Loading...
HomeMy WebLinkAbout91609 Specials SPECIAL PROVISIONS FOR CITY OF SAN LUIS OBISPO Broad Street/Woodbridge Pedestrian Hybrid Beacon Specification No. 91609 November 2020 PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION 919 Palm Street San Luis Obispo, CA 93401 (805) 781-7200 Broad Street Pedestrian Hybrid Beacon Specification No. 91609 Approval Date: March 17, 2020 November 6, 2020 November 6, 2020 TABLE OF CONTENTS NOTICE TO BIDDERS ..................................................................................................... I  BID SUBMISSION ...................................................................................................................................... I  BID DOCUMENTS .................................................................................................................................... II  PROJECT INFORMATION....................................................................................................................... III  QUALIFICATIONS .................................................................................................................................... III  AWARD ..................................................................................................................................................... V  ACCOMMODATION .................................................................................................................................. V  BID FORMS .................................................................................................................... A   BID ITEM LIST FOR BROAD STREET/WOODBRIDGE PEDESTRIAN HYBRID BEACON, SPECIFICATION NO. 91609 .................................................................................................................... A  LIST OF SUBCONTRACTORS ................................................................................................................ C  PUBLIC CONTRACT CODE SECTION 10285.1 STATEMENT .............................................................. D  PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE ......................................................... D  PUBLIC CONTRACT CODE SECTION 10232 STATEMENT ................................................................. D  LABOR CODE SECTION 1725.5 STATEMENTS ................................................................................... D  NON-COLLUSION DECLARATION .......................................................................................................... F  BIDDER ACKNOWLEDGEMENTS .......................................................................................................... G  QUALIFICATIONS .................................................................................................................................... H  ATTACH BIDDER'S BOND TO ACCOMPANY BID ................................................................................... I  SPECIAL PROVISIONS .................................................................................................. 1  DIVISION I GENERAL PROVISIONS ....................................................................................................... 1  1 GENERAL ........................................................................................................................................... 1  2 BIDDING ............................................................................................................................................. 1  4 SCOPE OF WORK ............................................................................................................................. 1  6 CONTROL OF MATERIALS ............................................................................................................... 2  7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC ....................................................... 2  8 PROSECUTION AND PROGRESS ................................................................................................... 3   DIVISION III GRADING ............................................................................................................................. 4  ADD TO SECTION 19-2.03A GENERAL: ................................................................................................. 4  ADD TO SECTION 19-5.03A GENERAL: ................................................................................................. 4  DIVISION VIII MISCELLANEOUS CONSTRUCTION .............................................................................. 4  73 CONCRETE CURBS AND SIDEWALKS ......................................................................................... 4  ADD TO SECTION 73-1.03 CONSTRUCTION: ....................................................................................... 4  ADD TO SECTION 73-1.04 PAYMENT .................................................................................................... 5  77 LOCAL INFRASTRUCTURE ............................................................................................................ 6  ADD TO SECTION 77-1.01 ....................................................................................................................... 6  DIVISION IX TRAFFIC CONTROL DEVICES........................................................................................... 6   84 MARKINGS ....................................................................................................................................... 6  DIVISION X ELECTRICAL WORK ............................................................................................................ 7  ADD TO SECTION 86-2.16A PAINTING, GENERAL: .............................................................................. 7  DIVISION XI MATERIALS ......................................................................................................................... 7  90 CONCRETE ...................................................................................................................................... 7  DIVISION XIII APPENDICES .................................................................................................................... 7  APPENDIX A - FORM OF AGREEMENT .................................................................... A-1  APPENDIX B – PG&E CONSTRUCTION DRAWING .................................................. A-4  NOTICE TO BIDDERS i NOTICE TO BIDDERS BID SUBMISSION Sealed bids will be mailed to the following address: City of San Luis Obispo Public Works Department, 919 Palm Street, San Luis Obispo, CA 93401, Attn: Jennifer Rice. Bids delivered in person will not be accepted. All mailed bids must be delivered and in possession of the Project Manager by 2:00 p.m. on December 17, 2020 at which time bids will be publicly opened and read aloud via Microsoft Teams video conference and conference call. In-person attendance of the bid opening will not be permitted in adherence to social distancing measures. Use the following link: https://teams.microsoft.com/l/meetup- join/19%3ameeting_MmRiZmQ2YmItY2JkZi00YTRmLWJjZGQtZGFiNWMwMDczOTFh %40thread.v2/0?context=%7b%22Tid%22%3a%22a78b182d-94e4-4507-a9a9- 330dcb148164%22%2c%22Oid%22%3a%22a8add278-38fa-47c3-8727- acd5a57b58ec%22%7d Or join by phone with this number: 1 (209) 645-4165 with Conference ID number: 238758467 Submit bid in a sealed envelope plainly marked: Broad Street/Woodbridge Pedestrian Hybrid Beacon, Specification No. 91609 Any bid received after the time and date specified will not be considered and will be returned to the bidder unopened. Bids received by Fax or Email will not be considered. By submission of bid you agree to comply with all instruction and requirements in this notice and the contract documents. All bids must be submitted on the Bid Item List form(s) provided and submitted with all other Bid Forms included in these Special Provisions. Each bid must be accompanied by either a: 1. certified check 2. cashier's check 3. bidder's bond made payable to the City of San Luis Obispo for an amount equal to ten percent of the bid amount as a guaranty. Guaranty will be forfeited to the City San Luis Obispo if the bidder, to whom the contract is awarded, fails to enter into the contract. NOTICE TO BIDDERS NOTICE TO BIDDERS ii The City of San Luis Obispo reserves the right to accept or reject any or all bids or waive any informality in a bid. All bids are to be compared based on the City Engineer's estimate of the quantities of work to be done, as shown on the Bid Item List. Bids will only be accepted from bidders that are licensed in compliance with the provisions of Chapter 9, Division III of Business and Professions Code. The award of the contract, if awarded, will be to the lowest responsive bid submitted by a responsible contractor whose bid complies with the requirements prescribed. If the contract is awarded, the contract will be awarded within 60 calendar days after the opening of the bids. Failure to raise defects in the notice to bidders or bid forms prior to bid opening constitute a waiver of those defects. BID DOCUMENTS A copy of the plans and special provisions may be downloaded, free of charge, from the City’s website at: www.slocity.org/government/department-directory/public-works/public-works-bids- proposals A printed copy may be obtained at the office of the City Engineer by paying a non- refundable fee of: 1. $15.00 if picked up in person, or 2. $25.00 if by mailing to the office of the City Engineer Request must include Specification Number. The office of the City Engineer is located at: 919 Palm Street San Luis Obispo, CA 93401 Standard Specifications and Engineering Standards referenced in the Special Provisions may be downloaded, free of charge, from the City’s website at: www.slocity.org/government/department-directory/public-works/documents- online/construction-documents A printed copy may be obtained by paying a non-refundable fee of: 1. $30.00 if picked up in person, or 2. $40.00 if by mailing to the office of the City Engineer You are responsible to obtain all issued addenda prior to bid opening. Addenda will be available to download at the City’s website listed above or at the office of the City Engineer. NOTICE TO BIDDERS NOTICE TO BIDDERS iii Contact the project manager, Jennifer Rice at 805-781-7058 or the Public Works Department at (805) 781-7200 prior to bid opening to verify the number of addenda issued. You are responsible to verify your contact information is correct on the plan holders list located on the City’s website at: www.slocity.org/government/department-directory/public-works/public-works-bids- proposals. PROJECT INFORMATION In general, the project includes construction of a Pedestrian Hybrid Beacon on Broad Street at the intersection of Woodbridge Drive including replacement of ADA curb ramps. The project estimated construction cost is $361,500 Contract time is established as 55 working days. Contract start time shall commence 25 working days prior to confirmed delivery date of the Pedestrian Hybrid Beacon System specified in Section 8-1.01A, Item 1. The fixed liquidated damages amount is established at $500 per day for failure to complete the work within the contract time. In compliance with section 1773 of the Labor Code, the State of California Department of Industrial Relations has established prevailing hourly wage rates for each type of workman. Current wage rates may be obtained from the Division of Labor at: https://www.dir.ca.gov/oprl/DPreWageDetermination.htm This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. QUALIFICATIONS You must possess a valid Class “A” or C-10 Contractor's License at the time of the bid opening. You and any subcontractors required to pay prevailing wage must be registered with the Department of Industrial Relations pursuant to Section 1725.5 of the Labor Code. You must have experience constructing projects similar to the work specified for this project. Provide three similar reference projects completed as either the prime or subcontractor. All referenced projects must have been completed within the last five years from this project’s bid opening date. NOTICE TO BIDDERS NOTICE TO BIDDERS iv One of the three reference projects must have been completed under contract with a city, county, state or federal government agency as the prime contractor. All of the referenced projects must be for installation of signal equipment. Failure to provide reference projects as specified in this section and as required on the qualification form is cause to reject a bid as being non-responsive. The City reserves the right to reject any bid based on non-responsiveness if a bidder fails to provide a bid that complies with all bidding instructions. The City reserves the right to reject a responsive bid based on the non-responsibility of the bidder if the Director of Public Works or Designee finds, after providing notice and a hearing to the bidder, that the bidder lacks the 1. knowledge 2. experience, 3. or is otherwise not responsible as defined in Section 3.24 of the San Luis Obispo Municipal Code to complete the project in the best interest of the City. Rejected bidders may appeal this determination. Appeal must comply with the requirements in this Notice to Bidders. It is the City of San Luis Obispo’s intent to award the contract to the lowest responsive bid submitted by a responsible bidder. If in the bidder’s opinion the contract has been or may be improperly awarded, the bidder may protest the contract award. Protests must be filed no later than five working days after either: 1. bid opening date 2. notification of rejected bid. Protest must be in writing and received by the project manager located at: 919 Palm Street San Luis Obispo, CA 93401. Valid protests must contain the following information: 1. the reasons for the protest 2. any supporting documentation 3. the ruling expected by the City to remedy the protest. Any protest not containing all required information will be deemed invalid and rejected. The City will consider additional documentation or other supporting information regarding the protest if submitted in compliance to the specified time limits. Anything submitted after the specified time limit will be rejected and not be considered. NOTICE TO BIDDERS NOTICE TO BIDDERS v The Director of Public Works or Designee may request additional information to be submitted within three days of the request, unless otherwise specified, and will notify the protester of ruling within ten days of determination. If the protester is not satisfied with ruling, the protester may appeal the ruling to the City Council in compliance with Chapter 1.20 of the City of San Luis Obispo Municipal Code. Pursuant to the Public Records Act (Government Code, § 6250, et seq.), the City will make public records available upon request. AWARD The lowest bidder will be determined using the BID TOTAL. As a condition to executing a contract with the City, two bonds each equal to one hundred percent of the total contract price are required in compliance with Section 3-1.05 of the Standard Specifications. You may substitute securities for moneys withheld under the contract in compliance with the provisions of the Public Contract Code, Section 10263. ACCOMMODATION If any accommodations are needed to participate in the bid process, please contact Argelia Chang at (805) 781-7200 or by Telecommunications Device for the Deaf at (805) 781-7107. Requests should be made as early as possible in the bidding process to allow time for accommodation. BID FORMS A BID FORMS All bid forms must be completed and submitted with your bid. Failure to submit these forms and required bid bond is cause to reject the bid as nonresponsive. Staple all bid forms together. THE UNDERSIGNED, agrees that they have carefully examined: 1. the location of the proposed work 2. the plans and specifications 3. read the accompanying instructions to bidders and propose to furnish all: 4. materials 5. labor to complete all the required work satisfactorily in compliance with 6. plans 7. specifications 8. special provisions for the prices set forth in the bid item list: BID ITEM LIST FOR BROAD STREET/WOODBRIDGE PEDESTRIAN HYBRID BEACON, SPECIFICATION NO. 91609 Item Item Unit of Estimated Item Price Total No. SS(1) Description Measure Quantity (in figures) (in figures) 1 12 Traffic Control LS 1 ----- 2 15, 86 Furnish and Install Pedestrian Hybrid Beacon Signal System LS 1 ----- 3 15, 51, 73, 90 Curb Ramp Improvements at Broad at Woodbridge (Northeast corner) LS 1 ----- 4 15, 51, 73, 90 Curb Ramp Improvements at Broad at Woodbridge (Southwest corner) LS 1 ----- 5 15, 51, 73, 90 Sidewalk Panel Replacement at Northwest and Southeast Corner SQFT 103 6 56, 73 Median Installation EA 2 7 15 Furnish and Install Truncated Domes EA 2 8 15 Remove and Seal Traffic Stripe and Pavement Markings LS 1 ----- 9 84 Traffic Stripe - Detail 2 LF 14 10 84 Traffic Stripe - Detail 22 LF 100 11 84 Traffic Stripe - Detail 32 LF 19 12 84 Traffic Stripe - Detail 39A LF 17 13 84 Traffic Stripe - 12" White LF 122 BID FORMS BID FORMS B Item Item Unit of Estimated Item Price Total No. SS(1) Description Measure Quantity (in figures) (in figures) 14 84 Hi-Vis Crosswalk EA 2 15 84 Bike Lane Buffer LF 62 16 84 White Thermoplastic Pavement Markings (Bike Lane Symbol, STOP legend, etc.) SQFT 76 17 56 R10-23 Sign on Signal Mast Arm EA 2 18 56 W11-15 Sign on Signal Mast Arm EA 2 19 56 R10-23 Sign on Signal Pole EA 2 20 56 R10-11 Sign on Signal Pole EA 2 21 56 R7-9 Sign w/ Post EA 2 22 56 R10-6 Sign w/ Post EA 2 23 56 R1-1 Sign EA 2 24 56 Type 2 Object Marker (OM2- 1H) EA 4 25 56 W11-15 Sign w/ Post EA 2 26 56 W16-9P Sign EA 2 27 84 Red Curb LF 210 28 56, 75 Relocate Bus Stop Bench and Sign LS 1 ----- 29 56 Remove and Reinstall Existing Post EA 2 30 5, 78 Benchmark Replacement and Survey LS 1 ----- Bid Total $ Company Name: (1) refers to section in the Standard Specifications, with modifications in the Special Provisions, that describe required work. BID FORMS BID FORMS C LIST OF SUBCONTRACTORS Pursuant to Section 4100 of the Public Contracts Code and section 2-1.33C of the standard specifications, the Bidder is required to furnish the following information for each Subcontractor performing more than 1/2 percent (0.5%) of the total base bid. Do not list alternative subcontractors for the same work. Subcontracting must not total more than fifty percent (50%) of the submitted bid except as allowed in section 5-1.13 of the standard specifications. For Streets & Highways projects, subcontractors performing less than ten thousand dollars ($10,000) worth of work need not be mentioned. Subcontractors required to pay prevailing wage, must be registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 to be listed. NOTE: If there are no subcontractors, write “NONE” and submit with bid. Name Under Which Subcontractor is Licensed License Number DIR Public Works Registration Number Address and Phone Number of Office, Mill or Shop Specific Description of Subcontract % of Total Base Bid Attach additional sheets as needed. BID FORMS BID FORMS D PUBLIC CONTRACT CODE SECTION 10285.1 STATEMENT In compliance with Public Contract Code Section 10285.1 (Chapter 376, Stats. 1985), the bidder hereby declares under penalty of perjury under the laws of the State of California that the bidder, or any subcontractor to be engaged by the bidder, has ____, has not ____ been convicted within the preceding three years of any offenses referred to in that section, including any charge of fraud, bribery, collusion, conspiracy, or any other act in violation of any state or federal antitrust law in connection with the bidding upon, award of, or performance of, any public works contract, as defined in Public Contract Code Section 1101, with any public entity, as defined in Public Contract Code Section 1100, including the Regents of the University of California or the Trustees of the California State University. The term "bidder" is understood to include any partner, member, officer, director, responsible managing officer, or responsible managing employee thereof, as referred to in Section 10285.1. NOTE: The bidder must place a check mark after "has" or "has not" in one of the blank spaces provided. The above Statement is part of the Bid. Signing this Bid on the signature portion constitute signature of this Statement. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution. PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE In compliance with Public Contract Code Section 10162, the Bidder must complete, under penalty of perjury, the following questionnaire: Has the bidder, any officer of the bidder, or any employee of the bidder who has a proprietary interest in the bidder, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation? Yes No If the answer is yes, attach a letter explaining the circumstances PUBLIC CONTRACT CODE SECTION 10232 STATEMENT In compliance with Public Contract Code Section 10232, you hereby state under penalty of perjury, that no more than one final unappealable finding of contempt of court by a federal court has been issued against you within the immediately preceding two-year period because of your failure to comply with an order of a federal court which orders you to comply with an order of the National Labor Relations Board. LABOR CODE SECTION 1725.5 STATEMENTS The bidder has delinquent liability to an employee or the state for any assessment of back wages or related damages, interest, fines, or penalties pursuant to any final judgment, order, or determination by a court or any federal, state, or local administrative agency, including a confirmed arbitration award. Any judgment, order, or determination that is BID FORMS BID FORMS E under appeal is excluded, provided that the contractor has secured the payment of any amount eventually found due through a bond or other appropriate means. Yes No The bidder is currently debarred under Section 1777.1 or under any other federal or state law providing for the debarment of contractors from public works. Yes No NOTE: The above Statements and Questionnaire are part of the Bid. Signing this Bid on the signature portion constitute signature of this Statement and Questionnaire. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution. BID FORMS BID FORMS F NON-COLLUSION DECLARATION I, , declare that I am of , the party making the foregoing bid that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone refrained from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. Executed on , 20 , in __ I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. (Signature and Title of Declarant) (SEAL) Subscribed and sworn to before me this _______day of _________, 20_____ Notary Public Company Name:____________________ BID FORMS BID FORMS G BIDDER ACKNOWLEDGEMENTS By signing below, the bidder acknowledges and confirms that this bid is based on the information contained in all contract documents, including the notice to bidders, plans, specifications, special provisions, and addendum number(s) . (Note: You are responsible to verify the number of addenda prior to the bid opening.) The undersigned further agrees that in case of default in executing the required contract, with necessary bonds, within eight days, (not including Saturdays, Sundays, and legal holidays), after having received a mailed notice that the contract is ready for signature, the proceeds of the check or bond accompanying his bid will become the property of the City of San Luis Obispo. Licensed in accordance with an act providing for the registration of contractors, License No. , Expiration Date . The above statement is made under penalty of perjury, and any bid not containing this information "will be considered non-responsive and will be rejected” by the City. Signature of Bidder (Print Name and Title of Bidder) DIR– Public Works Registration No: Business Name (DBA): Owner/Legal Name: Indicate One: Sole-proprietor  Partnership Corporation List Partners/Corporate Officers: Name Title Name Title Name Title Business Address Street Address Mailing Address City, State, Zip Code Phone Number Fax Number Email Address Date BID FORMS BID FORMS H QUALIFICATIONS Failure to furnish complete reference information ON THIS FORM, as specified in this project’s Notice to Bidders and indicated below, is cause to reject the bid. Additional information may be attached but is not a substitute for this form. Reference Number 1 Customer Name & Contact Individual Telephone & Email Project Name (Site Address): Is this similar to the project being bid or did this project include signal equipment installation work? Yes □ No □ Describe the services provided and how this project is similar to that which is being bid: Date project completed: Was this contract for a public agency? Yes □ No □ Reference Number 2 Customer Name & Contact Individual Telephone & Email Project Name (Site Address): Is this similar to the project being bid or did this project include signal equipment installation work? Yes □ No □ Describe the services provided and how this project is similar to that which is being bid: Date project completed: Was this contract for a public agency? Yes □ No □ Reference Number 3 Customer Name & Contact Individual Telephone & Email Project Name (Site Address): Is this similar to the project being bid or did this project include signal equipment installation work? Yes □ No □ Describe the services provided and how this project is similar to that which is being bid: Date project completed: Was this contract for a public agency? Yes □ No □ BID FORMS BID FORMS I ATTACH BIDDER'S BOND TO ACCOMPANY BID Know all men by these presents: That we ____________________________________________, AS PRINCIPAL, and _______________________________________________________, AS SURETY, are held and firmly bound unto the City of San Luis Obispo in the sum of: ____________________________________________________ Dollars (_____________) to be paid to said City or its certain attorney, its successors and assigns; for which payment, well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors or assigns, jointly and severally, firmly by these presents: THE CONDITION OF THIS OBLIGATION IS SUCH, that if the certain bid of the above bounden ______________________________________________________________________ to construct ___________________________________________________________________ (insert name of street and limits to be improved or project) dated _____________________ is accepted by the City of San Luis Obispo, and if the above bounden _______________________________________________________, his heirs, executors, administrators, successors, and assigns shall duly enter into and execute a contract for such construction and shall execute and deliver the two bonds described within ten (10) days (not including Saturdays, Sundays, or legal holidays) after the above bounden, ______________________________________________________, has received notice by and from the said City of San Luis Obispo that said contract is ready for execution, then this obligation shall become null and void; otherwise, it shall be and remain in full force and virtue. IN WITNESS WHEREOF, we hereunto set our hands and seals this ___ day of ______, 20____. Bidder Principal: Signature Date Title: Surety: Bidder's signature is not required to be notarized. Surety's signature must be notarized. Equivalent form may be substituted (Rev. 6-30-14) SPECIAL PROVISIONS 1 SPECIAL PROVISIONS ORGANIZATION Special provisions are under headings that correspond with the main section heading of the Standard Specifications. Each special provision begins with a revision clause that describes or introduces a revision to the Standard Specifications. Any paragraph added or deleted by a revision clause does not change the paragraph number of the Standard Specifications for any other reference to a paragraph of the Standard Specifications. DIVISION I GENERAL PROVISIONS 1 GENERAL Add to Section 1-1.01 GENERAL: The work must be done in compliance with the City of San Luis Obispo, Department of Public Works: 1. Broad Street Pedestrian Hybrid Beacon Special Provisions 2. City of San Luis Obispo Standard Specifications and Engineering Standards – 2020 edition 3. State of California, Department of Transportation Standard Specifications and Standard Plans – 2015 edition In case of conflict between documents, governing ranking must comply with section 5- 1.02 of the City of San Luis Obispo’s Standard Specifications. Failure to comply with the provisions of these sections is a material breach of contract: 1. Sections 5 through 8 of the Standard Specifications 2. Section 12 through 15 of the Standard Specifications 3. Section 77-1 of the Standard Specifications 4. Section 81 of the Standard Specifications 5. authorized working hours 6. OSHA compliance 2 BIDDING Replace Section 2-1.33A BID DOCUMENT COMPLETION AND SUBMITTAL, General with: Furnish bid using blank forms provided in the Special Provisions. Bid must include all forms and must be signed by the bidder. 4 SCOPE OF WORK Add to Section 4-1.03 WORK DESCRIPTION: Comply with the provisions of Sections 12, 15, 51, 56, 73, 84, 90 for general, material, construction, and payment specifics. SPECIAL PROVISIONS SPECIAL PROVISIONS 2 Add Section 4-1.03A WORK DESCRIPTION, Project Specific Signage: Maintain Revenue Enhancement Funding signage in work area. Return Revenue Enhancement Funding signs at the end of the project or upon the Engineer’s request. 6 CONTROL OF MATERIALS Add to Section 6-2.03 DEPARTMENT ACCEPTANCE: The Engineer will furnish Sales Tax signs mounted to moveable barricades. Maintain Sales Tax signage in work area. Return Sales Tax signs at the end of the project or upon the Engineer’s request. 7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC Replace last paragraph in Section 7-1.02K(3) LAWS, Labor Code – Certified Payroll Records (labor code 1776) with: Furnish the Engineer one Portable Document Format (PDF) file which contains all certified payroll records for the prior month’s work. Redact the PDF file making the employee’s social security number illegible. Failure to submit PDF file with other monthly payroll records is considered an incomplete payroll submission and penalties will be assessed. Add to Section 7-1.03B PUBLIC CONVENIENCE, Traffic Control Plan Work hours on Broad Street are restricted to Monday through Friday between 7:00 A.M. and 4:00 P.M. No lane reduction is permitted between 7:00 A.M. and 9:00 A.M Monday through Friday unless otherwise approved by the Engineer. Additionally, two (2) changeable message signs (CMS) must be installed and operational 1 week prior to the start of construction and be maintained throughout the duration of the project. Changeable message signs shall be programmed for two flashes with the messages to be approved by the Engineer. Pedestrian Hybrid Beacon system turn-on and testing must be conducted on a Tuesday, Wednesday or Thursday between 9:00 a.m. and 2:00 p.m., outside of peak school and commute traffic periods. If system is malfunctioning or not yet functioning under intended operations by 2:00 p.m., contractor must bag beacon indicators and resume installation or testing the following day within the established work hours. Provide traffic control plan and traffic control application at or before the preconstruction meeting. Traffic control plan must be drawn to scale. Traffic control application may be obtained on the City’s website: www.slocity.org/government/department-directory/public-works/documents- online/construction-documents Upon approval of the traffic control plan, the City will issue a no-fee Encroachment Permit. Permittee is responsible to comply with all conditions of the traffic control plan. Complete work using due diligence to restore free flowing of traffic. SPECIAL PROVISIONS SPECIAL PROVISIONS 3 8 PROSECUTION AND PROGRESS Replace the 1st paragraph in Section 8-1.02A SCHEDULE, General with: Provide a Level 1 schedule for this work. Add to Section 8-1.01A GENERAL, Order of Work: Below is the method for installation of signal equipment unless approved by the Engineer. Upon delivery of signal equipment, the contractor must proceed with the installation of signal equipment. Start of work to be scheduled based on equipment delivery dates. 1. Contractor will furnish and install all signal equipment needed for intended operation of Pedestrian Hybrid Beacon system. 2. Contractor must arrange to have the traffic controller manufacturer’s (McCain) representative present at the time of traffic controller installation and system turn- on. 3. Install AXIS CCTV camera and Encom 5.8 GHz radio antenna to establish wireless video service and wireless signal interconnect per Construction Plans. Contractor must obtain an IP Address from the City and program said radio antenna. Contractor must verify communications between traffic signal controller and QuicNet system. Contact vendors for necessary support and test connections to each radio antenna. Coil excess cable with a maximum of 10’ in the bottom of the controller cabinet. 4. Install Battery Backup Systems (BBS) at the service pedestal UPS system. Contractor must confirm with City that all batteries are charged and connected to Battery Backup System. 5. Contractor must install Polara Navigator type pedestrian push buttons (PPB) on the mast arm signal poles as shown on the Construction Plans and specified in these Special Provisions. Contractor must fill out order forms and audible message forms and submit to City as a submittal with all other signal equipment. Contractor will allow two (2) working days for audible message order forms to be processed/verified by the City. New pedestrian push buttons must be covered until signal is operational. 6. Contractor must install all remaining signal equipment shown on plans as needed for intended operation. 7. Contractor shall not stripe crosswalks until the Pedestrian Hybrid Beacon system is operational. SPECIAL PROVISIONS SPECIAL PROVISIONS 4 DIVISION III GRADING Replace Section 19-1.03B with: Notify the Engineer prior to removal of unsuitable material. Excavate unsuitable material. Ensure that unsuitable material is separated from other suitable construction materials or removed from the work area. Removal of unsuitable material including rock, within contract work area and limits and for which there is no separate pay item, is paid for in other items on the Bid Item List. Removal of unsuitable material outside contract work area and limits, as directed by the Engineer, will be paid by force account. Add to Section 19-2.03A General: Subgrade excavations over existing buried transcontinental and international fiber optic facilities must be undertaken with extra caution. No mechanized excavation within 2 feet from centerline of buried transcontinental and international fiber optic facilities is allowed. All excavation within two feet of buried transcontinental and international fiber optic facilities must use hand tools only unless otherwise allowed by the Engineer and utility owner. Sprint needs to be present for any activity near the fiber. The fiber can be electronically located horizontally but the vertical alignment can only be determined by potholing. No facilities should be added closer than two feet vertically or horizontally to Sprint’s structures, including the encasement. No surcharge loading such as falsework, temporary material storage, etc. may be placed above Sprint’s facilities without Sprint engineering approval. Add to Section 19-5.03A General: Compaction of subgrade within 2 feet from centerline of existing buried transcontinental and international fiber optic facilities must use vibratory plate compaction equipment unless otherwise allowed by the Engineer or utility owner. DIVISION VIII MISCELLANEOUS CONSTRUCTION 73 CONCRETE CURBS AND SIDEWALKS Add to Section 73-1.03 CONSTRUCTION: You must meet with the Engineer for an average of 1.5 hours total per ramp to complete the following coordination tasks: 1. Before saw-cutting to agree on the limits of demolition and removal. 2. After formwork is set, to verify that grades meet those stated on the Plans. 3. Upon completion of new curb ramp installation to verify finished grades. SPECIAL PROVISIONS SPECIAL PROVISIONS 5 Only two curb ramps will be allowed to be constructed at the same time unless approved by the Engineer. Curb ramps have been designed to comply with the current Caltrans Standard Plan detail RSP A88A and City Std. 4440. Field modifications to the design plans, if approved by the Engineer, must meet the dimensional and slopes requirements of Standard Plan RSP A88A. When measuring the ADA facility’s dimension and slopes, consider the required dimension or slope to have been met if the recorded individual measurements comply with the following:  Dimensional measurement does not exceed ½-inch from the dimension shown, i.e. ½-inch less than a minimum dimension, or ½-inch greater than a maximum dimension  Slope measurement does not exceed 0.2 percent from the slope shown You must give the City a 24-hour notice for inspection of formwork before pouring the concrete. You must calibrate all levels used in construction at the beginning of each work day. You must ensure that new ramp flowlines do not create any "ponding" areas. ADD TO SECTION 73-1.04 PAYMENT As shown on the bid item list, each new curb ramp will be paid in lump sum for all work shown on the plans for the individual corner, with the exception of the raised concrete median island with planter boxes and benchmark reset at the northwest corner, which are bid as separate pay items. The lump sum price paid for each curb ramp includes all of the work involved in installing the new curb ramps. The lump sum price includes all work shown on the Plans, as specified in the Standard Specifications and these Special Provisions. It also includes work for: 1. public notices 2. layout 3. elevation control 4. clearing and grubbing as needed 5. tree protection, if applicable 6. protection of existing utilities and improvements 7. saw-cutting 8. demolition 9. removal and disposal of demolished material 10. formwork 11. asphalt concrete paving, including final HMA and temporary cold mix 12. installation of curbs, curb & gutter, cross gutters, spandrels, sidewalk and ramps, detectable warning surface 13. red curb paint 14. cleanup SPECIAL PROVISIONS SPECIAL PROVISIONS 6 Sidewalk panels replaced at the northwest and southeast corners are paid for by the Sidewalk Panel Replacement bid item. 77 LOCAL INFRASTRUCTURE Add to Section 77-1.01 Protection and restoration of survey monuments and bench marks must comply with Section 5-1.26 and 5-1.36. DIVISION IX TRAFFIC CONTROL DEVICES 84 MARKINGS Add to Section 84-1.04 Payment Bike lane buffer is measured along the linear foot and accounts for all striping and cross hatching, regardless of width of buffer. Green bike lane coating is measured by the square foot for the area applied. Add to Section 84-6 84-6.01 Bike Lane Coating: A durable epoxy modified, acrylic, water bourne coating specifically designed for application on asphalt pavements, such as COLOR-SAFE® MMA, or approved equal* shall be installed by manufacture certified installer per manufacture’s specifications as shown on the plans. Bike lane coating shall conform to the following Federal Highway Administration (FHWA) requirements for green painted bike lanes. A. The daytime chromaticity coordinates for the color used for green colored pavement shall be as follows: 1 2 3 4 X Y X Y X Y X Y .230 .754 .266 .500 .367 .500 .444 .555 The daytime luminance factor (y) shall be at least 7, but no more than 35. B. The nighttime chromaticity coordinates for the color used for green colored pavement shall be as follows: 1 2 3 4 X Y X Y X Y X Y .230 .754 .336 .540 .450 .500 .479 .520 SPECIAL PROVISIONS SPECIAL PROVISIONS 7 Prior to installation the contractor shall submit a color sample and manufacturer specifications indicating compliance with the FHWA requirements as indicated above. *Green Paint previously approved for City administered projects include: Ride-A-Way acrylic coating and Color-Safe methyl methacrylate. City shall receive submittals of green paint and approve prior to application. 84-6.01 Payment must comply with section 84-1.04. DIVISION X ELECTRICAL WORK Add to Section 86-2.16A PAINTING, General: All traffic signal equipment, including Pedestrian Hybrid Beacons, must comply with Section 86-2.16B and be powder coated Dark Forest Green. DIVISION XI MATERIALS 90 CONCRETE Add to Section 90-1.01C(6) Mix Design: Concrete must contain a maximum of 15% pozolone or fly ash. Course aggregate for concrete must comply with the gradation specifications for the 1 inch x No. 4 primary aggregate nominal size. DIVISION XIII APPENDICES Add 100-1.01 Refer to Appendix A: Form of Agreement Refer to Appendix B: PG&E Construction Drawing APPENDIX APPENDIX A-1 APPENDIX A - FORM OF AGREEMENT THIS AGREEMENT, made on _____________, by and between the City of San Luis Obispo, a municipal corporation and charter city, San Luis Obispo County, California (hereinafter called the Owner) and COMPANY NAME (hereinafter called the Contractor). WITNESSETH: That the Owner and the Contractor for the consideration stated herein agree as follows: ARTICLE 1, SCOPE OF WORK: The Contractor shall perform everything required to be performed, shall provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility and transportation services required to complete all the work of construction of BROAD STREET/WOODBRIDGE PEDESTRIAN HYBRID BEACON, SPEC NO. 91609 in strict compliance with the plans and specifications therefor, including any and all Addenda, adopted by the Owner, in strict compliance with the Contract Documents hereinafter enumerated. It is agreed that said labor, materials, tools, equipment, and services shall be furnished and said work performed and completed under the direction and supervision and subject to the approval of the Owner or its authorized representatives. ARTICLE II, CONTRACT PRICE: The Owner shall pay the Contractor as full consideration for the faithful performance of this Contract, subject to any additions or deductions as provided in the Contract Documents, the contract prices as follows: Item No. Item Unit of Measure Estimated Quantity Item Price (in figures) Total (in figures) 1. 2. 3. BID TOTAL: $ .00 Payments are to be made to the Contractor in compliance with and subject to the provisions embodied in the documents made a part of this Contract. Should any dispute arise respecting the true value of any work omitted, or of any extra work which the Contractor may be required to do, or respecting the size of any payment to the Contractor, during the performance of this Contract, said dispute shall be decided by the Owner and its decision shall be final, and conclusive. APPENDIX APPENDIX A-2 ARTICLE III, COMPONENT PARTS OF THIS CONTRACT: The Contract consists of the following documents, all of which are as fully a part thereof as if herein set out in full, and if not attached, as if hereto attached: 1. Notice to Bidders and Information for Bidders 2. Standard Specifications and Engineering Standards 3. Special Provisions, any Addenda, Plans and Contract Change Orders 4. Caltrans Standard Specifications and Standard Plans 2015 5. Accepted Bid and Bid Bond 6. List of Subcontractors 7. Public Contract Code Sections 10285.1 Statement 8. Public Contract Code Section 10162 Questionnaire 9. Public Contract Code Section 10232 Statement 10. Labor Code Section 1725.5 Statements 11. Bidder Acknowledgements 12. Qualifications 13. Non-collusion Declaration 14. Agreement and Bonds 15. Insurance Requirements and Forms ARTICLE IV INDEMNIFICATION: The Contractor shall indemnify, defend with legal counsel approved by City, and hold harmless City, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with the Contractor’s negligence, recklessness or willful misconduct in the performance of work hereunder or its failure to comply with any of its obligations contained in this Agreement, except such loss or damage which is caused by the sole or active negligence or willful misconduct of the City. Should conflict of interest principles preclude a single legal counsel from representing both the City and the Contractor, or should the City otherwise find the Contractor’s legal counsel unacceptable, then the Contractor shall reimburse the City its costs of defense, including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation. The Contractor shall promptly pay any final judgment rendered against the City (and its officers, officials, employees and volunteers) with respect to claims determined by a trier of fact to have been the result of the Contractor’s negligent, reckless or wrongful performance. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement. The Contractor obligations under this section apply regardless of whether such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of the City under any provision of this agreement, the Contractor shall not be required to indemnify and hold harmless the City for liability attributable to the active negligence of City, provided such active negligence is determined APPENDIX APPENDIX A-3 by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where the City is shown to have been actively negligent and where the City’s active negligence accounts for only a percentage of the liability involved, the obligation of the Contractor will be for that entire portion or percentage of liability not attributable to the active negligence of the City. ARTICLE V. It is further expressly agreed by and between the parties hereto that should there be any conflict between the terms of this instrument and the bid of said Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said bid conflicting herewith. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands this year and date first above written. CITY OF SAN LUIS OBISPO A Municipal Corporation __________________________________ Derek Johnson, City Manager APPROVED AS TO FORM CONTRACTOR: Name of Company ________________________________ By:________________________________ J. Christine Dietrick City Attorney Name of CAO/President Its: CAO/PRESIDENT (2nd signature required if Corporation): By:________________________________ Name of Corporate Officer Its: ____________________ APPENDIX APPENDIX A-4 APPENDIX B – PG&E CONSTRUCTION DRAWING This page intentionally left blank SVLEGENDNEW1/0AXLPIN2"APPLICANTINSTALLEDDUCTNOTES:APPLICANTTOTRENCHANDINSTALLSUBSTRUCTURES.CONTACTPG&EINSPECTOR@546-5247FORTRENCHINSPECTION.INSTALLPANEL,DUCTANDTRENCHPERPG&ELATESTGREENBOOKSTANDARDS.REFERENCEINTERNETADDRESS:WWW.PGE.COM25ANNUALPERMITREQUIRED.SVSVSV100AMPMAIN120/240V1Ø10,000MAXSCI1-COMMERCIALMETERVD=2.5PG&ERISERQUADRANTPLACEPANELJUSTBEHINDSIDEWALK.107'/85'EnvironmentalReportLatitude:35.267429(36°16'2"N)Longitude:-120.654987(120°20'42"W)Elevation:208.0feetCity:SanLuisObispoDistrict:SANLUISOBISPODivision:LOSPADRESCountry:SanLuisObispoCorrosionArea:moderateInsideRaptorConcentrationZone(RCZ)?:YesFireAreaDesignation:LocalResponsibilityAreaPGEWildlandFireManagementArea:NoDesignationHistoricalPeakWind:60-70mph(3sec-gust)SummerTemperatureDistrict:CoastalSnowLoadingArea:LightClimateZoneCode:TFireIndexArea:NorecordsFireIndexControlCenters:NorecordsHighFireThreatDistrict:Tier1SurgeProtectionDistricts:District3PrimaryVoltageArea:2InsulationAreas:A1 /0 T P X512078065363120/240V1Ø25KVA19KVA(S)LOAD