Loading...
HomeMy WebLinkAboutPRR20109 Walter - Encroachment Permit Inspections1 From:William S. Walter <wwalter@tcsn.net> Sent:Wednesday, May 27, 2020 7:31 PM To:Christian, Kevin; Guzman, Manuel; Horn, Matt Cc:Marquart, Ben; Codron, Michael; Johnson, Derek; Stanwyck, Shelly; CityClerk; Amberg, Mark; 'Jensen, Eddie'; walterassistant@tcsn.net; 'Stephen Williams' Subject:PUBLIC RECORDS ACT REQUEST REGARDING ENCROACHMENT PERMIT INSPECTIONS RE: Lumec City of SLO; AVOIDING FURTHER DELAY DAMAGES OF $333.00 PER DAY (MINIMUM) Importance:High Pursuant to the California Public Records Act, based upon statements in Mr.  Guzman's email below,  I am requesting copies of the following document concerning the following:      1.  All records of inspections, reports, notes, documents, field  observations, corrections, concerning Encroachment Permit, Right of Way, ENCR‐5556‐2019, November 1, 2019,  concerning the installation of a one inch water service lateral to serve a one inch meter; D‐Call engineering Inc., Garrett  Loughran, including any final inspection, location of water meter box, location and length of connecting water service  pipes and valves.      2.  All records of inspections, employee time records, reports,  notes, documents, field observations, corrections, concerning Encroachment  Permit, Right of       Way, ENCR‐0780‐2020, April 24, 2020,  concerning the installation of curbs, gutters, sidewalks, parking meters,  street light base, water and utility meters,     etc.        3.  All records of inspections, reports, employee time records,  notes, documents, field observations, corrections, concerning Encroachment  Permit ENCR‐0780‐    2020, with regard to the following facts:  Anchor Bolts for the decorative street light fixture have been Inspected by Ben Marquart San Luis Obispo City            Public Work Inspector Ben Marquart, who also provided to the contractor on site and used a template  for bolt pattern for the  from a  previous install      before  concrete was installed for  the new mission style sidewalks on the frontage of 679 Monterey St. and the  installation is exactly per that bolt pattern.      The current  installation reflects the direction and templates provided by Mr. Marquart to the contractor on the site.       4.  All documents, communications, records, reports, notes,  conversations, communications between any and all city employees,  contractors, agents,       managers, engineers, supervisors,  inspectors regarding 679 Monterey St. and 677 Monterey St., Encroachment  EnCR‐0780‐2020,  not previously copied to     William S. Walter.       5.  All documents, communications, records, reports, notes,  conversations, communications between any and all city employees,  contractors, agents,       managers, engineers, supervisors,  inspectors regarding 679 Monterey St. and 677 Monterey St., Foundation  Repair Permit BLDG 1143‐2018, 679 Monterey     St.,  not previously  copied to William S. Walter.  2      6.  All documents, communications, records, reports, notes,  conversations, communications between any and all city employees,  contractors, agents,       managers, engineers, supervisors,  inspectors regarding 679 Monterey St., Arch‐1236‐2017,  not previously copied to William S. Walter.    I am sorry, Mr. Christian, to put this burden upon you but the City Council Protest hearing is pending and this  information is relevant to having a fair hearing.    WILLIAM S. WALTER, ATF  679 MONTEREY ST.  SAN LUIS OBISPO, CA 93401  805 541 6601  805 541 6640 (FAX)       ‐‐‐‐‐Original Message‐‐‐‐‐  From: William S. Walter <wwalter@tcsn.net>  Sent: Wednesday, May 27, 2020 4:19 PM  To: 'Guzman, Manuel' <mguzman@slocity.org>; 'Horn, Matt' <mhorn@slocity.org>  Cc: 'Marquart, Ben' <bmarquar@slocity.org>; 'Codron, Michael'  <mcodron@slocity.org>; 'Johnson, Derek' <djohnson@slocity.org>; 'Stanwyck, Shelly' <sstanwyc@slocity.org>;  'CityClerk' <CityClerk@slocity.org>; 'Amberg, Mark' <mamberg@slocity.org>; 'Jensen, Eddie' <eddie@cedslo.com>;  'walterassistant@tcsn.net' <walterassistant@tcsn.net>; 'Stephen Williams'  <sawillaims@yahoo.com>  Subject: RE: Lumec City of SLO; AVOIDING FURTHER DELAY DAMAGES OF $333.00 PER DAY (MINIMUM)    Greetings Mr. Guzman:      1.    Have you informed the supplier that you approve the  purchase, which is what I understand they want?    2.  When did you inspect the bolts and inform the contractor?    3.  What records reflect your inspection, including dates?    4.  Have you communicated this to Stephen Williams (he is not  copied on your email), and if not, why not?    The delays continue on your watch until the manufacturer is informed and the contractor is informed.    Best regards, work safe and work better.    Bill Walter    ‐‐‐‐‐Original Message‐‐‐‐‐  From: Guzman, Manuel <mguzman@slocity.org>  Sent: Wednesday, May 27, 2020 12:14 PM  To: William S. Walter <wwalter@tcsn.net>; Horn, Matt <mhorn@slocity.org>  Cc: Marquart, Ben <bmarquar@slocity.org>; Codron, Michael <mcodron@slocity.org>; Johnson, Derek  <djohnson@slocity.org>; Stanwyck, Shelly <sstanwyc@slocity.org>; CityClerk <CityClerk@slocity.org>; Amberg, Mark  <mamberg@slocity.org>; 'Jensen, Eddie' <eddie@cedslo.com>; walterassistant@tcsn.net  Subject: RE: Lumec City of SLO; AVOIDING FURTHER DELAY DAMAGES OF $333.00 PER DAY (MINIMUM)    Mr. Walter   3   City Engineering Standard Specification Section 5‐1.23 require the submittal of equipment information that is not  specified by standards.  In this case, the equipment being ordered is specified by Engineering Standard 7915.  Submittal, review and approval of this equipment is not required by the City prior to purchase since it is provided in  great detail in Engineering Standard 7915. Any delays identified in your email below are not the responsibility of the  City.    The submittal is approved but before you order your light fixture please confirm that your bolt pattern will work with  field work done to date. The bolt pattern in your submittal is a hard 12" meanwhile Engineering Standard  7915 requires 12" to 15" and your bolts have already been installed.    Thank you,    Manny Guzman, P.E.   Construction Engineering Manager  City of San Luis Obispo  E mguzman@slocity.org  T 805.781.7423  C 805‐540.0446    ‐‐‐‐‐Original Message‐‐‐‐‐  From: William S. Walter <wwalter@tcsn.net>  Sent: Wednesday, May 27, 2020 11:09 AM  To: Horn, Matt <mhorn@slocity.org>  Cc: Marquart, Ben <bmarquar@slocity.org>; Codron, Michael <mcodron@slocity.org>; Johnson, Derek  <djohnson@slocity.org>; Stanwyck, Shelly <sstanwyc@slocity.org>; Guzman, Manuel <mguzman@slocity.org>; CityClerk  <CityClerk@slocity.org>; Amberg, Mark <mamberg@slocity.org>; 'Jensen, Eddie' <eddie@cedslo.com>;  walterassistant@tcsn.net  Subject: RE: Lumec City of SLO; AVOIDING FURTHER DELAY DAMAGES OF $333.00 PER DAY (MINIMUM)    Greetings Mr. Horn,    We look forward to the response so that the decorative light can be manufactured and the time of 12 weeks to  manufacture it can commence and unreasonable further delays and costs to me (minimum of $333.33 per day) avoided.   Under protest, I have already paid for the fixture.  As I understand it, something direct in writing is required from the  City itself, for reasons unknown to me except that this is a municipal public works function.      Is there a history of problems with the manufacturing of these lights for the City of San Luis Obispo?    Best regards and keep safe!    Bill Walter                ‐‐‐‐‐Original Message‐‐‐‐‐  From: Horn, Matt <mhorn@slocity.org>  Sent: Tuesday, May 26, 2020 7:58 PM  To: William S. Walter <wwalter@tcsn.net>  4 Cc: 'Jensen, Eddie' <eddie@cedslo.com>; Marquart, Ben <bmarquar@slocity.org>; Codron, Michael  <mcodron@slocity.org>; Johnson, Derek <djohnson@slocity.org>; Stanwyck, Shelly <sstanwyc@slocity.org>; Guzman,  Manuel <mguzman@slocity.org>  Subject: RE: Lumec City of SLO    Mr. Walter,    Manny Guzman, Construction Engineering Manager, will respond to this request tomorrow.    Thanks,    Matt Horn  Deputy Director of Public Works / City Engineer  919 Palm Street, San Luis Obispo, CA 93401‐3218 E mhorn@slocity.org T  805.781.7191 C 805.431.5474     ‐‐‐‐‐Original Message‐‐‐‐‐  From: William S. Walter <wwalter@tcsn.net>  Sent: Tuesday, May 26, 2020 4:12 PM  To: Marquart, Ben <bmarquar@slocity.org>; Codron, Michael <mcodron@slocity.org>; Johnson, Derek  <djohnson@slocity.org>; Horn, Matt <mhorn@slocity.org>; Stanwyck, Shelly <sstanwyc@slocity.org>  Cc: CityClerk <CityClerk@slocity.org>; 'Jensen, Eddie' <eddie@cedslo.com>  Subject: RE: Lumec City of SLO  Importance: High    We are still waiting for the City's approval for the decorative light fixture.    Eddie indicates that a sign‐off on the attachment is required.     I have (under protest) already paid for the decorative light fixture and the  12 week lead time to manufacture it cannot commence until someone with authority at the City complies with the  manufacturers request for a "sign off" from the City.    Please coordinate with Eddie and provide him with the written approval as required by Lumec.    Best regards and keep safe!    Bill Walter    ‐‐‐‐‐Original Message‐‐‐‐‐  From: William S. Walter <wwalter@tcsn.net>  Sent: Thursday, May 21, 2020 5:54 PM  To: 'Ben' <bmarquar@slocity.org>; 'Codron, Michael' <mcodron@slocity.org>; 'Johnson, Derek' <djohnson@slocity.org>;  'Horn, Matt' <mhorn@slocity.org>; 'Stanwyck, Shelly' <sstanwyc@slocity.org>  Cc: 'CityClerk' <CityClerk@slocity.org>; 'Jensen, Eddie' <eddie@cedslo.com>  Subject: FW: Lumec City of SLO  Importance: High    Continuing under protest with my doing your public works functions at great time and annoyance, the Lumec factory  wants the City of San Luis Obispo to sign‐off on these specifications prior to building it.    5 Please respond to this by copying Eddie Jensen who has worked very hard to make sure that the City's decorative light  fixture which I am purchasing under protest is the correct item.      Apparently, we cannot purchase this item without the City's approval.    Best regards and keep safe!    Bill Walter        ‐‐‐‐‐Original Message‐‐‐‐‐  From: Jensen, Eddie <eddie@cedslo.com>  Sent: Thursday, May 21, 2020 9:36 AM  To: wwalter@tcsn.net  Subject: Lumec City of SLO      Hello,  The Lumec factory is asking for the submittal to be signed off prior to building it.  Do you need to forward this to the City  for approval?       Thank you,     Eddie Jensen  CED San Luis Obispo  2520 Victoria Ave  San Luis Obispo, CA 93401  805‐543‐4700