Loading...
HomeMy WebLinkAbout02-24-2022 ATC Agenda PacketCity of San Luis Obispo, Agenda, Planning Commission Agenda ACTIVE TRANSPORTATION COMMITTEE Thursday, February 24, 2022 6:00 p.m. SPECIAL MEETING Teleconference Pursuant to Executive Orders N-60-20 and N-08-21 executed by the Governor of California, and subsequently Assembly Bill 361, enacted in response to the state of emergency relating to novel coronavirus disease 2019 (COVID-19) and enabling teleconferencing accommodations by suspending or waiving specified provisions in the Ralph M. Brown Act (Government Code § 54950 et seq.), Active Transportation Committee (ATC) members and members of the public may participate in this meeting by teleconference. Using the most rapid means of communication available at this time, members of the public are encouraged to participate in ATC meetings in the following ways: 1. Remote Viewing - Members of the public who wish to watch the meeting can: • View the Webinar (recommended for the best viewing quality): ➢ URL: ➢ https://slocity-org.zoom.us/j/82717664638?pwd=eGs2V1RIR0JielFFMHpDZG94cUxRUT09 ➢ Telephone Attendee: +1 (669) 900 -6833 ➢ Webinar ID: 827 1766 4638; Passcode: 884685 Note: The City utilizes Zoom Webinar for remote meetings. All attendees will enter the meeting muted. Prior to joining the meeting, consider reviewing the following tutorials: Joining a Zoom Meeting, Zoom Audio & Video Basics, Basic In-Meeting Navigation. 2. Public Comment - The ATC will still be accepting public comment for items within their purview. Public comment can be submitted in the following ways: • Mail or Email Public Comment ➢ Received by 3:00 PM on the day of meeting - Can be submitted via email to advisorybodies@slocity.org or U.S. Mail to City Clerk at: 990 Palm St. San Luis Obispo, CA 93401. ➢ Emails sent after 3:00 PM – Can be submitted via email to advisorybodies@slocity.org and will be archived/distributed to members of the Advisory Body the day after the meeting. Emails will not be read aloud during the meeting. • Verbal Public Comment a. Received by 3:00 PM on the day of the meeting - Call (805) 781-7164; state and spell your name, the agenda item number you are calling about and leave your comment. The verbal comments must be limited to 3 minutes. All voicemails will be forwarded to Active Transportation Committee Agenda February 24, 2022 Page 2 Advisory Body Members and saved as Agenda Correspondence. Voicemails will not be played during the meeting. o During the meeting – Join the webinar (instructions above). Once public comment for the item you would like to speak on is called, please raise your virtual hand, your name will be called, and your microphone will be unmuted. If you have questions, contact the office of the City Clerk at cityclerk@slocity.org or (805) 781-7100. All comments submitted will be placed into the administrative record of the meeting. MISSION: The purpose of the Active Transportation Committee (ATC) is to provide oversight and policy direction on matters related to bicycle and pedestrian transportation in San Luis Obispo and its relationship to bicycling and walking outside the City. CALL TO ORDER: Chair Russell Mills ROLL CALL : Committee Members Donette Dunaway, Timothy Jouet, Briana Martenies (vice-chair), Russell Mills (chair), Jonathan Roberts, Nathan Stong PUBLIC COMMENT: At this time, people may address the Committee about items not on the agenda. Persons wishing to speak should come forward and state their name and address. Comments are limited to three minutes per person. Items raised at this time are generally referred to staff and, if action by the Committee is necessary, may be scheduled for a future meeting. ACTION ITEMS 1. 2022 PAVING PLAN (RICE/FUKUSHIMA – 110 MINUTES) See staff report in the agenda packet. ADJOURNMENT The next Regular Meeting of the Active Transportation Commi ttee is scheduled for Thursday , March 17 , 20 22, at 6:00 p.m., by teleconference. Active Transportation Committee Agenda February 24, 2022 Page 3 The City of San Luis Obispo wishes to make all of its public meetings accessible to the public. Upon request, this agenda will be made available in appropriate alternative formats to persons with disabilities. Any person with a disability who requires a modification or accommodation in order to participate in a meeting should direct such request to the City Clerk’s Office at (805) 781-7100 at least 48 hours before the meeting, if possible. Telecommunications Device for the Deaf (805) 781-7107. Agenda related writings and documents are available online or for public inspection at the Public Works Department, 919 Palm Street, SLO. Meeting audio recordings can be found at the following web address: https://opengov.slocity.org/WebLink/Browse.aspx?id=60965&dbid=0&repo=CityClerk City of San Luis Obispo, Agenda, Planning Commission Active Transportation Committee AGENDA REPORT ITEM 1 DATE: February 24, 2022 FROM: Adam Fukushima, Active Transportation Manager PREPARED BY: Jennifer Rice, Transportation Planner / Engineer Adam Fukushima, Active Transportation Manager SUBJECT: 2022 PAVING PLAN Recommendation: 1.Review the 90% draft plans for the 2022 Paving Plan and provide input to staff, with particular focus on the active transportation elements. Background As part of the City’s Pavement Management Program, specific streets are scheduled for maintenance work each summer, typically alternating each year between local neighborhood streets and arterial and collector streets. These projects provide excellent opportunities to incorporate planned safety and complete street improvements as part of these larger maintenance activities as well as provide significant cost savings so that more desired improvements can be built. During summer 2022, the following areas are planned for resealing: •Pavement Area 6 (Laguna Lake Neighborhood) •Pavement Area 7 (North City Neighborhoods) •Pavement Area 9 (Downtown Core) At the September 16, 2021 the Active Transportation Committee (ATC) reviewed the project scope and proposed design elements for the 2022 Paving Plan (See Attachment A for the September 16, 2021 ATC staff report). The ATC recommended the following actions for staff consideration as it finalized the design: 1.To consider looking for ways to help Lincoln Street neighborhood traffic calming without causing an unfair precedent with the Neighborhood Transportation Management program. 2.To recommend that staff consider comments made by the committee members including 1)Consider a traffic circle at Galleon / Oceanaire 2)Consider improved connections between Oceanaire and the Laguna Middle School Shared Use Path 3)Consider ways to include a protected bike lane on Monterey Street Agenda Item 1, Page 1 of 7 Active Transportation Committee Agenda Item 1, February 24, 2022 Page 2 The purpose of this item is for staff to provide an update on the project since it first came to the ATC in September and for the ATC to review and comment on the 90% level plan set before it is taken to the City Council for authorization to advertise for construction bids. Project Goals and Objectives The following primary goals and objectives will guide the project designs, along with input from the community and adjacent businesses. Overarching Project Goal: Reseal local roadways within Pavement Areas 6, 7 and 9 to revitalize neighborhoods and quality of life for residents. The project includes improvements along Higuera and Marsh Streets through the downtown while increasing accessibility and safety for all roadway users. Specific Design Objectives: 1. Resealing to extend the life of existing pavement surface 2. Improve ADA access and parking availability for persons with disabilities 3. Improve safety and access for walking and bicycling, incorporating neighborhood greenways, safe routes to school and the downtown core 4. Minimize impacts to on-street parking 5. Minimize inconveniences to residents and businesses during construction Proposed Complete Street Design Elements Complete street elements and active transportation improvements have been identified and refined throughout the design (See attachment A for a selection of the design plans). Many of the proposed modifications were envisioned in various adopted City plans including the Active Transportation Plan, the Bishop Peak and Pacheco Elementary Schools Safe Routes to School Plan and the City’s Downtown Concept Plan. Additionally, several more modifications have been proposed as a result of community and neighborhood engagement, including previous input received from the Active Transportation Committee. The following changes have been updated since the September 16th ATC meeting: Agenda Item 1, Page 2 of 7 Active Transportation Committee Agenda Item 1, February 24, 2022 Page 3 Pavement Area 6 (Laguna Lake Neighborhood) Changes include: • Speed humps on Oceanaire Dr will be extended from LOVR to Madonna Road Note that staff evaluated potential for a traffic circle at Oceanaire/Galleon per ATC request, but this was ultimately deemed not to be feasible due to challenges with driveway access on north leg of intersection and several utility conflicts directly where circle island would need to be placed. Ultimately, recommendation for all-way stop is retained. Agenda Item 1, Page 3 of 7 Active Transportation Committee Agenda Item 1, February 24, 2022 Page 4 Pavement Area 7 (North Downtown Neighborhoods) Changes include: • Speed humps on Meinecke between Broad and Chorro Streets • Speed humps on West and Lincoln Streets east of Chorro Agenda Item 1, Page 4 of 7 Active Transportation Committee Agenda Item 1, February 24, 2022 Page 5 Pavement Area 9 (Downtown Core) Changes include: • Monterey Street paving was removed from the project scope due to budget constraints. Monterey Street was originally scheduled for paving in 2023. Staff was hoping to advance this as part of 2022 Paving Project; however, once all 2022 project costs were accounted for including paving, many new ADA curb ramps (38 total), and additional traffic calming, it became clear that there would be insufficient funding to advance the upper Monterey Street paving. The Monterey Street paving will now occur in 2023, as originally planned. Staff will revisit plans for Monterey Street with the ATC as part of the community outreach efforts for the 2023 Paving Project, which will start in fall of 2022. Previous ATC Recommendations and Staff Response ATC Recommendation: To consider looking for ways to help Lincoln Street neighborhood traffic calming without causing an unfair precedent with the Neighborhood Transportation Management program. Staff Response: In addition to initial ATC input, during the community outreach meetings, several segments within these paving areas shared concerns with ongoing speeding issues and cut-through traffic on their streets (Oceanaire corridor, Meineke between Chorro and Broad, and Lincoln between West and Chorro). Staff verified that existing vehicle speeds warrant traffic calming consideration and residents and property owners along the route participated in a survey, which Note: Approximately 6 on-street parking stalls are planned for removal within the downtown core in order to provide adequate sight distance at certain driveways and intersections. Agenda Item 1, Page 5 of 7 Active Transportation Committee Agenda Item 1, February 24, 2022 Page 6 also demonstrated a clear majority in support of speed humps. Based on this, these segments are planned for speed humps in the 2022 Paving Plan. It should also be noted that residents along both Meinecke and Lincoln Streets have in the past applied for participation in the City’s Neighborhood Traffic Management Program and are currently in the queue behind several other neighborhoods. Implementing traffic calming as part of the 2022 Roadway Sealing Project provides a great opportunity to address neighborhood traffic concerns at these locations now as part of a larger project, while allowing staff to focus current attention and resources on other neighborhoods in the Neighborhood Traffic Management queue with ongoing issues and concerns. ATC Recommendation: To recommend that staff consider comments made by the committee members including 1. Consider a traffic circle at Galleon / Oceanaire Staff Response: Staff investigated the feasibility of installing a traffic circle at Galleon and Oceanaire in lieu of the planned all way stop. The intersection presents challenges with utility conflicts as there are many utility covers directly in the center. Additionally, the location of a driveway on the north side presents geometric challenges making this location not a feasible candidate for a traffic circle. 2. Consider improved connections between Oceanaire and the Laguna Middle School Shared Use Path Staff Response: Oceanaire between Los Osos Valley Road (shared use path entry) and Galleon is planned to be a shared street neighborhood greenway which will include speed humps, greenway pavement legends and share the road signage. It should be noted, a fully separated bicycle facility on Oceanaire between Los Osos Valley Road and Galleon would require removal of on-street parking. As this would require a considerable amount time to build neighborhood consensus which would not be feasible within the scheduling constraints of the paving project, staff is not proposing this at this time. 3. Consider ways to include a protected bike lane on Monterey Street Staff Response: Monterey Street paving will no longer be included in the 2022 Paving Project. However, in order to install protected bike lanes on Monterey, on- street parking would require removal. Until further parking options are available within the downtown, including the Nipomo parking garage, removal of large segments of on-street parking may not be feasible and would require support from the community and ultimately City Council approval. Agenda Item 1, Page 6 of 7 Active Transportation Committee Agenda Item 1, February 24, 2022 Page 7 Project Costs and Funding This project is currently estimated at $2.9 million including $200,000 for implementation of ATP elements. The majority of these costs are funded through the Street Reconstruction and Resurfacing Capital Improvement Project. Next Steps Following review and input from the ATC, staff will refine final project designs. The project is scheduled to go to the City Council on March 15, 2022 to approve final plans and request authorization to advertise for construction. Construction of the project is planned to begin in Summer 2022. Recommendation: 1.Review the 90% draft plans for the 2022 Paving Plan and provide input to staff, with particular focus on the active transportation elements. ATTACHMENT A: September 16, 2021 ATC Staff Report ATTACHMENT B: 2022 Paving 90% Draft Plans Agenda Item 1, Page 7 of 7 City of San Luis Obispo, Agenda, Planning Commission Active Transportation Committee AGENDA REPORT ITEM 3 DATE: September 16, 2021 FROM: Adam Fukushima, Active Transportation Manager PREPARED BY: Jennifer Rice, Transportation Planner / Engineer Adam Fukushima, Active Transportation Manager SUBJECT: 2022 PAVING PLAN Recommendation: 1.Review the 2022 Paving Plan and current design proposals and provide input to staff, with particular focus on the active transportation elements. As part of the City’s Pavement Management Program, specific streets are scheduled for maintenance work each summer, typically alternating each year between local neighborhood streets and arterial and collector streets. These projects provide excellent opportunities to incorporate planned safety and complete street improvements as part of these larger maintenance activities as well as provide significant cost savings so that more desired improvements can be built. During summer 2022, the following areas are planned for resealing: Pavement Area 6 (Laguna Lake Neighborhood) Attachment A, Page 1 of 8 Active Transportation Committee Agenda Item 3, September 16, 2021 Page 2 Pavement Area 7 (North City Neighborhoods) Pavement Area 9 (Downtown Core) Project Goals and Objectives The following primary goals and objectives will guide the project designs, along with input from the community and adjacent businesses. Overarching Project Goal: Attachment A, Page 2 of 8 Active Transportation Committee Agenda Item 3, September 16, 2021 Page 3 Reseal local roadways within Pavement Areas 6, 7 and 9 to revitalize neighborhoods and quality of life for residents. The project includes improvements along Higuera and Marsh Streets through the downtown while increasing accessibility and safety for all roadway users. Specific Design Objectives: 1. Resealing to extend the life of existing pavement surface 2. Improve ADA access and parking availability for persons with disabilities 3. Improve safety and access for walking and bicycling, incorporating neighborhood greenways, safe routes to school and the downtown core 4. Minimize impacts to on-street parking 5. Minimize inconveniences to residents and businesses during construction Proposed Complete Street Design Elements As preliminary designs are developed for the 2022 Paving Plan, staff has identified opportunities to implement several street modifications envisioned for these pavement areas in various adopted City plans including the Active Transportation Plan, the Bishop Peak and Pacheco Safe Routes to School Plan and the City’s Downtown Concept Plan. Final designs will be refined based on community input; however, specific elements proposed by staff as part of the preliminary designs include: Pavement Area 6 (Laguna Lake Neighborhood) • Curb Ramps – Upgrade curb ramps to current ADA standards at several locations (prioritized along Neighborhood Greenways and Safe Routes to School). • Pedestrian Crossing Treatments – Installation of high-visibility “ladder- style” marked crosswalks, prioritized on Safe Routes to School. • Oceanaire Neighborhood Greenway – Installation of speed humps along greenway route to reduce vehicle speeds and ensure a comfortable environment for those walking and biking. Figure 1 below identifies specific improvements for Pavement Area 6 proposed based on preliminary plans. Attachment A, Page 3 of 8 Active Transportation Committee Agenda Item 3, September 16, 2021 Page 4 Figure 1: Preliminary Complete Street Elements Considered for Pavement Area 6 Pavement Area 7 (North Downtown Neighborhoods) • Curb Ramps – Upgrade curb ramps to current ADA standards at several locations (prioritized along Neighborhood Greenways and Safe Routes to School). • Pedestrian Crossing Treatments – Installation of high-visibility “ladder- style” marked crosswalks, prioritized on Safe Routes to School. • Cerro Romauldo Neighborhood Greenway – Installation of speed humps along greenway route to reduce vehicle speeds and ensure a comfortable environment for those walking and biking. Planned traffic circle at the intersection of Patricia and Craig Streets. • La Entrada/Ramona Safe Routes to School – Installation of speed humps along identified Safe Route to School to reduce vehicle speeds along corridor. Planned traffic circle at the intersection of La Entrada and Ramona Streets. Figure 2 below identifies specific improvements for Pavement Area 7 proposed based on preliminary plans. Attachment A, Page 4 of 8 Active Transportation Committee Agenda Item 3, September 16, 2021 Page 5 Figure 2: Preliminary Complete Street Elements Considered for Pavement Area 7 Pavement Area 9 (Downtown Core) • Auto lane reductions – Repurpose auto lanes on Marsh and Higuera Street in the downtown core from three to two (as identified in the Downtown Concept Plan and as currently exists with the pilot “Open SLO” striping project on Higuera Street). This is consistent with the 2021 Downtown Paving Project currently in construction repurposing auto lanes on Marsh and Higuera outside of the downtown core. • Accessible On-Street Parking – Provide additional ADA on-street parking at multiple locations. • Pedestrian Crossing Treatments – Installation of high-visibility “ladder- style” marked crosswalks, and additional signalized crossing of Santa Rosa / Marsh intersection • Protected Bike Lanes – Provide protected bike lanes along Marsh Street between Nipomo and Santa Rosa, consistent with the 2021 Downtown Paving Project. Planned physical bikeway separation includes installation of concrete medians and landscaped planter boxes. Attachment A, Page 5 of 8 Active Transportation Committee Agenda Item 3, September 16, 2021 Page 6 • Buffered Bike Lanes – Provide striped bike lane buffers (without physical barriers between vehicle lanes and bike lanes) on Higuera Street between Santa Rosa and Nipomo with continuous green pavement. Protected bike lanes along these segments are infeasible without significant parking removal, removal of parklets, conflicts with bus stops, downtown delivery staging, Farmer’s Market operations and clear width requirements for fire access. The buffered bike lanes on Higuera will also accommodate permanent installation of parklets and provide more of a buffer zone between the parklets and vehicular lanes. Figure 3 below identifies specific improvements for Pavement Area 9 proposed based on preliminary plans. Higuera (Santa Rosa to Nipomo) Marsh (Santa Rosa to Nipomo) Attachment A, Page 6 of 8 Active Transportation Committee Agenda Item 3, September 16, 2021 Page 7 Figure 3: Preliminary Complete Street Elements Considered for Pavement Area 9 • Monterey Street Shared Lane Markings — Originally planned for 2023, the Monterey Street repaving (Santa Rosa – California) will be included as part of this project due to deteriorating pavement quality. While the Active Transportation Plan concept is for this segment to add a protected bike lane, due to insufficient funding this will have to remain a long-term goal and in the interim construct green backed shared lane markings since the Active Transportation Plan categorizes this project as part of the Tier 2 network and therefore will be constructed as opportunities arise based on funding. • Other Monterey Street Active Transportation Enhancements — The paving plan effort will be an opportunity to explore other proposed projects from the Active Transportation Plan including curb ramps, sidewalk upgrades, new bike/pedestrian crossing improvements at Monterey/Toro and Monterey/Pepper as well as improvements to the Monterey/Santa Rosa intersection including bike boxes and green bike lane extensions. Project Costs and Funding This project currently has a budget of approximately $3.5 million including $200,000 for implementation of ATP elements. The majority of these costs are funded through the Street Reconstruction and Resurfacing Capital Improvement Project. Next Steps Following review and input from the ATC, staff will refine project designs. A virtual community meeting will be hosted October 7, 2021 for further input from the community. Staff plans to return to the Active Transportation Committee in the Winter 2022 for additional review once the engineering plans and specifications are further developed. The project is schedule to go to the Attachment A, Page 7 of 8 Active Transportation Committee Agenda Item 3, September 16, 2021 Page 8 City Council in the Spring 2022 for authorization to advertise. Construction of the project is planned to begin in Summer 2022. Recommendations: 1. Review the 2022 Paving Plan and current design proposals and provide input to staff, with particular focus on the active transportation elements. Attachment A, Page 8 of 8 APPROVED BYSPECIFICATION NO.DATEofSHEETindex to planssheet descriptionsan luis obispo county, californiaBrian A. Nelson, Acting City Engineer R.C.E. C79870 Approved DateYMONTH YEAR1000560ROADWAY SEALING 2022T1T1 COVER PAGES1-5 OCEANAIRE DRS6 ATASCADERO AVES7-8 GALLEON WAYS8-10 ROYAL WAYS11-12 MADONNA RDS13-15 PREFUMO CYN RDS16 DESCANSO STS17 DIABLO DRS18 DALY AVES19-20 HIGHLAND DRS20-21 PATRICIA DRS22-27 CERRO ROMAULDOS28-30 RAMONA DRIVES31 BOYSEN AVES32 LA ENTRADA AVES33 MURRAY AVES34 MISSION STS35-39 LINCOLN STS40-41 PALM STREETS42-46 MONTEREY STS47-50 HIGUERA STS51-54 MARSH STS55-56 PACIFIC STS57 RAILROADS58 MARSH & HIGUERAS59 BEEBEE STS60 HINDS61-62 SUBURBAN ROADC? CURB RAMPSD1-2 DETAIL SHEETS[MO DAY, YEAR]No. C 79870BRI A N A. NELSONCIVILR EGISTERED P ROFESSIONAL ENGINEERSTATE OF CALI FOR NIA AREA 6AREA 7LEGENDSTREETS TO BE SEALEDDOWNTOWN BOUNDARY - SEALING TOBEGIN ON SEPTEMBER 1ST, 2022Reference Documents:City Standard Specifications - January 2020 EditionCity Engineering Standards - January 2020 EditionRKnow what's below. Call before you dig.AREA 6 & 7 BOUNDARIES0SCALE IN FEET1500NAttachment B, Page 1 of 33 CITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 300'MONTH YEAR1000560YSTRIPINGT2 RKnow what's below. Call before you dig.general notes:legend:PAVEMENT AREASDRIVEWAYSYMBOLSEWER MANHOLEUTILITY COVERWATER VALVEMONUMENTLIMITS OFROADWAY SEALING1. ALL WORK SHALL BE PERFORMED IN CONFORMANCE WITH THESEPLANS, SPECIAL PROVISIONS PREPARED FOR THIS PROJECT ANDTHE 2018 CITY OF SAN LUIS OBISPO STANDARD SPECIFICATIONSAND ENGINEERING STANDARDS, IN CONJUNCTION WITH THE STATEOF CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARDSPECIFICATIONS AND STANDARD PLANS, 2015 EDITION.2. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR ORPERMITTEE TO CONTACT "UNDERGROUND SERVICE ALERT OFNORTHERN CALIFORNIA" BY PHONE AT 8-1-1 FORTY-EIGHT (48)HOURS PRIOR TO START OF CONSTRUCTION FOR LOCATION OFPOWER, TELEPHONE, OIL AND NATURAL GAS UNDERGROUNDFACILITIES. CONTRACTOR OR PERMITEE SHALL ALSO CONTACTTHE APPROPRIATE AGENCY FOR THE LOCATION OF CABLE T.V.,WATER, SEWER, DRAINAGE OR UNDERGROUND FACILITIES.3. THE CONTRACTOR SHALL POSSESS A CLASS "A" OR "C12" LICENSEAT THE TIME THE BID OPENS AND DURING THE ENTIRE LENGTH OFTHE CONTRACT.4. THESE PLANS DO NOT INDICATE OVERHEAD LINES. CONTRACTORSHALL TAKE CARE DURING CONSTRUCTION TO AVOID CONTACTWITH OR DAMAGE TO EXISTING OVERHEAD LINES.5. PROTECT SURVEY MONUMENTS IN PLACE DURING CONSTRUCTION.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTSASSOCIATED WITH THE REPLACEMENT OF DAMAGED ORDISPLACED SURVEY MONUMENTS AND SHALL NOTIFY THE CITYFIVE (5) WORKING DAYS PRIOR TO RESTORING MONUMENTS.MONUMENTS SHALL BE RESET BY A CALIFORNIA LICENSED LANDSURVEYOR AND SHALL INCLUDE PREPARING AND FILING A CORNERRECORD WITH SAN LUIS OBISPO COUNTY.6. ALL STRIPING AND MARKINGS SHALL BE THERMOPLASTIC PERCALTRANS STANDARD PLANS A20A, A20B, A20C, A20D, A24A, A24B,A24C, A24D, AND A24E. ANY STRIPING NOT MARKED FOR REMOVALSHALL BE PROTECTED IN PLACE.7. WHERE NO CURB AND GUTTER EXISTS AND EDGE OF PAVEMENT ISOBSTRUCTED BY VEGETATION, CONTRACTOR SHALL TRIM BACKVEGETATION TO REVEAL EDGE OF PAVEMENT PRIOR TOIMPROVEMENTS.8. SHARROW, TURN SHARROW, AND GREENWAY SYMBOL MARKINGLOCATION SHALL BE FIELD LOCATED BY CITY TRANSPORTATIONSTAFF AND SHALL BE PLACED IN ACCORDANCE WITH DETAIL GSHEET 59.9. INSTALL R4-11 AT BEGINNING OF ALL SHARED ROUTES AND AFTERSIGNIFICANT INTERSECTIONS AS MARKED IN FIELD. WHERE NOTED,SIGNS SHALL BE ADDED TO EXISTING PUNCH POSTS (UPGRADINGTO 14' PUNCH POSTS IF NECESSARY TO MAINTAIN 7' CLEARANCEFROM WALKWAY).10. GREEN PAINT AT BIKE LANES SHALL BE COLOR-SAFE MMA OREQUIVALENT PER SECTION 84-6.01.11. HYDRANT MARKERS SHALL BE INSTALLED PER STD. 2920, DO NOTINSTALL IN BIKE LANES.12. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING UTILITYCOVERS IN FIELD.13. PROTECT UTILITY COVERS IN PLACE. ENSURE EXCESSIVE LIPBETWEEN COVER AND SLURRY DOES NOT FORM.14. PAVEMENT MARKS SHALL BE WHITE UNLESS OTHERWISE NOTED.15. CROSSWALKS SHALL BE 10' WIDE UNLESS OTHERWISE NOTED.16. NEW SIGN POST LOCATION MUST BE FIELD MARKED ANDLOCATIONS APPROVED BY THE ENGINEER PRIOR TO INSTALLATION.17. PARKING TEE LOCATION MUST BE FIELD MARKED AND LOCATIONSAPPROVED BY THE ENGINEER PRIOR TO PAINTING.18. THERMOPLASTIC STRIPING PLACED ON CONCRETE REQUIRES APRIMER COAT PRIOR TO APPLICATION.19. LOCATION OF ALL SIGNS, STRIPING AND SPEED HUMP/TABLES TOBE APPROVED BY THE ENGINEER PRIOR TO INSTALLATION.20. ADD AS GENERAL NOTE: ALL PUNCH POSTS IN DOWNTOWN COREPOWDER COATED GREEN PER STDS., TYP.EDGE GRINDINGPROPOSEDEXISTINGTREE PROTECTIONabbreviationsCont ContinuedBC Begin CurveDim Dimensions(E) ExistingEA EachEC End CurveE.S. Each SideLF Linear FeetPC Point of CurvatureRRadiusROW Right-of-WaySQFT Square FeetTyp. TypicalSTRIPINGPAVEMENT MARKING1. PROTECT TREE BRANCHES, TRUNK, ROOTS AND FOLIAGETHROUGH PROPER TRIMMING AND CONSTRUCTION TECHNIQUESWHENEVER POSSIBLE.2. WHERE TREES CANNOT BE TRIMMED TO AVOID CONFLICT WITHCONSTRUCTION EQUIPMENT, THE FOLLOWING TECHNIQUES MAYBE UTILIZED TO MINIMIZE DAMAGE DURING CONSTRUCTIONACTIVITIES:a. USE EQUIPMENT THAT IS SHORTER IN HEIGHT OR WIDTH TOAVOID CONTACT WITH TREESb. BACK EQUIPMENT UNDER LIMBS AND FOLIAGE TO MINIMIZECONTACT WITH CONSTRUCTION EQUIPMENTc. EMPLOY HAND TECHNIQUES TO AVOID USING EQUIPMENTUNDER VULNERABLE TREESd. UNDER COORDINATION WITH THE CITY ARBORIST, PUSHINTERFERING TREE LIMBS TEMPORARILY OUT OF THE WAYAttachment B, Page 2 of 33 "STOP" LEGEND22 SQFT, Typ.DETAIL 2607 LF12" WHITE29 LFNMATCHLINESEEBELOWLOS OSOS VALLEY ROADGREENWAY PER DETAIL L, SHEET D145.5 SQFT, Typ."HUMP" LEGEND25 SQFT, Typ.(N) SPEED HUMP (TYPE1) PER CITY STD 7320/21DETAIL 2250 LFINSTALL OCEANAIRENEIGHBORHOOD GREENWAYSIGN ON 12' PUNCH POSTINSTALL W84(CA)ON 12' PUNCH POSTMHMHMHYELLOW HI-VIS CROSSWALKPER CITY STD 7350 (86 LFINSTALL W84(CA) ON12' PUNCH POSTOCEANAIRE20'8'5'DETAIL 2103 LFDETAIL 2607 LF Cont.12" WHITE20 LFDETAIL 2250 LFNGALLEON MATCHLINESEEABOVEMATCHLINESEESHEET 2MATCHLINESEESHEET 8DRAKE GREENWAY PER DETAIL L, SHEET D145.5 SQFT, Typ."STOP" LEGEND22 SQFT, Typ.12" WHITE18 LF12" WHITE24 LFDETAIL 2250 LFDETAIL 2250 LFDETAIL 2250 LFINSTALL OCEANAIRE NEIGHBORHOODGREENWAY SIGN WITH RIGHT ARROWPLAQUE ON 12' PUNCH POSTINSTALL OCEANAIRENEIGHBORHOOD GREENWAY SIGNON 12' PUNCH POSTINSTALL W84(CA) ON12' PUNCH POSTINSTALL OCEANAIRE NEIGHBORHOODGREENWAY SIGN WITH LEFT ARROWPLAQUE ON 12' PUNCH POSTMHMH"HUMP" LEGEND25 SQFT, Typ.(N) SPEED HUMP(TYPE 1) PER CITYSTD 7320/21INSTALL R1-1 SIGN ON12' PUNCH POSTRED CURB68 LFINSTALL R1-1 SIGNON 12' PUNCH POSTYELLOW HI-VISCROSSWALK PERCITY STD 7350 (69 LF12" WHITE20 LFYELLOW HI-VIS CROSSWALKPER CITY STD 7350(69 LFREMOVEEXISTINGSIGN, INSTALLR1-1 SIGN ON(E) POSTOCEANAIRE20'20'20'8'8'5'8'8'5'CIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FO R N IA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS1040SCALE IN FEETAttachment B, Page 3 of 33 DETAIL 255 LFDETAIL 2271 LFNMATCHLINESEESHEET 1MATCHLINESEEBELOWDETAIL 2250 LFDETAIL 2250 LFDETAIL 2250 LF"HUMP" LEGEND25 SQFT, Typ.(N) SPEED HUMP (TYPE 1)PER CITY STD 7320/21MHMHMHINSTALL W84(CA) ON12' PUNCH POSTINSTALL W84(CA) ON12' PUNCH POSTOCEANAIREMARI N E R S COVE20'5'DETAIL 22230 LF"STOP" LEGEND22 SQFT, Typ.12" WHITE18 LFDETAIL 2250 LFNA V A L O N BALBOA MATCHLINESEEABOVEMA T C H L IN E S E E SH E E T 3 DETAIL 2268 LFDETAIL 2250 LFDETAIL 2250 LF"HUMP" LEGEND25 SQFT, Typ.(N) SPEED HUMP (TYPE1) PER CITY STD 7320/21MHMHINSTALL W84(CA)ON 12' PUNCH POSTINSTALL W84(CA)ON 12' PUNCH POSTYELLOW HI-VISCROSSWALKS PERCITY STD 7350 (41 LFOCEANAIREYELLOW HI-VISCROSSWALKS PERCITY STD 7350 (52 LF12" WHITE18 LF12" WHITE18 LF17'21'21'DETAIL 2250 LF12" WHITE18 LF8'5'8'5'8'8'CIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FOR NIA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS2040SCALE IN FEET0SCALE IN FEET40Attachment B, Page 4 of 33 DETAIL 2247 LFN AVALON MATCHLINESEEBELOWAVALONDETAIL 22290 LF"HUMP" LEGEND25 SQFT, Typ.(N) SPEED HUMP(TYPE 1) PER CITYSTD 7320/21M HOCEANAIRE 20'INSTALL R1-1 SIGN ON(N) PUNCH POSTREMOVE (E) YIELD SIGN12" WHITE8'AVALON LAKEVIEW DETAIL 255 LF12" WHITE17 LFDETAIL 2250 LFNMATCHLINESEEABOVE MATCHLINESEESHEET 5DETAIL 2871 LF"STOP" LEGEND22 SQFT, Typ.YELLOW HI-VISCROSSWALKS PER CITYSTD 7350 (89 LFDETAIL 2250 LFDETAIL 2250 LFDETAIL 2250 LFDETAIL 2250 LF"HUMP" LEGEND25 SQFT, Typ.(N) SPEED HUMP (TYPE1) PER CITY STD 7320/21M H MH 12" WHITE17 LF12" WHITE17 LFINSTALL W84(CA) ON12' PUNCH POSTINSTALL W84(CA) ON12' PUNCH POSTOCEANAIRE20'18'21'DETAIL 2250 LF12" WHITE18 LFINSTALL R1-1 SIGN ON(N) PUNCH POST8'8'5'8' 5'8'CIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FOR N IA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS3040SCALE IN FEET0SCALE IN FEET40Attachment B, Page 5 of 33 NMATCHLINESEESHEET 3MATCHLINESEEBELOWDETAIL 2871 LF Cont.MH MH 41'OCEANAIREN ATASCADERO MADONNAMATCHLINESEEABOVEMATCHLINESEESHEET 6DETAIL 2871 LF Cont.DETAIL 279 LFYELLOW HI-VISCROSSWALK PERCITY STD 7350(60 LF12" WHITE26 LF"STOP" LEGEND22 SQFTGREENWAY PER DETAIL L, SHEET D145.5 SQFTDETAIL 2250 LFDETAIL 2250 LFDETAIL 2250 LF"HUMP" LEGEND25 SQFT, Typ.(N) SPEED HUMP (TYPE 1)PER CITY STD 7320/21INSTALL OCEANAIRE NEIGHBORHOODGREENWAY SIGN WITH LEFT ARROWPLAQUE ON 12' PUNCH POSTREPLACE EXISTING 12' PUNCH POST WITH 14'PUNCH POST. INSTALL OCEANAIRENEIGHBORHOOD GREENWAY SIGN.REINSTALL R2-1 SPEED LIMIT SIGN BENEATHMH MHINSTALL W84(CA)SIGN ON NEW 12'PUNCH POSTDETAIL 2250 LFINSTALL OCEANAIRENEIGHBORHOOD GREENWAY SIGNW/ RIGHT PLAQUE ON 12' PUNCHPOSTLEFT TURN BIKE BOX WITH 452 SQFTGREEN BIKE LANE COATING PERSPECIAL PROVISIONS50'7'13'RED CURB21 LFRED CURB84 LFOCEANAIRE20' 20.5'20.5'8'INSTALL 10-6 SIGN ON (N)12' PUNCH POST13'BIKE LANE ARROW 3.5 SQFT, Typ.BIKE RIDER 7 SQFT, Typ.12 SCALE "WAITHERE" 9.7 SQFT24" WHITE13 LFCIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FO R N IA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS4040SCALE IN FEETAttachment B, Page 6 of 33 LAKEVIEWDETAIL 2250 LFNBALBOAMATCHLINESEEBELOWMATCHLINESEEBELOWDETAIL 2250 LF"STOP" LEGEND22 SQFT, Typ.YELLOW HI-VISCROSSWALKS PERCITY STD 7350(85 LFGULFYELLOW HI-VIS CROSSWALKPER CITY STD 7350(58 LFMHMHMHMH12" WHITE16 LF12" WHITE18 LFINSTALL R1-5 SIGN ON NEW 12'PUNCH POSTINSTALL R1-5 SIGN ONNEW 12' PUNCH POSTINSTALL R1-6PEDESTRIAN CROSSINGQUICK RELEASE, BACKTO BACK SIGNSYIELD LINE 5ΔYIELD LINE 5ΔINSTALL RED CURB PAINT THRUINTERSECTION TO NEARESTDRIVEWAYS SOUTH OF LAKEVIEW(140 LF)LAKEVIEW19'18' 5'8'5'8'NMATCHLINE SEE ABOVE YELLOW "XING" LEGEND21 SQFTYELLOW "SCHOOL" LEGEND35 SQFTYELLOW "SLOW" LEGEND23 SQFTMHMHBALBOA35'33'33'NMATCHLINE SEE ABOVE YELLOW "XING" LEGEND21 SQFTYELLOW "SCHOOL" LEGEND35 SQFTYELLOW "SLOW" LEGEND23 SQFTYIELD LINE 5Δ BALBOA35'33'33'CIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FOR N IA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS5040SCALE IN FEETAttachment B, Page 7 of 33 GULF NMATCHLINESEESHEET 5 MATCHLINESEEBELOW12" WHITE16 LF"STOP" LEGEND22 SQFT"HUMP" LEGEND25 SQFT, Typ.(N) SPEED HUMP(TYPE 1) PER CITYSTD 7320/21INSTALLW84(CA) ON 12'PUNCH POSTMHMHINSTALL R4-11 SIGN, STRAP TOEXISTING STREETLIGHT POLEATASCADERO41' 8' BORONDA NMATCHLINESEEABOVE"HUMP" LEGEND25 SQFT, Typ.(N) SPEED HUMP (TYPE 1)PER CITY STD 7320/21(N) SPEED HUMP (TYPE 1)PER CITY STD 7320/21MHMHINSTALL W84(CA) ON 12'PUNCH POSTATASCADERO41'CIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FOR N IA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS6040SCALE IN FEETAttachment B, Page 8 of 33 NATASCADERO MATCHLINESEEBELOW"HUMP" LEGEND25 SQFT, Typ.(N) SPEED HUMP (TYPE 1)PER CITY STD 7320/21GREENWAY PER DETAIL L, SHEET D145.5 SQFT, Typ.DETAIL 22180 LFINSTALLOCEANAIRENEIGHBORHOODGREENWAY SIGNON 12' PUNCHPOSTINSTALL R4-11 AND OCEANAIRENEIGHBORHOOD GREENWAYSIGNS ON 12' PUNCH POSTMHMHMHMHINSTALL W84(CA) ON 12'PUNCH POSTGALLEONCORAL W NEWPORT 41'YELLOW HI-VISCROSSWALKS PERCITY STD 7350(80 LFYELLOW "SCHOOL" LEGEND35 SQFT, Typ.YELLOW "SLOW" LEGEND23 SQFTYELLOW "XING" LEGEND21 SQFTDETAIL 2250 LFNROYALMATCHLINESEEABOVEMATCHLINESEESHEET 8"HUMP" LEGEND25 SQFT, Typ.(N) SPEED HUMP (TYPE 1)PER CITY STD 7320/21GREENWAY PER DETAIL L, SHEET D145.5 SQFT, Typ.INSTALL OCEANAIRE NEIGHBORHOOD GREEWAYSIGN WITH DOUBLE ARROW PLAQUE ON 12'PUNCH POSTMHMHMHINSTALL W84(CA) ON 12'PUNCH POSTDETAIL 22, 50 LF6" YELLOW 5' O.C.INSTALL BOLT-DOWNR1-6 SIGNRED CURB FROMDRIVEWAY TO DRIVEWAY(95 LF)GALLEONW NEWPORT 20'5'8'33'33'33'33'20'50'7'8'94'CIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FOR N IA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS7040SCALE IN FEETAttachment B, Page 9 of 33 CAVALIERNMATCHLINESEESHEET 7MATCHLINESEESHEET 1"HUMP" LEGEND25 SQFT, Typ.(N) SPEED HUMP (TYPE 1)PER CITY STD 7320/21SPEED HUMP (TYPE 1)PER CITY STD 7320/21MHMHMHINSTALL W84(CA) ON 12'PUNCH POSTGALLEONCAVALIER41'DETAIL 2247 LFDETAIL 2250 LFDETAIL 2250 LFDETAIL 2250 LFNFAIRWAYROYAL CT MA T C H L I N E SEE SH E E T 9 MHMHROYAL20'CIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FOR NIA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS8040SCALE IN FEETAttachment B, Page 10 of 33 EL TIGRENLOS OSOS VALLEY ROADMATCHLINESEESHEET 11DETAIL 38179 LFTYPE VII ARROW27 SQFT, Typ.DETAIL 22235 LFMHMHMYELLOW HI-VISCROSSWALK PERCITY STD 7350TYPE IV ARROW15 SQFT Typ.MADONNA12'13'15'8'156'LA VIRADAYELLOW HI-VISCROSSWALK PER CITYSTD 735073 LF"KEEP" LEGEND24 SQFT, Typ.12" WHITE51 LF12" WHITE54 LFDETAIL 22171 LFDETAIL 22127 LFDETAIL 38175 LFDETAIL 38175 LFDETAIL 9103 LF EATYPE IV ARROW15 SQFT, Typ.NLOS OSOS VALLEY ROAD"CLEAR" LEGEND27 SQFT, Typ.MHMH12" WHITE10 LFGREENBACKSHARROW SYMBOL36 SQFT, Typ.LAGUNA LN16'10'10'6'11'12" WHITE43 LF12" WHITE51 LF14'LEFT TURN BIKE BOX WITH GREENBIKE LANE COATING PER SPECIALPROVISIONS 1205 SQFTREMOVE (E) 12' PUNCH POST AND INSTALL(E) 14' PUNCH POST WITH MODIFIED R10-15RIGHT TURN YIELD TO BIKE SIGN.REINSTALL NO STOPPING ANY TIME SIGN.BIKE LANE ARROW3.5 SQFT, Typ.BIKE RIDER 7SQFT, Typ.12 SCALE "WAITHERE" 9.7 SQFT24" WHITE13 LFCIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FOR N IA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS12040SCALE IN FEETAttachment B, Page 11 of 33 DETAIL 22205 LFDETAIL 2295 LF12" WHITEDETAIL 2250 LFN"STOP" LEGEND22 SQFT, Typ.GREENWAY PER DETAIL L, SHEET D145.5 SQFT, Typ.SPEED HUMP(TYPE 1) PERCITY STD 7320/21"HUMP" LEGEND25 SQFT, Typ.INSTALL W17-1ON 12' PUNCHPOSTINSTALL W17-1ON 12' PUNCHPOSTMH MH MH MH MH (N) SPEED HUMP(TYPE 2) PER CITY STD7320/21INSTALLW84(CA) ON 12'PUNCH POSTINSTALL W84(CA) ON 12'PUNCH POSTJAYCEECRAIG 17'8'12" WHITE18 LF"STOP" LEGEND22 SQFT, Typ.DETAIL 2250 LFDETAIL 2250 LFNGREENWAY PER DETAIL L, SHEET D145.5 SQFT, Typ.DETAIL 2175 LF12" WHITE14 LFYELLOW HI-VIS CROSSWALKPER CITY STD 735058 LFDETAIL 2250 LF"AHEAD" LEGEND31 SQFTINSTALL CERRO ROMAULDONEIGHBORHOOD GREENWAY SIGNWITH LEFT ARROW PLAQUE ON 12'PUNCH POSTREPLACE EXISTING PUNCH POSTWITH 14' PUNCH POST. INSTALLCERRO ROMAULDO NEIGHBORHOODGREENWAY SIGN WITH LEFT ARROWPLAQUE. REINSTALL NOPARKING/END SIGN UNDERNEIGHBORHOOD GREENWAY SIGN.MH MH MH MATCHLINESEESHEET 20MATCHLINESEESHEET 23GREENBACKSHARROW SYMBOL36 SQFT, Typ.DETAIL 2271 LFYELLOW HI-VISCROSSWALKS PERCITY STD 735024 LFPATRICIAYELLOW HI-VISCROSSWALKS PERCITY STD 735055 LFCRAIG 18' 19'17'CRAIG 5' 8'5'8'8'8' 5'25'CIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FOR NIA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS21040SCALE IN FEETAttachment B, Page 12 of 33 6" YELLOW50 LFYELLOW HI-VISCROSSWALK PER CITYSTD 7350DETAIL 2151 LFMATCHLINESEEBELOWNGREENBACKSHARROW SYMBOL36 SQFT, Typ.INSTALL R4-11 SIGNON 12" PUNCHPOSTPATRICIA PATRICIA 16'"STOP" LEGEND22 SQFT, Typ.DETAIL 2250 LFDETAIL 2175 LFNDETAIL 2271 LFGREENWAY PER DETAIL L, SHEET D145.5 SQFT"HUMP" LEGEND25 SQFT, Typ.SPEED HUMP (TYPE 2) PERCITY STD 7320/21DETAIL 2366 LFINSTALL TRAFFIC CIRCLE PERDETAIL ON SHEET D2, R° 6'INSTALL CERRO ROMAULDONEIGHBORHOOD GREENWAYSIGN ON 12' PUNCH POSTINSTALL W-84 ON 12' PUNCH POSTINSTALL CERRO ROMAULDONEIGHBORHOOD GREENWAY SIGNWITH RIGHT ARROW PLAQUE ON 12'PUNCH POSTMHMHMHMHMHMATCHLINESEEABOVEMATCHLINESEESHEET 21MATCHLINESEESHEET 22 MATCHLINESEESHEET 24GREENBACK SHARROW SYMBOL36 SQFT, Typ.INSTALL R4-11 SIGNON 12" PUNCHPOST6" YELLOW, 17 LF12" WHITE, 15 LF6" YELLOW17 LF12" WHITE17 LFCERRO ROMAULDOPATRICIA 17' 16'17'17'8'8'INSTALL R6-5P ON12' PUNCH POSTINSTALL R6-5P ON(E) STOP SIGNPOSTRED CURB 20'FROM CURB RAMPREFRESH ALL RED CURBAT INTERSECTIONINSTALL R6-5P ON (E)STOP SIGN POSTRED CURB 20'FROM CURB RAMPRED CURB 20'FROM CURB RAMPINSTALL R6-5P ON12' PUNCH POST17'7'25'17'25'7'12" WHITE14 LFDETAIL 2250 LFNROSITA 16'8'MHMATCHLINESEESHEET 22MATCHLINESEESHEET 22 NDETAIL 22418 LFCERRO ROMAULDO CE R R O C T CERRO ROMAULDO18'8'CIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FOR N IA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS23040SCALE IN FEETAttachment B, Page 13 of 33 12" WHITE22 LF12" WHITE18 LFDETAIL 2250 LFDETAIL 2250 LFDETAIL 2250 LFDETAIL 2285 LFDETAIL 2250 LFNDETAIL 2366 LF, Cont."HUMP" LEGEND25 SQFT, Typ.(N) SPEED HUMP (TYPE 2)PER CITY STD 7320/21"STOP" LEGEND22 SQFT, Typ.GREENWAY PER DETAIL L, SHEET D145.5 SQFT, Typ.MHMHMHMHMHMHMHMHMATCHLINESEESHEET 23 MATCHLINE SEE SHEET 25 INSTALL W84(CA)SIGN ON 12" PUNCHPOSTCERRO ROMAULDOJEFFREY JEFFREY 17'19'16'12'8' 8' N12" WHITE22 LF"STOP" LEGEND22 SQFTMHJEFFREY HIGHLAND8'12" WHITE19 LFDETAIL 2250 LFN"STOP" LEGEND22 SQFTMH MH MH JEFFREYJEFFREY 13'8'"STOP" LEGEND22 SQFT, Typ.12" WHITE13 LFDETAIL 2250 LFN MH JEFFREYCRAIG 17'8'CIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FOR N IA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS24040SCALE IN FEETAttachment B, Page 14 of 33 LA CANADA N. TASSAJARADETAIL 2250 LFDETAIL 235 LFDETAIL 2250 LFDETAIL 279 LFNSANTA LUCIA(N) SPEED HUMP (TYPE 2)PER CITY STD 7320/21DETAIL 2250 LF"HUMP" LEGEND25 SQFT, Typ.GREENWAY PER DETAIL L, SHEET D145.5 SQFTMHMHMHMATCHLINESEESHEET 25 MATCHLINE SEE ABOVE 12" WHITE24 LF"STOP" LEGEND22 SQFT, Typ.12" WHITE24 LFINSTALL W84(CA)SIGN ON 12" PUNCHPOSTCERRO ROMAULDOINSTALL W84(CA)SIGN ON 12"PUNCH POST17' 8' 8'16'N. TASSAJARA CUES T A "STOP" LEGEND22 SQFT, Typ.12" WHITE20 LF12" WHITE23 LF"STOP" LEGEND22 SQFT, Typ.DETAIL 2250 LFDETAIL 279 LFDETAIL 2250 LFDETAIL 2250 LFDETAIL 2250 LFNDETAIL 22,68 LF6" YELLOW4' O.C.GREENWAY PER DETAIL L, SHEET D145.5 SQFT, Typ.12" WHITE26 LF12" WHITE36 LFINSTALL TRAFFIC CIRCLE PERDETAIL ON SHEET D2, R° 15'MHMHMHBELOWDETAIL 22, 50 LF6" YELOW 4' O.C.DETAIL 22, 74 LF6" YELLOW 4' O.C.DETAIL 22, 72 LF6" YELLOW 4' O.C.12" WHITE17 LF12" WHITE16.5 LFCERRO ROMAULDO17' 17'17'17'17'17'17'8'8'8'8'8'8'NINSTALL R6-5P ON (E)STOP SIGN POSTINSTALL R6-5P ON (E)STOP SIGN POSTINSTALL R6-5P ON(N) 12" PUNCHPOSTINSTALL R6-5P ON(N) 12" PUNCHPOSTRED CURB 20'FROM CURB RAMPRED CURB 20'FROM CURB RAMP13'25'6'16'35'18'13'26'CIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FO R N IA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS25040SCALE IN FEETAttachment B, Page 15 of 33 N. TASSAJARA CUESTA"STOP" LEGEND22 SQFT, Typ.DETAIL 2250 LFDETAIL 2250 LFDETAIL 2250 LFBICYCLE LOOP SYMBOLPER CALTRANS A24C2 SQFT, Typ.N12" WHITE 16 LF12" WHITE 32 LF12" WHITE 42 LF12" WHITE32 LF12" WHITE16 LF12" WHITE24 LFMHMHMHMHMHMHFOOTHILL12" WHITE 36 LF17'18'16'8'DETAIL 2775 LFN"HUMP" LEGEND25 SQFT, Typ.(N) SPEED HUMP (TYPE2) PER CITY STD 7320/21SPEED HUMP (TYPE 2) PERCITY STD 7320/21MHMHMHMATCHLINESEESHEET 25MATCHLINESEESHEET 32INSTALL W84(CA)SIGN ON 12" PUNCHPOSTCERRO ROMAULDO17'CERRO ROMAULDOCIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FOR NIA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS26040SCALE IN FEETAttachment B, Page 16 of 33 LA CANADA N TASSAJARA DETAIL 22207 LFNDETAIL 22270 LFMHMHMHMHMHTOLOSASANTA LUCIA 17' 17'YELLOW HI-VIS CROSSWALKSPER CITY STD 7350150 LFDETAIL 2250 LFDETAIL 2250 LFDETAIL 2250 LFDETAIL 2250 LF"STOP" LEGEND22 SQFT, Typ.DETAIL 2250 LFN12" WHITE37 LFMH MH MH MH MH MH MHMH4" WHITE EDGE LINE WITH12" WHITE 5' O.C.CUESTAHIGHLAND FELTON 17'15'17'18' 18'8'5'5' 8'8'5'5' 8'8'CIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FOR N IA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS27040SCALE IN FEETAttachment B, Page 17 of 33 DEL NORTE STOP N12" WHITE17 LF"STOP" LEGEND22 SQFT, Typ.MH MH MH "HUMP" LEGEND25 SQFT, Typ.(N) SPEED HUMP(TYPE 2) PER CITYSTD 7320/21INSTALL W84(CA)SIGN ON 12" PUNCHPOSTINSTALL W84(CA)SIGN ON 12" PUNCHPOSTLA ENTRADA8'MATCHLINESEEBELOW"STOP" LEGEND22 SQFT, Typ.12' WHITE17 LFDETAIL 2250 LFDETAIL 22837 LFN"HUMP" LEGEND25 SQFT, Typ.DETAIL 27B1439 LFDETAIL 27B845 LFINSTALL TRAFFIC CIRCLE PER DETAIL ON SHEET D2, R° 10'MHMHMATCHLINESEESHEET 29INSTALL W84(CA)SIGN ON 12" PUNCHPOSTSPEED HUMP (TYPE 2) PERCITY STD 7320/217'10'10'7'RAMONARAMONA16'8'INSTALL R6-5P ON12' PUNCH POSTINSTALL R6-5P ON12' PUNCH POST106 LF RED CURBFROM DRIVEWAY TORAMONA CORNERINSTALL R6-5P ON (E) STOP SIGN PUNCH POST20 LF RED CURBFROM CURB RAMP20 LF RED CURBFROM CURB RAMPMATCHLINESEEABOVE20 LF RED CURBFROM CURB RAMP20 LF RED CURBFROM CURB RAMPCIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FOR N IA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS28040SCALE IN FEETAttachment B, Page 18 of 33 12" WHITE16 LF"STOP" LEGEND22 SQFT, Typ.DETAIL 2250 LFNDETAIL 22837 LF Cont.DETAIL 27B1439 LF Cont.DETAIL 27B845 LF Cont.MHMHMATCHLINESEESHEET 28MATCHLINESEEBELOW7'10'10'7'RAMONADEL MAR 17'8'12" WHITE16 LF12" WHITE16 LF"STOP" LEGEND22 SQFT, Typ.12" WHITE16 LF12" WHITE16 LFDETAIL 2250 LFDETAIL 2250 LFDETAIL 2250 LFNDETAIL 22281 LF"HUMP" LEGEND25 SQFT, Typ.(N) SPEED HUMP (TYPE 2)PER CITY STD 7320/21DETAIL 27B262 LFDETAIL 27B1439 LF Cont.DETAIL 22191 LFDETAIL 27B176 LFMHMHMATCHLINESEEABOVEMATCHLINESEESHEET 307'10'10'7' 7'10'10'7'INSTALL W84(CA)SIGN ON 12" PUNCHPOSTRAMONARAFAEL S. TASSAJARA17'16.5'17'8'8'8'8'8'CIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FOR N IA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS29040SCALE IN FEETAttachment B, Page 19 of 33 DETAIL 27B179 LFDETAIL 22194 LFDETAIL 27B164 LF12" WHITE16 LFDETAIL 22194 LFDETAIL 22200 LFDETAIL 27B420 LFSTOP12" WHITE23 LFDETAIL 2250 LFGREENBACKSHARROWSYMBOL36 SQFT, Typ.N(N) SPEED TABLE PERCITY STD 7325"HUMP" LEGEND25 SQFT, Typ."STOP" LEGEND22 SQFT, Typ.MHMHMHMHMHMHMHMATCHLINESEESHEET 30INSTALL W84(CA)SIGN ON 12" PUNCHPOSTINSTALL W84(CA) SIGN ON12" PUNCH POSTS. TASSAJARA16.5'17'RAMONAELM CT VERDE 10'8'10'9'14'8'8'12" WHITE17 LFN12" WHITE14 LF"STOP" LEGEND22 SQFT, Typ.DETAIL 2250 LF12" WHITE25 LF12" WHITE20 LF12" WHITE19 LF12" WHITE30 LFMHMHMHLUNETAHERMOSA RAFA E L S TASSAJARA 20' 19'CIVILR EGISTERED P ROFESSIONAL ENGINEERSTATE OF CALI FOR NIA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS30040SCALE IN FEETAttachment B, Page 20 of 33 STOPSTOP12" WHITE21 LFSTOPDETAIL 2250 LFDETAIL 2250 LFN"STOP" LEGEND22 SQFT, Typ.12" WHITE37 LF12" WHITE20 LF(N) SPEED HUMP (TYPE 2)PER CITY STD 7320/21"HUMP" LEGEND25 SQFT, Typ.(N) SPEED HUMP (TYPE 2)PER CITY STD 7320/21REPLACE EXISTING PUNCH POSTWITH 14' PUNCH POST. INSTALLW-84 SIGN. REINSTALL PARKINGSIGN UNDER W-84 SIGN.INSTALL W-84 SIGNON 12' PUNCHPOSTMHMHMHMH12" WHITE21 LFMEINECKEBROAD BENTON CHORRO 18' 18'8'5'8'8'12" WHITE42 LFSTOPSTOP"STOP" LEGEND22 SQFT, Typ.BUMPN12" WHITE17 LFGREENBACK SHARROW SYMBOL36 SQFT, Typ.12" WHITE13 LF12" WHITE18 LF12" WHITE33 LFMHMHMHMHMHMHMH12" WHITE21 LFMURRAYBENTON BROAD CHORRO 8'5'8'8'CIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FOR NIA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS33040SCALE IN FEETAttachment B, Page 21 of 33 "HUMP" LEGEND25 SQFT, Typ.(N) SPEED HUMP (TYPE 2)PER CITY STD 7320/21INSTALL W84(CA)ON 12' PUNCH POSTNMATCHLINESEERIGHTWESTCalTr a n s S t d s 2 0 1 5DETAIL 22352 LF12" WHITE18 LF"STOP" LEGEND22 SQFTDETAIL 2250 LFRED CURB 3 LF RIGHTOF DRIVEWAY & 33 LFLEFT OF DRIVEWAY(PARK FRONTAGE)N MH MH MH MH MATCHLINESEEBELOWMATCHLINESEELEFTLINCOLNWEST MISSION19'20'8'REMOVE (E) ROUND POLE WITHSTREET NAME SIGNS. INSTALL 12’PUNCH POST WITH R1-1 SIGN ANDNEW STREET NAME SIGNS.CalTrans Stds 2015 N12" WHITE18 LF"STOP" LEGEND22 SQFTDETAIL 2250 LF"HUMP" LEGEND25 SQFT, Typ.SPEED HUMP (TYPE 2) PERCITY STD 7320/21(N) SPEED HUMP(TYPE 2) PER CITYSTD 7320/21MH MH MH MATCHLINESEESHEET 37MATCHLINESEEABOVE20'LINCOLNVENABLEMONTALBAN 8'RELOCATE (E) PUNCH POST WITHSTREET NAME SIGNS TO SWCORNER. INSTALL R1-1 SIGN.CalTrans Stds 2015CIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FOR NIA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS36040SCALE IN FEETAttachment B, Page 22 of 33 N "HUMP" LEGEND25 SQFT, Typ.(N) SPEED HUMP (TYPE 2)PER CITY STD 7320/2112" WHITE18 LF"STOP" LEGEND22 SQFTDETAIL 2250 LFMH MH MATCHLINESEEBELOWMATCHLINESEESHEET 3620'LINCOLNCENTERMOUNTAIN VIEW LINCOLN20'8' 8'RELOCATE (E) PUNCH POST WITHSTREET NAME SIGNS TO SWCORNER. INSTALL R1-1 SIGN.CalTrans Stds 2015DETAIL 2250 LFN12" WHITE19 LF12" WHITE37 LF12" WHITE37 LFINSTALL W84(CA) ON 12' PUNCH POSTMHMHMHMHMATCHLINESEESHEET 38MATC H LI N E SEE LEFT LINCOLNCHORRO20'5'8'"HUMP" LEGEND25 SQFT, Typ.SPEED HUMP (TYPE 2) PERCITY STD 7320/2112" WHITE18 LF"STOP" LEGEND22 SQFTDETAIL 2250 LFMHMATCHLINESEERIGHT MATCHLINESEEABOVEMOUNTAIN VIEW LINCOLN20'8'REMOVE (E) ROUND POLE WITHSTREET NAME SIGNS. INSTALL 12’PUNCH POST WITH R1-1 SIGN ANDNEW STREET NAME SIGNS.N CalTrans Stds 2015CIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FOR N IA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS37040SCALE IN FEETAttachment B, Page 23 of 33 COMMERCIAL LOADING ONLY COMMERCIAL LOADING ONLY COMMERCIAL LOADING ONLYNNTYPE IV (B) ARROW27 SQFT, Typ.PARKING TEEPER ENG. STD.7410, Typ.BIKE LANE ARROW(3.5 SQFT), Typ.BIKE RIDER(7 SQFT), Typ.DETAIL 2177 LFMODIFIEDDETAIL 2125 LFDETAIL 21106 LFDOUBLE 6" WHITE68 LF"PED" LEGEND18 SQFT, Typ."XING" LEGEND21 SQFT, Typ.DETAIL 21106 LFDETAIL 21159 LFDETAIL 21154 LFDETAIL 2177 LFGREENBACKSHARROW SYMBOL36 SQFT, Typ.12" WHITE41 LF12" WHITE41 LFDETAIL 22112 LF12" WHITE16 LF12" WHITE32 LF12" WHITE32 LFHI-VIS CROSSWALKS PERCITY STD 7350, 162 LF12" WHITE9 LFDETAIL 3850 LFTYPE IV ARROW15 SQFT, Typ.TYPE I 10" ARROW14 SQFT, Typ.DETAIL 3819 LFREPLACEIN-ROADWAYPED SIGNREPLACEIN-ROADWAYPED SIGNMHMHMHMHMHMHYIELD LINE 7Δ10.5 SQFTYIELD LINE 7Δ10.5 SQFTMONTEREYMORROMORROMATCHLINESEESHEET 42MATCHLINESEESHEET 44MATCHLINESEESHEET 4832'10'10'11' 18'BLUE CURB PAINT 22 LF. BLUE PARKING T'SAND ISA SYMBOL PER CALTRANS STD PLANA24C. INSTALL R99(CA) AND R99B(CA) SIGNSON (N) 14' PUNCH POST.CIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FOR N IA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS43040SCALE IN FEETAttachment B, Page 24 of 33 PARKING TEEPER ENG. STD.7410, Typ.12" WHITE105 LFTYPE IV ARROW15 SQFT, Typ.DETAIL 3850 LFDETAIL 3875 LFMHMHPALMMATCHLINESEESHEET 40NSANTA ROSACalTrans Stds 201512" YELLOW44 LF12" YELLOW44 LFTYPE I 10" ARROW14 SQFT, Typ.DETAIL 3850 LFDETAIL 3850 LFMH MH MH MH MHMHSANTA ROSAMONTEREYMATCHLINESEESHEET 44N2.0'11.0'5'10.0'±8'±8'BIKE BUFFER PERDETAIL C, SHEET D1193 LFDETAIL 39194 LFINSTALL RIGHT TURNYIELD TO BIKE SIGNNPARKING TEES, Typ."MPH" LEGEND19.3 SQFT, Typ."25" LEGEND17.5 SQFT, Typ.HI-VIS CROSSWALKSPER CITY STD 7350, 46 LFHI-VIS CROSSWALKS PERCITY STD 7350, 198 LFGREEN BIKE LANE COATING PERSPECIAL PROVISIONS 470 SQFT4" WHITE50 LF4" WHITE50 LFINSTALL R81(CA) AND R2-1 (25MPH) SIGNS ON 14' PUNCH POSTINSTALL R2-1 (25 MPH)SIGNS ON 12' PUNCH POSTTYPE VII ARROW27 SQFT, Typ.MHMH MH MH MH REMOVE (E) METAL PEDESTRIANBARRICADES AND NO PEDCROSSING SIGNAGESEE SIGNAL MODIFICATIONPLAN, SHEET X+32 00 +33 00 +34 00 +34 82 +72 00 +73 00 +74 00 +75 00 +75 912.0'SANTA ROSAHIGUERA MARSH MARSH STREET BRIDGE MATCHLINESEESHEET 49MATCHLINESEESHEET 53BIKE LANE ARROW(3.5 SQFT), Typ.BIKE RIDER(7 SQFT), Typ.DETAIL 4043 LF, EADETAIL 27B99 LFDETAIL 27B102 LFDETAIL 3913 LFDETAIL 3924 LFBLUE CURB PAINT 22 LF. BLUE PARKING T'SAND ISA SYMBOL PER CALTRANS STD PLANA24C. INSTALL R99(CA) AND R99B(CA) SIGNSON (N) 14' PUNCH POST.REMOVE NO CROSSINGSIGN ON LIGHT POLEDETAIL DSHEET D1, Typ.BLUE CURB PAINT 22 LF. BLUE PARKING T'SAND ISA SYMBOL PER CALTRANS STD PLANA24C. INSTALL R99(CA) AND R99B(CA) SIGNSON (N) 14' PUNCH POST.6'4'5' 20'CIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FOR N IA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS45040SCALE IN FEETAttachment B, Page 25 of 33 28.0'40.0'40.0'36.0'±8'2.0'5'2.0'10.0'11.0'BIKE LANEARROW(3.5 SQFT), Typ.BIKE RIDER(7 SQFT), Typ.TYPE VII ARROW27 SQFT, Typ.MOTORCYCLE SPACESPER CITY STD 7410DETAIL 39706 LFBIKE BUFFERPER DETAIL C,SHEET D1709 LFDETAIL 9 388 LFPARKING TEE PERENG. STD. 7410, Typ.±8'INSTALLRIGHT TURNYIELD TOBIKE SIGNINSTALL RIGHT TURN YIELD TOBIKE SIGNLEFT TURNBIKE BOX PERDETAIL F,SHEET D1, Typ.NGREEN BIKE LANE COATINGPER SPECIAL PROVISIONS1764 SQFTDETAIL 2175 LFDETAIL 2250 LFDETAIL 3850 LFHI-VIS CROSSWALKS PERCITY STD 7350, 130 LFDETAIL 3828 LFTYPE I 10" ARROW14 SQFT, Typ.TYPE IV ARROW15 SQFT, Typ.DETAIL 22271 LFGREEN BIKE LANE CASE 1 PERCITY STD 736040 LFGREEN BIKE LANE CASE 1 PERCITY STD 7360, 28 LFDETAIL 279 LFDETAIL 2250 LFGREENBACK SHARROW SYMBOL36 SQFT, Typ.GREEN BIKELANE CASE 1 PERCITY STD 736040 LFHI-VIS CROSSWALKSPER CITY STD 7350167 LFDETAIL 2175 LF, Cont.DETAIL 2250 LFMHMHMHMHMHMHMHMHMHDETAIL 3850 LF12" WHITE17 LFBROAD+1000+1100+1200+13 00+1400+1500HIGUERANIPOMO BROAD NIPOMO BROADPROTECT (E)PARKLET, Typ.LEFT TURN BIKEBOX PER DETAIL F,SHEET D1, Typ.MATCHLINESEESHEET 47MATCHLINESEESHEET 41MATCHLINESEESHEET 50MATCHLINESEESHEET 41MATCHLINESEESHEET 50BLUE CURB PAINT 22 LF. BLUE PARKING T'SAND ISA SYMBOL PER CALTRANS STD PLANA24C. REMOVE (E) POST, REINSTALL (E)SIGNS, AND INSTALL R99(CA) AND R99B(CA)SIGNS ON (N) 14' PUNCH POST.4" WHITE50 LF4" WHITE50 LF4" WHITE50 LFCIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FOR NIA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS46040SCALE IN FEETAttachment B, Page 26 of 33 37.0'40.0'10.0'±8'11.0'2.0'±8'±8'5'2.0'11.0'±8'BIKE LANEARROW(3.5 SQFT), Typ.BIKE RIDER(7 SQFT), Typ.MOTORCYCLESPACES PER CITYSTD 7410DETAIL 9205 LFMOTORCYCLESPACES PERCITY STD 7410TYPE I 10"ARROW14 SQFT, Typ."XING" LEGEND21 SQFT, Typ.DETAIL 39409 LFBIKE BUFFER PERDETAIL C, SHEET D1409 LFDETAIL 39 552LFBIKE BUFFER PERDETAIL C, SHEET D1555 LF"PED" LEGEND18 SQFT, Typ.DETAIL 9295 LFPARKING TEE PERENG. STD. 7410, Typ.LEFT TURN BIKE BOX PERDETAIL F, SHEET D1INSTALLRIGHT TURNYIELD TOBIKE SIGNNTYPE VIIARROW27 SQFT, Typ.TYPE IV ARROW15 SQFT, Typ.DETAIL 3850 LFDETAIL 22241 LFHI-VIS CROSSWALKSPER CITY STD 7350167 LFGREEN BIKE LANE CASE1 PER CITY STD 736037 LF"25" LEGEND17.5 SQFT, Typ."MPH" LEGEND19.3 SQFT, TYp.DETAIL 22282 LFGREEN BIKE LANECOATING PERSPECIALPROVISIONS1374 SQFTDETAIL 3850 LFYIELD LINE 7Δ10.5 SQFTINSTALL R81(CA) ONEXISTING PUNCH POSTWITH PARKING SIGN.GREENWAY PER DETAIL L, SHEET D145.5 SQFT, Typ.GREENWAYPER DETAIL L,SHEET D145.5 SQFT, Typ.MHMHMHMHMH12" WHITE34 LF EA12" WHITE20 LF12"WHITE40 LF12" WHITE20 LF2.5'10.0'2.0'5.0'+1600+17 00+1800+1900+2000+2100PROTECT (E)PARKLET, Typ.PROTECT (E)PAVERS, Typ.HIGUERAGARDEN CHORRO CHORROMATCHLINESEESHEET 46MATCHLINESEESHEET 48MATCHLINESEESHEET 51MATCHLINESEESHEET 474" WHITE50 LFCIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FO R N IA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS47040SCALE IN FEETAttachment B, Page 27 of 33 BIKE LANEARROW(3.5 SQFT), Typ.BIKE RIDER(7 SQFT), Typ.28.0'40.0'±8'10.0'2.0'11.0'±8'±8'10.0'5.0'11.0'2.0'5.0'±8'11.0'10.0'±8'±8'2.0'5.0'2.0'10.0'13.0'DETAIL C, SHEET D1TYPE VIIARROW 27SQFT, Typ.52.0'DETAIL 39294 LFBIKE BUFFERPER DETAIL C,SHEET D1 294LFDETAIL 39332 LFBIKE BUFFER PERDETAIL C, SHEET D1329 LFDETAIL 9273 LFDETAIL 9127 LFDETAIL 27B147 LFDETAIL 9199 LFPARKING TEEPER ENG. STD.7410, Typ."XING" LEGEND21 SQFT, Typ."PED"LEGEND 18SQFT, Typ.MODIFIED LEFT TURNBIKE BOX PERDETAIL F, SHEET D1INSTALL RIGHTTURN YIELD TOBIKE SIGNNGREEN BIKE LANECASE 1 PER CITYSTD 736040 LFGREEN BIKELANE COATINGPER SPECIALPROVISIONS823 SQFTGREEN BIKE LANE COATINGPER SPECIAL PROVISIONS729 SQFTGREEN BIKE LANECOATING PERSPECIAL PROVISIONS1110 SQFTCOATING PER SPECIALHI-VIS CROSSWALKSPER CITY STD 7350152 LFGREEN BIKE LANE CASE 1PER CITY STD 736028 LFGREEN BIKE LANE CASE 1PER CITY STD 736052 LFYIELD LINE 7Δ10.5 SQFTGREENWAY PER DETAIL L, SHEET D145.5 SQFT, Typ.INSTALL R2-1 "25MPH" SIGN 12'PUNCH POSTINSTALL R2-1 "25MPH" SIGN 12'PUNCH POSTREPLACE EXISTING PUNCHPOST WITH 14' PUNCH POST.INSTALL BILL ROALMANNEIGHBORHOOD GREENWAYSIGN. REINSTALL PARKINGSIGN UNDER NEIGHBORHOODGREENWAY SIGN.MHMHMHMHMH12" WHITE34 LF EA12" WHITE20 LF12" WHITE40 LF12" WHITE20 LF7.0'00+2200+2300+24 00+2500+2600+27HIGUERAMORRO MORRO2.0'PROTECT (E)PARKLET, Typ.2.0'2.0'MATCHLINESEESHEET 47MATCHLINESEESHEET 49MATCHLINESEESHEET 43MATCHLINESEESHEET 52BLUE CURB PAINT 22 LF. BLUE PARKING T'SAND ISA SYMBOL PER CALTRANS STD PLANA24C. INSTALL R99(CA) AND R99B(CA) SIGNSON (N) 14' PUNCH POST.BLUE CURB PAINT 22 LF. BLUE PARKING T'SAND ISA SYMBOL PER CALTRANS STD PLANA24C. INSTALL R99(CA) AND R99B(CA) SIGNSON (N) 14' PUNCH POST.4" WHITE50 LF4" WHITE50 LF4" WHITE50 LFCIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FOR N IA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS48040SCALE IN FEETAttachment B, Page 28 of 33 BIKE LANE ARROW(3.5 SQFT), Typ.BIKE RIDER(7 SQFT), Typ.40.0'40.0'5.0'±8'10.0'11'±8'±8'BIKE BUFFER PERDETAIL C, SHEET D1456 LFTYPE VII ARROW 27SQFT, Typ.GREEN BIKE LANE CASE 1PER CITY STD 736076 LF2.0'DETAIL 39 412LFBIKE BUFFERPER DETAIL C,SHEET D1 409LFPARKING TEE PERENG. STD. 7410, Typ.DETAIL 9436 LF76.0'10.0'11'INSTALL RIGHT TURN YIELD TO BIKESIGN ON (N) 12' PUNCH POST2.0'MODIFIED LEFT TURNBIKE BOX PERDETAIL F, SHEET D1N19.0'3.5'GREEN BIKE LANECOATING PER SPECIALPROVISIONS1110 SQFT Cont.GREEN BIKE LANE COATINGPER SPECIAL PROVISIONS1764 SQFT"25" LEGEND17.5 SQFT, Typ."MPH" LEGEND19.3 SQFT, TYp.DETAIL 3850 LFTYPE IVARROW15 SQFT, Typ.DETAIL 22230 LFDETAIL 22321 LFTYPE I 10"ARROW14 SQFT, Typ.GREEN BIKE LANE CASE 1PER CITY STD 736040 LFGREEN BIKE LANE CASE 1PER CITY STD 736040 LFDETAIL 3850 LFMHMHMHMH12" WHITE BOUNDINGLINES 292 LF TOTAL12" WHITE40 LF2.0'7.0'+2700+2800+2900+3000+3100+3200HIGUERAHIGUERAOSOSOSOS ST PROTECT (E)PARKLET, Typ.MATCHLINESEESHEET 48MATCHLINESEESHEET 45MATCHLINESEESHEET 44MATCHLINESEESHEET 53BLUE CURB PAINT 22 LF. BLUE PARKING T'SAND ISA SYMBOL PER CALTRANS STD PLANA24C. INSTALL R99(CA) AND R99B(CA) SIGNSON (N) 14' PUNCH POST.4" WHITE50 LF4" WHITE50 LF3'CIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FOR N IA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS49040SCALE IN FEETAttachment B, Page 29 of 33 DETAIL 27B381 LF±8'10.5'10.5'±8'GREEN BIKE LANE CASE2 PER CITY STD 736044 LFPARKING TEE PERENG. STD. 7410, Typ.TYPE VII ARROW27 SQFT, Typ.BIKE LANEARROW(3.5 SQFT), Typ.BIKE RIDER(7 SQFT), Typ.DETAIL 27B381 LFDETAIL 9247 LFMEDIAN PERDETAIL H, SHEETD1, 56 LFLEFT TURN BIKEBOX PER DETAILF, SHEET D1MARKINGSPER DETAIL D,SHEET D1, Typ.INSTALL RIGHTTURN YIELD TOBIKE SIGNNDETAIL 22271 LFDETAIL 2250 LF12" WHITE19 LFPROTECT (E)BIKE LANEDETAIL 3850 LF12" WHITE19 LFDETAIL 22128 LFDETAIL 3842 LFTYPE IV ARROW15 SQFT, Typ.TYPE I 10" ARROW14 SQFT, Typ.DETAIL 22262 LFDETAIL 3885 LFGREENBACKSHARROW SYMBOL36 SQFT, Typ.MEDIAN PER DETAIL H,SHEET D1, 58 LFGREENWAY PER DETAIL L, SHEET D145.5 SQFT, Typ.GREENBACKSHARROW SYMBOL36 SQFT, Typ.MHMHMHMHMHMHMHHI-VISCROSSWALKSPER CITYSTD 7350127 LF12" WHITE BOUNDINGLINES 320 LF TOTAL2.5'2.5'6.0'+5000+5100+52 00+53 00+5400+55003.0'MARSHNIPOMO PROTECT (E)PARKLET, Typ.LEFT TURN BIKEBOX PER DETAIL F,SHEET D1LEFT TURNBIKE BOX PERDETAIL F,SHEET D1BROAD INSTALL TYPE K-I (CA)BOLT DOWN MARKER0M2-1H ON MEDIANNOSE END, Typ.MATCHLINESEESHEET 51MATCHLINESEESHEET 46MATCHLINESEESHEET 54MATCHLINESEESHEET 46MATCHLINESEESHEET 54BLUE CURB PAINT 22 LF. BLUE PARKING T'SAND ISA SYMBOL PER CALTRANS STD PLANA24C. INSTALL R99(CA) AND R99B(CA) SIGNSON (N) 14' PUNCH POST.BLUE CURB PAINT 22 LF. BLUE PARKING T'SAND ISA SYMBOL PER CALTRANS STD PLANA24C. REMOVE (E) POST, REINSTALL (E)SIGN, AND INSTALL R99(CA) AND R99B(CA)SIGNS ON (N) 14' PUNCH POST.INSTALL R10-11SIGN ON NEW(N) PUNCHPOSTGREEN BIKE LANE CASE 2PER CITY STD 7360, 41 LFCUSTOM CLASS IVBIKEWAY SIGN PERDETAIL M ON PUNCHPOST. INSTALL WHITEFLEX POST DIRECTLYIN FRONT OF PUNCHPOSTDASHED GREEN BUSSTOP MARKING, 17'WIDE PER CITY ENG.STD. 7360, BIKE LANECASE 1, 60 LF4" WHITE50 LF4" WHITE50 LFPROTECT (E)PAVERSCIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FOR N IA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS50040SCALE IN FEETAttachment B, Page 30 of 33 MEDIAN WITH CENTERDRAINAGE GAP PER DETAILH, SHEET D1, 136 LFDETAIL 27B210 LFGREEN BIKE LANE CASE 2PER CITY STD 7360, 67 LFGREEN BIKE LANECASE 2 PER CITY STD7360, 37 LFBIKE LANE ARROW(3.5 SQFT), Typ.BIKE RIDER(7 SQFT), Typ.MOTORCYCLESPACES PER CITYSTD 7410TYPE VII ARROW27 SQFT, Typ.DETAIL 27B134 LFDETAIL 27B188 LFMEDIAN WITHCENTER DRAINAGEGAP PER DETAIL H,SHEET D1, 213 LFDETAIL 955 LFDETAIL 9151 LFDETAIL 27B284 LFLEFT TURN BIKEBOX PER DETAILF, SHEET D1LEFT TURNBIKE BOXPERDETAIL F,SHEET D1MARKINGS PERDETAIL D,SHEET D1, Typ.PARKING TEEPER ENG. STD.7410, Typ.INSTALL RIGHT TURNYIELD TO BIKE SIGNINSTALLRIGHT TURNYIELD TO BIKESIGNN"STOP" LEGEND22 SQFT, Typ.DETAIL 2250 LFDETAIL 3842 LFTYPE IV ARROW15 SQFT, Typ.TYPE I 10" ARROW14 SQFT, Typ.DETAIL 2250 LF4" WHITE MOTORCYCLEPARKING PER CITY STD 7410INSTALL ZICLA ZEBRACONFIGURATIONSPER DETAIL E2,SHEET D1, 24 LFINSTALL ZICLA ZEBRACONFIGURATIONS PERDETAIL E2, SHEET D1, 23LFINSTALL ZICLA ZEBRACONFIGURATIONSPER DETAIL E2,SHEET D1, 33 LFGREENWAY PER DETAIL L, SHEET D145.5 SQFT, Typ.MHMHMHMH12" WHITE BOUNDINGLINES 302 LF TOTAL12" WHITE BOUNDINGLINES 227 LF TOTALYIELD LINE 7Δ10.5 SQFT+5600+5700+58 00+5900+6000+6100±8'10.5'10.5'±8'2.5'2.5'6.0'3.0'6.0'3.0'±8'2'10.5'10.5'2'±8'MARSHGARDEN CHORRO DETAIL 3818 LFINSTALL TYPE K-I (CA)BOLT DOWN MARKER0M2-1H ON MEDIANNOSE END, Typ.8'MATCHLINESEESHEET 50MATCHLINESEESHEET 52MATCHLINESEESHEET 47MATCHLINESEESHEET 54MATCHLINESEESHEET 54BLUE CURB PAINT 22 LF. BLUE PARKING T'SAND ISA SYMBOL PER CALTRANS STD PLANA24C. REMOVE (E) POST, REINSTALL (E)SIGN, AND INSTALL R99(CA) AND R99B(CA)SIGNS ON (N) 14' PUNCH POST.BLUE CURB PAINT 22 LF. BLUE PARKING T'SAND ISA SYMBOL PER CALTRANS STD PLANA24C. REMOVE (E) POST, REINSTALL (E)SIGN, AND INSTALL R99(CA) AND R99B(CA)SIGNS ON (N) 14' PUNCH POST.CUSTOM CLASS IVBIKEWAY SIGN PERDETAIL M ON PUNCHPOST. INSTALL WHITEFLEX POST DIRECTLYIN FRONT OF PUNCHPOSTCUSTOM CLASS IVBIKEWAY SIGN PERDETAIL M ON PUNCHPOST. INSTALL WHITEFLEX POST DIRECTLYIN FRONT OF PUNCHPOST4" WHITE50 LF4" WHITE50 LF4" WHITE50 LF4" WHITE50 LFPROTECT (E) PAVERSPROTECT (E) PAVERSCIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FO R N IA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS51040SCALE IN FEETAttachment B, Page 31 of 33 DETAIL 27B273 LFMEDIAN PERDETAIL H,SHEET D1, 91 LFDETAIL 955 LFDETAIL 9127 LFBIKE LANE ARROW(3.5 SQFT), Typ.BIKE RIDER(7 SQFT), Typ."XING"LEGEND 21SQFT, Typ."PED"LEGEND18 SQFT, Typ.TYPE VIIARROWMEDIAN WITH CENTERDRAINAGE GAP PERDETAIL H, SHEET D1, 188 LFDETAIL 9175 LFDETAIL 27B273 LFDETAIL 27B102 LFDETAIL 27B126 LFDETAIL 27B235 LFMARKINGSPER DETAILD, SHEET D1,Typ.PARKING TEEPER ENG. STD.7410, Typ.INSTALL RIGHTTURN YIELD TOBIKE SIGNGREEN BIKE LANECASE 2 PER CITYSTD 7360, 31 LFN12" WHITE16 LFHI-VIS CROSSWALKSPER CITY STD 7350155 LF6" YELLOW50 LFYIELD LINE 7Δ10.5 SQFTLEFT TURN BIKE BOXPER DETAIL F, SHEET D1GREENWAY PER DETAIL L, SHEET D145.5 SQFT, Typ.MHMHMHMHGREEN BIKELANE CASE 1 PERCITY STD 736064 LFBIKE BUFFER PERDETAIL C, SHEET D134 LF EABIKE BUFFER PERDETAIL C, SHEET D130 LFGREEN BIKELANE COATINGPER SPECIALPROVISIONS152 SQFT+6100+6200+63 00+6400+65 00+66 00 MORRO6.0'3'10.5'10.5'2'7'5.0'2.0'6.0'3.0'±8'2'10.5'10.5'2'±8'6.0'3.0'±8'2'10.5'10.5'2'±8'MARSHMORRO DETAIL 2151 LFGREEN BIKELANE COATINGPER SPECIALPROVISIONS169 SQFT2.0'MATCHLINESEESHEET 51MATCHLINESEESHEET 53MATCHLINESEESHEET 48MATCHLINESEESHEET 55BLUE CURB PAINT 22 LF. BLUE PARKING T'SAND ISA SYMBOL PER CALTRANS STD PLANA24C. INSTALL R99(CA) AND R99B(CA) SIGNSON (N) 14' PUNCH POST.CUSTOM CLASS IV BIKEWAY SIGN PERDETAIL M ON PUNCH POST. INSTALLWHITE FLEX POST DIRECTLY IN FRONTOF PUNCH POST4" WHITE50 LF4" WHITE50 LF4" WHITE50 LFDASHED GREEN BUSSTOP MARKING, 17'WIDE PER CITY ENG.STD. 7360, BIKE LANECASE 1, 60 LFGREEN BIKE LANE COATING PERSPECIAL PROVISIONS116 SQFTBIKE BUFFER PERDETAIL C, SHEET D122 LF EACIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FOR N IA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS52040SCALE IN FEETAttachment B, Page 32 of 33 DETAIL 27B435 LFTYPE VII ARROW27 SQFT, Typ.DETAIL 9319 LFMEDIAN WITH CENTERDRAINAGE GAP PERDETAIL H, SHEET D1, 75 LFDETAIL 27B435 LFPARKING TEEPER ENG. STD.7410, Typ.LEFT TURN BIKE BOXPER DETAIL F, SHEET D1GREEN BIKE LANECASE 2 PER CITYSTD 7360, 46 LFN12" WHITE11 LFHI-VIS CROSSWALKS PERCITY STD 7350192 LFTYPE I 10" ARROW14 SQFT, Typ.TYPE IV ARROW15 SQFT, Typ.DETAIL 3850 LFDETAIL 22321 LFMEDIAN WITH CENTERDRAINAGE GAP PER DETAILH, SHEET D1, 118 LFGRIND EXISTING STRIPING ON CONCRETE BRIDGEDECK AND RESTRIPE PER PLAN. THERMOPLASTICSTRIPING PLACED ON CONCRETE BRIDGE DECKREQUIRES A PRIMER COAT PRIOR TO APPLICATION.MHMHMHMH+67 00+6800+6900+70 00+7100+7200MARSHOSOS ST 6.0'3.0'±8'2'10.5'10.5'2'±8'MARSHOSOS ST INSTALL RIGHT TURNYIELD TO BIKE SIGNINSTALL TYPE K-I (CA) BOLTDOWN MARKER 0M2-1H ONMEDIAN NOSE END, Typ.MATCHLINESEESHEET 52MATCHLINESEESHEET 45MATCHLINESEESHEET 49MATCHLINESEESHEET 55BLUE CURB PAINT 22 LF. BLUEPARKING T'S AND ISA SYMBOLPER CALTRANS STD PLAN A24C.INSTALL R99(CA) AND R99B(CA)SIGNS ON (N) 14' PUNCH POST.BLUE CURB PAINT 22 LF.BLUE PARKING T'S AND ISASYMBOL PER CALTRANS STDPLAN A24C. INSTALL R99(CA)AND R99B(CA) SIGNS ON (N)14' PUNCH POST.DETAIL DSHEET D1, Typ.4" WHITE50 LF4" WHITE50 LFBIKE LANE ARROW(3.5 SQFT), Typ.BIKE RIDER(7 SQFT), Typ.DASHED GREEN BUSSTOP MARKING, 17'WIDE PER CITY ENG.STD. 7360, BIKE LANECASE 1, 60 LFCIVILR EGISTERE D P ROFESSIONAL ENGINEERSTATE OF CALI FOR N IA No. C 84733HAI-L ONG Q. NGUYENCITY SPECIFICATION NO.DATE:PROJECT TITLE: SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONROADWAY SEALING 2022 HNKHMGBN1" = 40'FEBRUARY 20221000560YSTRIPINGS53040SCALE IN FEETAttachment B, Page 33 of 33