Loading...
HomeMy WebLinkAbout09-17-2019 Item 13 - 1144 Chorro Street - Initiation of a project to construct a six story mixed use building Department Name: Community Development Cost Center: 4003 For Agenda of: September 17, 2019 Placement: Public Hearing Estimated Time: 60 minutes FROM: Michael Codron, Community Development Director Prepared By: Kyle Bell, Associate Planner SUBJECT: INITIATION OF A PROJECT TO CONSTRUCT A SIX-STORY MIXED-USE BUILDING CONSISTING OF APPROXIMATELY 30,000 SQUARE FEET OF COMMERCIAL/OFFICE SPACE AND 50 RESIDENTIAL DWELLING UNITS LOCATED AT 1144 CHORRO STREET. PROJECT ENTITLEMENTS INCLUDE: 1) DEVELOPMENT REVIEW (MAJOR); 2) PLANNED DEVELOPMENT OVERLAY REZONE; AND 3) ENVIRONMENTAL REVIEW. RECOMMENDATION Receive a presentation on the project proposal from staff and the project applicant and direct staff to proceed with processing of the applications with the following considerations: 1. The application of a Planned Development (PD) Overlay zone is an appropriate method for implementation of the City Council’s goal for higher density housing in the Downtown; and 2. The Mandatory Project Features required for consideration of establishment of the PD Overlay zone and the Community Benefits Policy Objectives required for consideration of the proposed building height of 75 feet are appropriate and in alignment with the scope of the project given the priority that the City Council has placed on new housing in the Downtown. 3. Direct staff to move forward with priority processing of the project through the entitlement process, including environmental review pursuant to the California Environmental Quality Act (CEQA). DISCUSSION The purpose of the project initiation at 1144 Chorro Street, before the City Council is to offer feedback to the applicant and staff as to whether the project’s strategies for addressing the required Community Benefits Policy Objectives1 for structures over 50 feet in height, and the Mandatory Project Features2 to provide for the Planned Development Overlay are consistent with the intent of the Zoning Regulations before plans are further refined. These comments do not 1 Zoning Regulations §17.32.030.E.5. Community Benefits Policy Objectives. The intent of the following policy objectives is to ensure that buildings taller than 50 feet proposed in the C-D zone include features that meet the specific policy objectives outlined for tall buildings in the General Plan. 2 Zoning Regulations §17.48.060. Mandatory Project Features. The Planning Commission may recommend, and the Council may approve, a rezoning to apply the PD overlay zone only for a project that incorporates a minimum of three of the following four features… Packet Pg. 173 Item 13 bind the City Council to any final determinations and actions on the project and are intended to 1) Provide the public and community with opportunities for early and meaningful input on the project and 2) Provide the Council early input on key elements of the project including key criterion related to height. Background The subject property is located in the Downtown Commercial (C-D-H) zone within the Downtown Historic District. The proposed project consists of a six-story mixed-use development with a maximum height of 75 feet. The proposed plan includes; ground floor retail (4,806 sq. ft.) and parking (seven spaces), two stories of office space (25,251 sq. ft.), and three stories of residential dwellings (50 units) (Attachment A, Project Plans). 1. Zoning Regulation Guidance. The City’s Zoning Regulations, §17.32.030.E, provide regulations that outline the considerations for buildings higher than 50 feet in the Downtown Commercial (C-D) zone. This section encourages creative building design, mixed-use developments, and accommodation of additional residential units in the Downtown Core, provided that such taller buildings (analyzed through discretionary review processes) contribute defined community benefits and further the goals of the Downtown Core as stated in the Land Use Element of the General Plan. The Planning Commission may approve a building height up to 75 feet if it determines that the project includes three community benefits, with at least one of which must be from the affordable and workforce housing objective. The applicant in this instance seeks a conditional use permit for the 75 feet building by providing the following three Community Benefits Policy Objectives: a) Affordable and Workforce Housing: providing 25% moderate-income households; and b) Pedestrian Amenities: Downtown Centre proposed as a public plaza; and c) Historic Preservation (Off-site): provide permanent preservation of a listed building off- site within the Downtown or Chinatown Historic Districts (building not yet specified). Figure 1: Rendering as seen from mid-block of Marsh Street between Chorro and Morro Streets (Left), Rendering as seen from the intersection of Marsh and Chorro Streets (Right). Packet Pg. 174 Item 13 2. PD Overlay. The PD Overlay zone is intended to provide for flexibility in the application of zoning standards for proposed developments. The purpose is to allow consideration of innovation in site planning and other aspects of project design. This should include more effective design responses to site features, land uses on adjoining properties, and environmental impacts— than the development standards of the underlying zone would produce without adjustment. PD zoning shall be approved only in conjunction with derived long-term community benefits and where the project can help achieve the vision, goals, and policies of the General Plan. The applicant in this instance has proposed to include a PD Overlay to join the property located at 1144 Chorro Street (APN: 002-427-012) with the existing Downtown Centre property (APN: 002-427-016, 002-427-014, 002-427-015), allowing the residential density of the Downtown Centre to be completely utilized in the new building3, as seen in Figure 2. Through the PD Overlay the project proposes to meet three of the Mandatory Project Features (§17.48.060) by providing: a) Affordable Housing: A minimum of 25% moderate-income; and b) Energy Efficiency: LEED Silver rating; and c) Public Amenity: Guarantee long-term maintenance of a significant public plaza on the Downtown Centre site. Previous Advisory Body Actions 1. November 26, 2018 Cultural Heritage Committee (CHC) Review. The CHC reviewed the proposed project for consistency with the Historic Preservation Guidelines and Secretary of the Interior’s Standards. The CHC, with a vote of 7:0:0, provided eight directional items to the applicant to address specific concerns related to building and site design (Attachment B, CHC Staff Report and Meeting Minutes). 2. December 3, 2018 the Architectural Review Commission (ARC) Review. The ARC reviewed the proposed project for consistency with the Community Design Guidelines. The ARC, with a vote of 6:0:1, provided six directional items to the applicant to address specific concerns related to building and site design (Attachment C, ARC Staff Report and Meeting Minutes). The project plans as attached to this report have responded to some of the directional items, staff will provide a more detailed analysis of how directional items are addressed once an application has been deemed complete. 3 Zoning Regulations §17.70.040.B.1 Density Transfer. PD Overly Zone. Development potential may be transferred within the area covered by a planned development (PD) overlay zone, in conformance with the requirements of Chapter 17.48: Planned Development (PD) Overlay Zone. Figure 2: Vicinity Map, Red line indicates PD Overlay Boundary, hatch marks indicated project development site. Packet Pg. 175 Item 13 Next Development and Advisory Body Review Steps Should Council provide comments for the project to continue; the next step after all application materials are submitted and the project applications are deemed complete, and environmental review has been conducted pursuant to CEQA, further public hearings will be scheduled before the CHC and ARC. The CHC and ARC recommendations will be provided to the Planning Commission (PC). The PC will review the project as then proposed as well as the associated entitlements for consistency with the General Plan, Zoning Regulations, and applicable City development standards and guidelines, with a recommendation to City Council for final action. Staff Analysis Since the adoption of Ordinance No. 1509 (2007 Series)4, several projects have been considered for increased building heights above the 50-foot limit. However, of the projects that have received said entitlements, a majority of them have been revised to reduce the maximum height below 50 feet. The only other active project which received an entitlement to allow a height over 50 feet has not yet been constructed (San Luis Square - 60 feet maximum height). The applicant’s proposal to satisfy the Community Benefits Policy Objectives and Mandatory Project Features has been determined by staff to be consistent with the intent of the Zoning Regulations. A discussion of this analysis is below under the policy section. Notably, the PC or the City Council may prioritize some of the other Community Benefits identified in the Zoning Regulations to further the goals of the Downtown Core (Attachment D, Community Benefits Policy Objectives) in addition to what has been proposed by the project. Policy Context The City’s General Plan provides several policies regarding Downtown development. A more detailed discussion and initial analysis of the proposed project in regard to these policies has been provided as attached to this report (Attachment E – Policy Context). Public Engagement Consistent with the City’s Public Engagement and Noticing (PEN) Manual and the City’s Municipal Code, the project was noticed per the City’s notification requirements for Development Projects. Newspaper legal advertisements were posted in the Tribune ten days prior to each advisory body meeting (New Times for City Council). Additionally, postcards were sent to both tenants and owners of properties located within 300 feet of the project site ten days before each public hearing. Public comment was provided to the advisory bodies through written correspondence and through public testimony at each of the hearings. CONCURRENCE The project entitlements are currently under review by the various City Departments to ensure that staff has adequate information for a complete application to evaluate the project and identify any conflicts with City standards or guidelines. All City Departments will be providing comments that will be incorporated into the staff reports and recommended resolution/ordinance as conditions of the project. 4 Ordinance No. 1509 (2007 Series). An Ordinance of the City Council of San Luis Obispo Amending Section 17.42 of the Zoning Regulations Increasing Building Height and Intensity Limits in the Downtown – Commercial Zone. Packet Pg. 176 Item 13 ENVIRONMENTAL REVIEW As this is an initiation with no action regarding project approval to be provided, environmental review is not required at this time. The required level of environmental review will be addressed through an initial study as required for the Planned Development Overlay Rezone and in compliance with CEQA. FISCAL IMPACT Budgeted: Yes Budget Year: N/A Funding Identified: No Fiscal Analysis: Funding Sources Total Budget Available Current Funding Request Remaining Balance Annual Ongoing Cost General Fund N/A State Federal Fees Other: Total Per policy, Development Service fees are based on 100% cost recovery. As this is an initiation with no action to be provided, no fiscal impact will occur. ALTERNATIVE 1. Deny the consideration of the application related to the Mandatory Project Features and/or the Community Benefit Policy Objects chosen for the project by the applicant. The Council should provide direction to the applicant clearly identifying the priority Mandatory Project Features and/or the Community Benefit Policy Objects that the application should incorporate. 2. Continue consideration of the application to a future date. The Council can continue review of the project to a future meeting. If this alternative is taken, the Council should provide direction to staff regarding additional information needed to provide further direction regarding the project application. This alternative is not recommended because the scope of the Council's current review is limited to initiation, and the project will be sche duled for final review by the City Council following the typical PD Overlay application procedures. Packet Pg. 177 Item 13 Attachments: a - Project Plans b - CHC Report and Meeting Minutes c - ARC Report and Meeting Minutes d - Community Benefits Policy Objectives e - Policy Context Packet Pg. 178 Item 13 MARSH & CHORRO DEVELOPMENT at DOWNTOWN CENTRE ENTITLEMENTS PACKAGE, 06/12/19 Prepared by TEN OVER STUDIO Providing a true timeless character, the corner of Marsh & Chorro will bring contemporary living and working to the downtown through an architecture of quiet sophistication. Rhythm, texture, and light emits through classic massing and material selection while vibrancy, action, and enthusiasm pours from our truly mixed-use program of merchants, tech visionaries, and an abundance of small, hip, loft studios. Packet Pg. 179 Item 13 CLIENT JAMESTOWN PREMIER SLO RETAIL, LP COPELAND PROPERTIES PO BOX 12260, SAN LUIS OBISPO, CA CONTACT: MARK RAWSON mark@copelandproperties.com ARCHITECT MARK RAWSON, AIA PO BOX 12260, SAN LUIS OBISPO, CA mark@copelandproperties.com TEN OVER STUDIO 539 MARSH ST., SAN LUIS OBISPO, CA 93401 805.541.1010 CONTACT: JESSIE SKIDMORE jessies@tenoverstudio.com INDEX PROJECT INFO & DATA T1.0 SITE INFO & DATA T1.1 VIEW FROM CHORRO STREET T2.0 VIEW OF MARSH & CHORRO CORNER T2.1 VIEW FROM DOWNTOWN CENTRE PASEO T2.2 VIEW LOOKING DOWN MARSH STREET T2.3 VIEWSHED ANALYSIS T2.4 CONTEXTUAL SITE PLAN T3.0 SURVEY T3.1 SOLAR SHADING - SUMMER SOLSTICE T3.2 SOLAR SHADING - VERNAL EQUINOX T3.3 SOLAR SHADING - WINTER SOLSTICE T3.4 VISUAL STUDY T3.5 VISUAL STUDY T3.6 VISUAL STUDY T3.7 TREE REMOVAL PLAN L1.0 PLANTING PLAN L1.1 ROOFTOP PLANTING PLAN L1.2 PLANTING PALETTE L1.3 WATER CALCULATIONS L1.4 SITE ELEVATIONS A1.0 SITE SECTIONS A1.1 SITE AND FIRST FLOOR PLAN A2.0 SECOND FLOOR PLAN, THIRD , SIM. A2.1 FOURTH FLOOR PLAN A2.2 FIFTH FLOOR PLAN A2.3 SIXTH FLOOR PLAN A2.4 ROOF PLAN A2.5 TYPICAL UNIT FLOOR PLANS A2.6 BUILDING ELEVATIONS - SOUTH A3.0 BUILDING ELEVATIONS - EAST A3.1 BUILDING ELEVATIONS - NORTH A3.2 BUILDING ELEVATIONS - WEST A3.3 MATERIAL BOARD A3.4 CONTACTS Packet Pg. 180 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 DATE SUBMITTAL YYMMDD PERMIT RESUBMITTAL IISUBMITTAL SET DESCRIPTIONPROJECT NAMEPROJECT ADDRESSNOT FOR CONSTRUCTIONTHESE DRAWINGS ARE INSTRUMENTS OF SERVICE AND ARE THE PROPERTY OF TEN OVER STUDIO, INC. THE DESIGN AND INFORMATION REPRESENTED ON THESE DRAWINGS ARE EXCLUSIVELY FOR THE PROJECT INDICATED AND SHALL NOT BE TRANSFERRED OR OTHERWISE REPRODUCED WITHOUT EXPRESS WRITTEN PERMISSION FROM TEN OVER STUDIO, INC. COPYRIGHT 2017 T1.0 TITLE SHEET DRAWING SYMBOLS PROJECT DIRECTORY OWNER: COMPANY NAME CONTACT:NAME ADDRESS PH:PHONE ADDRESS EMAIL:email ARCHITECT: TEN OVER STUDIO, INC.CONTACT: JIM DUFFY 539 MARSH STREET PH:805.541.1010 SAN LUIS OBISPO, CA 93401 EMAIL:jimd@tenoverstudio.com PROJECT DATA PROJECT DESCRIPTION DESCRIPTION PROJECT ADDRESS APN ZONING CURRENT USE LOT SIZE LIVING SPACE GARAGE (TO BE REPLACED) BUILDING FOOTPRINT AGENCIES & UTILITIES CITY OF SAN LUIS OBISPO - COMMUNITY DEVELOPMENT DEPARTMENT 919 PALM STREET SAN LUIS OBISPO, CA 93401 PH:805.781.7180 CITY OF SAN LUIS OBISPO - BUILDING DEPARTMENT 919 PALM STREET SAN LUIS OBISPO, CA 93401 PH:805.781.7180 CITY OF SAN LUIS OBISPO - PLANNING DEPARTMENT 919 PALM STREET SAN LUIS OBISPO, CA 93401 PH:805.781.7170 CITY OF SAN LUIS OBISPO - PUBLIC WORKS DEPARTMENT 919 PALM STREET SAN LUIS OBISPO, CA 93401 PH:805.781.7220 CITY OF SAN LUIS OBISPO - FIRE DEPARTMENT 2160 SANTA BARBARA AVENUE SAN LUIS OBISPO, CA 93401 PH:805.781.7380 PG & E 406 HIGUERA STREET SAN LUIS OBISPO, CA 93401 PH:800.743.5000 SHEET INDEX TITLE / CODE T1.0 TITLE SHEET T1.1 CONDITIONS OF APPROVAL T2.0 GENERAL NOTES T2.1 CALGREEN COMPLIANCE T2.2 GREEN POINTS T3.0 TITLE 24 T3.1 TITLE 24 T4.0 CODE COMPLIANCE CIVIL C1.0 SHEET NAME C2.0 SHEET NAME C3.0 SHEET NAME ARCHITECTURAL A1.0 DEMOLITION SITE PLAN A1.1 SITE PLAN A2.0 DEMOLITION FLOOR PLAN A2.1 DIMENSION FLOOR PLAN A2.2 FLOOR PLAN A2.3 REFLECTED CEILING PLAN A2.4 POWER / COMMUNICATIONS PLAN A2.5 ROOF PLAN A3.0 EXTERIOR ELEVATIONS A4.0 BUILDING SECTIONS A4.1 WALL SECTIONS A5.0 ENLARGED FLOOR PLAN A6.0 INTERIOR ELEVATIONS A7.0 SCHEDULES A8.0 DETAILS A9.0 SPECIFICATIONS STRUCTURAL S1.0 SHEET NAME S2.0 SHEET NAME S3.0 SHEET NAME MECHANICAL M1.0 SHEET NAME M2.0 SHEET NAME M3.0 SHEET NAME PLUMBING P1.0 SHEET NAME P2.0 SHEET NAME P3.0 SHEET NAME ELECTRICAL E1.0 SHEET NAME E2.0 SHEET NAME E3.0 SHEET NAMECALIFORNIA CODE REFERENCES THIS PROJECT SHALL COMPLY WITH CURRENT APPLICABLE CODES & ORDINANCES 2016 CALIFORNIA BUILDING STANDARDS ADMINISTRATIVE CODE 2016 CALIFORNIA BUILDING CODE 2016 CALIFORNIA RESIDENTIAL BUILDING CODE 2016 CALIFORNIA ELECTRICAL CODE 2016 CALIFORNIA MECHANICAL CODE 2016 CALIFORNIA PLUMBING CODE 2016 CALIFORNIA ENERGY CODE 2016 CALIFORNIA HISTORICAL BUILDING CODE 2016 CALIFORNIA FIRE CODE 2016 CALIFORNIA EXISTING BUILDING CODE 2016 CALIFORNIA GREEN BUILDING STANDARDS CODE 2016 CALIFORNIA REFERENCE STANDARDS CODE CITY OF SAN LUIS OBISPO MUNICIPAL CODE: TITLE 15 BUILDINGS AND CONSTRUCTION CITY OF SAN LUIS OBISPO TITLE 17 ZONING REGULATIONS SAN LUIS OBISPO COUNTY CODE: TITLE 19 BUILDING AND CONSTRUCTION ORDINANCE SAN LUIS OBISPO COUNTY CODE: TITLE 22 LAND USE ORDINANCE SAN LUIS OBISPO COUNTY CODE: TITLE 23 COASTAL ZONE LAND USE ORDINANCE ABBREVIATIONS ABANCHOR BOLT ACAIR CONDITIONER ADJ ADJACENT AFFABOVE FINISH FLOOR ALALUMINUM APPROX. APPROXIMATELY ASPH ASPHALT AVG AVERAGE BDBOARD BLDG BUILDING BLK/BLKG BLOCK/BLOCKING BMBEAM BNBULLNOSE BOT BOTTOM C.F. CUBIC FOOT C.I.CUBIC INCH CICAST IRON CJCEILING JOIST/CONTROL JOINT CLCENTER LINE CLRCLEAR/CLEARANCE CLG CEILING CLKG CAULKING CMU CONCRETE MASONRY UNIT COCLEANOUT COL COLUMN CONC CONCRETE CONN CONNECTION CONST CONSTRUCTION CONT CONTINUOUS CTR CENTER CW COLD WATER C.Y. CUBIC YARD DBLDOUBLE DEG DEGREE DEPT DEPARTMENT DET DETAIL DFDOUGLAS FIR DIA DIAMETER DIMDIMENSION DNDOWN DSDOWNSPOUT DWDISHWASHER EAEACH EJEXPANSION JOINT ELEC ELECTRICAL ELEVELEVATION/ELEVATOR ENCL ENCLOSURE EOS EDGE OF SLAB EQEQUAL EQUIP EQUIPMENT EST ESTIMATE EXIST/(E)EXISTING EXTEXTERIOR FAU FORCED AIR UNIT FHFIRE HYDRANT F.O.C. FACE OF CURB F.O.F. FACE OF FINISH F.O.S. FACE OF STUD FDFLOOR DRAIN FDNFOUNDATION FEFIRE EXTINGUISHER FFFINISH FLOOR F.G./FGFINISH GRADE FINFINISH FIXFIXTURE FLRFLOOR FOS FACE OF STUD FPFIREPLACE / FLOOR PLAN F.S./FSFINISH SURFACE FTFOOT FTG FOOTING GGAS GAGAUGE GALV GALVANIZED GDGARBAGE DISPOSAL GLGLASS GYP GYPSUM HBHOSE BIBB HCHOLLOW CORE HDR HEADER HORIZ HORIZONTAL HRDW HARDWARE HTHEIGHT HWHOT WATER ININCH INCL INCLUDE INFO INFORMATION INSUL INSULATION INTINTERIOR INVINVERT JAN JANITOR KITKITCHEN LAM LAMINATED LAVLAVATORY LB/#POUND L.F./LFLINEAR FLOOT LSLAG SCREW MAXMAXIMUM MBMACHINE BOLT MECH MECHANICAL MFRMANUFACTURER MINMINIMUM MISC MISCELLANEOUS MTL METAL (N)NEW N.G./NGNATURAL GRADE NO. / #NUMBER NTS NOT TO SCALE O/OVER OBS OBSCURE O.C./OCON CENTER OPCIOWNER PROVIDED, CONTRACTOR INSTALLED OPOIOWNER PROVIDED, OWNER INSTALLED OSOCCUPANCY SENSOR OZOUNCE PERFPERFORATED PERPPERPENDICULAR PHPHONE PLPLATE/ PROPERTY LINE PLYWDPLYWOOD PRPAIR PREFABPRE-FABRICATED P.S.F.POUNDS PER SQUARE FOOT P.S.I.POUNDS PER SQUARE INCH PTDFPRESSURE TREATED DOUG FIR PVMT PAVEMENT RRISER RDROOF DRAIN REFREFRIGERATOR REQ REQUIRED RMROOM ROROUGH OPENING ROW RIGHT OF WAY RTS REFER TO STRUCTURAL RWDREDWOOD S4SSURFACED 4 SIDES SCSOLID CORE SDSMOKE DETECTOR S.F./SFSQUARE FOOT SHT SHEET SHTG SHEATHING SIM SIMILAR SPEC SPECIFICATION SST STAINLESS STEEL STD STANDARD SYM SYMBOL STL STEEL T&G TONGUE AND GROOVE TREA THKTHICK(NESS) TELTELEPHONE TEMPTEMPERATURE T.O.C. TOP OF CURB T.O.F. TOP OF FOOTING T.O.W. TOP OF WALL T.O.S. TOP OF SLAB TVTELEVISION TYP.TYPICAL UNO UNLESS NOTED OTHERWISE VCT VINYL COMPOSITION TILE VERTVERTICAL V.I.F. VERIFY IN FIELD W/WITH W/OWITHOUT WC WATER CLOSET WDWOOD WH WATER HEATER W.I.C. WALK IN CLOSET WTWEIGHT YDYARD BUILDING CODE DATA SPRINKLERS:REQUIRED:YES / NO PROPOSED:YES / NO CONSTRUCTION TYPE: OCCUPANCY GROUP: PROJECT NAME 2 ADDRESS PROJECT NAME 1 STRUCTURAL ENGINEER: COMPANY NAME CONTACT:NAME ADDRESS PH:PHONE ADDRESS EMAIL:email INTERIOR ELEVATION MARKER KEYNOTE DETAIL TARGET DETAIL REFERENCE:DETAIL NUMBER SHEET NUMBER DOOR NUMBER WINDOW NUMBER ELEV NUMBER SHEET NUMBER ELEVATION MARKER ELEV NUMBER SHEET NUMBER SECTION MARKER SECTION NUMBER SHEET NUMBER ROOF / GROUND SLOPE: INDICATES SLOPE AND DIRECTION OF SLOPE & DIRECTION OF VIEW HEIGHT / ELEVATION MARKER NORTH ARROW & DIRECTION OF VIEW & DIRECTION OF VIEW REVISION MARKER ROOM TAG XXX SLOPE X:XX XXX XXX MASTER BEDROOM 100 9'-0" X AX.XX X AX.XX X AX.X 1 2 3 4 X AX.XX X AX.XX X X N 1 EQUIPMENT NUMBERX MECHANICAL / PLUMBING ENGINEER: COMPANY NAME CONTACT:NAME ADDRESS PH:PHONE ADDRESS EMAIL:email ELECTRICAL ENGINEER: COMPANY NAME CONTACT:NAME ADDRESS PH:PHONE ADDRESS EMAIL:email CIVIL ENGINEERING: COMPANY NAME CONTACT:NAME ADDRESS PH:PHONE ADDRESS EMAIL:email SURVEY: COMPANY NAME CONTACT:NAME ADDRESS PH:PHONE ADDRESS EMAIL:email SOUTHERN CALIFORNIA GAS COMPANY 1314 BROAD STREET SAN LUIS OBISPO, CA 93401 PH:1.800.427.2200 N MARSH STHIGUERA STB R O A D S T S A N T A R O S A S T C H O R R O S T US-101 PACIFIC STPISMO STBUCHON STMO R R O S T PROJECT LOCATION CHORRO ST VICINITY MAP T1.0 DOWNTOWN CENTRE 1144 CHORRO ST.,AT DOWNTOWN CENTRE, SAN LUIS OBISPO, CA APN 002-427-012 CURRENT USE RETAIL 80249 SF 1.84 ACRE MAX SITE COVERAGE ALLOWABLE 100% FAR ALLOWABLE 4 DENSITY ALLOWABLE 36/ACRE= 66.24 DU PROPOSED 26.5 DU HEIGHT LIMIT ALLOWABLE 75'PROPOSED 75' HEIGHT BONUS POLICY OBJECTIVES HEIGHT BONUS PER C-D DEVELOPMENT STANDARDS 17.42.020 SEE PROJECT DESCRIPTION FOR PROPOSED OBJECTIVES ADJACENT ZONES NORTH C-D EAST C-D SOUTH C-D WEST C-D SETBACKS FRONT 0' SIDE 0' REAR 0' LAND USE REQUIREMENTS ZONING OVERLAY ZONES SPECIFIC AREA DESIGN GUIDELINES LOT SIZE C-D DOWNTOWN-COMMERCIAL N/A DOWNTOWN DESIGN GUIDELINES ADDRESS PROPOSED USE MIXED-USE : RETAIL, OFFICE & R-2 RESIDENTIAL ALLOWED USE IN ZONE Y ENTITLEMENTS/USE PERMIT REQUIRED ARC, PLANNING COMMISSION USE-PERMIT for height bonus PROJECT DESCRIPTION Marsh & Chorro (1144 Chorro) Mixed-Use proposes a new 6-story retail, office, and residential building on the northeast corner of Marsh St. & Chorro St. The first level is comprised of three retail suites with accomodations for restaurant use, a residential lobby, commercial office lobby, and a small parking facility with ADA parking, and delivery/drop off spaces. The second and third floor are designated commercial. The fourth, fifth and sixth floors house residential apartments. In addition to providing 25% moderate affordable units, the remaining units have been sized to be affordable by design, in that all but three of the units are less than 600 SF. The site and building design has been carefully considered to meet all the Downtown Design Guidelines to create a harmonious addition to downtown San Luis Obispo. The traditional brick architecture extends from the street to third level, to align with the massing of neighboring buildings. The top floors are in a traditional stucco, and step back significantly to reduce the massing from the pedestrian perspective, and further screened by substantial roof gardens on the fourth floor. Located on the northeast corner, this project is perfectly situated for the street frontages to bask in southern light, casting a shadow inward, towards the alley and services areas of adjacent neighbors. The project will never cast a shadow on either sidewalk of Marsh St or Chorro St, on any given day of the year between 11 am and 2 pm. This project is being proposed under a Planned Development Overlay to join 1144 Chorro with the existing Downtown Centre, allowing the underutilized density of the centre to transfer to the new building proposed and bring needed residential to the downtown. Through the PD Overlay project will meet the following Mandatory Project Features: a) Affordable Housing: A minimum of 25% moderate-income. b) LEED Silver rating for Energy Efficiency (or city approved equivalent) c) Preserve Open Space of at least a quarter of an acre on the Downtown Centre site. d) Guarantee long term Maintenance of a significant Public Plaza on the Downtown Centre Site. The project seeks a use-permit allowing 75' in height by providing the following Community Benefits Policy Objectives: (per San Luis Obispo Zoning Regulations 17.32.030) a) Affordable and Workforce Housing: 1) Project will provide 25% moderate-income households b) Pedestrian Amenities: 2) Project provides a significant public plaza c) View Access and Preservation: 2d) Project will provide a permanent preservation of a listed building off site within the downtown or Chinatown historic district. OVERALL BUILDING OCCUPANCY TYPE R-2, A-2/M, B CONSTRUCTION TYPE I-A, SPRINKLERED SPRINKLER SYSTEM NFPA 13 PROJECT MEETS REQUIREMENTS OF CFC, APPENDIX D STORIES PROPOSED ALLOWABLE UNLIMITED PROPOSED 6 HEIGHT PROPOSED ALLOWABLE UNLIMITED PROPOSED 75' AREA (MAX/FLOOR)ALLOWABLE UNLIMITED PROPOSED 12708 SF BUILDING CODE INFO SIDEWALK ALONG CHORRO STREET PARKING REQUIRED RESIDENTIAL USE UNIT COUNT (OR SF) PARKING FACTOR SPACES REQUIRED STUDIOS & 1 BD 47 1 47 2 BD 3 2 6 27 COMMERCIAL OFFICE 25,251 SF 1 PER 500 51 RESTAURANT 4,806 1 PER 100 48 24 COMBINED TOTAL 102 TOTAL PARKING PROVIDED 7 MOTORCYCLE REQ'D REQUIRED 5 (1:20)PROVIDED 2 PARKING CALCULATIONS TOTAL W/C-D ZONE 50% REDUCTION TOTAL W/C-D ZONE 50% REDUCTION RESIDENTIAL 50 2/UNIT + GST 100 1: 5 UNITS 10 2/UNIT 100 RESTAURANT 4806 1/500 SF 10 75%8 25% 3 OFFICE 25251 1/1500 SF 17 75%13 25% 4 REQ'D TOTAL 127 31 107 PROVIDED TOTAL 128* * LONG TERM BIKE STORAGE PROVIDED IN EACH RES. UNIT OR BASEMENT 28 BIKE STORAGE SPACES PROVIDED IN BIKE 106 AT FIRST LEVEL BICYCLE PARKING CALCULATIONS BIKE PARKING REQUIRED UNIT COUNT OR SF TOTAL BICYCLE SHORT TERM LONG TERM Packet Pg. 181 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 T1.1 TOTAL DENSITY ALLOWED LOT SIZE:1.84 ACRE DENSITY FACTOR: 36 / ACRE ALLOW. DENSITY: 66.24 DU UNITS PROVIDED UNIT TYPE UNIT COUNT DU FACTOR DENSITY PROVIDED FOURTH FLOOR STU/1BD <600 SF 15 0.5 7.5 STU/1-BD >600 SF 0 0.66 0 2-BD 1 1 1 FIFTH FLOOR STU/1BD <600 SF 16 0.5 8 STU/1-BD >600 SF 0 0.66 0 2-BD 1 1 1 SIXTH FLOOR STU/1BD <600 SF 16 0.5 8 STU/1-BD >600 SF 0 0.66 0 2-BD 1 1 1 TOTAL 50 26.5 DENSITY CALCULATIONS TOTAL BUILDING AREA COV'D DECK SF MAIN OCC. SF INCIDENTAL SF ACCESSORY SF FLOOR TOTAL BASEMENT 2415 2415 FIRST FLOOR 11049 744 11793 SECOND FLOOR 12543 12543 THIRD FLOOR 12708 12708 FOURTH FLOOR 8737 865 9602 FIFTH FLOOR 9216 311 9527 SIXTH FLOOR 9216 363 9579 BLDG TOTAL 65884 2283 68167 BASEMENT ROOM USE MAIN OCC. SF INCIDENTAL SF ACCESSORY SF STORAGE 001 STORAGE 2415 FIRST FLOOR ROOM USE MAIN OCC. SF INCIDENTAL SF ACCESSORY SF RETAIL 100 RESTAURANT 1738 RETAIL 101 RESTAURANT 1424 RETAIL 102 RESTAURANT 1425 RES. LOBBY 103 RESIDENTIAL 597 OFF. LOBBY 104 BUSINESS 594 SHOW /LCK 110 ACC. STORAGE 198 GARAGE 105 STORAGE 3782 BIKE 106 ACC. STORAGE 308 TRASH 107 ACC. STORAGE 612 UTILITY 108 ACC. STORAGE 480 FIRE RISER 109 ACC. STORAGE 89 COV'D AREA 111 STORAGE 546 TOTAL:11049 744 AREA % 6.73% ROOM USE MAIN OCC. SF INCIDENTAL SF ACCESSORY SF SECOND FLOOR OFFICE 200 BUSINESS 12543 TOTAL:12543 AREA %0.0% ROOM USE MAIN OCC. SF INCIDENTAL SF ACCESSORY SF THIRD FLOOR OFFICE 300 BUSINESS 12708 TOTAL:12708 AREA %0.0% USE & OCCUPANCY FLOOR AREAS RESIDENTIAL ENTRY ON CHORRO STREET ROOM USE MAIN OCC. SF INCIDENTAL SF ACCESSORY SF FOURTH FLOOR UNIT 401 RESIDENTIAL 357 UNIT 402 RESIDENTIAL 350 UNIT 403 RESIDENTIAL 318 UNIT 404 RESIDENTIAL 318 UNIT 405 RESIDENTIAL 616 UNIT 406 RESIDENTIAL 329 UNIT 407 RESIDENTIAL 329 UNIT 408 RESIDENTIAL 337 UNIT 409 RESIDENTIAL 362 LOUNGE 410 ASSEMBLY 479 UNIT 411 RESIDENTIAL 451 UNIT 412 RESIDENTIAL 451 UNIT 413 RESIDENTIAL 408 UNIT 414 RESIDENTIAL 450 UNIT 415 RESIDENTIAL 501 UNIT 416 RESIDENTIAL 484 UNIT 417 RESIDENTIAL 576 MEDIA 418 ASSEMBLY 386 CIRCULATION RESIDENTIAL 2100 TOTAL: 8737 865 AREA%9.9% ROOM USE MAIN OCC. SF INCIDENTAL SF ACCESSORY SF FIFTH FLOOR ALL UNITS RESIDENTIAL 7116 LDRY/JAN. 518 ASSEMBLY 221 ELEC. 519 STORAGE 90 CIRCULATION RESIDENTIAL 2100 TOTAL: 9216 311 AREA%3.4% ROOM USE MAIN OCC. SF INCIDENTAL SF ACCESSORY SF SIXTH FLOOR ALL UNITS RESIDENTIAL 7116 COMM. KIT. 618 ASSEMBLY 363 CIRCULATION RESIDENTIAL 2100 TOTAL: 9216 363 AREA%3.9% USE & OCCUPANCY FLOOR AREAS, CONT. ROOM USE MAIN OCC. SF INCIDENTAL SF ACCESSORY SFFOURTH FLOOR UNIT 401 RESIDENTIAL 357UNIT 402 RESIDENTIAL 350UNIT 403 RESIDENTIAL 318UNIT 404 RESIDENTIAL 318UNIT 405 RESIDENTIAL 616UNIT 406 RESIDENTIAL 329UNIT 407 RESIDENTIAL 329UNIT 408 RESIDENTIAL 337UNIT 409 RESIDENTIAL 362LOUNGE 410 ASSEMBLY 479UNIT 411 RESIDENTIAL 451UNIT 412 RESIDENTIAL 451UNIT 413 RESIDENTIAL 408UNIT 414 RESIDENTIAL 450UNIT 415 RESIDENTIAL 501UNIT 416 RESIDENTIAL 484UNIT 417 RESIDENTIAL 576MEDIA 418 ASSEMBLY 386CIRCULATION RESIDENTIAL 2100TOTAL: 8737 865AREA%9.9% ROOM USE MAIN OCC. SF INCIDENTAL SF ACCESSORY SF FIFTH FLOOR ALL UNITS RESIDENTIAL 7116 LDRY/JAN. 518 ASSEMBLY 221 ELEC. 519 STORAGE 90 CIRCULATION RESIDENTIAL 2100 TOTAL: 9216 311 AREA%3.4% ROOM USE MAIN OCC. SF INCIDENTAL SF ACCESSORY SF SIXTH FLOOR ALL UNITS RESIDENTIAL 7116 COMM. KIT. 618 ASSEMBLY 363 CIRCULATION RESIDENTIAL 2100 TOTAL: 9216 363 AREA%3.9% USE & OCCUPANCY FLOOR AREAS, CONT. Packet Pg. 182 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 T2.0 VIEW FROM CHORRO STREET MARSH C H O R R OHIGUERA Packet Pg. 183 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 T2.1 VIEW OF MARSH & CHORRO CORNER MARSH C H O R R OHIGUERA Packet Pg. 184 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 T2.2 VIEW FROM DOWNTOWN CENTER PASEO MARSH C H O R R OHIGUERA Packet Pg. 185 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 T2.3 VIEW LOOKING DOWN MARSH STREET MARSH C H O R R OHIGUERA Packet Pg. 186 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 T3.0 CONTEXTUAL SITE PLAN SCALE: N.T.S. EXISTING BUILDING ON SITE TO BE DEMOLISHED 4-STORY MARSH ST. PARKING STRUCTURE 4-STORY RETAIL AND OFFICE BUILDING CHASE BANK PARKING LOT 2-STORY EUREKA RESTAURANT 3-STORY OLD WINEMAN HOTEL 1 4 2 5 3 6 Our site is primarily surrounded by retail establishments.Some, like ours, with office space above. The buildings range from 2 to 4 stories. The Masonic Temple (3) and Marsh St. parking structure (4) both have heavy cornices that appear as 5-story buildings. The surrounding material pallette is brick and light-colored stucco. SUMMARY OF CONTEXT higuera stmonterey st marsh stpacific stc h o r r o s t mo r r o s t g a r d e n s t C-D-H C-D-H C-D-H C-D-H C-D-H C-D-H C-D O C-D C-D C-D C-D-H 1 4 2 5 3 6 O C-D-H C-D-H-PD O 52/62 47 40 31 46 43/75 30 35 41 32 37 34 36 46 40/47 35 37 39 64/77 HEIGHT AT: STREET / UPPER SETBACK OR TOWER ELEMENT Packet Pg. 187 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 T3.1Packet Pg. 188 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 T3.2 SOLAR SHADING STUDY SCALE: N.T.S. N SUMMER SOLSTICE - 10AM SUMMER SOLSTICE - 1PM SUMMER SOLSTICE - 11AM SUMMER SOLSTICE - 2PM SUMMER SOLSTICE - 12PM SUMMER SOLSTICE - 3PM Packet Pg. 189 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 T3.3 SOLAR SHADING STUDY SCALE: N.T.S. N VERNAL EQUINOX - 10AM VERNAL EQUINOX - 1PM VERNAL EQUINOX - 11AM VERNAL EQUINOX - 2PM VERNAL EQUINOX - 12PM VERNAL EQUINOX - 3PM Packet Pg. 190 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 T3.4 SOLAR SHADING STUDY SCALE: N.T.S. N WINTER SOLSTICE - 10AM WINTER SOLSTICE - 1PM WINTER SOLSTICE - 11AM WINTER SOLSTICE - 2PM WINTER SOLSTICE - 12PM WINTER SOLSTICE - 3PM Packet Pg. 191 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 KEY PLAN SCALE: N.T.S. VIEW FROM MARSH ST. TOWARDS HILL1 SIMULATED VIEW FROM MARSH ST. TOWARDS HILLS1 VISUAL STUDY T3.5MARSH STCHORRO ST 1 2 3 4 56 VISUAL STUDY Pursuant to Zoning regulations Section 17.32.030 F, a visual study shall determine whether the project will materially obstruct views of distant hills and/or create an adverse visual impact on existing or planned publicly owned gathering sites by materially obstructing views of nearby public open spaces, historic resources, City landmarks, or protected natural resources; and/or create adverse shade and shadow effects during the times of day when a gathering site is anticipated to be most used. For the proposed project at 1144 Chorro St., the publicly owned gathering spaces that exist within the viewshed of the hillside are the publicly owned sidewalks immediately adjacent on Marsh Street and Chorro Street. These are represented by Views 1, 3, 4, 5 & 6. View 2 is located at Downtown Centre Paseo. The most prominent, existing view of the hillside is shown in view 1. View S1 shows the simulated view where the project has a visual impact on the viewshed by partially catching the hillside. NPacket Pg. 192 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 SCALE: N.T.S. VIEW FROM PASEO COURTYARD TOWARDS HILL2 SIMULATED VIEW FROM PASEO COURTYARD TOWARDS HILLS2 VISUAL STUDY T3.6MARSH STCHORRO ST 1 2 3 4 56 The second most prominent, existing view of the hillside is shown in view 2 from the Downtown Centre. View S2 shows the simulated view where the project has no visual impact on the hillside viewshed. KEY PLANN Packet Pg. 193 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 T3.7 VIEW FROM MARSH STREET SCALE: N.T.S. VIEW FROM MARSH TOWARDS HILL3 VIEW FROM SOUTH CORNER OF MARSH & CHORRO TOWARDS SITE5 VIEW FROM EAST CORNER OF MARSH & CHORRO TOWARDS HILL4 VIEW FROM CHORRO TOWARDS SITE6 VISUAL STUDYMARSH STCHORRO ST 1 2 3 4 56 Views 5 & 6 show that there are no hillside views looking toward the proposed project's property from sidewalks on Chorro St. View 3 & 4, taken from the sidewalk at Marsh St. reveals how the hillside view is already currently largely blocked by the existing building and trees. KEY PLANN Packet Pg. 194 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 SCALE: N.T.S. DOWNTOWN DESIGN GUIDEINE - COMPLIANCE T3.8 STREET ORIENTATION GUIDELINE COMPLIANCE 4.2-A HEIGHT, SCALE GUIDELINE COMPLIANCE 4.2-B,1 4.2-B,1a 4.2-B,1b 4.2-B,1c 4.2-B,1d 4.2-B,2 4.2-B,3 The height and scale of new buildings and alterations to existing buildings shall fit within the context and vertical scale of existing development and provide human scale and proportion. Some tools to achieve this include: See A1.1, Site Sections DOWNTOWN DESIGN GUIDELINES Per San Luis Obispo Community Design Guidelines, Chapter 4- Downtown Design Guidelines. The primary goal of the following downtown design guidelines is to preserve and enhance its attractiveness to residents and visitors as a place where: people prefer to walk rather than drive; and where the pleasant sidewalks, shading trees, and variety of shops, restaurants, and other activities encourage people to spend time, slow their pace, and engage one another. The design of buildings and their setting, circulation, and public spaces in the downtown have, and will continue to play a crucial role in maintaining this character and vitality. Buildings in the downtown should be located at the back of the sidewalk unless space between the building and sidewalk is to be used for pedestrian features such as plazas, courtyards, or outdoor eating areas. See A1.1 and A2.0 In no case may the height of a building at the back of sidewalk exceed the width of the adjoining right-of-way (see Figure 4-2). See A1.1, Building Height Compliance New buildings that are significantly taller or shorter than adjacent buildings shall provide appropriate visual transitions. See T2.0-T2.3, Perspective Views For new projects adjacent to buildings included on the City’s Inventory of Historic Resources there shall be a heightened sensitivity to the mass and scale of the significant buildings. See Historical report The project provides upper story setbacks from the front building façade along the street consistent with LUE Policy 4.16.4. Portions of the building above 50 feet should be set back sufficiently so that these upper building walls are not visible to pedestrians on the sidewalk along the building’s frontage. New buildings shall not obstruct views from, or sunlight to, publicly-owned gathering places including, but not limited to, Mission Plaza, the Jack House gardens, and YCLC Cheng Park. In these locations, new buildings shall respect views of the hills, framing rather than obscuring them See T3.2-3.4, Solar Shading Studies New buildings should not shade the northerly sidewalk of Marsh, Higuera or Monterey Streets at noon on December 21st. Information demonstrating this objective shall accompany all applications for architectural review as detailed on application checklists. See T3.2-3.4, Solar Shading Studies 4.2-B,4 4.2-B,4a 4.2-B,4b 4.2-B,4c 4.2-B,4d 4.2-B,4e 4.2-B,4f 4.2-B,4g 4.2-B,4h See A3 - Elevations 4.2-B,4i 4.2-B,4j See A3.4 Materials Board 4.2-B,5 4.2-B,5a 4.2-B,5b See A2.0 4.2-B,5c 4.2-B,5d See T2.0-T2.3, Perspective Views See T2.0 See T2.1 See T2.0-T2.3, Perspective Views Use roof overhangs, cornices, dentals, moldings, awnings, and other decorative features to decrease the vertical appearance of the walls; Tall buildings (between 50 and 75 feet) shall be designed to achieve multiple policy objectives, including design amenities, housing and retail land uses. Appropriate techniques to assure that tall buildings respect the context of their setting and provide an appropriate visual transition to adjacent structures include, but are not limited to: See T2.0-T2.3, Perspective Views See T2.0-T2.3, Perspective Views For large projects that occupy several lots, variable roof heights and architectural features that penetrate the roof plane are encouraged to diminish the mass and scale of the taller structure; Reinforce the established horizontal lines of facades in adjacent buildings; Maintain the distinction between the first and upper floors by having a more transparent ground floor. Larger buildings (where frontages exceed 50 feet) should be clearly expressed at the street frontage by changing material or setback to respect the historic lot pattern and rhythm of downtown development; Abrupt changes in building heights and/or roof orientation should be diminished by offsets of building form and mass; Use recesses and projections to visually divide building surfaces into smaller scale elements; Use color to visually reduce the size, bulk and scale of the building; Use planter walls and other pedestrian-oriented features on the ground floor such as windows, wall detailing, and public art. Consider the quality of natural and reflected light in public spaces within and around the project site and choose materials and colors to enhance lighting effects with respect to available solar exposure. Utility boxes for phone, cable, electricity, natural gas, information systems and/or other services should be located along service alleys, within the building, or in a sub-grade vault. See A2.0, Site Plan See T2.0-T2.3, Perspective Views See T2.0-T2.3, Perspective Views See A2.0, Site Plan and A1.1 Site Sections See A2.0, A3.0-A3.3, Building Elevations Location of backflow prevention devices and the fire sprinkler riser must be identified on project plans submitted for Architectural Review and shall be located inside the building, consistent with County Health Department requirements. Minimum sidewalk width should be 8-feet clear of obstructions for pedestrians (furniture, news racks, street trees etc.) across 100% of the project frontage. Minor deviations may occur where necessary to preserve street trees, or where right-of-way limitations reduce available sidewalk width. Service access to the building for loading and maintenance functions should not exceed 20% of the project frontage on any facing street. 4.2-B,4 4.2-B,4a4.2-B,4b4.2-B,4c4.2-B,4d4.2-B,4e 4.2-B,4f 4.2-B,4g 4.2-B,4h See A3 - Elevations 4.2-B,4i 4.2-B,4j See A3.4 Materials Board 4.2-B,5 4.2-B,5a 4.2-B,5b See A2.0 4.2-B,5c 4.2-B,5d See T2.0-T2.3, Perspective ViewsSee T2.0See T2.1See T2.0-T2.3, Perspective Views Use roof overhangs, cornices, dentals, moldings, awnings, and other decorative features to decrease the vertical appearance of the walls; Tall buildings (between 50 and 75 feet) shall be designed to achieve multiple policy objectives, including design amenities, housing and retail land uses. Appropriate techniques to assure that tall buildings respect the context of their setting and provide an appropriate visual transition to adjacent structures include, but are not limited to: See T2.0-T2.3, Perspective Views See T2.0-T2.3, Perspective Views For large projects that occupy several lots, variable roof heights andarchitectural features that penetrate the roof plane are encouraged to diminish the mass and scale of the taller structure; Reinforce the established horizontal lines of facades in adjacent buildings; Maintain the distinction between the first and upper floors by having a more transparent ground floor. Larger buildings (where frontages exceed 50 feet) should be clearly expressed at the street frontage by changing material or setback to respect the historic lot pattern and rhythm of downtown development; Abrupt changes in building heights and/or roof orientation should be diminished by offsets of building form and mass; Use recesses and projections to visually divide building surfaces into smaller scale elements; Use color to visually reduce the size, bulk and scale of the building; Use planter walls and other pedestrian-oriented features on the ground floor such as windows, wall detailing, and public art. Consider the quality of natural and reflected light in public spaces within and around the project site and choose materials and colors to enhance lighting effects with respect to available solar exposure. Utility boxes for phone, cable, electricity, natural gas, information systems and/or other services should be located along service alleys, within the building, or in a sub-grade vault. See A2.0, Site Plan See T2.0-T2.3, Perspective Views See T2.0-T2.3, Perspective Views See A2.0, Site Plan and A1.1 Site Sections See A2.0, A3.0-A3.3, Building Elevations Location of backflow prevention devices and the fire sprinkler riser must be identified on project plans submitted for Architectural Review and shall be located inside the building, consistent with County Health Department requirements. Minimum sidewalk width should be 8-feet clear of obstructions for pedestrians (furniture, news racks, street trees etc.) across 100% of the project frontage. Minor deviations may occur where necessary to preserve street trees, or where right-of-way limitations reduce available sidewalk width. Service access to the building for loading and maintenance functions should not exceed 20% of the project frontage on any facing street. FAÇADE DESIGN GUIDELINE COMPLIANCE 4.2-C 4.2-C,1 4.2-C,2 4.2-C,3 4.2-C,4 4.2-C,5 4.2-C,6 See A2.0 4.2-C,7 New structures and remodels should provide storefront windows, doors, entries, transoms, awnings, cornice treatments and other architectural features that complement existing structures, without copying their architectural style. See T2.0-T2.3, Perspective Views, and A3.0-A3.3 Elevations Overall character. In general, buildings should have either flat or stepped rooflines with parapets, and essentially flat facades. Walls with round or curvilinear lines, or large pointed or slanted rooflines should generally be avoided. See T2.0-T2.3, Perspective Views, and A3.0-A3.3 Elevations Proportions in relation to context . Buildings should be designed with consideration of the characteristic proportions (relationship of height to width) of existing adjacent facades, as well as the rhythm, proportion, and spacing of their existing door and window openings. Storefront rhythm . A new building facade that is proposed to be much "wider" than the existing characteristic facades on the street should be divided into a series of bays or components, defined by columns or masonry piers that frame windows, doors and bulkheads. Creating and reinforcing a facade rhythm helps tie the street together visually and provides pedestrians with features to mark their progress down the street. See T2.0-T2.3, Perspective Views See T2.0-T2.3, Perspective Views, and A3.0-A3.1 Elevations Individual storefront proportions. Storefronts should not overpower the building façade, and should be confined to the area framed by the support piers and the lintel above, consistent with classic “Main Street” architecture. Wall surfaces. Wall surfaces, particularly at the street level, should be varied and interesting, rather than unbroken and monolithic, because blank walls discourage pedestrian traffic Doorways. Doorways should be recessed, as described in Section D.3, Bulkheads. Storefront windows should not begin at the level of the sidewalk, but should sit above a base, commonly called a “bulkhead,” of 18 to 36 inches in height. Desirable materials for bulkhead facing include those already common in the downtown: ornamental glazed tile in deep rich hues, either plain or with Mediterranean or Mexican patterns; dark or light marble panels; and pre-cast concrete. See A3.0-A3.1 Building Elevations See T2.0-T2.3, Perspective Views, and A3.0-A3.1 Elevations See T2.0-T2.3, Perspective Views, and A3.0-A3.1 Packet Pg. 195 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 T3.9 SCALE: N.T.S. DOWNTOWN DESIGN GUIDEINE - COMPLIANCE 4.2-D,1 GUIDELINE COMPLIANCE 4.2-D,3 4.2-D,3a 4.2-D,3b 4.2-D,3c 4.2-D,4 4.2-D,4a 4.2-D,4b 4.2-D,4c 4.2-D,4d MATERIALS & ARCHITECTURAL DETAILS Finish materials. The exterior materials of downtown buildings involve several aspects including color, texture, and materials. Materials with integral color such as smooth troweled plaster, tile, stone, and brick are encouraged. If the building's exterior design is complicated, with many design features, the wall texture should be simple and subdued. However, if the building design is simple (perhaps more monolithic), a finely textured material, such as patterned masonry, can greatly enrich the building's overall character. See A3.4, Material Board Materials should complement those on significant adjacent buildings. The following materials are considered appropriate for buildings within the downtown. - Exterior plaster (smooth troweled preferred) - Cut stone, rusticated block (cast stone), and precast concrete - New or used face-brick - Ceramic tiles (bulkhead or cornice) - Clapboard (where appropriate) - Glass block (transom) - Clear glass windows See T2.0-T2.3, Perspective Views Use of clear glass (at least 88 percent light transmission) on the first floor is recommended. Introducing or changing the location or size of windows or other openings that alter the architectural rhythm or character of the original building is discouraged. See A3.0-A3.1 Building Elevations Doorways. Doors and storefront systems should be of materials and have details and ornament appropriate to the building wall materials. See A3.0-A3.1 Building Elevations Storefront entrance doors should be recessed within the building façade to provide an area for pedestrians to transition from the interior space to the public sidewalk. See A2.0 First Floor Plan Doors themselves should be primarily of glass, to avoid conflicts between entering and exiting patrons. See A3.0-A3.1 Building Elevations See T2.0-T2.3, Perspective Views, See T2.0-T2.3, Perspective Views, and A3.0-A3.1 Elevations Door and entry designs and materials should be compatible with the other storefront materials. Terrazzo and tile pavers are attractive and appropriate paving materials common in the downtown, while indoor/outdoor carpeting and wood planking are inappropriate materials. Windows. Windows that allow pedestrians to see the activities within the ground floors of downtown buildings are important in maintaining the pedestrian orientation of the downtown. Ground floor windows adjacent to sidewalks encourage pedestrians to linger, while extensive blank walls do not. When windows are added or changed, it is important that the design be compatible with the themes common on the same block. N/A Permanent, fixed security grates or grilles in front of windows are not permitted. Any necessary security grilles should be placed inside, behind the window display area. See A3.0-A3.1 Building Elevations Traditional storefront transom windows should be retained whenever feasible. If the ceiling inside the structure has been lowered, the ceiling should be stepped up to meet the transom so that light will penetrate the interior of the building. See A3.0-A3.1 Building Elevations 4.2-D,4e 4.2-D,5 4.2-D,5a 4.2-D,5b 4.2-D,5c 4.2-D,5d 4.2-D,5e 4.2-D,5f See A2.0 4.2-D,5g 4.2-D,6 GUIDELINE COMPLIANCE 4.2-E See A2.0 4.2-E,a See L1.1,A2.0 4.2-E,b See L1.1,A2.0 4.2-E,c See L1.0 4.2-E,d See L1.1,A2.0 4.2-E,e See A2.0 4.2-E,f See A2.0, Room 106 Existing windows should be maintained, and not "walled-in" or darkened to provide more interior wall or storage space. N/A Awnings. Awnings should be retained and/or incorporated where feasible and compatible with the storefront. Where the facade of a commercial building is divided into distinct bays, awnings should be placed within the vertical elements rather than overlapping them. See T2.0-T2.1 Perspective Views Primary access to public plazas and courtyards should be from the street; secondary access may be from retail shops, restaurants, offices, and other uses. Shade trees or architectural elements that provide shelter and relief from direct sunlight should be provided. Courtyards should be buffered from parking areas or drive aisles by low walls, landscaping, or other features to clearly define the edges of the pedestrian space. Ample seating should be provided. Bicycle parking should be provided. Awning shape should relate to the window or door opening. See T2.0-T2.1 Perspective ViewsAwnings may not be internally illuminated. Plazas and courtyards are encouraged within the downtown. . Awnings can be either fixed or retractable. The use of second floor awnings shall be coordinated with lower storefront awnings. Canvas is the most appropriate material for awnings. Metal, plastic (vinyl), or glossy materials are not appropriate. See T2.0-T2.3, Perspective Views, and A3.0-A3.1 Awnings should be functional and at least four feet wide. A single building face with multiple tenants should use consistent awning design and color on each building floor, unless the building architecture differentiates the separate tenancies. See T2.0-T2.3, Perspective Views, and A3.0-A3.1 Other details. A number of other details should be incorporated into exterior building design to add a degree of visual richness and interest while meeting functional needs. These details include such items as: Light fixtures, wall mounted or hung with decorative metal brackets Metal grillwork, at vent openings or as decorative features at windows, doorways or gates, decorative scuppers, catches and down-spouts, preferably of copper, balconies, rails, finials, corbels, plaques, etc. Flag or banner pole brackets. Crafted artworks. See T2.0-T2.3, Perspective Views PUBLIC SPACES, PLAZAS AND COURTYARDS Public spaces on downtown sites should be designed as extensions of the public sidewalk by providing pedestrian amenities such as benches fountains, and by continuing the pavement treatment of the sidewalk. Packet Pg. 196 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 L1.0 planting & TREE REMOVAL PLAN SCALE: 1” = 20’-0”NUPUPP.L 119.30'204.5 FF 204.38 FF 204.4 FF 204.37 FF 204.15 FF 204.06 FF 204.28 FF 204.77 FF 204.61 FF CALIFORNIA PIZZA KITCHEN CHORRO STREET MARSH STREET(E) 10'-0" ALLEY (N) MIXED USE BUILDING BRANZINO 1 122 2333 3 4 54 6 5 TREES QTY BOTANICAL NAME / COMMON NAME CONT REMARKS 4 Jacaranda mimosifolia / Single Trunk 24" box Size: 40-50` tall and 20-30` wide WUCOLS PF = .4-.6 SHRUBS QTY BOTANICAL NAME / COMMON NAME SIZE REMARKS 12 Sansevieria trifasciata / Mother-in-law`s Tongue 5 gal Size: 2`-4` tall and 1-2` wide WUCOLS PF = .1-.3 13 Senecio mandraliscae `Blue Chalk Sticks` / Senecio 1 gal Size: 1`-3` tall x 2`-3` wide WUCOLS PF = .1 - .3 PLANT SCHEDULE 1 SITE PLAN SCALE:1" = 30'MARSH & CHORRO MIXED-USE1144 CHORRO STREET, SAN LUIS OBISPO, CAJACARANDA MOTHER IN LAWS TONQUE SENECIO KEYNOTES 1. (E) STREET TREE TO REMAIN 2. (N) DECORATIVE PATIO FENCE 3. (N) RAISED PLANTERS 4. (E) PALM TO BE REMOVED 5. (E) CARROTWOOD TREE TO BE REMOVED 6. (E) BRACHYCHITON TO BE REMOVED Packet Pg. 197 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 L1.1 ROOFTOP planting plan SCALE: 1” = 20’-0”NSTUDIO 601 357 SF STUDIO 603 318 SF STUDIO 604 318 SF STUDIO 607 329 SF STUDIO 608 337 SF 1-BD 611 451 SF STUDIO 613 408 SF STUDIO 614 450 SF STUDIO 615 501 SF STUDIO 616 484 SF 1-BD 617 576 SF 2-BD 605 660 SF STUDIO 602 350 SF STUDIO 606 329 SF 1-BD 609 362 SF 1-BD 610 479 SF 1-BD 612 451 SFCOMMON KITCHEN 618 363 SF (N) MIXED USE BUILDING 1 1 1 1 1 1 1 2 22 22 2 TREES QTY BOTANICAL NAME / COMMON NAME CONT REMARKS 8 Magnolia grandiflora `Little Gem` / Dwarf Southern Magnolia 15 gal Size: 20`-25` tall and 10`-15` wide WUCOLS PF = .4 - .6 SHRUBS QTY BOTANICAL NAME / COMMON NAME SIZE REMARKS 4 Cotinus coggygria `Royal Purple` / Royal Purple Smoke Tree 5 gal Size: 16` tall and 15` wide . WUCOLS PF = .4 - .6 43 Nepeta x faassenii `Walkers Low` / Walkers Low Catmint 1 gal Size: 2`- 2 1/2` tall and 2`-3` wide WUCOLS PF: .1-.3 9 Olea europaea `Little Ollie` TM / Little Ollie Olive 5 gal Size: 4`-6` tall and wide WUCOLS PF = >.1 PLANT SCHEDULE 20 Senecio mandraliscae `Blue Chalk Sticks` / Senecio 1 gal Size: 1`-3` tall x 2`-3` wide WUCOLS PF = .1 - .3 1 SITE PLAN SCALE:1" = 30'MARSH & CHORRO MIXED-USE1144 CHORRO STREET, SAN LUIS OBISPO, CADWARF SOUTHERN MAGNOLIA PURPLE ROYAL SMOKE TREE WALKERS LOW CATMINT LITTLE OLLIE OLIVE MOTHER IN LAWS TONQUE SENECIO KEYNOTES 1. (N) RAISED PLANTERS 2. (N) ROOFTOP PATIO Packet Pg. 198 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 L1.2 WATER CALCS Estimated Total Water Use Equation: ETWU = (ETo) x (0.62) x [(PF x HA/IE) + SLA] Enter values in Pale Blue Cells Tan Cells Show Results Messages and Warnings Enter Irrigation Efficiency (equal to or greater than 0.71)0.91 Irrigation Efficiency Default Value 0.71 Plant Water Use Type Plant Factor Low 0 - 0.3 Medium 0.4 - 0.6 High 0.7 - 1.0 SLA 1.00 Hydrozone Plant Water Use Type (s) (low, medium, high) Plant Factor (PF) Hydrozone Area (HA) (ft2) PF x HA (ft 2) 1 Low 0.20 72 14 2 Medium 0.40 80 32 3 Low 0.20 276 55 4 Low 0.40 192 77 0 0 0 0 0 0 0 0 0 0 178 SLA 1 0 0 Sum 620 Results MAWA = 9,262 ETWU= 5,324 Gallons ETWU complies with MAWA 712 Cubic Feet 7 HCF 0.02 Acre-feet 0.01 Millions of Gallons Enter value in Pale Blue Cells Tan Cells Show Results Messages and Warnings Click on the blue cell on right to Pick City Name San Luis Obispo Name of City ETo of City from Appendix A 43.80 ETo (inches/year) Enter total landscape including SLA 620.00 LA (ft2) Enter Special Landscape Area 0.00 SLA (ft2) Results: MAWA = (ET o) x (0.62) x [(0.55 x LA)+(0.45 x SLA)]9,261.56 Gallons 1,238.09 Cubic Feet 12.38 HCF 0.03 Acre-feet 0.01 Millions of Gallons MAWA calculation incorporating Effective Precipitation (Optional) ETo of City from Appendix A 43.80 ETo (inches/year) Landscape Area 620.00 LA (ft2) Special Landscape Area 0.00 SLA (ft2) 0.00 Total annual precipitation Enter Effective Precipitation 0.00 Eppt (in/yr)(25% of total annual precipitation) Results: MAWA=(ET o - Eppt) x (0.62) x [(0.55 x LA)+(0.45 x SLA)]- Gallons - Cubic Feet - HCF - Acre-feet - Millions of Gallons Packet Pg. 199 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 A1.0 2. MARSH STREET ELEVATION 1. CHORRO STREET ELEVATION SCALE: 1” = 30’-0” SCALE: 1” = 30’-0” MARSH ST TOP OF STRUCTURE 62'-0" TOP OF BUILDING 55'-0" TOP OF PARAPET 75'-0" TOP OF PARAPET 42'-6" TOP OF ROOF 47'-0" TOP OF PARAPET 75'-0" TOP OF PARAPET 42'-6" TOP OF ROOF 30'-0" TOP OF STRUCTURE 35'-0" PLPL PL PL 54'-0"15'-0" 5'-0" 10'-0" 70'-00"134'-6"5'-0" 110'-0" CHORRO ST MARSH ST 4'-6" 1"=30'-0" TOP OF STRUCTURE 62'-0" TOP OF BUILDING 55'-0" TOP OF PARAPET 75'-0" TOP OF PARAPET 42'-6" TOP OF ROOF 47'-0" TOP OF PARAPET 75'-0" TOP OF PARAPET 42'-6" TOP OF ROOF 30'-0" TOP OF STRUCTURE 35'-0" PLPL PL PL 54'-0"15'-0" 5'-0"10'-0" 70'-00"134'-6"5'-0" 110'-0" CHORRO ST MARSH ST 4'-6" 1"=30'-0" Packet Pg. 200 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 A1.1 SITE SECTION 2 SITE SECTION 1 SCALE: 1” = 30’-0” SCALE: 1” = 30’-0” Packet Pg. 201 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 A2.0 site plan and first floor plan SCALE: 1” = 20’-0”NKEYNOTES 1. (N) TREES. SEE LANDSCAPE PLAN FOR SPECIES/SIZE. MAINTAIN 8’ CLEARANCE 2. (N) CURB CUT 3. (E) TREE TO REMAIN. MAINTAIN 8’ CLEARANCE AT SIDEWALK AROUND TREE. 4. (N) PAVING AT SIDEWALK 5. (E) GAS METER IN SIDEWALK 6. (E) PGE VAULT 7. (E) MANHOLE 8. (E) WATER METER IN SIDEWALK 9. (E) WATER METER IN SIDEWALK TO BE RELOCATED OUTSIDE OF TREE GRATE AREA 10. (E) FIRE HYDRANT 11. (E) TRUNCATED DOME - ADA MARKING STRIP 12. (E) STREET LIGHT &TRAFFIC SIGNAL 13. (E) PEDESTRIAN SIGNAL 14. (E) CURB CUT AT ALLEY 15. (N) STORMWATER BIOFILTER PLANTER TYP. 16. APPROXIMATE SIZE AND LOCATION OF (E) BASEMENT TO REMAIN (STORAGE 001) 17. NEW FINISH FLOOR GRADES AT DOOR THRESHOLDS PER 1.5% MAX CROSS SLOPE FROM ADJACENT TOP OF CURB. B 1 24'-0"15'-0"24'-0" 2 3 4 5 6 1 2 3 4 5 6 C D E F G B C D E F G 20'-0"23'-0"20'-0"20'-0" 20'-0"23'-0"20'-0"20'-0"5'-0"25'-0"20'-0"25'-0"15'-0"5'-0"25'-0"20'-0"25'-0"720'-0"7 20'-0"A A 10'-0" 10'-0" H H 22'-6" 22'-6"UPUPRETAIL 102 1,425 SF TRASH 107 612 SF UTILITY 108 480 SF 2 3 RETAIL 101 1,424 SF RETAIL 100 1,738 SF OFFICE LOBBY 104 594 SF RES. LOBBY 103 597 SF GARAGE 105 3,782 SF P.L 119.30'(E) 10'-0" ALLEY (E) ADJACENT BUILDING CHORRO STREET MARSH STREET 4 5 MC - 2 MC - 1 1-ADA BIKE 106 292 SF SHOW / LOCKERS 110 198 SF FIRE RISER 109 89 SF COVERED AREA 111 546 SF MAIL BOXES 1 1 3 2 311 45 5 6 6 7 7 8 8 8 9 10 11 12 13 10 14 5'-0"15 2 A1.1 1 A1.1 6 7 12'-4"4'-4"9'-4"12'-6"10'-0"10'-0"8'-0"16 204.5 FF 204.38 FF 204.4 FF 204.37 FF 204.15 FF 204.06 FF 204.28 FF 204.77 FF 204.61 FF 17 Packet Pg. 202 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 A2.1 SECOND floor plan third floor, sim. SCALE: 1” = 20’-0”NPacket Pg. 203 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 A2.2 fourth FLOOR plan SCALE: 1” = 20’-0”NPacket Pg. 204 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 A2.3 fifth FLOOR plan SCALE: 1” = 20’-0”NPacket Pg. 205 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 A2.4 sixth FLOOR plan SCALE: 1” = 20’-0”NPacket Pg. 206 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 A2.5 ROOF PLAN SCALE: 1” = 20’-0”NPacket Pg. 207 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 A2.6 2-BEDROOM 505 616 SF SCALE: 3/32” = 1’-0” UNIT FLOOR PLAN EXAMPLES STUDIO 507 329 SFSTUDIO 504 318 SFSTUDIO 501 357 SF 1-BEDROOM 511 451 SF STUDIO 516 484 SF1-BEDROOM 510 479 SF1-BEDROOM 509 362 SF Packet Pg. 208 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 A3.0 SOUTH ELEVATION SCALE: 1/16” = 1’-0” SECOND FLOOR 15'-0" THIRD FLOOR 27'-0" FIFTH FLOOR 50'-0" TOP OF PARAPET 42'-6"75'-0"MAX. BUILDING HEIGHTPL PL SIXTH FLOOR 61'-0" FOURTH FLOOR 39'-0" TOP OF PARAPET 75'-0" TOP OF ROOF 72'-0" FIRST FLOOR 0'-0"15'-0"12'-0"12'-0"11'-0"11'-0"11'-0"1/16"=1'-0" - SOUTH Packet Pg. 209 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 A3.1 EAST ELEVATION SCALE: 1/16” = 1’-0”75'-0"MAX. BUILDING HEIGHTPLPL 5'-0"STAIRTOWERSECOND FLOOR 15'-0" THIRD FLOOR 27'-0" FIFTH FLOOR 50'-0" TOP OF PARAPET 42'-6" SIXTH FLOOR 61'-0" FOURTH FLOOR 39'-0" TOP OF PARAPET 75'-0" TOP OF ROOF 72'-0" FIRST FLOOR 0'-0"15'-0"12'-0"12'-0"11'-0"11'-0"11'-0"EAST - 1/16"=1'-0"Packet Pg. 210 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 A3.2 NORTH ELEVATION SCALE: 1” = 20’-0” PLPL 75'-0"MAX. BUILDING HEIGHT5'-0"STAIRTOWERSECOND FLOOR 15'-0" THIRD FLOOR 27'-0" FIFTH FLOOR 50'-0" TOP OF PARAPET 42'-6" SIXTH FLOOR 61'-0" FOURTH FLOOR 39'-0" TOP OF PARAPET 75'-0" TOP OF ROOF 72'-0" FIRST FLOOR 0'-0"15'-0"12'-0"12'-0"11'-0"11'-0"11'-0"1/16"=1'-0" - NORTH Packet Pg. 211 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 A3.3 WEST ELEVATION SCALE: 1” = 20’-0”75'-0"MAX. BUILDING HEIGHTPL PL 5'-0"STAIRTOWERPL SECOND FLOOR 15'-0" THIRD FLOOR 27'-0" FIFTH FLOOR 50'-0" SIXTH FLOOR 61'-0" FOURTH FLOOR 39'-0" TOP OF PARAPET 75'-0" TOP OF ROOF 72'-0" FIRST FLOOR 0'-0"15'-0"12'-0"12'-0"11'-0"11'-0"11'-0"TOP OF PARAPET 42'-6" 1/16"=1'-0" - WEST Packet Pg. 212 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 A3.4 MATERIAL BOARD BLACK NO.29 BLACK NEWPORT SW 7069 IRON OREP-525 NAVAJO WHITE BULKHEADS AND WINDOW HEADERS CONCRETE FINISH OR POLISHED PLASTER STOREFRONT KAWNEER, ANODIZED ALUM. WALL SCONCE LUMENS URBAN INDOOR/OUTDOOR BRICK SIDING COMMERCIAL BRICK CORP SIDING AND TRIM PANELS BLACK METAL STUCCO SIDING MERLEX SBF BASE A Packet Pg. 213 Item 13 Packet Pg. 214 Item 13 CULTURAL HERITAGE COMMITTEE REPORT 1.0 PROJECT DESCRIPTION AND SETTING The applicant has applied for the conceptual review of a six-story mixed-use development with a maximum height of 75-feet within the Downtown Historic District, see Figure 1. The subject property is directly adjacent to the Master List Historic Resource Hotel Wineman, and in vicinity of the Master List Masonic Temple and the Master List Commercial Bank Building. The subject property is not listed as historic resource. The proposed concept plan consists of ground floor retail and parking, two stories of office space, and three stories of residential dwellings (Attachment 1, Project Plans). General Location: The property is located on the corner of Marsh and Chorro Streets within the Commercial Downtown zone on the border of the Downtown Historic District. Present Use: Vacant Zoning: Downtown Commercial within the Downtown Historic District (C-D-H) General Plan: General Retail Surrounding Uses: East: California Pizza Kitchen West: Eureka Burger North: Hotel Wineman South: Chorro Street Parking Structure 2.0 PROPOSED DESIGN Design details: Brick design that extends from the street level to the third and fourth stories. Upper floors consisting of stucco siding that are stepped back five feet from the brick façade. Materials: Brick & Stucco siding, anodized aluminum storefronts, concrete bulkheads and window header, and black metal awnings/balconies. 3.0 NEXT STEPS Proceeding the feedback from the CHC, the project will be scheduled for conceptual review by the ARC, tentatively scheduled for December 3, 2018. The ARC will review the project and provide feedback based on the Community Design Guidelines. Following conceptual review, the applicant will Meeting Date: November 26, 2018 Item Number: 1 Item No. 1 FROM: Brian Leveille, Senior Planner BY: Kyle Bell, Associate Planner PROJECT ADDRESS: 1144 Chorro Street FILE NUMBER: ARCH-1903-2018 APPLICANT: Mark Rawson REPRESENTATIVE: Ten Over Studios, Inc. ____________________________________________________________________________________________________ For more information contact: (Kyle Bell) at 781-7524 or kbell@slocity.org Packet Pg. 215 Item 13 consider feedback and prepare a formal application for complete review. Once all information is collected and the project is deemed complete hearings will be scheduled before the CHC, ARC, PC, and City Council for final review of the project. 4.0 FOCUS OF REVIEW The CHC’s role is to review the project for consistency with the Historic Preservation Guidelines and Secretary of the Interior’s Standards and other policies and standards identified in this report, and to provide the applicant and staff with feedback on the proposed conceptual design. A Historic Preservation Report, prepared by SWCA Environmental Consultants, has been provided with this report that includes an assessment of the project’s conformance with Historic Preservation Guidelines (Attachment 2). Historic Preservation Guidelines: https://www.slocity.org/home/showdocument?id=4144 Secretary of Interior Standards: https://www.slocity.org/home/showdocument?id=16940 5.0 GUIDANCE DOCUMENTS/DISCUSSION ITEMS HISTORIC PRESERVATON GUIDELINES CHC Discussion Items §3.2.1 Architecturally compatible development within Historic Districts. The CHC should provide feedback on the project’s compatibility with the prevailing historic character in terms of scale, massing, rhythm, detailing, materials, and setting. The CHC should discuss whether the architectural style could be found compatible with the district based on scale, massing, rhythm, signature architectural elements, and materials. §3.2.2 Architectural compatibility. The CHC should discuss and provide feedback on whether the proposed project contrasts with, significantly blocks public views of, or visually detracts from, the historic character of historically designated structures within the vicinity. §5.2.2 Downtown Historic District The CHC should discuss and provide feedback whether the project includes common site features, and predominant architectural characteristics of the Historic District. Figure 1: Neighborhood Context and adjacent building heights. Packet Pg. 216 Item 13 6.0 PROJECT STATISTICS Site Details Proposed Allowed/Required* Setbacks 0 feet 0 feet Density (DU) 29.26 DU 13.68 DU Maximum Height of Structures 75 feet 50 - 75 feet Max Building Coverage (footprint) 91% 100% Floor Area Ratio (FAR) 3.87 FAR 3.75 FAR Total # Parking Spaces 11 spaces 93 spaces *2018 Zoning Regulations 7.0 ATTACHMENTS 7.1 Project Plans 7.2 Historic Preservation Report Packet Pg. 217 Item 13 DRAFT Minutes – Cultural Heritage Committee Meeting of November 26, 2018 Page 1 Minutes CULTURAL HERITAGE COMMITTEE Monday, November 26, 2018 Regular Meeting of the Cultural Heritage Committee CALL TO ORDER A Regular Meeting of the San Luis Obispo Cultural Heritage Committee was called to order on Monday, November 26, 2018 at 5:30 p.m. in the Council Hearing Room, located at 990 Palm Street, San Luis Obispo, California, by Chair Papp. ROLL CALL Present: Committee Members Sandy Baer, Thom Brajkovich, Glen Matteson, Damon Haydu, Craig Kincaid, Vice-Chair Shannon Larrabee, and Chair James Papp Absent: None Staff: Senior Planner Brian Leveille, Associate Planner Kyle Bell, Assistant Planner Walter Oetzell, and Recording Secretary Summer Aburashed APPROVAL OF MINUTES 1. Consideration of Minutes of the Regular Cultural Heritage Committee Meeting of October 22, 2018: ACTION: UPON MOTION BY COMMITTEE MEMBER MATTESON, SECONDED BY COMMITTEE MEMBER BAER, CARRIED 6-0-0-1 (VICE-CHAIR LARRABEE ABSTAINING), the Cultural Heritage Committee approved the Minutes of the Regular Cultural Heritage Committee Meeting of October 22, 2018, as amended. Spelling corrections on page 2, Applicant representatives names Emily “Year” should be changed to “Ewer” and Bryce “Armstrong” to “Engstrom”. Spelling corrections on page 1, Committee Member Thom Brajkovich should be changed from “Brajk” to “Brajkovich.” Update the action for Leff Street on page 2 to reflect it to state “forward recommendation to find proposed project consistent with applicable standards.” Update Recess to show that all Committee Members were present excusing Vice-Chair Larrabee as she was absent for that meeting. Packet Pg. 218 Item 13 Minutes – Cultural Heritage Committee Meeting of November 26, 2018 Page 2 PUBLIC COMMENT None End of Public Comment-- PUBLIC HEARING ITEMS 2. 1144 Chorro Street. Case #: ARCH-1903-2018, C-D-H Zone; Mark Rawson, Applicant. Associate Planner Kyle Bell provided a PowerPoint presentation and responded to Committee inquiries. Applicant representatives, Mark Rawson with Copeland Properties, Ten Over Studio Principal Jim Duffy, Project Architect Jessie Skidmore, and Paula Carr provided a presentation and responded to Committee inquiries. Public Comment Dave Hannings Jeanne Kinney James Lopes Greg Wynn Sandra Marshall Stan Carpenter End of Public Comment-- ACTION: UPON MOTION BY COMMITTEE MEMBER BAER, SECONDED BY COMMITTEE MEMBER KINCAID, CARRIED 7-0-0, identifying specific directional items for the conceptual review of a proposed six-story mixed use building with a maximum height of 75-feet adjacent to the Master List Historic Structure Hotel Wineman within the Downtown Historic District. The committee provided the following directional items to the applicant: 1. The project shall include a height analysis of buildings in the vicinity and within the Historic District, including the Masonic Temple. 2. The shading study shall be revised to identify the specific shadow of the proposed structure, to distinguish between shading of existing structures. 3. The Historic Preservation Report shall be revised to address the existing structure’s potential historic eligibility within the district, in consideration of the evaluation criteria for historic resource listing. 4. The proposed scale and mass of the structure above fourth story, referred to as the stucco portion”, is considered incompatible with the Historic District. Packet Pg. 219 Item 13 Minutes – Cultural Heritage Committee Meeting of November 26, 2018 Page 3 5. The architectural style is considered too “institutional”, alternative styles should be considered giving the projects prominent location and opportunity to contribute to the Historic District’s prevailing significance and distinctive architecture. 6. The proposed design should be modified to include more architectural details and features consistent with the character of the Historic District. 7. The proposed fenestration is considered monotonous and should provide greater variety and articulation. 8. The project design should provide more articulation and variety along the storefront elevations. Recess: The Committee recessed at 7:35p.m. and reconvened at 7:39 p.m. with all committee members present. 3. 857 Monterey. Case #: ARCH-1885-2018, C-D-H Zone; Danny Freitas, Applicant Assistant Planner Walter Oetzell provided a PowerPoint presentation and responded to Committee inquiries. Applicant representatives, Ten Over Studios representatives, Jim Duffy and Jessie Skidmore provided a PowerPoint presentation and responded to Committee inquiries. Public Comment Greg Wynn End of Public Comment-- ACTION: UPON MOTION BY COMMITTEE MEMBER MATTESON, SECONDED BY COMMITTEE MEMBER BAER, CARRIED 7-0-0, to recommend that the Community Development Director find the project consistent with Historic Preservation Ordinance, with consideration of the consistency of proposed wall sconces with the building’s period of significance and with the character of surrounding buildings, and with consideration of the color of the window muntins, for a less stark appearance. 4. 771 Buchon Street. Case #: HIST-1936-2018, R-2-H Zone; Chris and Heidi Frago, Applicants Assistant Planner Walter Oetzell provided a PowerPoint presentation and responded to Committee inquiries. Packet Pg. 220 Item 13 Minutes – Cultural Heritage Committee Meeting of November 26, 2018 Page 4 Applicant representatives, Chris and Heidi Frago, provided a brief description of their request and of the Nathaniel Brew Home, and responded to Committee inquiries. Public Comment None End of Public Comment-- ACTION: UPON MOTION BY COMMITTEE MEMBER KINCAID, SECONDED BY VICE-CHAIR LARRABEE, CARRIED 7-0-0, to approve a Historical Preservation Agreement (Mill's Act Program) for the Master List Nathaniel Brew Home at 771 Buchon as presented, with an amendment to exclude interior painting from the list of improvements proposed under the agreement. PRESENTATION AND DISCUSSION 5. Review of documentation and discussion of whether additional information should be provided for the proposed demolition of 664 Upham Street (not a listed historic resource) Senior Planner Brian Leveille provided a presentation and responded to Committee inquiries. Greg Wynn provided a presentation and responded to Committee inquiries. The Committee was in consensus that additional information is not necessary, and that the demolition can proceed without further review of potential historical significance. COMMENT AND DISCUSSION Senior Planner Brian Leveille provided an agenda forecast. ADJOURNMENT The meeting was adjourned at 8:40 p.m. The Regular Cultural Heritage Committee meeting for December 17, 2018 has been cancelled. The next Regular Cultural Heritage Committee meeting is scheduled for Monday, January 28, 2019 at 5:30 p.m., in the Council Hearing Room, 990 Palm Street, San Luis Obispo, California. APPROVED BY THE CULTURAL HERITAGE COMMITTEE: 01/28/2019 Packet Pg. 221 Item 13 ARCHITETURAL REVIEW COMMISSION REPORT 1.0 PROJECT DESCRIPTION AND SETTING The applicant has applied for the conceptual review of a six-story mixed-use development with a maximum height of 75-feet within the Downtown Historic District, see Figure 1. The proposed concept plan consists of ground floor retail and parking, two stories of office space, and three stories of residential dwellings (Attachment 1, Project Plans). General Location: The property is located on the corner of Marsh and Chorro Streets within the Commercial Downtown zone and Downtown Historic District. Present Use: Vacant Zoning: Downtown Commercial within the Downtown Historic District (C-D-H) General Plan: General Retail Surrounding Uses: East: California Pizza Kitchen West: Eureka Burger North: Hotel Wineman South: Chorro Street Parking Structure 2.0 PROPOSED DESIGN Design details: Brick design that extends from the street level to the third and fourth stories. Upper floors consisting of stucco siding that are stepped back five feet from the brick façade. Materials: Brick & Stucco siding, anodized aluminum storefronts, concrete bulkheads and window header, and black metal awnings/balconies. 3.0 NEXT STEPS The project has been conceptually reviewed by the Cultural Heritage Committee (CHC) on November 26, 2018. Following conceptual review, the applicant will consider feedback from the CHC and the ARC and prepare a formal application for complete review. Once all application materials are collected (including a viewshed analysis and visual assessment) and the project is deemed complete, review hearings will be scheduled before the CHC, ARC, PC, and City Council for final review of the project. Meeting Date: December 3, 2018 Item Number: 1 Item No. 1 FROM: Doug Davidson, Deputy Director BY: Kyle Bell, Associate Planner PROJECT ADDRESS: 1144 Chorro Street FILE NUMBER: ARCH-1903-2018 APPLICANT: Mark Rawson REPRESENTATIVE: Ten Over Studios, Inc. ____________________________________________________________________________________________________ For more information contact: (Kyle Bell) at 781-7524 or kbell@slocity.org Packet Pg. 222 Item 13 4.0 FOCUS OF REVIEW The ARC’s role is to review the project for consistency with the Community Design Guidelines and applicable City policies and standards, to provide the applicant and staff with feedback on the proposed conceptual design. A Historic Preservation Report, prepared by SWCA Environmental Consultants, has been provided with this report that includes an assessment of the project’s conformance with Historic Preservation Guidelines (Attachment 2). This was the focus of the CHC’s review. Community Design Guidelines: https://www.slocity.org/home/showdocument?id=2104 Downtown Concept Plan: https://www.slocity.org/home/showdocument?id=17344 5.0 COMMUNITY DESIGN GUIDELINES/DISCUSSION ITEMS Highlighted Sections ARC Discussion Items CDG Chapter 2 – General Design Principles §2.1 - Site Design The ARC should discuss whether the project concept considers the context of best examples of architecture in the vicinity. §2.2 - Building Design The ARC should discuss whether the building design provides adequate proportion and balance of the building elements, including articulation that effectively reduces the apparent mass of the structure. CDG Chapter 4 - Downtown Design Guidelines §4.2B - Height, Scale The ARC should discuss whether the height and scale of the project provides adequate visual transitions and sensitivity to historic resources of structures in the vicinity. The ARC should discuss whether the project provides the appropriate techniques, identified in CDG 4.2.B.4, to assure the height of the building respects the context of the site setting. §4.2C - Façade Design The ARC should discuss whether the building façade provides appropriate rhythm and proportion of storefront systems and window openings. §4.2D - Materials and Details The ARC should discuss whether the projects materials and architectural details are consistent with the distinctive character of Downtown. Figure 1: Neighborhood Context and adjacent building heights. Packet Pg. 223 Item 13 6.0 PROJECT STATISTICS/ASSOCIATED STUDIES Site Details Proposed Allowed/Required* Setbacks 0 feet 0 feet Density (DU) 29.26 DU 13.68 DU Residential Uses Provided Required Height of Structures Minimum 6-stories 2-stories along street Maximum 75 feet 50 feet Maximum with PC Exception 75 feet 75 feet Max Building Coverage (footprint) 91% 100% Floor Area Ratio (FAR) 3.87 FAR 3.75 FAR Total # Parking Spaces 11 spaces 93 spaces Limitations on New Driveways Requested Restricted Application Requirements Viewshed Analysis1 & Visual Study Pending Submittal Required Solar Shading Analysis Provided Required Parking Demand Management Pending Submittal Required 3-D Digital Model Pending Submittal Required Solid Waste Management Plan Pending Submittal Required Green Building Plan Pending Submittal Required Emergency Services Access Plan Pending Submittal Required Public Safety Plan Pending Submittal Required Utilities Infrastructure Analysis Pending Submittal Required Building Code Analysis Pending Submittal Required *2018 Zoning Regulations 7.0 ATTACHMENTS 7.1 Project Plans 7.2 Historic Preservation Report 1 Zoning Regulations Section 17.32.030E.6.a - Viewshed Analysis. A written and graphic viewshed analysis from various perspectives. The analysis shall identify visual resources within the viewshed of the project and indicate how the design of the project addresses those views from each perspective. Specific attention shall be given to views from adjacent publicly owned gathering spaces, such as Mission Plaza. Packet Pg. 224 Item 13 Minutes ARCHITECTURAL REVIEW COMMISSION Monday, December 3, 2018 Regular Meeting of the Architectural Review Commission CALL TO ORDER A Regular Meeting of the Architectural Review Commission was called to order on Monday, December 3, 2018 at 5:00 p.m. in the Council Chamber, located at 990 Palm Street, San Luis Obispo, California, by Chair Root. ROLL CALL Present: Commissioners Richard Beller, Brian Rolph, Micah Smith, Angela Soll, Christie Withers, and Chair Allen Root Absent: Vice-Chair Amy Nemcik Staff: Deputy Director Doug Davidson, Associate Planner Kyle Bell, Senior Planner Shawna Scott, and Recording Secretary Summer Aburashed. Other staff members presented reports or responded to questions as indicated in the minutes. PUBLIC COMMENT ON ITEMS NOT ON THE AGENDA None End of Public Comment-- APPROVAL OF MINUTES 1. Consideration of Minutes of the Regular Architectural Review Commission Meeting of October 15, 2018. ACTION: MOTION BY COMMISSIONER BELLER, SECOND BY COMMISSIONER WITHERS, CARRIED 6-0-1(VICE-CHAIR NEMCIK ABSENT) to approve the minutes of the Regular Architectural Review Commission of October 15, 2018, as presented. Packet Pg. 225 Item 13 Minutes – Architectural Review Commission Meeting of December 3, 2018 Page 2 PUBLIC HEARINGS 2. 1144 Chorro Street. Case #: ARCH 1903-2018, C-D-H Zone; Mark Rawson, applicant Associate Planner Kyle Bell presented the staff report with the use of a PowerPoint presentation and responded to Commissioner inquiries. Applicant representatives, Project Architect Mark Rawson, provided a PowerPoint presentation and responded to Commissioner inquiries. Public Comments: Dave Hannings James Lopes Jeanne Kinney Sandra Marshall John Grady Quinn Pullen Les Beck End of Public Comment-- By consensus, the Commission reviewed a proposed six-story mixed use building with a maximum height of 75-feet within the Downtown Historic District. No final action was taken on the project. The following direction was provided to the applicant: The project should respond to the Cultural Heritage Committee directional items with emphasis on providing a higher degree of articulation to relieve building mass and provide a greater variety of fenestration, the project should consider a variety in relief of roof lines. The project should consider and respond to the planning principles and goals identified in the Downtown Concept Plan. The architectural style should be distinctive as a gateway feature to downtown through design excellence justifying the requested height above 50 feet, given the project prominence along the intersection, the design should be of its own time while compatible with adjacent historic structures. The project should provide greater step backs on the upper levels and/or consider a height reduction with sensitivity to adjacent historic resources, the design and mass should reinforce the horizontal lines of adjacent facades. The design should focus on pedestrian scale, consider opportunity to revitalize the corner of Marsh and Chorro as a design feature combined with greater sidewalk widths and additional relief of storefronts to provide for patio dining. Consider tying into the pedestrian experience of the Downtown Center. Packet Pg. 226 Item 13 Minutes – Architectural Review Commission Meeting of December 3, 2018 Page 3 Materials should be high quality and selected carefully to be compatible with the historic buildings, without replicating design features, the second story windows should be reduced in height to reflect traditional transom window designs. 3. 1241 Laurel Lane. Case #: ARCH-1909-2018, C-N Zone, Laurel Lane Investments LLC, applicant Deputy Director Doug Davidson presented the staff report with the use of a PowerPoint presentation and responded to Commissioner inquiries. Applicant representative, Sean Beauchamp, Southpaw Signs, provided graphic materials to the Commission and responded to Commissioner inquiries. Public Comments: None End of Public Comment-- ACTION: MOTION BY COMMISSIONER BELLER, SECOND BY COMMISSIONER WITHERS, CARRIED 6-0-1(VICE-CHAIR NEMCIK ABSENT) to adopt Resolution No. ARC-1023-2018 entitled: A RESOLUTION OF THE ARCHITECTURAL REVIEW COMMISSION OF THE CITY OF SAN LUIS OBISPO, CALIFORNIA, APPROVING A SIGN PROGRAM FOR THE VILLAGE AT LAUREL LANE SHOPPING CENTER AT 1241 LAUREL LANE APPLICATION ARCH-1909-2018)”, as amended below. Approve sign program for shopping center with the monument sign modified to 12-foot maximum above natural grade with up to 2 foot concrete base, with hanging signs and market signs as proposed. The Commission also advised staff to: confirm site distance visibility, including visibility from the bike path; and consider landscaping around the center identification sign. COMMENT AND DISCUSSION Deputy Director Davidson provided a brief agenda forecast. ADJOURNMENT The meeting was adjourned at 6:59 p.m. The Regular Architectural Review Commission for Monday, December 17, 2018 has been cancelled. The next Regular Architectural Review Commission meeting is scheduled for Monday, January 7, 2019 at 5:00 p.m., in the Council Hearing Room, 990 Palm Street, San Luis Obispo, California. Packet Pg. 227 Item 13 Minutes – Architectural Review Commission Meeting of December 3, 2018 Page 4 APPROVED BY THE ARCHITECTURAL REVIEW COMMISSION: 02/04/2019 Packet Pg. 228 Item 13 March 2019 CITY OF SAN LUIS OBISPO Title 17 – ZONING REGULATIONS 2-32 5. Community Benefits Policy Objectives. The intent of the following policy objectives is to ensure that buildings taller than 50 feet proposed in the C-D zone include features that meet the specific policy objectives outlined for tall buildings in the General Plan (including, but not limited to, Land Use Element Chapter 4.0). A variety of objectives are listed to ensure that proposed project features are appropriate for the site and surroundings, and to allow for a wide range of possible project types. Regardless of the number of objectives proposed, the Planning Commission shall determine that the overall project is consistent with the General Plan, including goals and policies for view preservation, historical resource preservation, solar access, and architectural character. a. Affordable and Workforce Housing. (1) The project provides affordable housing, in compliance with City standards, at the rate of five percent for low-income households, or 10 percent for moderate-income households, as a percentage of the total number of housing units built (no in-lieu fee option). (2) The project qualifies for, and utilizes, a density bonus in compliance with the City’s affordable housing incentives (Chapter 17.140). (3) The project includes residential density greater than or equal to 36 units per acre and the average floor area of units is 1,000 square feet or less. Group housing projects shall show that the proposed building meets or exceeds the population density that would otherwise be achieved by this objective. b. Pedestrian Amenities. (1) The project provides a major pedestrian connection between Higuera Street and the Creekwalk, Monterey Street and the Creekwalk, Higuera Street and Marsh Street, or at another acceptable mid- block location. (2) The project provides open space in the form of a significant public plaza, where: (a) The minimum area of any public plaza shall be 7,500 square feet; and (b) The public plaza is owned, operated, and maintained by the developer or property manager in accordance with an approved maintenance plan to be reviewed and approved by the Director; and (c) Each part of the public plaza shall be accessible from other parts of the open sp ace without leaving the open space area; and (d) The public plaza shall be on the ground level and directly accessible from the sidewalk, and be accessible to persons with disabilities; and (e) The public plaza shall be open to the public, without charge, each day of the year, except for temporary closures for necessary maintenance or public safety; and (f) At a minimum, the following elements shall be included within the open space: trees and landscaping, seating, bicycle racks, trash and recycling receptacles, and signage that include hours of operation; and (g) The public art requirement is met by providing the art onsite (no in-lieu fee option). c. View Access and Preservation. (1) The project provides a public viewing deck or decks, or similar feature, to provide significant free public access to views of surrounding natural features such as, but not limited to, Cerro San Luis. (2) The project improves and dedicates land within the downtown core for publicly owned open space with street-level views of hillside resources, consistent with Land Use Element Policies 4.10 (Open Places and Views) and 4.20.4 (Building Height). Packet Pg. 229 Item 13 March 2019 CITY OF SAN LUIS OBISPO Title 17 – ZONING REGULATIONS 2-33 d. Historic Preservation (Off Site). Where there are no historic resources on the project site, the project provides for the permanent preservation of a building off site within the downtown historic district or Chinatown historic district that is listed in the City’s inventory of historical resources through the recordation of a historic preservation agreement. e. Mode Split. The project provides for the permanent mode shift towards alternative transportation for building occupants through a Transportation Demand Management Program that achieves modal split objectives of Circulation Element Policy 1.7.1 (Encourage Better Transportation Habits). Prior to the issuance of building permits, a covenant agreement shall be recorded that discloses the required Transportation Demand Management provisions. This agreement shall be recorded in the office of the County Recorder to provide constructive notice to all future owners of the property of any ongoing programmatic requirements. f. Open Space Preservation. The project provides for the permanent preservation of open space land in the City’s greenbelt through land dedication, the recordation of a conservation easement, or other recognized preservation method, to the approval of the City. g. Zero Net Energy. The project provides 100 percent of total building energy load measured as kilowatt per square foot through solar panels, wind turbines, or other renewable sources. h. Common Garbage Facility. The project provides a common garbage storage and compacting facility of adequate size and in an appropriate location to accommodate the needs of the project and all adjacent properties or other grouping of users acceptable to the City. i. Other Policy Objectives. The project directly implements specific and identifiable City objectives as set forth in the General Plan, the Downtown Concept Plan, or other key policy document, to the approval of the Planning Commission. (This subsection may be used to meet requirements for one policy objective.) 6. Application Requirements. Planning applications submitted for new buildings over 50 feet in height shall include the following additional items to assist the review authority in the analysis and decision-making process: a. Viewshed Analysis. A written and graphic viewshed analysis from various perspectives. The analysis shall identify visual resources within the viewshed of the project and indicate how the design of the project addresses those views from each perspective. Specific attention shall be given to views from adjacent publicly owned gathering spaces, such as Mission Plaza. b. Solar Shading Analysis. A written and graphic solar shading analysis showing the effects of shading on its surroundings between 10:00 AM and 3:00 PM on the winter solstice, summer solstice and vernal or autumnal equinox. The analysis shall compare shading caused by the project to the City’s solar access standards (Conservation Open Space Element Table 2). c. Parking Demand Management – Trip Reduction Programs. A verifiable parking demand management program and a trip reduction program to reduce resident/employee dependence on single-occupant vehicle trips, subject to the approval of the Public Works Director. d. Three-Dimensional Digital Model. A complete three-dimensional digital model of the proposed building, consistent with the specifications for the City’s baseline 3-D digital model of the downtown core and suitable for display on the City’s website. e. Solid Waste Management Plan. A solid waste management plan to show how the project meets or exceeds the City’s solid waste guidelines, subject to the approval of the Utilities Director. If any exceptions to the solid waste guidelines are requested, the plan shall include a written explanation and justification. f. Green Building Plan. A written green building plan to indicate how the project complies with performance standards for energy efficiency. Packet Pg. 230 Item 13 Policy Context The City’s General Plan provides several policies regarding Downtown development. The following provides a discussion and initial analysis of the proposed project in regard to these policies. 1. Downtown Design. The Land Use Element (LUE) provides specific design guidelines for new buildings within the Downtown Core. Policy 4.20 and its subsequent sub-policies detail specific guidelines for construction and uses of the new development. The proposed project is designed to be consistent with these policies and includes elements such as continuous street level stores and restaurants, upper level residential dwellings, similar storefront widths to existing buildings in the Downtown, and includes design details such as transom windows, bulkheads, large display windows, awnings, landscaping and patios which can be appreciated by people on the sidewalks. Policy 4.20.4 of the LUE states, in part, that tall buildings (50-75 feet) shall be designed to achieve multiple policy objectives, including design amenities, housing and retail land uses. The project includes public/private viewing decks,1 is designed to meet LEED silver energy standards, and includes a public/private plaza that connects Higuera to Marsh Street (Downtown Center paseo). 2. Downtown Residential. LUE Policy 4.2 states that the Downtown is not only a commercial district, but also a neighborhood. Its residential uses contribute to the character of the area and allow a 24-hour presence which enhances security and help the balance between jobs and housing in the community. As such, the LUE encourages the development within the Downtown to include a variety of uses, including residential2, and be designed for the enjoyment of those that live within Downtown3. Housing Element (HE) Policy 5.3 encourages the development of housing above ground-level retail stores and offices to provide housing opportunities close to activity centers and to use land efficiently. HE Policy 6.10 indicates that in order to help meet the Quantified Objectives, the City will support 1 LUE Policy 4.2.4(A) and LUE Policy 4.17. New Buildings and Views: Downtown development nearby publicly owned gathering places shall respect views of the hills. In other locations Downtown, views will be provided parallel to the street right-of-way, at intersections where building separation naturally makes more views available, and at upper -level viewing decks. 2 LUE Policy 4.2.1. Existing and New Dwellings: The City shall use the following when evaluating development in the Downtown area: A) Existing residential uses within and around the commercial core should be protected, and new ones should be developed; B) Dwellings should be provided for a variety of households; C) Dwellings should be interspersed with commercial uses; D) All new, large commercial projects should include residential uses; E) Commercial core properties may serve as receiver sites for transfer of development credits, thereby having higher residential densities than otherwise allowed see Policies 6.4.5 and 6.4.6). 3 HE Policy 7.2. Higher density housing should maintain high quality standards for unit design, privacy, security, on-site amenities, and public and private open space. Such standards should be flexible enough to allow innovative design solutions in special circumstances, e.g. in developing mixed-use developments or in housing in the Downtown Core. Packet Pg. 231 Item 13 Council Agenda Item #2537 1144 Chorro Street (ARCH- Page 2 residential infill development and promote higher residential density where appropriate. Furthermore, HE Policy 6.2 specifically requires that new commercial developments in the Downtown Core shall include housing. 3. Mixed-Use Development. The HE and LUE encourage mixed-use projects where they can be found to be compatible with existing and potential future development. The LUE encourages compatible mixed uses in commercial districts (LUE Policy 3.8.5) and specifically discusses residential and commercial mixed use (LUE Policy 2.3.6)4. LUE encourages residential dwellings within all new commercial developments and indicates that commercial core properties may serve as receiver sites for transfer of development credits, thereby having higher residential densities than otherwise allowed (LUE Policy 4.2.1). The HE provides policies and programs that speak specifically to supporting affordable housing projects where appropriate (HE Goals 2, 4, & 6). 4. Housing is a Major City Goal for 2019-21. Housing was determined to be one of Council’s priority goals for the City to accomplish over the 2019-21 financial plan. The goal states: Facilitate increased production of all housing types designed to be economically accessible to the area workforce and low and very low-income residents, through increased density and proximity to transportation corridors in alignment with the Climate Action Plan. 4 LUE Policy 2.3.6. The City shall encourage mixed use projects, where appropriate and compatible with existing and planned development on the site and with adjacent and nearby properties. The City shall support the location of mixed use projects and community and neighborhood commercial centers near major activity nodes and transportation corridors / transit opportunities where appropriate. Packet Pg. 232 Item 13 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 EX.1 CITY OF SAN LUIS OBISPO - MAJOR CITY GOALS Housing: facilitate the production of housing with an update of the housing element, including an emphasis on affordable housing (including unhoused people) and workforce housing through the lens of climate action and regionalism. Fiscal Sustainability and Responsibility: Continue to implement the City’s Fiscal Responsibility Philosophy with a focus on efficiencies, strategic economic development, unfunded liabilities, and infrastructure financing (Funding the Future). Sustainable Transportation: Enhance accessible regional transit, bicycle, and pedestrian mobility to promote a transition to a car-free or shared-car lifestyle and to reduce greenhouse gases. Climate Action: In response to the climate crisis, continue to update and implement the Climate Action Plan for carbon neutrality, including preservation and enhancement of our open space and urban forest and planning for resilience. Downtown Vitality: Support the economic and cultural heart of the City with attention to safety, maintenance, infrastructure, and amenities. 09-17-2019 Item 13 - Applicant Presentation 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 EX.2 CITY OF SAN LUIS OBISPO - downtown concept plan The demand for a home in a more walkable urban environment close to jobs and services is increasing, along with a desire for an affordable small-footprint residence. Ensure that downtown functions both as a comercial district and a residential neighborhood, with a variety of housing options to meet different needs. Encourage higher-density projects, smaller dwelling units, accessory dwelling units, and other innovative residential solutions. 09-17-2019 Item 13 - Applicant Presentation 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 EX.3 CITY OF SAN LUIS OBISPO - housing element Continue to encourage the creation of dwellings in the Downtown Core (C-D Zone) and the Downtown Planning Area. Encourage the development of housing above ground-level retail stores and offices to provide housing opportunites close to activity centers and to use land efficiently. New commercial developments in the Downtown Core (C-D Zone) shall include housing: Consistent with the City’s goal to stimulate higher density infill where appropriate in the Downtown Core (C-D Zone), the City shall consider changes to the Zoning Regulations that would allow for the developement of smaller apartments and efficiency units. Continue to develop incentives to encourage additional housing in the Downtown Core (C-D Zone), particularly in mixed-use developements. Density based on average unit size in a project should be explored to encourage the development of smaller efficiency units. 09-17-2019 Item 13 - Applicant Presentation 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 EX.4 CITY OF SAN LUIS OBISPO - land use element The Downtown is not only a commercial district, but also a neighborhood. Its residential uses contribute to the character of the area and allow a 24-hour presence which enhances security and help the balance between jobs and housing in the communitY. To keep the commercial core’s sense of place and appeal for walking, it should remain compact and be the City’s most intensely developed area. Existing residential uses shall be preserved and new ones encouraged above the street level. This new housing will include a range of options and affordability levels. The City shall modify zoning regulations to allow efficiency units and variable density in the Downtown Core. 09-17-2019 Item 13 - Applicant Presentation 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 09/17/2019 EX.5 PROJECT PROGRAM MARSH & CHORRO MIXED-USE1144 CHORRO STREET, SAN LUIS OBISPO, CAMARSH & CHORRO MIXED-USE1144 CHORRO STREET, SAN LUIS OBISPO, CAMARSH & CHORRO MIXED-USE1144 CHORRO STREET, SAN LUIS OBISPO, CAFIRST FLOOR PLAN • 3 retail suites, 4,587 SF • Accomodations for restaurant use • Separate residential and commercial lobbies • Small parking area for shared use vehicles, ADA parking, and loading • long-term storage for 128 bikes FOURTH, FIFTH, SIXTH FLOOR PLANS • 50 small residences • 400 SF average size • Primarily studios and 1-bedrooms • Rooftop deck and balconies • Shared communal kitchen, media room, and laundry SECOND/THIRD FLOOR PLANS • Open floor office use • 12,500 SF per floor 09-17-2019 Item 13 - Applicant Presentation 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 EX.6 community concerns Height Views Shadows Density Parking 09-17-2019 Item 13 - Applicant Presentation 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 09/17/2019 EX.7 The project includes 50 Residential units (primarily studios and 1-bedroom units) with some shared amenities. The upper residential floors are set back to provide a roof top deck garden no the 4th floor, to reduce the perceived building height from the pedestrian level, and to give the residents privacy from the street. The project provides electric, ride-share vehicle parking only as the building is across the street from the existing parking garage. The building shadows fall inward on the internal alleys and adjacent rooftops, not onto the streets, due to building orientation. The building does not block any significant views of the hillside from the public sidewalks. The angled set back mimics the parking garage across the street, creating a gateway to downtown along Marsh from the freeway. project detailsproject details 09-17-2019 Item 13 - Applicant Presentation 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 09/17/2019 EX.8 land use compliance Mandatory Project Features Through the PD Overlay, the project will meet the following: Affordable Housing A minimum of 25% moderate-income. LEED Silver Minimum LEED Silver Energy Efficienct rating (or city approved equivalent). Preserve Open Space At least a quarter of an acre on the Downtown Centre Site. Public Plaza Guarantee long term Maintenance of a significant Public Plaza on the Downtown Centre Site. Community Benefits Policy Objectives The project seeks a use-permit allowign 75’ in height by providing: Affordable and Workforce Housing Project will provide 25% moderate-income households. public plaza Project provides a significant public plaza. preservation of the Muzio Building Project will provide a permanent preservation of the Muzio Building at 868/870 Monterey Street. 09-17-2019 Item 13 - Applicant Presentation 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 09/17/2019 EX.9 chc & arc directional items chc directional items • Provide height analysis of buildings in vicinty • Distinguish projects shadows from others • Review existing structure potential historic eligibilty • Revise scale and mass of ABOVE FOURTH STORY • Provide less “institutional” style • Add architectural DETAILS CONSISTENT WITH HISTORIC DISTRICT • Provide greater variety in articulation • Add variety along storefront elevations arc directional items • Relieve building mass, provide variety of fenestration, and roof lines • Follow planning principles of the Downtown Concept Plan • Be distinctive as a gateway feature. The design should be of its own time, but compatible with adjacent historic structures • Provide GREATER STEP BACKS / or consider a height reduction. Design should reinforce the horizontal lines of adjacent structures. • Focus on pedestrian scale, revitalize corner of marsh & chorro, provide greater sidewalk widths for patio dining. 09-17-2019 Item 13 - Applicant Presentation 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 09/17/2019 EX.10 (E) 10' ALLEY CHORRO ST. P.L. 140.07'P.L. 119.30' (E) 10' ALLEY MARSH ST.KEYNOTES(N) TREES(N) CURB (E) TREE TO REMAIN (E) SIDEWALK TO REMAIN (E) GAS METER (E) WATER METER (E) PGE VAULT (E) MANHOLE TO REMAIN (E) FIRE HYD. TO REMAIN (E) TREE TO BE REMOVED (E) WATER VAULT 12 3 4 5 6 7 8 9 10 11 MARSH & CHORRO MIXED-USE1144 CHORRO STREET, SAN LUIS OBISPO, CASMALLER FOOTPRINT BUILDABLE AREA 16,710 sf PROPOSED footprint 13,601 sf DELTA 3,100 sf 12’-6” setback from property line on marsh 9’-0” setback from property line on chorro 09-17-2019 Item 13 - Applicant Presentation 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 09/17/2019 EX.11 ROOF GARDEN 12.5’/ 22’ setback from property line on marsh 21’ setback from the property line on chorro (E) 10' ALLEY CHORRO ST. P.L. 140.07'P.L. 119.30' (E) 10' ALLEY MARSH ST.09-17-2019 Item 13 - Applicant Presentation 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 06/12/2019 EX.12 DOWNTOWN DESIGN GUIDELINES Facade Design • Overall character • Proportions in relation to context • Storefront rhythm • Individual storefront proportions • Wall surfaces • Doorways • Bulkheads Street Orientation Height, Scale Materials & Architectural Details • Finish Materials • Windows • Awnings 09-17-2019 Item 13 - Applicant Presentation 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 09/17/2019 EX.13 VIEW LOOKING DOWN MARSH STREET revisedprevious 09-17-2019 Item 13 - Applicant Presentation 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 09/17/2019 EX.14 VIEW FROM CHORRO STREET revisedprevious 09-17-2019 Item 13 - Applicant Presentation 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 09/17/2019 EX.15 VIEW FROM DOWNTOWN CENTER PASEo revisedprevious 09-17-2019 Item 13 - Applicant Presentation 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 09/17/2019 EX.16 VIEW OF MARSH AND CHORRO CORNER revisedprevious 09-17-2019 Item 13 - Applicant Presentation 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 09/17/2019 EX.17 75’ 1 2 3 4 5 1. CITY OF SLO PARKING GARAGE - MORRO ELEVATION 75’ at STREET / 80’ OVERALL 2. ANDERSON HOTEL - MONTEREY ELEVATION 75’ at STREET / 80’ OVERALL 3. AT&T BUILDING - MORRO ELEVATION 65’ at STREET / 75’ OVERALL 4. MARSH & CHORRO MIXED USE - CHORRO ELEVATION 42’-6” at STREET / 80’ OVERALL 5. MARSH ST PARKING GARAGE - CHORRO ELEVATION 52’ at STREET / 62’ OVERALL height comparison 09-17-2019 Item 13 - Applicant Presentation 539 Marsh Street San Luis Obispo, CA 805.541.1010 info@tenoverstudio.com MARSH & CHORRO MIXED-USE at DOWNTOWN CENTRE SAN LUIS OBISPO, CA DATE: 09/17/2019 EX.18 09-17-2019 Item 13 - Applicant Presentation 9/17/2019 Item 13 ‐ Staff Presentation 1 1144 Choro Street ARCH-1687-2018 Marsh & Chorro Development Initiation Initiation of a project to construct a six-story mixed-use building consisting of approximately 30,000 square feet of commercial/office space and 50 residential dwelling units. September 17, 2019 Applicant: Mark Rawson, Copeland Properties Focus of Review 2 Receive a presentation on the project proposal and direct staff to proceed with processing of the applications with the following considerations: 1. The application of a Planned Development (PD) Overlay zone is an appropriate method for implementation of the City Council’s goal for higher density housing in the Downtown; and 1 2 9/17/2019 Item 13 ‐ Staff Presentation 2 Focus of Review 3 Receive a presentation on the project proposal and direct staff to proceed with processing of the applications with the following considerations: 2. The Mandatory Project Features required for consideration of establishment of the PD Overlay zone and the Community Benefits Policy Objectives required for consideration of the proposed building height of 75 feet are appropriate and in alignment with the scope of the project given the priority that the City Council has placed on new housing in the Downtown. Focus of Review 4 Receive a presentation on the project proposal and direct staff to proceed with processing of the applications with the following considerations: 3. Direct staff to move forward with priority processing of the project through the entitlement process, including environmental review pursuant to the California Environmental Quality Act (CEQA). 3 4 9/17/2019 Item 13 ‐ Staff Presentation 3 Next Steps 5 •Applicant will work with staff to address directional items identified under the conceptual review and Council Initiation. •Once an application is determined to be complete and responds to the directional items the project will be scheduled for recommendations and action by; •Cultural Heritage Committee (CHC) •Architectural Review Commission (ARC) •Planning Commission (PC) •City Council Project Description 6 The mixed-use project consists of a six-story structure comprised of; Ground floor commercial (4,806 sq. ft.) 2nd &3rd floor office (25,251 sq. ft.) 4th –6th floor residential (50 units) The project includes a Planned Development (PD) Overlay, and a request to establish a max height of 75- feet. 5 6 9/17/2019 Item 13 ‐ Staff Presentation 4 7 Maximum Height - Community Benefits 8 The City’s Zoning Regulations, §17.32.030.E, provide regulations that outline the considerations for buildings higher than 50 feet in the Downtown Commercial (C-D) zone. The PC may approve a building height up to 75 feet if it determines that the project includes three community benefits: a)Affordable and Workforce Housing b)Pedestrian Amenities c)View Access and Preservation d)Historic Preservation e)Mode Split f)Open Space Preservation g)Zero Net Energy h)Common Garbage Facility i)Other Policy Objectives 7 8 9/17/2019 Item 13 ‐ Staff Presentation 5 Maximum Height - Community Benefits 9 The applicant seeks a conditional use permit for the 75- foot tall building by providing: a)Affordable and Workforce Housing: providing 25% moderate-income households; and b)Pedestrian Amenities: Downtown Centre proposed as a public plaza; and c)Historic Preservation (Off-site): provide permanent preservation of a listed building off-site within the Downtown or Chinatown Historic Districts (building not yet specified). PD Overlay - Mandatory Project Features 10 The PD Overlay zone is intended to provide for flexibility in the application of zoning standards for proposed developments. The PC may recommend, and the Council may approve, a rezoning to apply the PD overlay zone only for a project that incorporates a minimum of three of the four Mandatory Project Features. 9 10 9/17/2019 Item 13 ‐ Staff Presentation 6 PD Overlay - Mandatory Project Features 11 The applicant has proposed to include a PD Overlay to allow the residential density of the Downtown Centre to be utilized in the new building. Through the project proposes to meet three of the Mandatory Project Features by providing; a)Affordable Housing: A minimum of 25% moderate- income; and b)Energy Efficiency: LEED Silver rating; and c)Public Amenity: Guarantee long-term maintenance of a significant public plaza on the Downtown Centre site. Previous Conceptual Review 12 On November 26, 2018, the CHC reviewed the project and provided eight directional items to the applicant to address, withavoteof7:0. On December 3, 2018, the ARC reviewed the project and provided six directional items to the applicant to address, withavoteof6:0. Staff will provide an analysis of how directional items are addressed once an application has been deemed complete. 11 12 9/17/2019 Item 13 ‐ Staff Presentation 7 CHC Directional Items 13 1. Requested a height analysis of buildings in the vicinity. 2. A shading study to identify the specific shadow of the proposed structure 3. The Historic Preservation Report shall be revised to address the existing structure’s potential historic eligibility 4. The scale and mass of the structure above fourth story, is considered incompatible with the Historic District. 5. The architectural style is considered too “institutional” 6. The proposed design should include more architectural details and features 7. The proposed fenestration is considered monotonous and should provide greater variety and articulation. 8. The project design should provide more articulation and variety along the storefront elevations. ARC Directional Items 14 1. The project should respond to the Cultural Heritage Committee directional items with emphasis on providing a higher degree of articulation to relieve building mass and provide a greater variety of fenestration, the project should consider a variety in relief of roof lines. 2. The project should consider and respond to the planning principles and goals identified in the Downtown Concept Plan. 3. The architectural style should be distinctive as a gateway feature to downtown through design excellence justifying the requested height above 50 feet, given theproject prominence along the intersection, the design should be of its own time while compatible with adjacent historic structures. 4. The project should provide greater step backs on the upper levels and/or consider a height reduction with sensitivity to adjacent historic resources, the design and mass should reinforce the horizontal lines of adjacent facades. 5. The design should focus on pedestrian scale, consider opportunity to revitalize the corner of Marsh and Chorro as a design feature combined with greater sidewalk widths and additional relief of storefronts to provide for patio dining. Consider tying into the pedestrian experience of the Downtown Center. 6. Materials should be high quality and selected carefully to be compatible with the historic buildings, without replicating design features, the second story windows should be reduced in height to reflect traditional transom window designs. 13 14 9/17/2019 Item 13 ‐ Staff Presentation 8 Rendering – View from Chorro 15 Rendering – View from Marsh 16 15 16 9/17/2019 Item 13 ‐ Staff Presentation 9 Rendering – View from Marsh & Chorro 17 18 Staff Agenda Correspondence Building Height Ordinance Residential Density Option for more units Moderate Income Affordability Criteria Downtown Center Paseo and PD Mandatory Features Process for Evaluating Response to ARC and CHC conceptual reviews 17 18 9/17/2019 Item 13 ‐ Staff Presentation 10 Focus of Review 19 Receive a presentation on the project proposal and direct staff to proceed with processing of the applications with the following considerations: 1. The application of a Planned Development (PD) Overlay zone is an appropriate method for implementation of the City Council’s goal for higher density housing in the Downtown; and 2. The Mandatory Project Features required for consideration of establishment of the PD Overlay zone and the Community Benefits Policy Objectives required for consideration of the proposed building height of 75 feet are appropriate and in alignment with the scope of the project given the priority that the City Council has placed on new housing in the Downtown. 3. Direct staff to move forward with priority processing of the project through the entitlement process, including environmental review pursuant to the California Environmental Quality Act (CEQA). 20 Downtown Historic District Boundary CM1 19 20 Slide 20 CM1 Codron, Michael, 9/17/2019 1010 Marsh St., San Luis Obispo, CA 93401 (805) 546-8208 . FAX (805) 546-8641 PROOF OF PUBLICATION (2015.5 C.C.P.) STATE OF CALIFORNIA, County of San Luis Obispo, I am a citizen of the United States and a resident of the county aforesaid; I am over the age of eighteen years, and not a party interested in the above entitled matter. 1 am the principal clerk of the printer of the New Times, a newspaper of general circulation, printed and published weekly in the City of San Luis Obispo, County of San Luis Obispo, and which has been adjudged a newspaper of general circulation by the Superior Court of the County of San Luis Obispo, State of California, under the date of February 5, 1993, Case number CV72789: that notice of which the annexed is a printed copy (set in type not smaller than nonpareil), has been published in each regular and entire issue of saiInewspaper and not in any supplement thereof on the following dates, to -wit: P in the year 2019. 1 certify (or declare) under the the penalty of perjury that the foregoing is true and correct. Dated at San Luis Obi n,alif rnia, this day_ 5_ of N" 2019. Patricia Horton, New Times Legals Admin & P n- i .l/•NTMG A hnirJNTMG 0f[w,4I1SINl7'5/Puhn Naire ,TP fol Pb Proof of Publication of I RECEIVED P 0 9 2019 SLO CITY CLERK 0 SAN LUIS OBISPO CITY COUNCIL NOTICE OF PUBLIC HEARING The Sart Los Obispo City Council lrwiies alt inlems[ad persons. to attond a puhNc hearing on Tlresday, Seplernber 17, 2019, is 100 the Ohjwf � UFFOmto, ralaiivo iNon tth elalcr hgg, Porn StreOt San Luis 1144 Charm Sires 4 AKH-1087,2011P, Initiation Of a ptojw to cartafruct a si>patory nuzed-wo brnldna wrt&ishn{T or QW-11riately 30,000 square feel of oomr faaV moa, S 8rrd 50 raskDBntia! units. Project oniiilan'*nk1 Induae }} �'elepmpni raNeW ImpIOr7: I conr�tiogaf use perYnn. 3} pfalnnpsi development i7verlay razari%and a) "vkanmertbl revlsvv. For mora.inlormoliort, yware inviff d toconlacl Ifyfe Hello! the Citys COmmunpmen lty Davabt D&MIlmernlal MW 7r,522a or by enw9 at kbeWsto*,org. This Qv Cwxit may 4,w asyo95 OMor hearkV or business itsrns lwtora of after the llama 11%ed ebaro, lt. you challorga tho proposed rwoiWs In court, you may be limiS6d 10 reistrtp only Itrpap imm }}ouu Of sdmeane else rt—I&W at #m. public heartily deserihed In this nor m or in written carro5porxiance delivered tc tlt9 Gly Council al. 0 pnof 10, the fMOiC hearings. Re for this nlcie169 mil be ava IWO For Mgkerw 0 ftCity Clerk's otf1I. and onNna st vNewabcityorg on Vledrnt%tay,;K�rlEmber FT, 2019. Please tall the City park's 011ig8 at {8051 7@i•7117p for nwo {old• ;tion The City Cmmcd 1`110110V will be televised We on Ctraner 0a>>1e Chpnnei 20 arxl live Mrew*g nn www.*city,ulg, Totem Purriogion. City Clark City of Son Lids Ob spo SeplemhOr 5, 2019