HomeMy WebLinkAbout9/17/2019 Item 13, CodronCity of San Luis Obispo, Council Memorandum
Council Agenda Correspondence
DATE: September 17, 2019
TO: City Council
FROM: Michael Codron, Community Development Director
VIA: Derek Johnson, City Manager DJ
SUBJECT: Item #13 – 1144 Chorro Project Initiation
Staff has received questions regarding this item from Council Members and via agenda
correspondence and is providing this memo as background information for tonight’s meeting.
Building Height Ordinance
The City’s Building Height Ordinance has been part of the Zoning Regulations since 2007
(Council Ordinance #1509, 2007 Series). The ordinance was approved following a major outreach
effort by City staff to reconcile policies in the General Plan that enabled taller, infill buildings
downtown. This policy was often referred to as the Landmark Building policy and provided for a
limited number of 75-foot tall buildings would be appropriate for the downtown core, but it
conflicted with the Zoning Regulations height limits of 50 feet.
The Building Height project concurrently updated General Plan policies and Zoning Regulations
standards to ensure consistency of application and clarity of process. Although the City has
received several applications for taller buildings downtown, including the original SLO Hotel and
Hotel Cerro projects, only one project has received an entitlement to be taller than 50 feet so far
(San Luis Square at the corner of Marsh and Nipomo was approved with a maximum height of 60
feet).
Residential Density
The Planned Development (PD) Overlay is a Zoning Designation that allows for density to be
transferred within lots covered by the overlay zone. The total land area covered by the proposed
PD Overlay zone is 1.84 acres. This would allow for a total of 66.24 density (a two-bedroom unit
is equivalent to 1 density unit, and studio and one-bedroom units under 600 square-feet are
equivalent to .5 density units). The proposed project, when factored across the entire site, includes
26.5 density units so there is additional potential for residential development within the PD
Overlay in the future should any portion or all of the existing buildings be redeveloped.
It is important to note that the effective density of the 1144 Chorro site is 69.73 density units,
which meets the Zoning Regulations policy objective of a minimum of 36 units per acre
(17.32.030.E.5.a.3. - Packet Page 229). Therefore, it is staff’s belief that the project has the
potential for a positive outcome with respect to the provision of an important increment of new
housing downtown. If the Council is interested in seeing more residential density under the PD
Overlay, then direction should be provided to staff to work with the applicant on this concept.
Item #13 – 1144 Chorro Project Initiation (September 17, 2019) Page 2
Moderate Income Affordability Criteria
The project includes 33 studios, 14 one-bedroom units, and 3 two-bedroom units. Maximum rents
for low and moderate-income units are highlighted in the following table.
Status of Downtown Center Paseo and PD Overlay Mandatory Features
The existing paseo at the Downtown Center is identified in the project application as a PD
Mandatory Feature and a Pedestrian Amenity under the Community Benefits requirement of the
downtown height ordinance. Staff has researched the original approval of the paseo and found that
the paseo is private property controlled by the property owner, and that access could be revoked
at any time.
A future redevelopment of the property could result in a different configuration of the property
and loss of pedestrian access through the block, which is certainly an important pedestrian amenity.
The Council should provide direction to staff if it believes that the paseo is not sufficient for
inclusion as a pedestrian amenity. This would require an additional Community Benefits Policy
Objective to be selected and provided as part of the project (see list on Packet Pages 229-230).
Staff is supportive of the paseo being identified as a PD Overlay Mandatory feature even though
it currently exists because the PD Overlay will provide certainty that public access through the site
will be maintained in perpetuity and provide a key mid-block pedestrian connection between
Marsh and Higuera Streets.
Item #13 – 1144 Chorro Project Initiation (September 17, 2019) Page 3
Response to ARC and CHC Conceptual Reviews
Attachments B and C in the September 17, 2019 packet provide the meeting minutes from the
conceptual reviews by the CHC and ARC. The following directional items were provided.
CHC Direction
1. The project shall include a height analysis of buildings in the vicinity and within the Historic
District, including the Masonic Temple.
2. The shading study shall be revised to identify the specific shadow of the proposed structure,
to distinguish between shading of existing structures.
3. The Historic Preservation Report shall be revised to address the existing structure's potential
historic eligibility within the district, in consideration of the evaluation criteria for historic
resource listing.
4. The proposed scale and mass of the structure above fourth story, referred to as the "stucco
portion", is considered incompatible with the Historic District.
5. The architectural style is considered too "institutional", alternative styles should be
considered giving the projects prominent location and opportunity to contribute to the
Historic District's prevailing significance and distinctive architecture.
6. The proposed design should be modified to include more architectural details and features
consistent with the character of the Historic District.
7. The proposed fenestration is considered monotonous and should provide greater variety and
articulation.
8. The project design should provide more articulation and variety along the storefront
elevations.
ARC Direction
1. The project should respond to the Cultural Heritage Committee directional items with
emphasis on providing a higher degree of articulation to relieve building mass and provide a
greater variety of fenestration, the project should consider a variety in relief of roof lines.
2. The project should consider and respond to the planning principles and goals identified in the
Downtown Concept Plan.
3. The architectural style should be distinctive as a gateway feature to downtown through
design excellence justifying the requested height above 50 feet, given the project prominence
along the intersection, the design should be of its own time while compatible with adjacent
historic structures.
4. The project should provide greater step backs on the upper levels and/or consider a height
reduction with sensitivity to adjacent historic resources, the design and mass should reinforce
the horizontal lines of adjacent facades.
5. The design should focus on pedestrian scale, consider opportunity to revitalize the comer of
Marsh and Chorro as a design feature combined with greater sidewalk widths and additional
relief of storefronts to provide for patio dining. Consider tying into the pedestrian
experience of the Downtown Center.
6. Materials should be high quality and selected carefully to be compatible with the historic
buildings, without replicating design features, the second story windows should be reduced
in height to reflect traditional transom window designs.
Item #13 – 1144 Chorro Project Initiation (September 17, 2019) Page 4
Generally, the revised plans have responded to directional items to varying degrees. The analysis
of how well these items have been integrated into the revised plans, and any further changes that
may be recommended by staff, will be undertaken as part of the discretionary review process. Staff
has not completed a thorough analysis of the revised submittal as this review will occur as part of
the full project review and additional changes to the design may still be recommended by the CHC,
ARC and Planning Commission, and required by the City Council during the final review of the
project.