HomeMy WebLinkAbout06-04-2019 Item 09 - Award Stafford Kentucky Sewer Line Replacement Project - spec no 91265
Department Name: Public Works
Cost Center: 6102
For Agenda of: June 04, 2019
Placement: Consent
Estimated Time: N/A
FROM: Daryl Grigsby, Public Works Director
Prepared By: Hai Nguyen, Engineer III
SUBJECT: AWARD THE STAFFORD/KENTUCKY SEWER LINE REPLACEMENT
PROJECT, SPECIFICATION NO. 91265
RECOMMENDATION
1. Award a contract to R. Burke Corporation in the amount of $908,202 for the
Stafford/Kentucky Sewer Line Replacement Project, and
2. Approve the following budget transfers:
a) $208,469 from the Sewer Fund Undesignated Capital account to the project account.
b) $414,543 from the Sewer Lining Project 2019 account to the project account.
DISCUSSION
On April 02, 2019 the City Council authorized inviting bids for the Stafford/Kentucky Sewer
Line Replacement Project, Specification Number 91265. Two bids were received and opened on
May 09, 2019 and R. Burke Corporation was the lowest responsible bidder with a bid of
$908,202. This bid is higher than the publicly disclosed Funding Amount of $768,000 by
$140,202. This increase in costs may be attributed to the overall increase in construction activity
and high demand for contract work.
The Contractor’s references, license, and registration with the Department of Industrial Relations
have been verified (See attached Bid Results, Attachment A). It is recommended that the project be
awarded to R. Burke Corporation and various budget amendments and transfers be completed to
fund the project (see attached Contract, Attachment B).
Previous Council or Advisory Body Action
This project was identified in the City Council approved 2013-15 Financial Plan, Capital
Improvement Plan. Project construction was delayed until now due to availability of staffing to
finalize construction documents.
Policy Context
The City Council approved the Wastewater Collection System Infrastructure Renewal Strategy in
January 2016. The plan identified a strategy for prioritizing pipeline replacement in the
wastewater collection system to serve existing customers and future development in the City.
Packet Pg. 115
Item 9
Per Exhibit 202-A of the October 2015 Financial Management Manual, Council approval is
required for Public Projects that cost over $175,000.
Public Engagement
Public engagement was done during the initial identification of this project to be included in the
2013-15 Financial Plan and again during preparation of the construction documents. Residents
that will be affected from construction operations will be notified of the upcoming work to
reduce adverse impacts.
CONCURRENCE
There is concurrence from the Utilities Department of the project need based on conditions of
existing infrastructure, available staffing resources, and upon the review of the bid results.
ENVIRONMENTAL REVIEW
This project is categorically exempt from environmental review pursuant to section 15301 of the
CEQA Guidelines (Existing Facilities) since it is a maintenance and replacement project. A
Notice of Exemption has been filed through the Community Development Department.
FISCAL IMPACT
Budgeted: Yes Budget Year: 2011-13 & 2013-15
Funding Identified: Yes
Fiscal Analysis:
Funding Sources Current FY Cost
Annualized
On-going Cost
Total Project
Cost
General Fund
State
Federal
Fees
Sewer Fund $1,228,702
Total $1,228,702
Packet Pg. 116
Item 9
Total Project Bid $908,202
Contingencies:$110,000
Construction Management and Construction Inspection:$200,000
Material Testing:$10,000
Printing:$500
Total Cost of Project $1,228,702
Project Account (91265)$605,690
Sewer Undesignated Captial (602.9501.71501)$208,469
Sewer Lining Project 2019 (91641)$414,543
Total Funding Available $1,228,702
Stafford / Kentucky Sewerline Replacement Project (91265)
The Base Bid and Additive Alternative A is $908,202. The Council Agenda Report (Attachment
C) authorizing the advertisement of this project identifies the Project Account (91265) and Sewer
Fund Undesignated Capital account to support this project.
In addition, staff is recommending an additional reallocation of $414,543 from the Sewer Lining
Project 2019 (91641) which has a current balance of $660,000 and resulting balance of
$245,457. The Sewer Lining Project 2019 is scheduled for construction in August 2019 and the
remaining balance of $245,457 in the account (91641) is sufficient to support the Engineer’s
project estimate of $180,000, which is based upon recent bid proposals for similar work.
The project will be scheduled to overlap with two other sewer projects starting construction later
this summer, which will provide opportunities to reduce inspection costs.
ALTERNATIVES
Deny award of the contract. The City Council may choose not to award the contract and reject all
bids. Staff does not recommend this alternative. Further delay of rehabilitating these segments of
wastewater collection sewer pipe will only increase the costs associated with the maintenance,
emergency repair after complete failure, and construction phase of work.
Attachments:
a - 91265 Bid Results
b - 91265 Contract
c - 91265 Copy of original report authorizing advertising
Packet Pg. 117
Item 9
STAFFORD/KENTUCKY SEWERLINE REPLACEMENT, SPECIFICATIONS NO. 91265Bid Opening: 5/9/2019UNITTOTALUNITTOTALUNITTOTALNo.ITEMUNIT QUAN PRICEPRICEPRICEPRICEPRICEPRICE1Comply with OSHALS 1$3,300.00$3,300.00$10,000.00$10,000.00$50,000.00$50,000.002APCD Permit and ComplianceLS 1$2,500.00$2,500.00$3,000.00$3,000.00$6,000.00$6,000.003Caltrans Permit and ComplianceLS 1$2,500.00$2,500.00$2,500.00$2,500.00$25,000.00$25,000.004Comply with UPRR ROW Encroachment PermitLS 1$25,000.00$25,000.00$60,000.00$60,000.00$35,000.00$35,000.005Comply with WPCPLS 1$5,000.00$5,000.00$6,000.00$6,000.00$9,000.00$9,000.006Traffic ControlLS 1$19,800.00$19,800.00$90,000.00$90,000.00$37,000.00$37,000.007By-Pass PumpingLS 1$5,000.00$5,000.00$21,000.00$21,000.00$47,000.00$47,000.008*Rock ExcavationCY 20$100.00$2,000.00$200.00$4,000.00$405.00$8,100.009Abandon and Grout (E) Sanitary Sewer with Flowable Fill LF 123$40.00$4,920.00$115.00$14,145.00$115.00$14,145.0010Clean & Rehabilitate (E) Sewer ManholeEA 1$3,500.00$3,500.00$7,800.00$7,800.00$9,500.00$9,500.0011Remove & Dispose of (E) Sewer ManholeEA 3$5,000.00$15,000.00$900.00$2,700.00$9,000.00$27,000.0012Install (N) Sewer Manhole with (N) Frame & CoverEA 5$13,000.00$65,000.00$9,900.00$49,500.00$21,500.00$107,500.0013Connect Live Sewer Lateral to Sewer Main (Note: CIPP Lateral Connections Not Included in this Pay Item – they are separate and in the Add Alternate Portion of Work)EA 13$1,000.00$13,000.00$2,700.00$35,100.00$1,200.00$15,600.0014Abandon and Plug (E) Sewer Pipe or LateralEA 18$400.00$7,200.00$1,200.00$21,600.00$2,200.00$39,600.0015Furnish and Install 8-inch HDPE SDR 17 SewerLF 276$335.00$92,460.00$480.00$132,480.00$800.00$220,800.0016(S) Furnish & Install 8-inch HDPE SDR 17 Sewer with Pipe Bursting MethodsLF 341$250.00$85,250.00$82.00$27,962.00$300.00$102,300.0017(S) Furnish & Install 8-inch HDPE SDR 17 Sewer Pipe Encased in 24 Inch Schedule 40 Steel Pipe with Jack and Bore MethodsLF 100$1,500.00$150,000.00$1,950.00$195,000.00$2,200.00$220,000.0018Re-Grade, Install (N), and Connect (E) Sewer Lateral Beyond 5-feetLF 54$100.00$5,400.00$260.00$14,040.00$320.00$17,280.0019Health & Safety Plans (HSP) – (Note: required HSP for CIPP included in CIPP items of work & not included in this pay item)LS 1$2,670.00$2,670.00$1,000.00$1,000.00$3,000.00$3,000.0020HSP Implementation and Area Monitoring – Contingent Upon Encountering Contaminated Soils (Note: Monitoring for CIPP included in CIPP items of work & not included in this pay item)DAYS 20$500.00$10,000.00$230.00$4,600.00$1,800.00$36,000.0021Excavation, Containment, and Stockpiling of Non-Contractor Contaminated Soils – Contingent Upon Encountering Contaminated SoilsCF 1000$30.00$30,000.00$3.00 $3,000.00$16.00$16,000.0022Install Cork Oaks - 24" BoxEA 3$5,000.00$15,000.00$2,500.00$7,500.00$1,200.00$3,600.00$564,500.00$712,927.00$1,049,425.0023Traffic Control for Line B and Line A (From STA: 07+18.87 to end of A).LS 1$11,000.00$11,000.00$34,500.00$34,500.00$18,000.00$18,000.0024By-Pass Pumping for Line B and Line A (From STA: 07+18.87 to end of A).LS 1$10,000.00$10,000.00$17,000.00$17,000.00$4,000.00$4,000.0025Clean & Rehabilitate (E) Sewer ManholeEA 5$3,500.00$17,500.00$7,880.00$39,400.00$4,700.00$23,500.0026(S) Furnish and Install 6-inch CIPP (Cure-In-Place-Pipe) Sewer LF 1495$100.00$149,500.00$65.00$97,175.00$84.00$125,580.0027Replace Frame and Cover on a Rehab ManholeEA 3$1,500.00$4,500.00$1,500.00$4,500.00$1,500.00$4,500.0028Point repair (including complete remove and replace)EA 1$11,000.00$11,000.00$2,700.00$2,700.00$16,500.00$16,500.00$203,500.00$195,275.00$192,080.00$768,000.00 $908,202.00 $1,241,505.00ADDITIVE ALTERNATE "A" BID TOTALTOTAL BIDSpecialty Construction, Inc. BASE BID TOTALEngineer's EstimateR.Burke CorporationPacket Pg. 118Item 9
AGREEMENT
THIS AGREEMENT, made on this day of S/23 12019 , 2019, by and between
the City of San Luis Obispo, a municipal corporation and charter city, San Luis Obispo
County, California (hereinafter called the Owner) and R. BURKE CORPORATION
(hereinafter called the Contractor).
WITNESS ETH:
That the Owner and the Contractor for the consideration stated herein agree as follows:
ARTICLE 1, SCOPE OF WORK: The Contractor shall perform everything required to be
performed, shall provide and furnish all of the labor, materials, necessary tools,
expendable equipment, and all utility and transportation services required to complete all
the work of construction of
STAFFORD/KENTUCKY STREET SEWER REPLACEMENT, SPEC NO. 91265
in strict compliance with the plans and specifications therefor, including any and all
Addenda, adopted by the Owner, in strict compliance with the Contract Documents
hereinafter enumerated.
It is agreed that said labor, materials, tools, equipment, and services shall be furnished and
said work performed and completed under the direction and supervision and subject to the
approval of the Owner or its authorized representatives .
. ARTICLE II, CONTRACT PRICE: The Owner shall pay the Contractor as full consideration
for the faithful performance of this Contract, subject to any additions or deductions as
provided in the Contract Documents, the contract prices as follows:
Item Item Unit of Estimated Item Price Total
No. SS11> Description Measure Quantity (in fioures) (in fiaures)
1 7 Comply with OSHA LS 1 $10,000.00 $10,000.00
2 14 APCD Permit and LS 1 $3,000.00 $3,000.00 Compliance
3 3,5 Caltrans Permit and LS 1 $2,500.00 $2,500.00 Compliance
4 5 Comply with UPRR ROW LS 1 $60,000.00 $60,000.00 Encroachment Permit
5 13 Comply with WPCP LS 1 $6,000.00 $6,000.00
6 7,77 Traffic Control LS 1 $90,000.00 $90,000.00
7 77 By-Pass Pumping LS 1 $21,000.00 $21,000.00
Packet Pg. 119
Item 9
Packet Pg. 120
Item 9
Packet Pg. 121
Item 9
Packet Pg. 122
Item 9
uocu::s1gn t:nve1ope 1u: (.;U4tiJo!::I r -bl (.;J-4til l-A4ots-(.;\ifUUtsLAAt:\:H:i
J.
City Attomey
Christine
Dietrick
Hai Nguyen
Engineer II
•CrrYOFSfIIl LUIS OBISPO
Public Works
5��rf�%°6V,�'..--tty_M_a-na_g_e_r _
CONTRACTOR:
R.BURKE CORPORATION.
By: � , �. /l ·"---==cRobert E. U(ke Its: President : r,·;";· �:�E l7f It��),Car ate Officer 1..-:'l, 11 ,. ; �,1_,,r· /.- ,-·
Its: I <(c ·. u I c,' r
-----
919 Palm Street, San Luis Obispo, CA 93401-3218
E hnguyen@slocity.org
T 805.781.7108
slocity.org
2
Packet Pg. 123
Item 9
Department Name: Public Works
Cost Center: 6102
For Agenda of: April 2, 2019
Placement: Consent
Estimated Time: N/A
FROM: Daryl Grigsby, Public Works Director
Prepared By: Hai Nguyen, Engineer III
SUBJECT: ADVERTISE THE STAFFORD/KENTUCKY SEWER LINE REPLACEMENT
PROJECT, SPECIFICATION NO. 91265
RECOMMENDATION
1. Approve the project plans (Attachment A) and specifications (Attachment B) for the
Stafford/Kentucky Sewer Line Replacement Project, Specification Number 91265; and
2. Authorize staff to advertise the Project for bids; and
3. Authorize the City Manager to award the construction contract if the lowest responsible bid
is within the publicly disclosed funding amount of $768,000; and
4. Approve the transfer of $250,000 from the Sewer Fund Undesignated Capital account to the
project account.
DISCUSSION
Background
Replacement of aging, deteriorating, or deficient wastewater collection pipelines is part of an
ongoing sewer infrastructure maintenance program. This program has several objectives,
including, provide uninterrupted sewage flow, eliminate potential health hazards and/or effluent
leakage, reduced need for emergency repairs and reduced maintenance. Furthermore, repairing
defective components of the City’s wastewater collection systems will reduce the
infiltration/inflow of groundwater and surface runoff into the collection system thereby reducing
operational costs and the potential for overflows.
In the past ten years, the City prioritized the replacement of sewer lines crossing the Union
Pacific Railroad tracks due to pipe age, condition, and ramifications of pipe failure. The
Stafford/Kentucky Sewer Line Replacement Project (Project), including the additive alternate,
proposes replacement or lining of approximately 2,200 feet of sewer main. The sewer main
crossing under the railroad tracks near the intersection of California and Taft streets was installed
sometime between 1910 and 1927, is made of cast iron and terra cotta pipe, and has operated
beyond its useful life. Other sewer mains included in the Project are made of terra cotta or
vitrified clay pipe and have severe root intrusion at the pipe joints requiring regular maintenance
every four months.
Packet Pg. 124
Item 9
This Project is structured to request bidders provide a base bid as well as a bid for one additive
alternate. The base bid work is planned for an easement area adjacent to Taft Street and the
Union Pacific Railroad. The additive alternate locations are planned for segments of Taft,
Stafford and Kentucky streets (Attachment C).
Base Bid
The Base Bid portion of the Project includes installation of approximately 100 lineal feet of
sewer line by “jack and bore” construction, 276 lineal feet of sewer line by open trenching and
341 lineal feet of sewer line by pipe bursting. Pipe bursting installs a sewer pipe inside the
existing sewer pipe resulting in a new sewer pipe of the same or greater size than the prior sewer
pipe size. This Project will result in lower maintenance costs and reduced customer impacts due
to any necessary emergency repairs.
Additive Alternative A
Additive Alternative A includes installation of approximately 1,490 feet of cure-in-place pipe
(CIPP) polyester lining. CIPP is a trenchless rehabilitation method used to repair and extend the
useful life of pipes. CIPP lining of the existing pipe will result in a reduced construction
timeframe as compared to traditional open trench construction and is less disruptive to the
community.
Previous Council or Advisory Body Action
This project is identified in the City Council approved 2013-15 Financial Plan, Capital
Improvement Plan. Project construction has been delayed until now due to availability of staffing
to finalize construction documents.
Policy Context
The City Council approved the Wastewater Collection System Infrastructure Renewal Strategy in
January 2016. The plan identified a strategy for prioritizing pipeline replacement in the
wastewater collection system to serve existing customers and future development in the City.
Per the October 2018 Financial Management Manual, Council approval is required for Public
Projects that cost over $175,000.
Public Engagement
Public engagement was done during the initial identification of this project to be included in the
2013-15 Financial Plan and again during preparation of the construction documents. Residents
that will be affected from construction operations will be notified of the upcoming work to
reduce adverse impacts.
CONCURRENCE
There is concurrence from the Utilities Department of the project need based on conditions of
existing infrastructure and upon the review of the Project plans and special provisions.
Packet Pg. 125
Item 9
ENVIRONMENTAL REVIEW
This project is categorically exempt from environmental review pursuant to section 15301 of the
CEQA Guidelines (Existing Facilities) since it is a maintenance and replacement project. A
Notice of Exemption has been filed through the Community Development Department.
FISCAL IMPACT
Budgeted: Yes Budget Year: 2011-13 & 2013-15
Funding Identified: Yes
Fiscal Analysis:
Funding Sources Current FY Cost
Annualized
On-going Cost
Total Project
Cost
General Fund
State
Federal
Fees
Sewer Fund $856,294
Total $856,294
Estimated Project Cost by Funding Sources
Base Bid Estimate $565,000
Add Alt A Estimate $203,000
Total Project Estimate:$768,000
Contingencies (10%):$77,794
Material Testing:$10,000
Printing:$500
Total for Project $856,294
Project Budget (91265)$606,294
Supplemental Funds (602.9501.71501)$250,000
Total Funding Available $856,294
Consruction Management, Total Contingencies,
Material Testing, Printing Costs $88,294
Publically Disclosed Funding Amount $768,000
Stafford / Kentucky Sewerline Replacement Project (91265)
Packet Pg. 126
Item 9
This project is identified in the 2013-15 Financial Plan page 3-161. The project is structured with
a Base Bid and one Additive Alternative to maximize the scope of work within available
funding. The strategy is to award the contract with the Base Bid and Additive Alternative A as
funding will allow, up to the Publicly Disclosed Funding amount of $768,000 in compliance with
Public Contract Code Section 20103.8(c). Funding for this project is available in the project
account (91265) which has a current available balance of $606,294. Staff is recommending that
additional funding of $250,000 be transferred from the Sewer Fund Undesignated Capital
account to provide sufficient funding for the project. Undesignated Capital has a current balance
of $208,469. An additional $41,531 is expected to become available in the Undesignated Capital
account after completion of the Telemetry Upgrade Project (project 91370). Funding will
become available in April, 2019 prior to the start of construction scheduled for July, 2019.
ALTERNATIVES
Deny authorization to advertise. The City Council may choose not to authorize project
advertisement. Staff does not recommend this alternative. Further delay of rehabilitating these
segments of wastewater collection sewer pipe will only increase the costs associated with the
maintenance, emergency repair after complete failure, and construction phase of work.
Attachments:
a - Council Reading File - 91265 Plans
b - Council Reading File - 91265 Specifications
c - Project Vicinity Map
Packet Pg. 127
Item 9
Page intentionally left
blank.
Packet Pg. 128
Item 9