HomeMy WebLinkAboutpermit historyPermit Number
ENCR-0747-2018
ENCR-0280-2017
ENCR-2556-2018
ENCR-0992-2018
ENCR-2061-2018
ENCR-2447-2018
ENCR-0896-2018
ENCR-1508-2017
ENCR-2850-2018
ENCR-3298-2019
ENCR-2130-2018
ENCR-0076-2018
ENCR-2804-2018
Main Address
1825 Monterey St
1865 Monterey St
1865 Monterey St
1815 Monterey St
1865 Monterey St
1885 Monterey St
1845 Monterey St
1845 Monterey St
1845 Monterey St
1825 Monterey St
1865 Monterey St
1845 Monterey St
1885 Monterey St
Permit Type
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Work Class
Utility Company - Blanket Maint Work
Right of Way
Utility Company - Blanket Maint Work
Utility Company - Blanket Maint Work
Utility Company - Blanket Maint Work
Utility Company - Blanket Maint Work
Right of Way
Right of Way
Utility Company - Blanket Maint Work
Right of Way
Right of Way
Utility Company - Blanket Maint Work
Utility Company - Blanket Maint Work
Apply Date
4/11/2018
2/24/2017
11/9/2018
5/15/2018
9/28/2018
10/31/2018
5/2/2018
8/15/2017
12/21/2018
2/26/2019
10/5/2018
1/12/2018
12/18/2018
Issue Date
4/11/2018
2/24/2017
11/9/2018
5/15/2018
9/28/2018
10/31/2018
5/2/2018
8/15/2017
12/21/2018
2/26/2019
10/5/2018
1/12/2018
12/18/2018
Expire Date
9/14/2018
12/5/2018
2/22/2019
7/20/2018
10/29/2018
3/1/2019
4/12/2019
10/6/2017
8/30/2019
5/1/2019
11/5/2018
5/14/2018
2/8/2019
Company
Southern California Gas Company
Don Kimmel Hotel Construction Management
Southern California Gas Company
AT&T
Pacific Gas & Electric
Southern California Gas Company
Vernon Construction
Souza Construction
Pacific Gas & Electric Company (PG&E)
Sprouse Communications
D-Kal Engineering Inc
Southern California Gas Company
Southern California Gas Company
Description
After-the-fact gas service maintenance alteration and reinstate (emergency work). Work is completed, but final paving is remaining with this permit. All work to be done per the attached
plans and to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls per City Appendix G & MUTCD Standards. Contact the Public Works inspection hotline
at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the
permit can be closed.
<On 9/4/2018, permit extended to 12/5/2018.><On 8/24/2017, permit extended to 12/29/2017.> Set up traffic control for truck entering and exiting at job site. All work to be done to City
Standard Specifications & Engineering Standards. Traffic and pedestrian controls per the attached plan and City Appendix G & MUTCD Standards. Contact the Public Works inspection hotline
at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the
permit can be closed.
Remove and replace a panel of sidewalk, if necessary. Work is anticipated to stay behind the back of sidewalk (earth cut). Move gas meter and perform gas meter and MSA (Meter Service
Assembly) maintenance. All work to be done per the attached plans and to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls per the attached plans
and City Appendix G & MUTCD Standards. Contact the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Set up traffic control to access AT&T manhole for fiber placement. Manhole is in front of 1815 Monterey (near intersection of Grand and Monterey). All work to be done to City Standard
Specifications & Engineering Standards. Traffic and pedestrian controls per City Appendix G & MUTCD Standards. Contact the Public Works inspection hotline at 805-781-7554 two working
days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Remove PG&E pole and install new PG&E pole in new location. All work to be done per the attached plans and to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls per the attached plans and City Appendix G & MUTCD Standards. Contact the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one
working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
After-the-fact permit for gas service abandonment. Final paving to be completed with this permit. Work required one 5'x3' asphalt cut. All work to be done per the attached plans and
to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls per City Appendix G & MUTCD Standards. Contact the Public Works inspection hotline at 805-781-7554
two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
<On 1/29/2019, permit extended to 4/14/2019 and permittee changed from Don Kimmel to Vernon Construction, Inc.> <On 9/4/2018, permit extended to 12/5/2018.> Remove and replace two driveways.
Remove and replace applicable sidewalk to install dry utilities. All work to be done per the attached plans and to City Standard Specifications & Engineering Standards. Traffic and
pedestrian controls per City Appendix G & MUTCD Standards. When applicable, a traffic and pedestrian control plan must be submitted and approved prior to each phase of construction;
confirm with PW inspector. Contact the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection.
Permittee is responsible for calling for final inspection so the permit can be closed.
Install 4" water service lateral, 6" sewer lateral, and 8" fire service lateral. All work to be done per the approved building plans and to City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls per the attached plan and City Appendix G & MUTCD Standards. Contact the Public Works inspection hotline at 805-781-7554 two working days
prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please
contact the Utilities Department at 805-781-7215 to coordinate wye installation two working days in advance.
Set up traffic and pedestrian controls to install PG&E service in customer-installed conduit. All work to be done per the attached plans and to City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls per the attached plan and City Appendix G & MUTCD Standards. Contact the Public Works inspection hotline at 805-781-7554 two working days
prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Bore under sidewalk to install Charter fiber optic cable to serve 1825 Monterey. Remove and replace two panels of sidewalk. Also install aerial fiber optic cable. All work to be done
per the attached plans and to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls per City Appendix G & MUTCD Standards. Contact the Public Works inspection
hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection
so the permit can be closed.
Excavate in asphalt approximately 3'x6' to abandon fire service lateral. Work requires night work approval and payment of overtime inspection fees (five hours worth). All work to be
done per the attached plans and to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls per the attached plans and City Appendix G & MUTCD Standards.
Contact the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible
for calling for final inspection so the permit can be closed.
Trench to install gas service. All work to be done per the attached plans and to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls per City Appendix
G (including figures A, M, N and P) & MUTCD Standards. Contact the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Abandon gas service. Gas service was a stub that was not in-use. Work requires one approximately 2'x3' trench. All work to be done per the attached plans and to City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls per the attached plans and City Appendix G & MUTCD Standards. Contact the Public Works inspection hotline at 805-781-7554 two
working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.