Loading...
HomeMy WebLinkAboutDaily Papich South Broad Improvements 8-12-19 1 1 8/12/2019 19:00:00 1 10 1 1 10 1 1 10 1 10 1 10 1 10 1 10 1 10 1 10 1 10 1 10 1 10 1 10 10 10 2 10 1 10 1 10 1 10 1 10 4 10 19 10 1 1 2 10 1 1 1 8 1 1 8 1 12 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - RESIDENT ENGINEER'S DAILY INSPECTION REPORT Men LOCATION AND DESCRIPTION OF OPERATION: Signature: Title: Engineer Inspector Materials: Start Stop Date Doug Nelms South Broad Street Improvements Sal Cervantes Labor Ismeal Moldenaldo Labor Paul Chavez Labor Saltero Lopez Labor Mark Beery - truck Operator Eddie Mc Caa - truck Operator 5:00:00am Skip & Drag Anthony Labor Daniel TC Mini Cat skister Water trucks Kenny W Operator Rudy Operator Becky Operator Eddie R Operator Cheeto Truck Driver Grinder 7' RX-700 Grinder 12' RX -60C Cat Loader 930G w- broom 4 ton TC Truck X Broom Sweeper Light Towers Bottom Trucks Farivanti Grinder grind & pave Rollers Rubber tire roller Paver w winrow Geosulations G3 Weather: 57</ Rentals Speeds Trucking Burke rental 7:00 pm Contractor is setting up TC for grinding operations. 8:00 pm Contractor started grinding at Tank Farm twards Airport number 1 & center lanes 16' North bound lane. 8:30 PM kEYY ON SITE TO REPAIR SIGNAL CONDUIT ON ARO. 9:30 pm Geo techs are on site. Contractor ground over sewer MH across from Aro vista. Sewer maint. Matt on sight with vactor truck. 11:00 pm completed cleaning out sewer MH. Kelly also completed repairing signal conduit. 10:00: pm HMA arrived on site. 4:30 am Contractor completed placing HMA. 6:00 AM TC is picked up and crew has left site.