Loading...
HomeMy WebLinkAboutItem 07 - Update to the City's Master Fee Schedule Department Name: Community Development Cost Center: 4006 For Agenda of: July 7, 2020 Placement: Consent Estimated Time: N/A FROM: Michael Codron, Director of Community Development Department Prepared By: Nanika Kala, Administrative Analyst Jacob Nunez, Revenue Specialist SUBJECT: ADOPT A RESOLUTION UPDATING THE CITY’S MASTER FEE SCHEDULE TO INCLUDE NEW DEVELOPMENT REVIEW FEES FOR TEMPORARY CERTIFICATE OF OCCUPANCY, AND PLANNING CONSULTATION, AND UPDATE THE CURRENT FEE FOR ENVIRONMENTAL IMPACT DETERMINATION AND APPLY NEEDED CORRECTIONS TO ADOPTED FEES RECOMMENDATION Adopt a Resolution (Attachment A) updating the City’s Master Fee Schedule, as follows: 1. Create a new fee for a Temporary Certificate of Occupancy. 2. Create a new fee for Planning Consultations. 3. Update the fee currently charged for Environmental Impact Determinations, Cannabis application fees, water and wastewater fees, and building fees. 4. Decrease Utilities set-up and discontinuation fees. 5. Eliminate the Utilities Property Management set-up fee. 6. Add the updated LOVR Subarea fees, Parking in-lieu fees, and Orcutt Area Specific Plan fees to the Master Fee Schedule. REPORT IN BRIEF This report covers a variety of fee updates and new fees associated with development services. There are two new fees proposed, first for a Temporary Certificate of Occupancy, and second for Planning Consultation. These fees are necessary to address expenses currently incurred by the Community Development Department for which there is no cost recovery. City budget policies calls for a high level of cost recovery for development services activities. In addition to these two new fees, there are modifications proposed to a variety of existing fees. For example, staff is recommending that the fee for Environmental Impact Determination shift from a fixed fee to a cost recovery model based on the City’s actual cost of hiring a consultant to perform the work. Changes to Utilities fees are recommended to more accurately reflect the cost of services provided and include elimination of the current Property Management set-up Fee. Item 7 Packet Page 53 Council is also being asked to add a variety of fees to the Master Fee schedule to facilitate administration and ensure transparency. The following table summarizes the recommendations in this report. Fee Name Reason for Change Temporary Certificate of Occupancy • New fee for cost recovery Planning Consultation • New fee for cost recovery Environmental Impact Determination • Change from fixed fee to cost recovery model Building Fees • Correction to the cost inflator Water and Wastewater Fees • Updated fee to reflect fee changes applied in December 2019 Cannabis related fees • Correction to the cost inflator LOVR Transportation Add-On • Not listed in current Master Fee Schedule Parking In-Lieu Fee • Not listed in current Master Fee Schedule Orcutt Area Specific Plan Impact Fee • Not listen in current Master Fee Schedule Utilities Set-Up and Discontinuation of Service Fees • Change to fee due to increased efficiencies providing the service. DISCUSSION Community Development Department Fees The Community Development Department is proposing to add two new fees and update an existing fee associated with City Development Review services. Charging these fees is consistent with City budget policies and will help ensure that the City meets its cost recovery goals. These fees will be experienced by customers pursuing entitlements and constructing their projects. 1. Temporary Certificate of Occupancy (TCO) Fee The California Building Code permits building officials to issue Temporary Certificates of Occupancy (TCOs) prior to completion of all work covered by the permit, provided the building is found safe for occupancy. TCOs are issued only when incidental construction, such as site and interior work not regulated by the code, or exterior decoration not necessary to the integrity of the building, remain. Projects that require a Certificate of Final Completion and Occupancy (CFC) but are not ready for final inspections may apply for a TCO. A TCO may be granted for a reasonable timeframe and are commonly used for all occupancy classifications including single family residences. If approved, an owner will be permitted to make use of the building for a period of time agreed upon by both the owner of the property and the City while completing the remaining construction work. TCO requests are evaluated on a case-by-case basis. A TCO request is reviewed by multiple departments, such as Fire, Community Development, Utilities, and Public Works. The Community Development Department currently does not have an established fee that recovers the cost of staff time. However, TCO requests have become common and often require significant coordination and oversight of the “conditions” under which a TCO is issued. The proposed fee is $860 which would capture the expense of staff’s time for a typical TCO review process. Item 7 Packet Page 54 The City of Santa Barbara has an established TCO fee for service at $985. Similar to Santa Barbara, the City of San Luis Obispo based its fee upon the number of staff h ours required to process a typical request and the associated hourly rates of staff members involved. Along with the established fee, a formal application process will be implemented that will require contractors to plan for a TCO in advance. While some TCO’s can be turned around in three days if review by multiple City departments is unnecessary, applicants should make their application for TCO at least 10 business days in advance to ensure that the approval can be reviewed and completed by the intended temporary occupancy date. TCOs are valid for a maximum of 90 days. If the TCO is to expire and an extension is required , one 45-day extension may be approved by the building official. If this timeframe cannot be met, a new TCO request must be filed with the associated fees. The proposed fee and application process will improve customer service by establishing clear expectations via a formal review process, reducing the potential for miscommunication around project occupancy dates. 2. Planning Consultation Fee The Planning Division implements the General Plan and Zoning Regulations by reviewing current development proposals and providing informal feedback over the phone or at the Planning Counter. While this arrangement works for many customers, some require additional guidance or feedback on their project through multiple iterations over an extended period of time. In this case, documentation and tracking of the feedback provided by staff is helpful to both staff and the project proponent, since these projects often turn into formal applications down the road. Fees are charged for formal review of proposed development projects, however, there is currently no charge for planning consultations regardless of the amount of time a staff member may spend with a potential applicant. The recommendation is for Community Development to implement a cost recovery fee for consultations on more complicated or time-consuming projects prior to an application being filed with the City. Staff recommends the fee be assessed to anyone who is seeking a written response to questions and/or the amount of time required to address the customer’s questions is greater than 30 minutes. A free, 30-minute initial consultation will satisfy the needs of most customers. The rate for a Planning Consultation that goes beyond 30 minutes will be $173 per hour and will only be charged to the customer if they agree to the fee and wish to continue with the consultation. The fee was determined based on the full cost recovery hourly rate for the staff involved as identified in the 2017 NBS City User Fee and Rate Study. NBS determined that the Fully Burdened Hourly Rate (FBHR) for Development Review is $173 per Activity Based Cost hour, and the City is keeping in line with this analysis. The proposed fee will formalize an existing process to the benefit of customers by providing for documented responses and focused staff time on a particular project or question prior to the major expense of a new Planning Application. This fee would result in costs that would likely be more than a “zoning letter” ($453.42) but less than a “Pre-Application” ($956.09). Item 7 Packet Page 55 3. Environmental Impact Determination Fee City staff reviews all discretionary projects for compliance with CEQA and when necessary, the National Environmental Policy Act (NEPA) in order to make an environmental impact determination for the project. If an Initial Study of Environmental Impact is required, additional studies and/or technical analysis may be necessary to determine the appropriate course of action. When this is the case, the City experiences additional costs associated with staff and consultant services to perform the analysis. For these more complicated projects, the cost to the City to reach an environmental determination would exceed the City’s current flat fee for Environmental Impact Determination, which is set at $6,357.27. Going forward, the flat fee would only be assessed in cases where the scope of the Initial Study is limited and does not require consultant support or special studies for the purpose of making the final determination. The purpose of this recommendation is to provide a moderate Environmental Impact Determination fee that falls between the flat rate (typically required for a simple Negative Declaration) and a full Environmental Impact Report. Creating this moderate Environmental Impact Determination fee allows the City to capture the additional cost for work performed by staff and the consultant, and eliminates increased unbudgeted expenses when additional studies and/or technical analysis are necessary for staff to make an environmental determination. In this fee structure, the cost to the applicant would be the full cost of the consultant contract plus 30% to cover staff time associated with administration and oversight of the consultant work product. Changes to the Approved Master Fee Schedule On June 2, 2020, the City Council adopted the City’s Master Fee Schedule for 2020-21. After the approval, staff began to update the systems through which fees are being assessed and charged. During the update, it was discovered that several fees, though approved by the Council, were never added to the previous Master Fee Schedule, hence they were not increased by the applicable inflator. In addition, the Utilities Department received approval from Council to change its water and wastewater impact fees outside the annual cycle. This increase was not reflected in the fees that Council approved on June 2nd. Given these discrepancies, staff took another look at the fees to make sure no increases or changes were missed in the 2019-20 Master Fee Schedule that provided the basis for the fees to be charged in 2020-21. Changes proposed in Attachment A – Exhibit A are the result of this review and will correct all the fees that were surfaced with having deficiencies or had never been incorporated into the schedule. If approved, the fees will be incorporated into the Master Fee Schedule and provide the correct basis for all subsequent updates. In order to ensure that all fees are captured when introduced, changed, or adjusted during the year, staff will implement appropriate processes to ensure that the Master Fee Schedule reflects the correct fees and is all inclusive. Item 7 Packet Page 56 Utilities Fee Adjustments 4. Decrease Utilities set-up fee Change from $90 to $38 Customers pay a fee when they start a new water and sewer account. The purpose of this fee is to recover the cost to provide the service. The fee pays for the time that it takes a Utility Billing Assistant to set-up the account in the utility billing software and the time that it takes a Water Distribution Operator to visit the property to turn-on and/or read the water meter. Since the set- up fee was adopted in 2017, several more efficient procedures and technologies have been implemented that have greatly decreased the time it takes to complete these activities. Better Data Over the past year, the Water Distribution division has used its asset management software, Cityworks, to track the amount of time that it takes to turn-on and/or read a water meter for a new account. This data shows that this activity takes less time to complete than it did in the past. This is largely due to efficiencies in procedures and the utilization of technology. Efficiencies Water Distribution has begun using mobile mapping to complete turn -ons and meter reads for new accounts. The mobile map routes all the day’s work activities on a map that field staff follows. This allows staff to complete all their field work in the most efficient way possible. The Utility Billing (UB) division has also implemented several more efficient procedures since the current fee schedule was adopted that have reduced the amount of time that it takes to set -up a new water and sewer account. UB implemented a Laserfiche form to collect new account information from customers. The form makes the process to set up an account much quicker because the form automatically sends customers a confirmation email. Previously this was done manually. All communications between UB and Water Distribution related to new accounts are now electronic and automated. In the past, UB printed paperwork orders that were picked up from the office by Water Distribution. This electronic communication has proved to be a huge time saver. 5. Discontinuation for Non-Payment Fee (Restore) Change from $117 to $50 Customers pay a fee when their water is shut-off for non-payment. The purpose of this fee is to recover all the costs incurred to shut-off a delinquent customer’s water. This includes all notifications and the time it takes to shut off the water and then turn it back on after the customer pays their past due bill. Item 7 Packet Page 57 Better Data As with the set-up fee, Water Distribution has been tracking the amount of time that it takes to turn off water and then return to the property to turn it back on. This data shows that these activities take less time than they did in the past. Efficiencies UB has implemented several more efficient procedures since the current fee schedule was adopted that have reduced the amount of time that it takes to shut off water for non -payment. For example, UB used to prepare door tags for every customer whose water is shut off. This activity was eliminated with very few customer service impacts. In addition, telephone communication between the office and field has been replaced with service requests that automatically notify field staff, when a customer has paid, to turn water back on. Mobile mapping is also used for shut-offs and restoration of service. The following table displays the change to staff time for each of the fees. Current Fee Basis Proposed Fee Basis Set-Up Fee - Total .75 hours .35 hours Office Staff .25 hours .1 hours Field Staff .5 hours .25 hours Discontinuation Fee - Total .86 hours .5 hours Office Staff .46 hours .25 hours Field Staff .4 hours .25 hours 6. Property Management Fee Eliminate This fee allowed property management companies or individuals who start multiple new water and sewer accounts each year to pay an annual fee for unlimited new accounts. In 2017, the City implemented Master accounts which are continuous service agreements that automatically revert an account back to a landlord or property manager’s name when the tenant moves out. Master accounts have replaced the property management fee. Previous Council or Advisory Body Action Minor changes to overall fee study City Council previously reviewed and adopted on June 2, 2020. Similar fee categories were presented; however, these fees were not included at that time. Item 7 Packet Page 58 Policy Context The budget policy for cost recovery is located in the 2019-2021 Financial Plan (Page 476), and reads as follows: Public Engagement Staff has utilized a “notify” level of public engagement to implement the proposed additional and updated fees. In each case, staff has sought to add value to the services offered by the Community Development Department through the proposed fee structure. Each of these fees reflects a service that is commonly used by customers, but for which a fee does not exist, or in the case of Environmental Impact Determination, the current fee does not cover the full scope of the service needed. In performing outreach for this item, staff sent e-mail correspondence to its Developer’s Roundtable notification list and notified the Chamber of Commerce directly. CONCURRENCE The City’s Finance Department concurs with the recommendation. ENVIRONMENTAL REVIEW The California Environmental Quality Act does not apply to the recommended action in th is report, because the action does not constitute a “Project” under CEQA Guidelines Sec. 15378. FISCAL IMPACT Budgeted: No Budget Year: 2020-2021 Funding Identified: N/A Item 7 Packet Page 59 Fiscal Analysis: Funding Sources Total Budget Available Current Funding Request Remaining Balance Annual Ongoing Cost General Fund N/A State Federal Fees Other: Total The fees listed in the Master Fee Schedule allow for cost recovery for services provided. The level of cost recovery is set by the City Council and reflected in the City’s financial policies. As such, all actions outlined in this report have a positive impact and the City budgets for all service fees within its annual budget appropriation to off-set operating expenditures. Several of the fees outlined in Exhibit A to the resolution have already been applied to the respective services but have not been integrated into the overall fee schedule. This action corrects this oversight and will assure appropriate fee adjustments in the future. The presented fee increases recover the approximate $200,000 in cost of transaction expenses that the City incur each year. This cost has never been considered in the cost of the service. Additionally, some fees were not published in previous fee schedules. All fees that were not previously published will be incorporated into this Master Fee Schedule, which will serve as the guiding fee document for the City moving forward. Temporary Certificate of Occupancy (TCO) By not recovering full costs of services performed, the City is realizing a revenue deficit. This deficit must be met through other funds, such as the General Fund, to subsidize the shortfall in staffing costs. A TCO is an applicant driven fee and because the vast majority of building permits don’t need a TCO, it is not economically fair to include this cost in every permit, but to only apply this fee to those who actually need one. This fee provides a net increase in revenue and was not included in the previous fee study. Planning Consultation Fee Fee revenues are comprised primarily of the fees paid for all the different types of development applications processed by the Development Review program. There are many different fees charged by the Department for its various development project applications. These include fees for building permit applications. This fee would cover staff time and materials necessary to provide the customer information relative to their specific issue or project. Full cost recovery hourly rate for planners are established at $173/hour for the Planner Consultation Fee. Item 7 Packet Page 60 Environmental Impact Determination The fiscal impact analysis is focused on the City’s General Fund budget. When applications are submitted and deemed to require an Environmental Impact Determination, the applicant pays the $6357.27 flat fee for this service. However, in order to make an environmental determination, additional studies and/or technical analysis may be required. In these cases, additional unbudgeted funds are necessary to cover the cost of the service, not covered by the customer, to pay for staff and consultants for the additional work performed once the original fee amount is depleted. The proposed moderate Environmental Impact Fee would fully cover this additional expense. This fee would mirror the fee structure already in place for an Environmental Impact Report. The 30% administration fee associated with the Environmental Impact Determination fee is directly absorbed by the General Fund, bringing in additional revenue to cover staff costs. For example, if a contract consultant scope of work is $10,000, the applicant would pay that amount plus $3,000 administrative fee towards the General Fund. Utilities Fee Decreases The Utilities fee reductions represent a direct benefit to customers resulting from operational efficiencies. The reduction in the set-up fee and discontinuation fee will result in an approximate $80,000 decrease in revenue to the Water fund and an approximate decrease of $80,000 to the sewer fund. Although these amounts are not insignificant, this a less than 0.1% reduction to revenue in each of the funds. ALTERNATIVES 1. Council could decide not to authorize proposed new fees and the City is not recovering costs for the work performed. This alternative is not recommended because customers value the services being requested and cost recovery as proposed is consistent with City policy. 2. Council could decide not to update the Master Fee Schedule, however, this is not recommended because incorporating fees into the Master Fee Schedule is the best way to ensure that they are updated properly on an annual basis and that all of the City’s fees are available in one location. 3. Council could defer action and ask for additional information. If the Council pursues this alternative it should provide direction to staff regarding the information needed to make a decision. Attachments: a - Draft Resolution b - Exhibit A to Resolution - Fee Correction Item 7 Packet Page 61 R ______ RESOLUTION NO. _____ (2020 SERIES) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN LUIS OBISPO, CALIFORNIA, ADOPTING NEW FEES AND AMENDING THE 2020-21 MASTER FEE SCHEDULE WHEREAS, Section 2 of the City’s 2019-21 Financial Plan, titled “User Fee Cost Recovery Goals,” defines the level of cost of services cost recovery for the various City services; and WHEREAS, Section 1(H) of the City’s 2019-21 Financial Plan provides that Development Review Programs cost recovery should be 100% of cost of service; and WHEREAS, the Community Development Department offers services that are not currently covered by fees: and WHERAS, the Community Development Department has assessed the cost of the services and desires to begin assessing fees to cover its costs; and WHERAS, the Utilities Department has reassessed the basis for cost recovery for service turn-on and disconnect which lead to a lower than currently applied service charge and the conclusion that certain fees no longer apply; and WHEREAS, on June 2, 2020, the City Council approved the City’s Master Fee Schedule listing all applicable service fee levels for fiscal year 2020-21; and WHEREAS, it was subsequently discovered that several approved fees were not reflected in the fee schedule; and WHEREAS, several Utilities fees had been updated mid-year and did not reflect the correct level of cost recovery; and WHEREAS, the Master Fee Schedule will be updated to reflect all new, additional, and updated fees becoming effective July 1, 2020. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of San Luis Obispo as follows: SECTION 1. The Community Development Department will begin charging fees for Temporary Certificates of Occupancy and Planning Consultation as set forth in Exhibit A to this Resolution. These fees will be adjusted annually between any Cost of Services study with the Consumer Price Index Los Angles/Riverside. Item 7 Packet Page 62 Resolution No. _____ (2020 Series) Page 2 R ______ SECTION 2. The Environmental Impact Determination will be changed from a fixed fee to a cost recovery model as set forth in Exhibit A to this Resolution. This fee will be adjusted annually between any Cost of Services study with the Consumer Price Index Los Angles/Riverside SECTION 3. Due to increased efficiency in the Utilities department’s system, the Utilities service turn-on and disconnect fees are hereby lowered to better reflect the current cost of services. Additionally, the Utilities department’s property management services fee is hereby discontinued as the introduction of master accounts has rendered it obsolete. SECTION 4. Fees previously introduced and approved are herewith incorporated into the Master Fee Schedule. Such fees are: Parking-in-Lieu, Los Osos Valley Road Add-On Impact Fees, Orcutt Specific Plan Area Add-On Impact Fee, Park Impact Fees, and multiple Building related fees. Item 7 Packet Page 63 Resolution No. _____ (2020 Series) Page 3 R ______ SECTION 5. Certain Planning fees, Cannabis application fees, Building Plan Check and Inspections fees, and Water and Wastewater impact fees are hereby adjusted to reflect the appropriate fee levels for 2020-21. Upon motion of _______________________, seconded by _______________________, and on the following roll call vote: AYES: NOES: ABSENT: The foregoing resolution was adopted this _____ day of _____________________ 2020 ____________________________________ Mayor Heidi Harmon ATTEST: ____________________________________ Teresa Purrington City Clerk APPROVED AS TO FORM: _____________________________________ J. Christine Dietrick City Attorney IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Luis Obispo, California, on _____________________. ____________________________________ Teresa Purrington City Clerk Item 7 Packet Page 64 Fee Description Proposed Fee Amount Temporary Certificate of Occupancy $860.00 Planning Consultation $173.00 Per Hour Fee Description Proposed Fee Amount Environmental Impact Determination Fee- Moderate Consultant Contract + 30% for Administrative and Review Services Community Development New Fees New Fees Amended Fees Community Development New Fees Item 7 Packet Page 65 Fee Number Fee Description June 2nd Adopted Fee Proposed Fee 3 Minor Use Permit (Admin)$2,148.64 $2,163.68 4 Conditional Use Permit (Planning Commission) $4,226.00 $4,255.58 12 Affordable Housing Incentive Request $810.77 $816.45 13 Reviews Requiring ALUC Hearing $1,011.06 $1,018.13 22 Signs $2,985.69 $3,006.59 23 Conceptual Review $3,880.05 $3,907.21 24 Development Projects - Moderate $8,018.39 $8,074.52 25 Development Projects - Major $10,619.22 $10,693.55 26 Development Project - Minor $2,678.28 $2,697.03 27 Plan Revision $2,969.05 $2,989.84 PLANNING FEES Planning Fees have two components‐ the initial fee and completion fee.  10 Planning Fees were published  without a CPI increase being applied to the Completion Fee.  The increase to the planning fee is reflected  above Corrected Fees Item 7 Packet Page 66 Fee Number Fee Description June 2nd Adopted Fee Proposed Fee One Time Application Fee 1 Retail Store Front Application Fee $23,262.13 $23,885.42 Other Commercial Cannabis Business Applicants 2 Initial Application Fee $5,302.00 $5,087.79 3 Final Application fee when permit issues $19,589.00 $18,797.63 Cannabis Fees Council Approved changes that were made in December of 2019 were not considered in the fee  schedule.  A council correspondence was created to correct this, but the calculation was  inaccurate Corrected Fees Item 7 Packet Page 67 Fee Description June 2nd Fee Proposed Fee Account Set-up $93.81 $37.84 Property Management (first 25 set-ups)$1,196.00 $1,237.19 Each Additional 25 set-ups $1,196.00 $1,237.19 Disconnect Service for Non-Payment $117.00 $50.16 Class I (ex: Automotive Repair, Photo processors)$338.00 $340.37 Class II (ex: Restaurant, Bakery)$182.00 $183.27 Significant Industrial User (ex: Chemical Manufacturing, Electro-plating)$1,762.00 $1,774.33 Industrial User Re-Inspection $82.00 $82.57 Industrial User permits were not increased by CPI on June 2nd Utilities Fees  The Utilities Business Manager conducted an analysis for the Account Set Up and Disconnect Service fee that considered the same components  as the original fee study that priced all fees.  New ways of doing business has resulted in decreased for both Fees The Property Management and Each Additional 25 Set ups are no longer fees that the City Charges.  We are looking to remove them from Master  Fee Schedule Corrected Fees Item 7 Packet Page 68 June 2nd Fee Proposed Fee IA, IB IA, IB base base 1-2,499 $3,400.80 $3,478.09 2,500-3,999 $6,802.68 $6,957.28 4,000-5,999 $7,482.84 $7,652.90 6,000-7,999 $8,503.08 $8,696.33 8,000-Unlimite $10,204.56 $10,436.48 This fee was incorrectly Published in previous fee schedules.   June 2nd Fee Proposed Fee IA, IB IA, IB base base 1-399 $1,222.87 $1,834.30 400-599 $1,342.50 $2,012.63 600-999 $1,998.24 $2,997.36 1,000-2,999 $2,391.46 $3,586.64 3,000-Unlimite $3,980.97 $5,971.46 IIB,IIIB,VB,IV IIB,IIIB,VB,IV 1-4,999 $1,412.28 $1,566.24 5,000-9,999 $2,824.56 $6,264.99 10,000-49,999 $3,389.47 $10,962.63 50,000-99,999 $4,236.84 $15,661.36 100,000-Unlimited $5,649.12 $21,926.36 These fees were incorrectly Published in previous fee schedules.   Corrected Fees Low & Moderate Hazard Storage Single-Family/Duplex Residential Building Plan Check Fees Building Inspection Fees Attached Accessory/Utility Uses Item 7 Packet Page 69 Land Use Category Water Development Impact Fee(Citywide) Wastewater Development Impact Fee (Citywide) Water Development Impact Fee(Citywide) Wastewater Development Impact Fee (Citywide) Single Family & Multifamily (per Dwelling Unit Size) ≥ 1,201 sq. ft. (fees are per unit)$12,393.83 $11,192.24 $12,416.15 $11,531.37 801 to 1,200 sq. ft. (fees are per unit)$9,915.07 $8,954.00 $9,932.92 $9,279.25 451 to 800 sq. ft. (fees are per unit)$8,675.68 $7,834.88 $8,691.30 $8,120.01 ≤ 450 sq. ft. (fees are per unit)$3,718.15 $3,357.36 $3,746.63 $3,458.57 Mobile/Manufactured Home (per Dwelling Unit) Mobile/Manufactured Home $7,436.30 $6,715.76 $7,493.25 $6,919.24 Non-Residential (by Meter Size) 3/4" meter $12,393.83 $11,192.24 $12,488.74 $11,531.37 1" meter $21,069.10 $19,027.12 $21,230.45 $19,603.11 1.5" meter $42,139.24 $38,053.20 $42,461.96 $39,206.23 2" meter $66,926.91 $60,437.69 $67,439.47 $62,268.97 3" meter $132,613.60 $119,757.30 $132,852.31 $123,385.42 4" meter $206,976.61 $186,910.75 $207,349.16 $192,573.62 6" meter $413,954.26 $373,820.45 $414,699.37 $385,147.24 June 2nd Adopted Fee Proposed Fee Water and Wastewater Impact Fees Council‐Approved changes that were made in December of 2019 were not considered in the fee schedule.  Corrected Fees Item 7 Packet Page 70 New Construction: Standard (Fee Per Space)$20,793.00 $21,478.29 Community Partners (50% Reduction)$10,395.00 $10,742.09 Additions to Existing Buildings: Standard (Fee Per Space)$20,793.00 $21,487.29 Community Partners (50% Reduction)$10,395.00 $10,742.09 Change in Occupancy Requiring Additional Parking: [1] Standard (Fee Per Space)$5,198.00 $5,371.57 Community Partners (50% Reduction)$2,600.00 $2,686.82 Fees to be added to the Schedule Parking In‐Lieu Fees were never included in previous fee schedules.  These fees are also increased by CCCI instead of  CPI because the nature of these fees is more in line with the Construction Industry Fee Description FY 19-20 Base Fee Rate Proposed Fees [1] Per vehicle space required by zoning egulations and not otherwise provided.  The number of spaces required by  the change shall be the difference between the number required by the new use and the number required by the  previous occupancy. Public Works Fees Proposed Fee Increase Parking in-Lieu Fees [1] Item 7 Packet Page 71 Transportation (LOVR Add on Fee- Avila Ranch)Transportation (LOVR Add on Fee- All Other Areas)Citywide Transportation (Orcutt Specific Plan Area Add on) Prior to 7/1/2018Citywide Transportation (Orcutt Specific Plan Area Add on) After to 7/1/2018Transportation (Orcutt Specific Plan Area Add on) Prior to 7/1/2018Transportation (Orcutt Specific Plan Area Add on) After to 7/1/2018Transportation (LOVR Add on Fee- Avila Ranch)Transportation (LOVR Add on Fee- All other Areas)Citywide Transportation (Orcutt Specific Plan Area Add on) Prior to 7/1/2018Citywide Transportation (Orcutt Specific Plan Area Add on) After to 7/1/2018Transportation (Orcutt Specific Plan Area Add on) Prior to 7/1/2018Transportation (Orcutt Specific Plan Area Add on) After to 7/1/2018ResidentialSingle Family≥ 1,400 sq. ft. (fees are per unit)$2,260.00 $2,157.00$3,922.00 $10,817.88 $17,185.00 $16,207.00$2,314.26 $2,208.78 $3,990.64 $11,020.17 $18,045.28 $17,018.32700 to 1,399 sq. ft. (fees are per sq. ft.)N/AN/A$3,922.00 $7.73 N/AN/AN/AN/AN/A $7.87N/A≤ 699 sq. ft. (fees are per unit)$2,260.00 $2,157.00$3,922.00 $5,408.94 $17,185.00 $16,207.00$2,314.26 $2,208.78 $3,990.64 $5,510.09 $18,045.28 $17,018.32Multifamily Condominium/Apartment≥ 1,100 sq. ft. (fees are per unit)$1,061.00 $1,445.00$3,480.00 $8,404.87 $12,005.00 $11,322.00$1,086.47 $1,479.68 $3,545.07 $8,562.04 $12,605.97 $11,888.78550 to 1,099 sq. ft. (fees are per sq. ft.)N/AN/A$3,480.00 $7.65 N/AN/AN/AN/AN/A $7.79N/A≤ 549 sq. ft. (fees are per unit)$1,061.00 $1,455.00$3,480.00 $4,202.43 $12,005.00 $11,322.00$1,086.47 $1,489.93 $3,545.07 $4,281.02 $12,605.97 $11,888.78Non-ResidentialOffice (fees are per sq. ft.)$3,063.00 $3,063.00$7.86 $10.44 N/AN/A$3,136.53 $3,136.53$8.01 $10.64N/AService (fees are per sq. ft.)$3,063.00 $3,063.00N/A $10.44 N/AN/A$3,136.53 $3,136.53N/A $10.64N/ARetail (fees are per sq. ft.)$24,160.00 $19,199.00$8.26 $15.17 N/AN/A$24,739.99 $19,659.89$8.41 $15.45N/AIndustrial (fees are per sq. ft.)$1,704.00 $1,704.00N/A $6.08 N/AN/A$1,744.91 $1,744.91N/A $6.19N/AInstitutional (fees are per sq. ft.)$1,316.00 $1,316.00N/A $12.28 N/AN/A$1,347.59 $1,347.59N/A $12.51N/ALodging (fees are per room)$1,316.00 $1,316.00N/A $4,364.54 N/AN/A$1,347.59 $1,347.59N/A $4,446.16N/ASpecialty (fees are per ADT) (2)$2,157.00 $2,157.00$365.00 $665.41 N/AN/A$2,208.78 $2,208.78 $371.83 $677.85 $1,985.17Per PM Trip Per PM Trip$1,890.53 $1,782.94Per PM Trip Per PM Trip$1,872.19The LOVR Add on Fee for Avila Ranch and All other Areas were never included in previous fee schedulesThe Orcutt Specific Plan Area prior to and after 7/1/2018 were never included in previous fee schedulesTransportation Impact FeesProposed FeeFY 2019-20 RateFees to be added to the Schedule‐ ContinuedItem 7Packet Page 72 Parkland Development Fees (Orcutt Area) Parkland Development Fees (Orcutt Area) Residential FY 19-20 Base Proposed Fee Single Family (per Dwelling Unit)$7,130.18 $7,259.30 Multifamily Condominium (per Dwelling unit) $5,304.38 $5,400.44 Multifamily Apartment (per Dwelling unit)$5,304.38 $5,400.44 The Parkland Development Fees were never published in previous Master Fee Schedules Fees to be added to the Schedule‐ Continued Item 7 Packet Page 73 Fee Description FY 19-20 Base Fee Rate Proposed Fee A/C Residential - BLDG $74.73 $76.44 After Hours Call Out (Building) - BLDG $451.63 $462.00 Air Handler - BLDG $56.32 $57.61 Antenna/Tower w/ Equipment Shelter - BLDG $666.08 $681.38 Appeal of Building Official Decision - BLDG $1,128.54 $1,154.47 Awning/Canopy - BLDG $385.57 $394.43 Boiler - BLDG $94.23 $96.40 Building Sewer - BLDG $74.73 $76.44 Chiller - BLDG $94.23 $96.40 Commercial Access Upgrade - Site work - BLDG $1,193.53 $1,220.95 Commercial Access Upgrade - Upgrades - BLDG $955.26 $977.20 Commercial Coach Installation - BLDG $1,585.59 $1,622.02 Construction Tax - BLDG $154.95 $158.51 Deferred Submittal (Building) $225.28 $230.45 Demolit - Interior or Garage/Utility Build - BLDG $451.64 $462.01 Demolition - Entire Building - BLDG $790.64 $808.80 Drain Vent Repair/Replace - BLDG $56.32 $57.61 Driveway $186.33 $190.61 Dry Rot / Termite Repair - BLDG $235.03 $240.43 Duct Work Only - BLDG $56.32 $57.61 Electric Car Charging System -BLDG $122.39 $125.20 Electric Service Upgrade (up to 200 amp) -BLDG $122.39 $125.20 Electrical Volume & Current Fee Analysis - BLDG $69.31 $70.91 Evaporative Cooler - BLDG $56.32 $57.61 Exhaust Hood - Type I - BLDG $113.72 $116.34 Exhaust Hood - Type II - BLDG $74.73 $76.44 Exhaust Hood & Duct - Residential - BLDG $56.32 $57.61 Fence or Non-Engineered Wall - BLDG $680.16 $695.79 Fire Permit Handling Fee - BLDG 451.63 $462.00 Fireplace Insert Upgrade -BLDG $326.00 $333.49 Fireplace Retrofit / Chimney Repair - BLDG $649.83 $664.76 Fees to be added to the Schedule‐ Continued Additional Building Fees Additional Building Fees Continued on Next Page Item 7 Packet Page 74 Fee Description FY 19-20 Base Fee Rate Proposed Fee (Incl. Credit Card and CPI Increase) Fireplace: Masonry $560.09 $572.96 Fixtures - BLDG $56.32 $57.61 Flag, Light, or Sign Pole - BLDG $809.05 $827.63 Foundation New/Replace - BLDG $1,355.99 $1,387.14 Foundation Repair Only - BLDG $676.91 $692.47 Furnace/Heater Replacement -BLDG $122.39 $125.20 Furnaces - BLDG $74.73 $76.44 Generator Installation - BLDG $86.65 $88.64 Graywater Systems - BLDG $150.55 $154.01 Graywater/Rainwater Harvesting System -BLDG $74.73 $76.44 Grease Trap - BLDG $56.32 $57.61 Guest Quarters Permit $1,167.29 $1,194.11 Handicap Board of Appeals - BLDG $1,128.54 $1,154.47 Heat Pump - BLDG $56.32 $57.61 Heater - BLDG $56.32 $57.61 Heater - Wall - BLDG $74.73 $76.44 Inert Gas Systems $1,049.33 $1,073.44 Inspection Fee $191.11 $195.50 Insulation/Energy Upgrade -BLDG $118.05 $120.76 Make-Up Air System - BLDG $56.32 $57.61 Manufactured Homes $851.19 $870.75 Mechanical Volume & Current Fee Analysis - BLDG $69.31 $70.91 Minor Code Corrections - BLDG $235.02 $240.42 Minor Lease Space Improvements - BLDG $1,355.99 $1,387.14 Minor Repairs - up to 2 inspections - BLDG $309.76 $316.87 Misc Electrical Items NOS - BLDG $74.74 $76.45 Misc Mechanical Items NOS - BLDG $74.73 $76.44 Misc Plumbing Items NOS - BLDG $74.74 $76.45 New/Altered Circuits - 15 or 20 amp - BLDG $56.32 $57.61 New/Altered Circuits - 200+ amps - BLDG $56.32 $57.61 New/Altered Circuits - 25 to 40 amp - BLDG $37.91 $38.78 New/Altered Circuits - 50 to 175 amp - BLDG $45.48 $46.53 Other Electrical Inspections - BLDG $225.28 $230.45 Other Mechanical Inspections - BLDG $225.28 $230.45 Other Plumbing & Gas Inspections - BLDG $225.28 $230.45 Paint Booth - BLDG $1,016.99 $1,040.36 Patio - Enclosed - BLDG $1,185.95 $1,213.19 Patio Cover - Open - BLDG $680.16 $695.79 Permit Issuance - BLDG $243.68 $249.28 Photovoltaic Systems (residential roof mount)$160.12 $163.79 Photovoltaic Unit Installation - Residential $69.18 $70.77 Plumbing Volume & Current Fee Analysis - BLDG $68.23 $69.80 Pool/Spa Commercial - BLDG $1,128.54 $1,154.47 Preliminary Project Consult/Code Analysis - BLDG $225.28 $230.45 Refrigeration Compressor/Condenser - BLDG $94.23 $96.40 Re-Roof Residential - BLDG $235.03 $240.43 Re-roof with Added Ventilation -BLDG $118.05 $120.76 Residential Photovoltaic System $168.96 $172.84 Residential Pool/Spa - Site Built - BLDG $903.27 $924.02 Retaining Wall Non-Engineered - BLDG $792.80 $811.01 School Tenant Permit $901.81 $922.53 Added Fees‐ Continued Additional Building Fees Additional Building Fees Continued on Next Page Item 7 Packet Page 75 Fee Description FY 19-20 Base Fee Rate Proposed Fee (Incl. Credit Card and CPI Increase) Secondary Dwelling Units $1,232.42 $1,260.74 Seismic Strengthening of URM Bldg $46.49 $47.55 Shear Wall / Steel Support Column - BLDG $903.27 $924.02 Sign - Monument or free standing - BLDG $603.26 $617.12 Sign - Wall - BLDG $347.00 $354.97 Skylight $305.70 $312.72 SMIP (Commercial)$28.92 $29.59 SMIP (Residential)$13.43 $13.74 Solar / PV System - Commercial -BLDG $812.30 $830.96 Solar Photovoltaic - Commercial/Multifamily - BLDG $790.63 $808.79 Solar Water System Fixtures - BLDG $74.73 $76.44 Stairs - Repair/Replace - BLDG $1,016.99 $1,040.36 Stand Alone Electrical Plan Check - BLDG $227.45 $232.67 Stand Alone Mechanical Plan Check - BLDG $113.72 $116.33 Stand Alone Plumbing Plan check - BLDG $225.28 $230.45 Store Front / Facade Alterations: Minor - BLDG $1,016.99 $1,040.36 Stormwater - Major Project - BLDG $3,953.16 $4,043.99 Stormwater - Minor Project - BLDG $295.68 $302.47 Stormwater - Moderate Project - BLDG $1,863.95 $1,906.77 Stucco/Siding - BLDG $428.89 $438.75 Supplemental Inspection (Building) - BLDG $225.28 $230.45 Supplemental Plan Check (Building) - BLDG $225.28 $230.45 T-Bar Ceiling - BLDG $676.91 $692.47 Temporary Service - BLDG $56.32 $57.61 Trash Enclosure - BLDG $1,128.54 $1,154.47 URM Seismic Strengthening - BLDG $41.32 $42.27 Vapor Recovery - BLDG $565.36 $578.35 Vent Fan (Single Duct) - BLDG $56.32 $57.61 Walk-in Box/Refrigerator Coil - BLDG $74.73 $76.44 Water Heater Replacement -BLDG $74.73 $76.44 Water Pipe Repair/Replace - BLDG $56.32 $57.61 Window Retrofits (non-structural) -BLDG $197.12 $201.65 Fees may be subject to a 3.05% IT Surcharge Additional Building fees were not published in previous fee schedules Additional Building Fees Added Fees‐ Continued Item 7 Packet Page 76