE MEMBERS 30
ESPINOSA AND KIENOW ABSENT), to approve the Minutes of the Active Transportation 31
Committee Meeting of January 17, 2019, as presented. 32
33
2.Review Minutes of the Active Transportation Committee Meeting of February 26, 2019:34
35
ACTION: UPON MOTION BY COMMITTEE MEMBER ORTON, SECONDED BY 36
COMMITTEE MEMBER ROBERTS, CARRIED 5 -0-2 (COMMITTEE MEMBERS 37
ESPINOSA AND KIENOW ABSENT), to approve the Minutes of the Active Transportation 38
Committee Meeting of February 26, 2019, with amendments of clarification to lines 33 and 39
34. 40
41
Public Comment 42
None. 43
44
Attachment 1, Page 1 of 3
DRAFT Minutes – Active Transportation Committee Meeting of March 21, 2019 Page 2
--End of Public Comment-- 45
46
DISCUSSION ITEMS 47
48
1. United States Bicycle Route System: Route 95 49
50
Active Transportation Manager Fukushima provided a PowerPoint presentation and 51
responded to Committee inquiries regarding the development of the United States Bicycle 52
Route System. The Committee provided input on a preferred alignment of Route 95 53
through the Cit y limits. 54
55
Public Comment 56
Myron Amerine 57
58
--End of Public Comment-- 59
60
No action was taken on this item. 61
62
2. 2019 Summer Paving Plan Update 63
64
Active Transportation Manager Fukushima provided a PowerPoint presentation and 65
responded to Committee inquiries in regard to paving Broad Street between Tank Farm 66
Road and the southern city limits. 67
68
Public Comment 69
Myron Amerine 70
71
--End of Public Comment-- 72
73
No action was taken on this item. 74
75
76
COMMENT AND DISCUSSION 77
78
3. Committee Member Updates 79
Jouet Studios will be hosting a bike breakfast on April 1 as an early kick off to Bike Month. 80
Committee Member Orton’s term is up making this his final meeting as a member. 81
82
4. Staff Updates 83
84
Active Transportation Manager Fukushima provided a verbal update regarding the following: 85
● Active Transportation Plan Update 86
● Bicycle Friendly Community Reapplication 87
● Bike Month (Bike Rodeo and Bike to Work Day) 88
● Budget Update 89
● Agenda Forecast 90
Attachment 1, Page 2 of 3
DRAFT Minutes – Active Transportation Committee Meeting of March 21, 2019 Page 3
91
ADJOURNMENT 92
93
The meeting was adjourned at 7:49 p.m. The next Regular Active Transportation Committee 94
meeting is scheduled for Thursday, May 16, 2019 at 6:00 p.m., in the Council Hearing Room, 95
990 Palm Street, San Luis Obispo, California. 96
97
98
APPROVED BY THE ACTIVE TRANSPORTATION COMMITTEE: XX/XX/2019 99
100
101
Attachment 1, Page 3 of 3
DRAFT Minutes – Active Transportation Committee Meeting of April 17, 2019 Page 1
Minutes - DRAFT
ACTIVE TRANSPORTATION COMMITTEE
Wednesday, April 17, 2019 1
Special Meeting of the Active Transportation Committee 2
3
CALL TO ORDER 4
5
A Special Meeting of the San Luis Obispo Active Transportation Committee was called to order 6
on Wednesday, April 17, 2019 at 6:00 p.m. in the Council Hearing Room, located at 990 Palm 7
Street, San Luis Obispo, California, by Chair Brooks. 8
9
ROLL CALL 10
11
Present: Committee Members Thomas Arndt, Jenna Espinosa, Timothy Jouet, Briana 12
Martenies, Jonathan Roberts, Vice Chair Ken Kienow, and Chair Lea Brooks 13
14
Absent: None 15
16
Staff: Active Transportation Manager Adam Fukushima, and Recording Secretary Lareina 17
Gamboa 18
19
Oath: Swearing in of Thomas Arndt and Timothy Jouet 20
21
PUBLIC COMMENT ITEMS NOT ON THE AGENDA 22
None. 23
24
--End of Public Comment-- 25
26
APPROVAL OF MINUTES 27
No minutes to approve at this time. 28
29
Public Comment 30
None. 31
32
--End of Public Comment-- 33
34
DISCUSSION ITEM 35
36
1.Active Transportation Plan Bicycle Network37
38
Active Transportation Manager Fukushima provided a PowerPoint presentation and 39
responded to Committee inquiries in regards to bikeway facilities in the western and northern 40
areas of the City. 41
42
Public Comment 43
Attachment 2, Page 1 of 2
DRAFT Minutes – Active Transportation Committee Meeting of April 17, 2019 Page 2
Adrienne Harris (via email) 44
Gary Havas 45
Myron Amerine 46
47
--End of Public Comment-- 48
49
No action was taken on this item. 50
51
52
ADJOURNMENT 53
54
The meeting was adjourned at 7:49 p.m. The next Regular Active Transportation Committee 55
meeting is scheduled for Thursday, May 16, 2019 at 6:00 p.m., in the Council Hearing Room, 990 56
Palm Street, San Luis Obispo, California. 57
58
59
APPROVED BY THE ACTIVE TRANSPORTATION COMMITTEE: XX/XX/2019 60
61
62
Attachment 2, Page 2 of 2
1050 Southwood Drive
San Luis Obispo, CA 93401
P 805.544.7407 F 805.544.3863
Attachment 3, Page 1 of 1
PROJECT:Bob Jones Trail - Prefumo Creek Connection PROJ. NO.:170211
PHASE:LOVR Protected Bike Lanes Alternative EST./CHK.:WC/WC
CLIENT:City of San Luis Obispo DATE:5/8/2019
DESCRIPTION:SITE PREPARATION QUANTITY UNIT UNIT COST TOTAL
Tree Removal/Relocation 8 EA $600.00 $4,800
Concrete Pavement Removal 32,000 SF $3.00 $96,000
Concrete Curb & Gutter Removal 3,200 LF $10.00 $32,000
AC Pavement Removal 1,200 CY $30.00 $36,000
Agg. Base Removal 4,800 CY $30.00 $144,000
SUBTOTAL $312,800
DESCRIPTION:ROADWAYS QUANTITY UNIT UNIT COST TOTAL
6" AC Pavement (Roadway)18,700 SF $4.00 $74,800
8" PCC Pavement (Roadway)3,600 SF $8.00 $28,800
23" Agg. Base (Roadway)18,700 SF $5.00 $93,500
6" Agg. Base (Roadway)3,600 SF $1.50 $5,400
Bus Pad 1,200 SF $38.00 $45,600
Cross Gutter and Spandrel 1,950 SF $22.00 $42,900
Concrete Sawcut 110 LF $7.50 $800
AC Sawcut 5,200 LF $4.00 $20,800
Concrete Truck Apron 880 SF $8.00 $7,000
SUBTOTAL $319,600
DESCRIPTION:ROAD EDGES QUANTITY UNIT UNIT COST TOTAL
Concrete Driveway Approach 2,000 SF $18.50 $37,000
ADA Ramp 22 EA $3,000.00 $66,000
Curb & Gutter 4,700 LF $45.75 $215,000
Curb 2,200 LF $47.00 $103,400
AC Dike 950 LF $18.50 $17,600
Concrete Sidewalk 23,900 SF $10.00 $239,000
4" AC Pavement (Bikeway)31,600 SF $2.50 $79,000
12" Agg. Base (Bikeway)31,600 SF $2.50 $79,000
Relocate Bus Shelter 1 EA $10,000.00 $10,000
SUBTOTAL $846,000
DESCRIPTION:TRAFFIC CONTROL QUANTITY UNIT UNIT COST TOTAL
Thermoplastic Striping & Markers
White Dashed Laneline (Caltrans Detail 9)5,700 LF $1.75 $10,000
White Dashed Lane Drop Line (Caltrans Detail 37B)400 LF $3.00 $1,200
White Channelizing Line (Caltrans Detail 38)500 LF $1.75 $900
White Right Edgeline (Caltrans Detail 27B)1,700 LF $1.50 $2,600
White Dashed Right Edgeline (Caltrans Detail 27C)900 LF $1.50 $1,400
White Bike Lane Line (Caltrans Detail 39)300 LF $1.75 $500
White Dashed Bike Lane Line (Caltrans Detail 39A)800 LF $1.75 $1,400
Paint Curb Red 500 LF $2.50 $1,300
Remove Striping 6,100 LF $5.75 $35,100
Thermoplastic Crosswalks 1,100 SF $11.00 $12,100
Thermoplastic Markings 500 SF $11.00 $5,500
Green Bike Lane Paint 1,500 SF $3.25 $4,900
Relocate Signs 19 EA $230.00 $4,400
Traffic Control 1 LS $55,000.00 $55,000
SUBTOTAL $136,300
Sheet 1 of 2OPINION OF PROBABLE CONSTRUCTION COST
F:\proj\2017\170211\2 Project Management\Cost Estimates\170211 Bob Jones Trail - LOVR Protected Bike Lanes Alternative OPCC.xlsx
Attachment 4, Page 1 of 2
PROJECT:Bob Jones Trail - Prefumo Creek Connection PROJ. NO.:170211
PHASE:LOVR Protected Bike Lanes Alternative EST./CHK.:WC/WC
CLIENT:City of San Luis Obispo DATE:5/8/2019
DESCRIPTION:UTILITIES QUANTITY UNIT UNIT COST TOTAL
Relocate Fire Hydrant 7 EA $4,250.00 $29,800
Relocate Water Meter 13 EA $750.00 $9,800
Relocate Storm Drain Inlet 12 EA $7,250.00 $87,000
Relocate Power Pole 2 EA $27,900.00 $55,800
SUBTOTAL $182,400
DESCRIPTION:MISCELLANEOUS QUANTITY UNIT UNIT COST TOTAL
Landscape and Irrigation 23,100 SF $3.75 $86,600
Erosion Control 1 LS $10,000.00 $10,000
SUBTOTAL $96,600
TOTAL (WITHOUT MARKUPS)$1,893,700
MARK-UPS
Construction Contingency (25%)$473,400
Survey and Design (10%)$189,400
Environmental Permitting $50,000
CM and Administration (15%)$284,100
MARK-UP SUBTOTAL $996,900
TOTAL ESTIMATED COST (INCLUDING MARK-UPS)$2,890,600
ASSUMPTIONS AND EXCLUSIONS
1. City assessments, fees, permits, inspections, & environmental mitigation costs not included
2. Design fees not included
3. Based on SLO County Unit Costs and recent contractor bids as applicable
4. All SLO County unit costs have been escalated to 2019 Q1 Caltrans Cost Index. Escalation from 2011 baseline to 2019 is 1.86
5. All unit costs from recent contractor bids have been escalated to April 2019 using ENR's cost index history
6. All quantities and costs are approximate and subject to change during detailed design
THIS OPINION OF PROBABLE CONSTRUCTION COST HAS BEEN PREPARED USING STANDARD ENGINEERING ESTIMATE PROCEDURES. CANNON HAS NO CONTROL
OVER ACTUAL CONTRACTOR COSTS, BIDDING, OR MARKET CONDITIONS. WE RECOMMEND THAT THESE COSTS BE VERIFIED WITH CONTRACTOR BIDS.
OPINION OF PROBABLE CONSTRUCTION COST Sheet 2 of 2
F:\proj\2017\170211\2 Project Management\Cost Estimates\170211 Bob Jones Trail - LOVR Protected Bike Lanes Alternative OPCC.xlsx
Attachment 4, Page 2 of 2
Project Study Report
Bob Jones Trail Oceanaire to
Calle Joaquin Connection
Prepared for
City of San Luis Obispo
Public Works Department
919 Palm Street
San Luis Obispo, CA 93401
Prepared by
Cannon
1050 Southwood Drive
San Luis Obispo, CA 93401
Althouse and Meade, Inc.
1602 Spring Street
Paso Robles, CA 93446
Earth Systems Pacific
4378 Old Santa Fe Road
San Luis Obispo, CA 93401
Attachment 5, Page 1 of 21
Project Study Report
Bob Jones Trail Oceanaire to Calle Joaquin
Administrative Draft
November, 2018
Prepared By:
Attachment 5, Page 2 of 21
Contributors
City of San Luis Obispo
Adam Fukushima, Active Transportation
Manager
Jake Hudson, Transportation Manager
Robert Hill, Natural Resources Manager
Earth Systems Pacific
Robert Down, Vice President, Senior Engineer
Cannon
Larry Kraemer, Director, Public Infrastructure
Chenin Otto, Civil Associate Engineer
Althouse and Meade, Inc
LynneDee Althouse, Principal Scientist
Darcee Guttilla, Senior Biologist
Attachment 5, Page 3 of 21
Bob Jones Trail
Prefumo Creek Connection to Oceanaire
Specification No 91374
Project Study Report
City of San Luis Obispo Page 1
November 2018
Table of Contents
1 Introduction ......................................................................................................................................... 2
1.1 Project Overview ........................................................................................................ 2
1.2 Purpose and Scope .................................................................................................... 3
1.3 Project Study Area ..................................................................................................... 3
1.4 Trail Goals and Objectives ........................................................................................ 3
2 Design Standards ............................................................................................................................... 4
2.1 City of San Luis Obispo Standards .......................................................................... 4
2.2 California HDM ........................................................................................................... 4
2.3 National Association of City Transportation Officials (NACTO) Design Guidance 4
2.4 City of San Luis Obispo 2013 Bicycle Transportation Plan ................................... 4
2.5 Bob Jones City-To-Sea Trail Preliminary Alignment Plan, 2002 ........................... 4
3 Existing Conditions, Opportunities and Constraints ...................................................................... 5
3.1 Previous Studies ........................................................................................................ 5
3.2 Land Use ..................................................................................................................... 5
3.3 Agricultural Resources.............................................................................................. 6
3.4 Biological Resources................................................................................................. 6
3.5 Cultural Resources .................................................................................................... 7
3.6 Trail Connection Opportunities ................................................................................ 7
3.7 Right of Way Constraints .......................................................................................... 7
4 User Needs .......................................................................................................................................... 8
4.1 Bicycle and Walking Experience .............................................................................. 8
4.2 Facilities, Activity Nodes and Destinations............................................................. 8
5 Analysis of Trail Alternatives............................................................................................................. 8
5.1 Trail Alternatives ........................................................................................................ 8
5.1.1 Alternative 1: Trail Along Agricultural Access Road ........................................ 10
5.1.2 Alternative 2: Trail along Creek ....................................................................... 10
5.1.3 Alternative 3: Trail along Creek all the way to Calle Joaquin .......................... 10
5.2 Analysis of Existing Bridge Structure and Condition .......................................... 11
5.3 Cost Analysis ........................................................................................................... 11
6 Alignment Selection ......................................................................................................................... 18
6.1 Advisory Body Input and Community Input .......................................................... 18
7 Preferred Alignment ......................................................................................................................... 18
7.1 Consultant Recommendations ............................................................................... 18
8 Next Steps.......................................................................................................................................... 18
List of Figures
1. Bob Jones Trail City of San Luis Obispo
Overview
2. Bob Jones Trail Typical Cross Section
3. Alignment Alternatives Overview
List of Tables
1. Summary of Cost Comparison
2. Alignment Alternatives Matrix
3. Alignment Alternatives Cost Comparison
4. Alignment 1 Cost Estimate
5. Alignment 2 Cost Estimate
6. Alignment 3 Cost Estimate
Attachment 5, Page 4 of 21
Bob Jones Trail
Prefumo Creek Connection to Oceanaire
Specification No 91374
Project Study Report
City of San Luis Obispo Page 2
November 2018
1 Introduction
1.1 Project Overview
The Bob Jones Trail is a regional pathway intended to connect the City of San Luis Obispo’s downtown
core to Avila Beach. The Bob Jones Trail is comprised of numerous segments within the City of San Luis
Obispo and unincorporated County of San Luis Obispo. As a critical piece in the City’s 2013 Bicycle
Transportation Plan (City Bike Plan) as well as the County Bikeways Plan, the Trail provides a
transportation and recreation corridor and a connection to the state-legislated California Coastal Trail.
Several segments of this trail have been constructed and several more are in the planning and design
phase. The Bob Jones Trail segments within the City of San Luis Obispo are highlighted in Figure 1
below.
The extension of the Bob Jones Trail along Prefumo Creek from the end of Oceanaire Avenue (Segment
4), near Froom Ranch Way, to the northern end of Calle Joaquin is identified in the 2013 Bicycle
Transportation Plan, as well as the Agricultural Master Plan (Ag Plan) for the Calle Joaquin Agricultural
Reserve. However, both documents indicate differences in the alignment of the trail; depending on which
alignment is constructed the trail will be approximately 2,500 to 3,500 feet long. Near Oceanaire Avenue
the trail will cross Froom Ranch Road and then cross over Prefumo Creek via a proposed
bikeway/pedestrian bridge. From the creek crossing, the trail will generally follow the creek or existing
agricultural dirt roads until it connects to Calle Joaquin.
Figure 1: Bob Jones Trail City of San Luis
Obispo Overview
Segment 1: Marsh Street to Prado Road
Segment 2: Prado Road to Los Osos Valley
Road
Segment 3: Calle Joaquin to Oceanaire
Ave/Froom Ranch Way
Segment 4: L.O.V.R. to South Higuera (City
Octagon Barn Connection)
Segment 5: Octagon Barn to Avila Beach
(County of San Luis Obispo)
Attachment 5, Page 5 of 21
Bob Jones Trail
Prefumo Creek Connection to Oceanaire
Specification No 91374
Project Study Report
City of San Luis Obispo Page 3
November 2018
1.2 Purpose and Scope
The goals of this project study report are to evaluate alignment alternatives, review constraints and
opportunities, and select a preferred alignment for the extension of the Bob Jones Trail from Calle
Joaquin to Oceanaire. The report also presents a concept design for the preferred alternative to further
the “readiness” of this project to compete for grants funding for final design and construction, and help
inform the environmental documentation of the project. An effort has been made to analyze how the trail
alignment interfaces with potential future development in the area, which will include the extension of
Froom Ranch Way over Prefumo Creek.
1.3 Project Study Area
The specific focus of this project study is from the southern end of Oceanaire Drive to Calle Joaquin. The
proposed route starting from Oceanaire going south traverses through City-owned land and right-of-way
dedicated by the Prefumo Creek Commons development. Once the trail crosses the creek to the east
bank, the trail will be within the City-owned agricultural reserve. The agricultural reserve is adjacent to
Prefumo Creek and the proposed San Luis Ranch development, which includes an agricultural reserve
dedication directly adjacent to the existing reserve. The San Luis Ranch development project may
include a construction access road along the east border of the City reserve which may ultimately be
dedicated as an access easement for a shared agricultural access road for both parcels. It is also
important to note that this area is entirely contained within the 100-year flood plain and it is not feasible to
fill within the area because of impacts to the floodplain and historical drainage path. The alternatives for a
connection to Calle Joaquin are discussed in detail later in this report, but Alternative 3 crosses back to
the west side of Prefumo Creek to follow the creek corridor through four private properties.
1.4 Trail Goals and Objectives
The goal of Trail Segment 4 of the City of SLO portion of the Bob Jones Trail is to provide a safe and
convenient bicycle and pedestrian connection between Calle Joaquin through the agricultural reserve to
the residential and commercial developments adjacent to Prefumo Creek to the south of Madonna Road.
The trail should integrate with adjacent developments and the City’s Bicycle Master Plan. Environmental,
cultural, biological, and agricultural impacts as well as construction costs should be minimized as much
as possible to increase the likelihood for funding and feasibility of construction.
Some additional overall objectives for the Bob Jones City-to-Sea Trail are listed below from the Bob
Jones City-To-Sea Trail Preliminary Alignment Plan, 2002.
Trail Alignment Objectives
· Minimize trail encroachment into creek setback areas. Encroachment should only occur where
physical constraints prevent placement outside of the setback area or where encroachment into
the setback area is deemed the most appropriate location for the trail facility
· Avoid encroachment into the creek channel and riparian habitat where possible.
· Look for opportunities to support and enhance recreational users.
· Look for important connections - align trail with other bike routes, urban uses and residential
areas.
· Avoid vehicle and pedestrian conflicts to the greatest extent possible.
· Minimize creek and drainage crossings.
· Look for good connections for law enforcement and maintenance access.
· Utilize signalized intersections at street crossings where possible.
· Align trail to allow for logical placement of staging areas.
· Avoid areas of extreme topography.
· Maintain consistency with the Bicycle Transportation Plan.
Attachment 5, Page 6 of 21
Bob Jones Trail
Prefumo Creek Connection to Oceanaire
Specification No 91374
Project Study Report
City of San Luis Obispo Page 4
November 2018
Trail Design Objectives
· Provide secure and controlled access for:
o Police and Fire Support
o Trail Maintenance
· Reduce potential for vandalism, theft and trespass.
· Provide for directional and safety signage.
· Provide security lighting at staging areas and road crossings.
· Locate staging areas at appropriate locations along trail that provide:
o Restrooms
o Telephone
o Drinking water
o Bike racks and lockers
o Trash receptacles
o Shelter / seating
o Information kiosks
· Provide Informational Kiosks at major staging areas for:
o Rules of trail use and hours of operation, directional signing (“you are here”)
o Location map for nearby services, significant information references, and mapping
· Provide interpretive exhibits at appropriate locations along the trail corridor for:
o Environmental and historical information
· Incorporate consistent design character for all areas of the trail corridor.
· Choose appropriate landscape materials, such as local native plants, for all new landscape and
enhancement areas.
· Provide for physical buffers between trail and adjacent uses or habitats.
· Use fences and/or other barriers:
o As a separation between the trail and sensitive riparian habitat
o As a separation from adjacent land uses
2 Design Standards
2.1 City of San Luis Obispo Standards
The Trail design should be consistent with the City of San Luis Obispo Standards for Class I Bikeways,
which generally provides for a 12’ wide solid surface trail with two-foot shoulders on each side
2.2 California HDM
The trail should follow design guidelines provided by the California Highway Design Manual.
2.3 National Association of City Transportation Officials (NACTO) Design Guidance
The City has adopted NACTO as a primary design guide for development of bicycle facilities. The trail
should use best practices from this design guidance as possible.
2.4 City of San Luis Obispo 2013 Bicycle Transportation Plan
The City’s Bike Plan provides general route and design guidelines; some importance design guidance
that applies to this project include:
· Where a bikeway extends along a creek, a four-foot tall split rail or wood and wire fence shall be
installed at the inside edge of the bikeway to discourage trail users from entering the creek.
· Bikeways that cross or border agricultural land shall be fenced and signed to discourage
trespassing onto adjoining areas.
2.5 Bob Jones City-To-Sea Trail Preliminary Alignment Plan, 2002
The Bob Jones Trail Plan describes a scenic bike path along the creek corridors from the City of San Luis
Obispo to Avila Beach. The plan designates the “Bob Jones” standard as a 12’ wide asphalt Trail outside
the creek setback (or an 8’ wide Trail within the creek setback) with two-foot shoulders.
Attachment 5, Page 7 of 21
Bob Jones Trail
Prefumo Creek Connection to Oceanaire
Specification No 91374
Project Study Report
City of San Luis Obispo Page 5
November 2018
Figure 2: Bob Jones Trail Typical Section
Source: Adapted from Bob Jones City-To-Sea Preliminary Alignment Plan, 2002
3 Existing Conditions, Opportunities and Constraints
3.1 Previous Studies
Previous studies for this project area include:
Agricultural Master Plan for
the City of San Luis Obispo’s
Calle Joaquin Agricultural
Reserve, 2011
City of San Luis Obispo
Bicycle Transportation Plan,
2013
Bob Jones City-To-Sea Trail
Preliminary Alignment Plan,
2002
Additional studies reviews for this project include:
· Environmental Impact Report for the San Luis Ranch Project, 2017
3.2 Land Use
Figure 3 shows the three trail alignment alternatives. Starting from the north end of the project, the trail
begins at the south end of Oceanaire Drive, which services Low Density Residential to the North west of
Prefumo Creek. The trail will cross City right-of-way dedicated for the extension of Froom Ranch Way
and connect to City-owned property zoned for Conservation/Open Space dedicated as part of the
Attachment 5, Page 8 of 21
Bob Jones Trail
Prefumo Creek Connection to Oceanaire
Specification No 91374
Project Study Report
City of San Luis Obispo Page 6
November 2018
Prefumo Creek Commons commercial project to the west. This area is currently developed as a park and
creek Open Space area. Once the trail crosses to the east of Prefumo Creek the Trail runs through City-
owned property zoned for Conservation/Open Space bordered by Highway 101 to the east, Tourist
Commercial to the South, Prefumo Creek to the East and residential/future Froom Ranch Right of Way to
the North. Properties adjacent to the creek south of the City owned property area are zoned for
commercial. At this time, the properties are mostly used for automotive sales, service, and associated
businesses. The Bear Valley Center hosts a variety of commercial and retail services.
3.3 Agricultural Resources
A large portion of this trail will run through or adjacent to existing agricultural land. Agricultural operations
in this area date back to approximately 1900. Most of this land is currently being cultivated for row crops.
The soils where crops are currently planted are considered prime agricultural soils. The only constraint is
that some soils may become unworkable in the wet season and the farm road on the eastern border of
the City’s agricultural reserve can become inaccessible with heavy rains. The Trail should be aligned to
minimize impacts to cultivation and farming access.
The 25-acre existing Calle Joaquin Agricultural Reserve was dedicated to the City of San Luis Obispo as
part of the preservation of agricultural land requirement when adjacent agricultural land was developed.
With the development of the San Luis Ranch parcel, the agricultural reserve will more than double. The
current plan for San Luis Ranch includes a shared farm access road to be constructed on the San Luis
Ranch parcel for the benefit of the existing reserve and the reserve dedicated by that project. The Calle
Joaquin Agricultural Reserve Master Plan includes provisions for the Bob Jones Trail along the creek
corridor. Plans for the property are to lease 20 acres of cultivatable land to a nonprofit for production with
plans for a light processing facility and an education center. Maintenance of the creek corridor, Bob
Jones Trail, and other small areas will be maintained by the City. Since the master plan was developed,
Central Coast Grown has secured a 20-year lease on the property and plans are developing as
anticipated.
3.4 Biological Resources
Most of the alignment of the trail will run along the Prefumo Creek Corridor. In the vicinity of this project,
Prefumo Creek is carrying water from Laguna Lake to San Luis Obispo Creek. Some man-made
concrete structures, irrigation lines, storm drain outlets and other evidence of human management of this
creek is present. Significant amounts of trash and evidence of human habitation within the creek corridor
were observed during site visits for this project. It also appeared that stormwater runoff from some of the
commercial properties on the south end of the project may be going directly into the creek. In a 2016
Biological Assessment Report for San Luis Ranch by Althouse and Meade Prefumo Creek’s riparian
corridor was described as “Gdominated by arroyo willow but is invaded by non-native trees such as
Canary Island date palm which have encroached from residential yards on the west side of the creek.
The eastern creek bank is lined with mature blue gum eucalyptus. Prefumo Creek is an important
connection between San Luis Obispo Creek and Laguna Lake. It is often seasonally dry, and water flow
is subsurface during summer months.”
In the Environmental Impact Report for San Luis Ranch, Rincon Environmental staff reported that the
project site contains suitable habitat for sixteen special status animal species, but no special status plant
species. The creek corridor is a potential habitat for some of the special status species, though none of
these species were detected during the study. Other species, such as various birds and monarch
butterflies identified within the report, are specific to grasslands and tree stands that are not within the
bikeway project area. During the San Luis Ranch project study, as well as site visits for this project,
standing pools of water were observed near the proposed bridge crossing of Froom Ranch Way.
According to Althouse and Meade’s report at the time they were observed in May 2016 the pools
contained a sufficient amount of cover, protective canopy, and depth to support California red-legged frog
breeding; and the California Natural Diversity Database (CNDDB) documents an occurrence of CRLF just
north of the confluence of Prefumo Creek and San Luis Obispo Creek, approximately one-half mile
downstream from the project site. In January 2018, the U.S. Fish and Wildlife Service stated that “San
Attachment 5, Page 9 of 21
Bob Jones Trail
Prefumo Creek Connection to Oceanaire
Specification No 91374
Project Study Report
City of San Luis Obispo Page 7
November 2018
Luis Ranch may affect but is unlikely to adversely affect the federally threatened California red-legged
frog (Rana draytonii).”
The report also notes that Prefumo Creek is a federally-designated critical habitat for the south-central
California Coast distinct population segment (DPS) steelhead. According to the 2011 Agricultural Master
Plan for the San Joaquin Agricultural Reserve (Ag Plan), the water quality within the project vicinity is
inferior and steelhead do not stay within this area; they only migrate through the area when the creek
flows during the rainy season. In November 2017, the National Marine Fisheries Services stated that the
San Luis Ranch Project would not have a direct effect to steelhead trout: “Because usable habitat for
steelhead within the action area persists for only a few months during the wet season (e.g.,
December through May) and no work would occur during this period or when water is present in the
creek, no direct effects to steelhead are anticipated to occur from the proposed action.”
The Prefumo Creek riparian zone (willow woodland vegetation) is considered Waters of the State on the
banks, and Waters of the U.S. and the State below the ordinary high water mark in the channel and within
adjacent wetlands that contain hydric soil, wetland vegetation, and exhibit wetland hydrology. Impacts to
Waters of the State and outside of federal jurisdiction require authorization under the Porter Cologne Act
and a Lake and Streambed Alteration Agreement under Fish and Game Code 1602.
Potential wetland habitat occurs on the east side of Prefumo Creek near the proposed bridge for
Alignment 3. This habitat was identified in the Ag Plan as an area that is prone to flooding and would
likely be a feature regulated as a Water of the State and Water of the U.S. (special aquatic site).
This area is identified on Figure 3.
3.5 Cultural Resources
The alignment of this project is proposed to cross existing developed land, adjacent to a creek corridor,
and through established agricultural land. There are no known major items of cultural or historical
significance on the current City property. No disturbance to cultural resources is anticipated with this
project, however areas within 150’ of Prefumo Creek are considered sensitive archeological sites and so
the City policy requires a Phase I Archeological Resources Inventory for permitting of construction within
this area.
3.6 Trail Connection Opportunities
This section of the trail is a critical link in the City’s Bob Jones City-to-Sea Trail which is intended to
connect the west end of the downtown San Luis Obispo to the southwest corner of the city limits with
connection to the County portion of the trail beyond, ultimately connecting to Avila Beach. This section is
intended to connect the Laguna Lake (Oceanaire) residential neighborhood through the retail commercial
area south of Froom Ranch Road to Calle Joaquin with a connection to the future extension of Froom
Ranch Way East of Prefumo Creek. The Class I path will end at Calle Joaquin and the bikeway will
continue via surface streets to another Class I connection planned to the Octagon Barn, which is the
City’s southernmost portion of the trail. Proposed development (San Luis Ranch) to the north east of the
trail will provide a Class I connection to Madonna Road and ultimately a better connection to downtown
San Luis Obispo. The proposed development will have a direct link to this section of the Bob Jones Trail
at the proposed Froom Ranch Way bridge crossing.
3.7 Right of Way Constraints
Alignments 1 and 2 are contained within city property and right-of-way. Alignment 1 is proposed to run
along the eastern border of the existing city-owned agricultural reserve. In this area there is a 10’ PG&E
pole line and Public Utility Easement that may restrict how close the path can be to the property line,
which may push the bike path into the cultivatable land and cause an impact to the existing lease on the
property. Alignment 2 will run adjacent to an existing landscape easement in favor of the adjacent
commercial properties along Calle Joaquin.
Alignment 3 passes through five separate private properties. There is an existing drainage and Public
Utility Easement that is 90’ wide centered on the creek through these properties, so some of the
Attachment 5, Page 10 of 21
Bob Jones Trail
Prefumo Creek Connection to Oceanaire
Specification No 91374
Project Study Report
City of San Luis Obispo Page 8
November 2018
development is set back far enough to provide space for a trail between the developed facilities and the
creek. However, there will be some impacts to existing facilities adjacent to the creek and easements will
need to be obtained. Alternative 3 reaches Calle Joaquin on the inside of a roadway curve, and a safe
connection will be needed to the intersection of Los Osos Valley Road. This connection can be contained
within existing City right-of-way, but it may require relocation and reconstruction of some existing facilities.
4 User Needs
4.1 Bicycle and Walking Experience
According to a bicycle user survey conducted by the San Luis Obispo Council of Governments
(SLOCOG), 64.5% of residents would use a bicycle more if there were more low-stress bicycle facilities
that provide more separation from cars or lower traffic speeds. Each of the alternatives feature Class I
multiuse paths where motor vehicle use would be prohibited. Also, by prohibiting motor vehicle use, each
alternative provides separation from motor vehicle traffic and reduced traffic noise to the benefit of the
walking experience.
4.2 Facilities, Activity Nodes and Destinations
This segment of the Bob Jones Trail serves a few different destinations including: three schools in the
Laguna Lake area, commercial areas along Los Osos Valley Road and Madonna Road, the City Farm
and education center on the agricultural reserve, and the Octagon Barn on South Higuera. The trail will
be portion of a connection for residents from the east side of Highway 101 to businesses and schools on
the west side and vice versa. For example, a student who lives in the Los Ranchos development may
use the path along their way to C.L. Smith Elementary school. The trail could also be used by residents
and workers from future development along the southern end of Calle Joaquin to access the Madonna
Plaza, and someday destinations east of Highway 101 via the Prado Road Overpass. The path will help
connect users to the City Farm, the Octagon Barn, and ultimately to Avila Beach via the County of San
Luis Obispo’s portion of the trail system.
5 Analysis of Trail Alternatives
This section presents the alignments that were reviewed as a part of this analysis and the pros and cons
of each of those alternatives. See Figure 3 for the Trail alternatives.
5.1 Trail Alternatives
The alternatives presented here stemmed out of the two design documents, the City’s 2013 Bicycle
Transportation Plan and the Agricultural Master Plan for the Calle Joaquin Agricultural Reserve. Some
potential new alignments became apparent upon preliminary review of the two published alternatives. All
alternatives begin on the northern end at an existing connection to Oceanaire Drive. From here the Trail
proceeds south across a proposed extension of Froom Ranch Way and through existing recreation
facilities adjacent to the Prefumo Creek Commons development to a creek crossing location. The
crossing location and the extension of the trail to Calle Joaquin has three main alternatives presented
below. See Table 2 for a matrix review of the alternatives. The alternatives within this report will be
presented for public outreach and review by appropriate advisory bodies to help select the best one.
Attachment 5, Page 11 of 21
POTENTIALWETLANDMEADOWFigure 3: Trail Alignment AlternativesAttachment 5, Page 12 of 21
Bob Jones Trail
Prefumo Creek Connection to Oceanaire
Specification No 91374
Project Study Report
City of San Luis Obispo Page 10
November 2018
5.1.1 Alternative 1: Trail Along Agricultural Access Road
This alignment was indicated in the City’s 2013 Bicycle Transportation Plan. On the east side of Prefumo
Creek the path follows an existing agricultural access road south-east on the north-eastern border of the
Calle Joaquin Agricultural Reserve toward the north end of Calle Joaquin.
This alignment provides a fairly direct, flat and scenic route with one creek crossing. There appears to be
adequate width to meet design recommendations for a 12’ wide path. This route runs between two
agricultural fields which may have more impact to agricultural operations and cause more exposure for
the users of the path to agricultural equipment. The route likely has the least impact to the creek corridor,
but it does not benefit from the shade of the trees along the creek. Some users may prefer to ride closer
to the natural edge of the creek. The end of this path takes users right past the City Farm and provides
good connectivity to that site, however the Trail does not align with the preliminary plans for developing
the City Farm facilities. The Trail would run parallel to the eastern property line of the existing city
agricultural reserve. There is an existing PG&E pole line and Public Utility Easement that spans this
property line, so the trail may be pushed into agricultural operations in the existing leased property.
Alternative 1 would minimize impacts to riparian vegetation with a perpendicular crossing near the
proposed Froom Ranch Way Bridge. State agency authorization for the bridge and approach ramps
would be required from the California Department of Fish and Wildlife (CDFW) and the Regional Water
Quality Control Board (RWQCB).
5.1.2 Alternative 2: Trail along Creek
This alignment is indicated in the Agricultural Master Plan for the Calle Joaquin Agricultural Reserve (Ag
Plan). The path follows the same general alignment as Alternative 1 on the west side of Prefumo Creek
at the Prefumo Commons, but it continues south to a creek crossing shown in the Agricultural Master
Plan. From the bridge the path follows the creek south along the border of the riparian zone from the
bridge crossing to the edge of the City’s property. Alternative 2 would be placed on the edge of
approximately 1100 feet of riparian habitat and would avoid permanent impacts to most of the riparian
habitat. From the south side of City Farm, the path shown on the Ag Plan continues to generally follow
the border of the property all the way to the cul-de-sac at the north end of Calle Joaquin.
This trail also provides a relatively flat and pleasant user experience with one creek crossing. This
alignment also appears to provide adequate width to meet design recommendations for a 12’ wide path,
though as the design is developed there may be more challenges to providing a wide flat path adjacent to
the creek bank. This option utilizes more of the existing recreation facilities adjacent to the Prefumo
Creek Commons project, but it also requires more modification of the existing trail to provide adequate
width for the trail. This trail is a little less direct, however the trail is consistent with the vision for the Bob
Jones trail under the shade and along the creek corridor. To provide the most direct route possible and
prevent shortcutting some agricultural land will be split by the path near the end. The existing operations
of the City Farm and agricultural lease have provided for this alignment with a 20’ buffer from the edge of
agricultural operations to the edge of the creek riparian habitat and the trail will provide good access for
the City Farm. State agency authorization would be required for biological impacts such as pruning to
the edge of riparian for installation of the bike path (without removing riparian vegetation) and installation
of the creek crossing at bridge site B.
5.1.3 Alternative 3: Trail along Creek all the way to Calle Joaquin
Alignment 3 follows the Alternative 2 toward the City Farm and diverges where Alternative 2 heads away
from the creek and Alternative 3 continues along the creek corridor. As this alignment was developed it
was determined that the west creek bank provided the most room for the trail. There is an existing
drainage and Public Utility Easement that is 90’ wide centered on the creek through these properties, so
most of the development is setback far enough to provide space for a trail between the developed
Attachment 5, Page 13 of 21
Bob Jones Trail
Prefumo Creek Connection to Oceanaire
Specification No 91374
Project Study Report
City of San Luis Obispo Page 11
November 2018
facilities and the creek. However, there will be some impacts to existing facilities adjacent to the creek
and easements will need to be obtained. The path crosses back over the creek where it follows the creek
corridor out to Calle Joaquin through private property. Alternative 3 would be placed in or on the edge of
approximately 2750 feet of riparian habitat. Along Calle Joaquin there is a potential to provide a trail out
to Los Osos Valley Road by widening the sidewalk or possibly by providing a two-way cycle track.
This alternative provides the most direct and possibly the most pleasant user experience along the creek
corridor. However, this alignment would require two creek crossings and the path would likely need to be
narrowed to 8’ to minimize impacts to the creek and adjacent properties. The City does not currently own
the right-of-way for this entire trail and easements would be needed through five separate private
properties. The trail could provide a potential benefit to adjacent property owners with fencing and
lighting enhancements. There may also be the potential to reduce creek pollution by providing a buffer
between adjacent properties and the creek bank. This trail is the most expensive of the three alternatives
and it would also have the most impact to the creek and adjacent properties.
5.2 Analysis of Existing Bridge Structure and Condition
The City currently has a bridge in storage that may be useful for this project. The bridge is in two pieces
that are approximately 50’ long each, together they could span 100’. The crossing proposed for
Alternatives 2 and 3 may be able to use this bridge, however the cost associated with designing and
constructing connections and abutments for this bridge versus a new bridge have not been evaluated at
this time.
5.3 Cost Analysis
A preliminary costs analysis was completed for the three alternatives. The costs estimates are based
loosely on the preliminary alignment length, bridge crossings, and preliminary design needs.
Maintenance and right-of-way acquisition were not included in the estimates. See Tables 3-6 for cost
estimates for each alternative.
Table 1: Summary of Cost Comparison
TOTAL TRAIL
LENGTH (ft) TOTAL COST
ALIGNMENT 1 - ALONG AG SERVICE ROAD WITH
BRIDGE LOCATION A 4,480 $2,911,500
ALIGNMENT 2 - ALONG CREEK WITH BRIDGE
LOCATION B 4,670 $2,270,000
ALIGNMENT 3 - ALONG CREEK TO CALLE JOAQUIN
WITH BRIDGES A & B 3,320 $4,137,300
Note: See following pages for assumptions and exclusions
Attachment 5, Page 14 of 21
1Agricultural Access Roadadjacent to Ag Reserve to Calle Joaquin Cul-de-Sac2Along creek and through Ag Reserve toCalle Joaquin Cul-de-sac3Along creek toCalle Joaquin Bridges B & D• Moderate-High user experience: scenic, flat, straight, downside may be no shade • Moderate-High user experience: scenic, relatively flat, shaded, potential for bird watching and Creekside recreation• Moderate-High user experience: scenic, relatively flat, shaded, potential for bird watching and Creekside recreation• Good access and exposure to City Farm & Ag Center • Good access and exposure to City Farm & Ag Center • Appears to be most direct with potential for the longest separated low-stress path• DESIGN OPTION: Design shown slight modification from Ag Plan to prevent shortcutting• DESIGN OPTION: Less exposure to Ag Center, but there may be an option to put a trail spur in• DESIGN OPTION: With Bridge at Location B, promotes use of previously installed improvements• Moderate-High safety: good visibility• Moderate-High safety: perception of safety may be decreased with narrow corridor in an area with high transient traffic; however, increased access for police patrol and increased number of users may reduce the transient use and may increase the overall safety of the creek corridor• Moderate-High safety: perception of safety may be decreased with narrow corridor in an area with high transient traffic; however, increased access for police patrol and increased number of users may reduce the transient use and may increase the overall safety of the creek corridor• Potential exposure to agricultural sprays and agricultural equipment • Potential exposure to agricultural sprays, but separated from agricultural equipment• Potential exposure to agricultural sprays, but separated from agricultural equipment• High/Good connectivity on both ends• High/Good connectivity on both ends• Most direct connection• Minimal impacts to riparian habitat at creek• Moderate potential for riparian habitat impact• High potential for riparian habitat impact • Potential for CDFW to require maintenance permit with mitigation to prune riparian vegetation along the corridor. City could amend its existing LSAA for this purpose.• Potential for CDFW to require maintenance permit with mitigation to prune riparian vegetation along the riparian corridor• DESIGN OPTION: Depending on bridge location, may be able to minimize impact by avoiding mature stands of riparian trees• Jurisdictional agencies will likely not support two crossings over one• Low-Moderate impact to useable agricultural land, some impact at bridge• Low-Moderate impact to usable agricultural land: 20’ buffer has been set between cultivation and creek • Low-Moderate impact to usable agricultural land: 20’ buffer has been set between cultivation and creek• Moderate potential impact to operations if route is needed for ag equipment. Creates a separation between two ag parcels.• Low-moderate impact to agricultural operations: some impact at bridge entrance • Low-moderate impact to agricultural operations: some impact at bridge entrance• Moderate potential impacts from off-leash animals• DESIGN OPTION: With shortcut there is the potential to cut off a portion of cultivatable land (not currently used)• Moderate-minimal difficulty• Moderate difficulty• Highest Difficulty• All City-owned land• All City-owned land• Requires lease or land acquisition from 5 property owners• Requires coordination with Ag Lease and agricultural equipment routing• Requires more coordination with jurisdictional agencies (runs adjacent to more jurisdictional boundary)• Utility and Signage Relocation on sidewalk along Calle Joaquin• DESIGN OPTION: Potential for coordination with San Luis Ranch grading access road and connection to development• Topography may be slightly more difficult to design a path through (curves and dips next to creek)• DESIGN OPTION: Potential to use Sanitary Sewer Easement on SLR property to gain access for the City to manholesUSACE CWA Section 404 Not RequiredNot RequiredRequired if fill proposed in federal wetland featureUSFWSConsultation not required. "Take" of listed species (e.g. California Red-legged Frog not authorized). Avoidance required. Consultation not required. "Take" of listed species (e.g. California Red-legged Frog not authorized). Avoidance required. If a 404 permit is required, ESA consultation with USFWS will be requested by USACENMFSConsultation not required. "Take" of listed species (e.g. South-Central California Steelhead Distinct Population Segment not authorized). Avoidance required. Consultation not required. "Take" of listed species (e.g. South-Central California Steelhead Distinct Population Segment not authorized). Avoidance required. If a 404 permit is required, ESA consultation with NMFS will be requested by USACERWQCBCWA Section 401Not requiredNot requiredRequired if fill proposed in federal wetland featureRWQCBNPDES PermitRequired for impacts to riparian zoneRequired for impacts to riparian zoneNot required if a 401 is needed. An individual WDR would be applied for, not the streamline version, if more than 300 linear feet of riparian habitat is permanently impacted.Potential Impact to Biological and Cultural ResourcesPotential Impact on Agricultural Resources and OperationsEase of ImplementationEnvironmental Permitting1ConsiderationPathway User ExperiencePathway User Safety and ConnectivityTable 2: Alignment Alternatives MatrixAttachment 5, Page 15 of 21
1Agricultural Access Roadadjacent to Ag Reserve to Calle Joaquin Cul-de-Sac2Along creek and through Ag Reserve toCalle Joaquin Cul-de-sac3Along creek toCalle Joaquin Bridges B & DCDFWRequired for impacts to riparian zoneRequired for impacts to riparian zoneRequired for impacts to riparian zone and Waters of the State (e.g. federal/state wetland feature)Permit Timing4 to 6 months (allow for approximately 45 days after CEQA document complete). The RWQCB strongly recommends that applicant makes initial telephone or personal contact with RWQCB regulatory staff to discuss a proposed new discharge before submitting application.(Same as Alternative 1)1.5 years if more than 400 linear feet of riparian zone impacted and a USACE 404 permit not required (allows for minimum of one hearing in front of the Water Board). If 404 required, allow approximately 6 to 12 months for a standard 404 and 401 plus LSAA. Provide alternatives analysis to demonstrate how this project is the least damaging project alternative. Compensatory mitigation for impacts to Waters of the U.S. would be required, and a conservation easement placed over the mitigation area. Partial List of Documents RequiredJurisdictional delineation of state and federal features, biological report that covers state and federally protected species, hydrologic analysis (for bridge crossings and any proposed fill on floodplain), and wetland/riparian mitigation and monitoring plan.(Same as Alternative 2 with a compelling reason for impacts to riparian zone that are larger than Alternative 1).Jurisdictional delineation of state and federal features, biological assessment with an effects analysis for federally listed species (for federal agencies) and biological report that covers state and federally protected species (for state agencies), hydrologic analysis (for bridge crossings and any proposed fill on floodplain), biological report that covers state and federally protected species (for state agencies), hydrologic analysis, cultural resources study, and wetland/riparian mitigation and monitoring plan.CLASS I: 2,560 LFCLASS II 1,200 LF (On Calle Joaquin, not in cost)CLASS III: 720 LF (On Calle Joaquin, not in cost)TOTAL: 4,480 LFCLASS I: 2,750 LFCLASS II 1,200 LF (On Calle Joaquin, not in cost)CLASS III: 720 LF (On Calle Joaquin, not in cost)TOTAL: 4,670CLASS I: 3,320 LFCLASS I/CLASS IV: 400 LF (On Calle Joaquin)TOTAL: 3,720 LF$2,911,500$2,270,200$4,137,300• BASELINE• BASELINE• Addition of one bridge• DESIGN OPTION: Bridge location B may require demo of existing facilities on the west side of the creek to bring up to Class I standards• Increased construction costs with retaining walls and constraints• Longest total path length• Additional cost for potential sidewalk or street reconfigure• Moderate maintenance needed with potential crossing by agricultural equipment • Moderate-Minimal maintenance, CDFW may require pruning mitigation• Moderate-Minimal maintenance, CDFW may require pruning mitigation• Longer length for maintenance and pruning1. Environmental Permitting NotesUSACEUS Army Corps of Engineers - Clean Water Act Section 404 (Nationwide Permit 14. Linear Transportation Projects. Activities required for the construction, expansion, modification, or improvement of linear transportation)USFWSUS Fish and Wildlife Service - Endangered Species Act (ESA) Section 7 (or Section 10 if a federal permit nexus is not used)NMFSNational Marine Fisheries Service - Endangered Species Act Section 7 (or Section 10 if a federal permit nexus is not used)RWQCBRegional Water Quality Control Board - Clean Water Act Section 401 (Water Quality Certification required to authorize federal 404 permit)RWQCBRegional Water Quality Control Board - NPDES Waste Discharge Requirement (WDR for STATE WATER RESOURCES CONTROL BOARD WATER QUALITY ORDER NO. 2004-0004-DWQ). CDFWCalifornia Department of Fish and Wildlife - Lake and Streambed Alteration Agreement (Fish and Game Code 1602)Environmental Permitting, Contd.Length of Trail(off road)Cost *Excludes Permitting and acquisitionMaintenanceConsiderationTable 2: Alignment Alternatives Matrix, ContdAttachment 5, Page 16 of 21
Sheet 1 of 4
PROJECT:Bob Jones Trail - Prefumo Creek to Calle Joaquin PROJ. NO.:170211
PHASE:ALIGNMENT ALTERNATIVES EST./CHK.:EL/CO
CLIENT:City of San Luis Obispo DATE:11/6/2018
TRAIL
LENGTH (ft)TOTAL COST
ALIGNMENT 1 - ALONG AG SERVICE ROAD WITH BRIDGE LOCATION A 4,490 $2,911,500
ALIGNMENT 2 - ALONG CREEK WITH BRIDGE LOCATION B 4,670 $2,270,200
ALIGNMENT 3 - ALONG CREEK TO CALLE JOAQUIN WITH BRIDGES A & B 3,320 $4,137,300
ASSUMPTIONS AND EXCLUSIONS
THIS OPINION OF PROBABLE CONSTRUCTION COST HAS BEEN PREPARED USING STANDARD ENGINEERING ESTIMATE PROCEDURES AND IS BASED ON PLANS AND DOCUMENTS 10/4/2018.
CANNON HAS NO CONTROL OVER ACTUAL CONTRACTOR COSTS, BIDDING, OR MARKET CONDITIONS.
OPINION OF PROBABLE LAND DEVELOPMENT COSTS
DESCRIPTION:
1. Based on SLO County Unit Costs and Bob Jones Pathway Octagon Barn Connection Study as applicable.
2. County unit costs have been escalated to 2017 Caltrans Cost Index as currently used by City of San Luis Obispo. Escalation between 2011 costs
and 2017 is 1.73. Escalation between 2013 Bob Jones Trail Study to 2018 is 1.22.
3. Costs not included: Right of Way acquisition, maintenance, permits, environmental mitigation, site furniture, bike racks, etc.
Alternatives Comparison
Table 3: Alignment Alternatives Cost Comparison
Attachment 5, Page 17 of 21
PROJECT:Bob Jones Trail - Prefumo Creek to Calle Joaquin PROJ. NO.:170211
PHASE:ALIGNMENT ALTERNATIVES EST./CHK.:EL/CO
CLIENT:City of San Luis Obispo DATE:11/6/2018
ALIGNMENT 1 - ALONG AG SERVICE ROAD WITH BRIDGE LOCATION A CLASS I PATH LENGTH (LF) 2,570
CLASS II/III PATH LENGTH(LF) 1,920
DESCRIPTION:Site Preparation QUANTITY UNIT UNIT COST TOTAL
Mobilization Level 1 1 LS $3,700.00 3,700$
Clearing and Grubbing 41,200 SF $0.03 2,000$
Excavation 2,100 CY $22.00 46,200$
SUBTOTAL 51,900$
DESCRIPTION:SLO CITY CLASS I BIKEWAY (7040)QUANTITY UNIT UNIT COST TOTAL
4" AC 30,900 SF $6.40 $197,800
12" Class II base (under pavement)30,900 SF $4.32 $133,700
16" Class II Base Shoulder 7,710 SF $5.36 $41,400
Flush Curb 5,200 LF $27.68 $144,000
13' Wide Geogrid 2,800 SF $1.73 $4,900
Chain Link Fence 0 LF $35.00 $0
42" Rail Fence 3,700 LF $11.00 $40,700
Striping (City 7040, 3 stripes)7,710 LF $2.08 $16,100
SUBTOTAL $578,600
DESCRIPTION:TRAFFIC CONTROL QUANTITY UNIT UNIT COST TOTAL
Signage (City 7210) - 1 at each end of trail 2 EA $730.00 $1,500
Enhanced Crossing with HAWK system and crosswalk at grade 1 LS $158,000 $158,000
Construction Signage 1 LS $12,200 $12,200
SUBTOTAL $171,700
DESCRIPTION:MISC QUANTITY UNIT UNIT COST TOTAL
Bridge A 100 LF $7,000.00 $700,000
Culvert (3 x 18" Pipe)0 LF $103.79 $0
Retaining Walls (3' tall)0 SF $28.00 $0
Lighting (City 7905)2 EA $3,000 $6,000
Reestablish Access Road (20' MIN width, 22" Base)40,000 SF $7.78 $311,357
SUBTOTAL $1,017,357
TOTAL:1,819,600$
$ 454,900
$ 182,000
182,000$
273,000$
2,911,500$
CM and Administration (15%)
Total Cost
THIS OPINION OF PROBABLE CONSTRUCTION COST HAS BEEN PREPARED USING STANDARD ENGINEERING ESTIMATE PROCEDURES AND IS BASED ON PLANS AND DOCUMENTS 10/4/2018.
CANNON HAS NO CONTROL OVER ACTUAL CONTRACTOR COSTS, BIDDING, OR MARKET CONDITIONS.
Sheet 2 of 4OPINION OF PROBABLE LAND DEVELOPMENT COSTS
Environmental Permitting (10%)
Survey and Design (10%)
Construction Contingency (25%)
Table 4: Alignment 1 Cost Estimate
Attachment 5, Page 18 of 21
PROJECT:Bob Jones Trail - Prefumo Creek to Calle Joaquin PROJ. NO.:170211
PHASE:ALIGNMENT ALTERNATIVES EST./CHK.:EL/CO
CLIENT:City of San Luis Obispo DATE:11/6/2018
ALIGNMENT 2 - ALONG CREEK WITH BRIDGE LOCATION B CLASS I PATH LENGTH (LF) 2,750
CLASS II/III PATH LENGTH(LF) 1,920
DESCRIPTION:Site Preparation QUANTITY UNIT UNIT COST TOTAL
Mobilization Level 1 1 LS $3,700.00 3,700$
Clearing and Grubbing 44,000 SF $0.03 2,000$
Excavation 2,200 CY $22.00 48,400$
SUBTOTAL 54,100$
DESCRIPTION:SLO CITY CLASS I BIKEWAY (7040)QUANTITY UNIT UNIT COST TOTAL
4" AC 33,000 SF $6.40 $211,300
12" Class II base (under pavement)33,000 SF $4.32 $142,800
16" Class II Base Shoulder 8,300 SF $5.36 $44,600
Flush Curb 5,500 LF $27.68 $152,300
13' Wide Geogrid 3,000 SF $1.73 $5,200
Chain Link Fence 530 LF $35.00 $18,600
Split Rail Fence 2,600 LF $11.00 $28,600
Striping (City 7040)8,300 LF $2.08 $17,300
SUBTOTAL 620,700$
DESCRIPTION:TRAFFIC CONTROL QUANTITY UNIT UNIT COST TOTAL
Signage (City 7210) - 1 at each end of trail 2 EA $730.00 $1,500
Enhanced Crossing with HAWK system and crosswalk at grade 1 LS $158,000 $158,000
Construction Signage 1 LS $12,200 $12,200
SUBTOTAL 171,700$
DESCRIPTION:MISC QUANTITY UNIT UNIT COST TOTAL
Bridge B 80 LF $7,000.00 $560,000
Culvert (3 x 18" Pipe)60 LF $103.79 $6,227
Retaining Walls (3' tall)0 SF $28.00 $0
Lighting (City 7905)2 EA $3,000 $6,000
SUBTOTAL 572,227$
TOTAL:1,418,800$
$ 354,700
$ 141,900
141,900$
212,900$
2,270,200$
Environmental Permitting (10%)
CM and Administration (15%)
Total Cost
THIS OPINION OF PROBABLE CONSTRUCTION COST HAS BEEN PREPARED USING STANDARD ENGINEERING ESTIMATE PROCEDURES AND IS BASED ON PLANS AND DOCUMENTS 10/4/2018.
CANNON HAS NO CONTROL OVER ACTUAL CONTRACTOR COSTS, BIDDING, OR MARKET CONDITIONS.
OPINION OF PROBABLE LAND DEVELOPMENT COSTS
Construction Contingency (25%)
Survey and Design (10%)
Sheet 3 of 4
Table 5: Alignment 2 Cost Estimate
Attachment 5, Page 19 of 21
PROJECT:Bob Jones Trail - Prefumo Creek to Calle Joaquin PROJ. NO.:170211
PHASE:ALIGNMENT ALTERNATIVES EST./CHK.:EL/CO
CLIENT:City of San Luis Obispo DATE:11/6/2018
ALIGNMENT 3 - ALONG CREEK TO CALLE JOAQUIN WITH BRIDGES A & B CLASS I PATH LENGTH (LF) 3,320
DESCRIPTION:Site Preparation QUANTITY UNIT UNIT COST TOTAL
Mobilization Level 2 (includes streetside construction)1 LS $4,900.00 4,900$
Clearing and Grubbing 53,200 SF $0.03 2,000$
Excavation 2,700 CY $22.00 59,400$
SUBTOTAL 66,300$
DESCRIPTION:SLO CITY CLASS I BIKEWAY (7040)QUANTITY UNIT UNIT COST TOTAL
4" AC 39,900 SF $6.40 $255,400
12" Class II base (under pavement)39,900 SF $4.32 $172,600
16" Class II Base Shoulder 10,000 SF $5.36 $53,700
Flush Curb 6,700 LF $27.68 $185,500
14' Wide Geogrid 3,900 SF $1.73 $6,800
Chain Link Fence 990 LF $35.00 $34,700
Split Rail Fence 2,000 LF $11.00 $22,000
Striping (City 7040, 3 stripes)10,000 LF $2.08 $20,800
SUBTOTAL 751,500$
DESCRIPTION:TRAFFIC CONTROL QUANTITY UNIT UNIT COST TOTAL
Signage (City 7210) - 1 at each end of trail 2 EA $730.00 $1,500
Enhanced Crossing with HAWK system and crosswalk at grade 1 LS $158,000 $158,000
Construction Signage 1 LS $12,200 $12,200
SUBTOTAL $171,700
DESCRIPTION:MISC QUANTITY UNIT UNIT COST TOTAL
Bridge B 80 LF $7,000.00 $560,000
Bridge C 100 LF $7,000.00 $700,000
Culvert (3 x 18" Pipe)60 LF $103.79 $6,300
Retaining Walls (3' tall)980 SF $28.00 $27,500
Lighting (City 7905)2 EA $3,000 $6,000
SUBTOTAL $1,299,800
DESCRIPTION:MULTI-USE PATH ALONG CALLE JOAQUIN QUANTITY UNIT UNIT COST TOTAL
Path Length 400 LF
Demo C&G 400 LF $17.30 $7,000
Demo Street 40 CY $86.49 $3,500
Driveway Approaches 384 SF $15.57 $6,000
Sidewalk (5')2000 SF $17.30 $34,600
Stamped Concrete (2.5')1000 SF $25.95 $26,000
Curb and Gutter 400 LF $38.05 $15,300
Relocate Utilities 1 LS $100,000 $100,000
New ADA Ramp 1 LS $3,000 $3,000
Striping (1 CL Stripe)400 LF $2.08 $1,000
Signal Modification 1 LS $100,000 $100,000
SUBTOTAL $296,400
TOTAL:2,585,700$
$ 646,500
$ 258,600
258,600$
387,900$
4,137,300$
Environmental Permitting (10%)
CM and Administration (15%)
Total Cost
THIS OPINION OF PROBABLE CONSTRUCTION COST HAS BEEN PREPARED USING STANDARD ENGINEERING ESTIMATE PROCEDURES AND IS BASED ON PLANS AND DOCUMENTS 10/4/2018.
CANNON HAS NO CONTROL OVER ACTUAL CONTRACTOR COSTS, BIDDING, OR MARKET CONDITIONS.
Sheet 4 of 4OPINION OF PROBABLE LAND DEVELOPMENT COSTS
Construction Contingency (25%)
Survey and Design (10%)
Table 6: Alignment 3 Cost Estimate
Attachment 5, Page 20 of 21
Bob Jones Trail
Prefumo Creek Connection to Oceanaire
Specification No 91374
Project Study Report
City of San Luis Obispo Page 18
November 2018
6 Alignment Selection
6.1 Advisory Body Input and Community Input
Advisory body and community input will be engaged as this report is circulated.
7 Preferred Alignment
The preferred alignment should be chosen based on input from the consultants collaborating on this
report, advisory body input, and community input. Only consultant recommendations are included at this
time.
7.1 Consultant Recommendations
Alignment 2 appears to be the best option; Alignment 2 best balances user experience with impacts to
agricultural and biological resources with the cost and ease of implementation. The trail along the creek
will be shady with a pleasant nature-rich feel, which matches the original intent of the Bob Jones trail to
provide a recreational connection between San Luis Obispo and Avila Beach via the drainage channel.
The trail will provide better access to the creek for monitoring overgrowth, and according to some law
enforcement officers, routes like this provide better “eyes on the creek” to report and prevent illegal
activity. The route is already accommodated within the current lease on the city’s agricultural reserve and
will provide good access to the City Farm and education center. This route has less of a potential for
conflicts with farming equipment and less of an impact to cultivatable land than Alternative 1. The
alignment with bridge location B leaves open the possibility of using the bridge the city currently has in
storage.
Regarding using experience, none of the routes stood far above the rest in this analysis and any of the
routes has the potential to create a great connection. Although Alignment 3 arguably provides the best
user experience and most direct route, the implementation would be very difficult and costly. The cost
could be double that of other routes.
Regarding biological impacts and permit costs, the clear leader is Alignment 1, with Alignment 2 close
behind. Permit timing would require four to six months for the first two alternatives. Alignment 3 would
significantly impact the Prefumo Creek riparian corridor on the west side of the creek and permitting
would likely take over 1.5 years.
8 Next Steps
This report will be brought to the appropriate City advisory bodies to help select the best alternative.
Once the alternative is selected, design drawings, environmental review, and any permitting and
acquisitions can begin.
Attachment 5, Page 21 of 21
Project Status Notes Cost Priority
drainage grate upgrades at San Luis Drive (north of
Johnson), California at CHP office, 2 at Santa Barbara at
Broad, Broad SB near South Street, Madonna near S.
Higuera high
green bike lanes on LOVR on areas left over from the 2017
paving
Bob Jones Trail
alignment on LOVR
may recify this. On
hold until BJT
alignment resolved.high
Improvements to path between Sinsheimer Park and RRST
request forwarded to
School District
School Dist not able to bring
improvements at this time medium
sharrow on Monterey st by the Fremont theatre medium
Actuation for Bikes on Broad and Upham crossing medium
Ped and bike crossing improvements on South St at King medium
flip stop signs on Morro and Pismo to favor bike blvd medium
Ped improvements on South St at King medium
Address car parking in bike lane on EB South St medium
pavement maintenance at Monday Club bridge over creek low
correct light angled on Jennifer St bridge
need clarification of
light location. Not
able to identify it.low
install sharrows and signage on Chorro between Palm and
Monterey
anticipated as part of
Broad Street Bike
Blvd construction low
King Street to Meadow Park ramp low
drainage issues in bike lane on Orcutt near Tank Farm low
flip yield sign on Jennifer Street bridge low
removal of bollards on pathway at Exposition and Bridge
streets low
Remove/move side railing on Jennifer Street Bridge low
replace concrete landing on Jennifer Street Bridge complete!high
2018 summer paving plan improvements complete!high
Bollard removed on the Jennifer Street Bridge driveway
ramp Completed!low
bike box at Chorro / Foothill Completed!medium
bike lane improvements on LOVR bridge Completed!high
Remove parking on California Street at Higuera to improve
sight distance Completed!low
green bike lanes in front of Marigold Plaza on Los Osos
Valley Road Completed!high
Parking removed on California Street at Higuera to improve
sight distance for bike lane Completed!medium
improve delination between bike lane and travel lane on Completed!medium
green bike lanes on Santa Rosa at Olive completed!high
Improve delineation between bike lane and travel lane on
southbound S. Higuera to Madonna Rd completed!high
Remove bollards on the path behind Monday Club Completed! high
removal of three parking spaces on NB California Blvd at
Marsh Completed!high
Remove single bollard on Railroad Safety Trail at
George/Jennifer Street trailhead Completed!
The three bollards on the curb
ramp make this single bollard
on the trailhead redundant high
Yield markings and a push button beacon at the Broad
Street at Upham ped crossing Completed!high
Last Updated: 5/08/19
Minor Bike Project Wish List: Annual Allocation $100k
Attachment 6, Page 1 of 1