Loading...
HomeMy WebLinkAboutDaily Papich South Broad Improvements 8-9-19 1 1 1 8/9/2019 19:00:00 1 10 1 1 10 1 10 1 10 1 10 1 10 1 10 1 10 1 10 1 10 1 10 1 10 1 10 1 10 10 10 2 10 1 10 1 10 1 10 1 10 4 10 19 10 1 1 8 2 10 1 1 1 8 1 1 8 1 1 8 1 12 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - RESIDENT ENGINEER'S DAILY INSPECTION REPORT Men LOCATION AND DESCRIPTION OF OPERATION: Signature: Title: Engineer Inspector Materials: Start Stop Date Doug Nelms South Broad Street Improvements Sal Cervantes Labor Ismeal Moldenaldo Labor Paul Chavez Labor Saltero Lopez Labor Mark Beery - truck Operator Eddie Mc Caa - truck Operator 5:00:00am Skip & Drag Anthony Labor Daniel TC Mini Cat skister Water trucks Kenny W Operator Rudy Operator Becky Operator Eddie R Operator Cheeto Truck Driver Grinder 7' RX-700 Grinder 12' RX -60C Cat Loader 930G w- broom 4 ton TC Truck X Broom Sweeper Light Towers Bottom Trucks Farivanti Grinder grind & pave Rollers Rubber tire roller Paver w winrow Geosulations G3 Weather: 57</ Rentals Speeds Trucking Burke rental D38 mechanic 7:00 pm Contractor is setting up TC for grinding operations. 8:00 pm Contractor started grinding at Tank Farm twards Airport number center lanes 16' south bound lane. 9:30 pm Geo techs are on site. 10:30 pm HMA arrived on site. Contractor called me at 1:00 am grinder hit 4" conduity at Airport Drive . I directed contractor to cover conduit with pbase and pave over it. Wire was not damaged signal is operating correctly after I tested signal cycle. 4:15 am contractor completed paving operations. Airport enterance was not closed at any time tonight. 4:30 contractor is placing temp striping and cleaning up site for the weekend