Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Daily Papich South Broad Improvements 8-14-19
1 1 8/13/2019 19:00:00 1 14 1 1 14 1 14 1 14 1 14 1 14 1 14 1 14 1 14 1 14 1 14 1 14 1 14 1 4 2 14 1 14 2 14 1 0 14 1 14 1 14 1 14 10 12 19 14 1 1 2 14 1 14 1 1 12 1 1 12 1 12 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - RESIDENT ENGINEER'S DAILY INSPECTION REPORT Men LOCATION AND DESCRIPTION OF OPERATION: Signature: Title: Engineer Inspector Materials: Start Stop Date Doug Nelms South Broad Street Improvements Sal Cervantes Labor Ismeal Moldenaldo Labor Paul Chavez Labor Saltero Lopez Labor Mark Beery - truck Operator Eddie Mc Caa - truck Operator 5:00:00am Skip & Drag Anthony Labor Daniel TC Mini Cat skister Water trucks Kenny W Operator Rudy Operator Becky Operator Eddie R Operator Cheeto Truck Driver Grinder 7' RX-700 Grinder 12' RX -60C Cat Loader 930G w- broom 4 ton TC Truck X Broom Sweeper Light Towers Bottom Trucks Farivanti Grinder grind & pave Rollers Rubber tire roller Paver w winrow Geosulations G3 Weather: 57</ Rentals Speeds Trucking Burke rental 7:00 pm Contractor is setting up TC for grinding operations. 9:30 pm Contractor started paving top lift starting at Tank farm South bound lanes 12:30 am I spoke with Mark B. and we decided to continue to pave 1/2 of the project 2000 tons, 8:30 am Contractor completed paving 1/2 HMA lift. Traffic is heavey