PLANNING COMMISSION AGENDA REPORT
SUBJECT: REQUEST TO ESTABLISH A HOTEL USE, CONSISTING OF THREE (3)
GUEST SUITES IN A MIXED-USE DEVELOPMENT, THAT OPERATES DAILY FOR
TWENTY-FOUR HOURS A DAY
PROJECT ADDRESS: 830 Orcutt Road BY: Hannah Hanh, Associate Planner
Phone Number: (805) 781-7432
Email: hhanh@slocity.org
FILE NUMBER: USE-0680-2022 FROM: Tyler Corey, Deputy Director
RECOMMENDATION
Adopt the Draft Resolution approving the project, based on the findings and subject to the
conditions of approval. The project is categorically exempt from environmental review
under Sections 15301 (Existing Facilities) and 15332 (In-Fill Development Projects) of the
California Environmental Quality Act (CEQA) Guidelines.
SITE DATA
Applicant
Zone
General Plan
Land Use
Site Area
Project Area
Environment
al Status
830 Orcutt, LLC
Service Commercial (C-S)
Services and Manufacturing
(SM)
0.56 acres
1,500 square foot building
Categorically exempt from
environmental review under
CEQA Guidelines Sections
15301 (Existing Facilities)
and 15332 (In-Fill
Development Projects)
SUMMARY
830 Orcutt, LLC (Applicant) applied for a Conditional Use Permit to establish a hotel use
that would operate daily for twenty-four hours a day in the commercial building of a mixed-
use development at 830 Orcutt Road between McMillan Avenue and Duncan Road. The
project is a boutique hotel that provides a contactless hospitality experience and consists
of three (3) guest suites in an approximate 1,500 square foot, single-story building.
The mixed-use development is currently under construction and associated site
improvements such as surface parking spaces and access would be shared between all
uses. Additionally, tenant improvements would be required to create the three (3) guest
suites in the project building.
Meeting Date: 3/8/2023
Item Number: 4a
Time Estimate: 30 minutes
Page 9 of 28
Item 4a
USE-0680-2022 (830 Orcutt Road)
Planning Commission Report – March 8, 2023
1.0 PLANNING COMMISSION’S PURVIEW
The Planning Commission’s role is to review the project for consistency with the General
Plan, Zoning Regulations, and applicable City development standards and regulations.
Per Table 2-1 (Uses Allowed by Zone), a hotel use requires approval of a Conditional Use
Permit to operate in the C-S Zone. In addition, hours of operation outside of 7:00 a.m. to
8:00 p.m. for the commercial component of a mixed-use development require approval of
a Minor Use Permit per Section 17.70.130(F)(4)(b) (Hours of Operation – All Other Zones
that Allow Mixed-Use Projects).
2.0 PROJECT INFORMATION
2.1 Site Statistics
Present Development
and Uses
Mixed-use development, consisting of one (1) commercial
building and three (3) residential buildings that are under
construction
Topography Relatively flat, creek habitat along the east property line
Access Orcutt Road
Surrounding Zones and
Uses
North: M Zone / light manufacturing and storage uses
South: C-C-PD and R-4-PD Zones / residential uses
East: C-S Zone / warehouse, distribution, office,
bar/tavern, and alcohol production uses
West: C-S Zone / light manufacturing and recreational
uses
2.2 Site Background and Project Description
On December 9, 2020, the Planning Commission reviewed and approved the request to
construct a mixed-use development consisting of 15 residential units, 1,500 square feet
of commercial space, a density bonus, and various reductions or waivers to development
standards at 830 Orcutt Road (ARCH-0764-2019, AFFH-0210-2020, and USE-0209-
2020) (Resolution No. PC-1028-2020, Minutes). The development is currently under
construction and site improvements such as surface parking spaces and access would
be shared between all uses. Approval of this mixed -use development includes the
construction of three (3) residential buildings and one (1) commercial building, which the
Applicant is proposing to utilize for the hotel use. The proposed hotel does not include
any changes to the approved building location or construction of additional building
square footage.
The project is a 24-hour boutique hotel consisting of three (3) guest suites in an
approximate 1,500 square foot, single-story building. Proposed operations would utilize
a contactless system, where guests reserve, pay, check-in and check-out, and request
for assistance without in-person interactions with hotel staff. Guests would make a
reservation online; receive emails for information on hotel processes, rules, and
Page 10 of 28
Item 4a
USE-0680-2022 (830 Orcutt Road)
Planning Commission Report – March 8, 2023
regulations; access the room with a security code; and contact a 24 -hour hotline for
maintenance requests and nuisance reports. All necessary information would be provided
electronically and physically in the guest suites. No onsite employees are proposed, and
general housekeeping and maintenance services would be regularly fulfilled by
independent contractors on a contract basis.
3.0 PROJECT ANALYSIS
Approval of the Conditional Use Permit to establish the hotel use and allow daily, twenty-
four hour operation is subject to requirements outlined in Section 17.110.060 (Criteria for
Approval) and Section 17.110.070 (Required Findings) for consistency with the General
Plan and Zoning Regulations and for compatibility with existing and future land uses in
the vicinity. Staff has evaluated the project against applicable policies and standards and
found it to be in compliance as discussed in this analysis.
3.1 Consistency with the General Plan and Zoning Regulations
The project site is located in the Services and Manufacturing (SM) Land Use Designation
and Service Commercial (C-S) Zone, which are intended for a wide range of service uses
that meet needs of the City and demands of the region. As proposed, the project would
facilitate Community Goal No. 27 of the Land Use Element and be consistent with the
purpose of the Land Use Designation and Zone by providing a lodging option for those
visiting the City and/or region. Since the project will operate within a previously approved
building with no changes to location or additional square footage, development standards
related to setbacks, height, lot coverage, and floor area ratio outlined in Section 17.36.020
(Development Standards) remain unchanged for the commercial building.
The project was evaluated for consistency with the original mixed -use development
approval and for compatibility with the residential uses in the development. No conflicts
with the original conditions of approval or design were identified. Additionally, th e project
would comply with applicable performance standards in Section 17.70.130(F) (Mixed-Use
Developments – Performance Standards) for nonresidential uses and be compatible with
the neighboring residences in this development as discussed below.
Lighting
Section 17.70.100 (Lighting and Night Sky Preservation) requires all outdoor lighting
fixtures be shielded and directed downward to minimize spillover and operated with the
minimum intensity necessary for safety and security. The Applicant is required to submit
a building permit for the tenant improvements to create the guest suites. As part of the
building permit review, proposed lighting improvements will be evaluated and verified for
compliance with lighting requirements in this preceding section. Therefore, the proposed
hotel would not result in adverse impacts related to lighting.
Noise
Chapter 9.12 (Noise Control) requires all activities operate in compliance with defined
noise levels and in a manner that does not constitute a public nuisance. The project is a
small-scale operation consisting of three (3) guest suites that are less than 500 square
Page 11 of 28
Item 4a
USE-0680-2022 (830 Orcutt Road)
Planning Commission Report – March 8, 2023
feet each, does not include outdoor amenities, is prohibited from having amplified sounds
outdoors, and is subject to compliance with noise requirements in this preceding chapter
(Condition No. 4). As conditioned, the hotel would not result in adverse impacts related
to noise.
Air Quality and Odors
The project does not include use of mechanical equipment or involve operations that
produce air pollutant emissions or odors. Therefore, the proposed hotel would not result
in adverse impacts to air quality or emit odors.
Hours of Operation
To ensure commercial uses do not negatively impact residential uses within a mixed-use
development, hours of operation outside of 7:00 a.m. to 8:00 p.m. for the commercial
component require approval of a Use Permit per Section 17.70.130(F)(4)(b) (Hours of
Operation – All Other Zones that Allow Mixed-Use Projects). The Applicant is requesting
to operate daily for twenty-four hours a day to implement typical hotel operations, which
include overnight accommodations throughout the entire week.
To address any potential impacts related to noise, parking, etc. on the neighboring
residences, the project is conditioned to retain a responsible party that is available via
telephone for twenty-four hours a day to respond to any emergencies or nuisance
complaints (Condition No. 3). The contact information for the responsible party shall be
made available to hotel guests and residents living in the neighboring units. Additionally,
amplified sounds are not permitted outdoors (Condition No. 4).
Parking
A 10 percent parking reduction, in exchange for replacement bicycle parking, was
included as part of the original approval for the mixed -use development. Since the site
consists of multiple uses that have varying peak hours of use, it was determined peak
parking demand would not overlap or coincide to exceed the 32 spaces provided onsite.
Per Table 3-4 (Parking Requirements by Use), a multi-unit residential use requires 0.75
space per bedroom (no less than one (1) space per dwelling unit), plus one (1) guest
parking space per five (5) dwelling units, and a hotel use requires one (1) space per room.
The entire development includes 15 multi-family residential units and three (3) hotel
rooms, which would require a total of 28 spaces, or 25 spaces with the 10 percent
reduction applied.
Of the 32 spaces provided onsite, there are four (4) surface parking spaces that would be
shared by guests for the hotel and residences (Resolution No. PC-1028-2020). To ensure
parking availability when the hotel use is occurring, one (1) parking space for each
reserved guest suite shall be available for hotel guests between the hours of 4:00 p.m.
and 11:00 a.m. for the length of their stay (Condition No. 5). These hours align with typical
check-in and check-out times and would allow for overnight parking by hotel guests. As
conditioned, all uses would be sufficiently served by onsite parking and the proposed
Page 12 of 28
Item 4a
USE-0680-2022 (830 Orcutt Road)
Planning Commission Report – March 8, 2023
hotel would not result in a parking deficiency for the site.
4.0 ENVIRONMENTAL REVIEW
The project is categorically exempt from provisions of CEQA as described in Sections
15301 (Existing Facilities) and 15332 (In-Fill Development) of the CEQA Guidelines.
The project is exempt under Section 15301 (Existing Facilities) of the CEQA Guidelines
because it includes the operation of a three-room hotel use in, and minor tenant
improvements to, the commercial building of a mixed-use development that was
previously approved and is currently under construction. The Planning Commission’s
review and approval of the mixed-use development (ARCH-0764-2019, AFFH-0210-
2020, and USE-0209-2020) on December 9, 2020 included a determination that the
proposed development is categorically exempt. Required construction permits have since
been obtained and the mixed-use development, including the commercial building that is
proposed for hotel use, is under construction. The hotel use does not include any changes
to the location of the commercial building or construction of additional square footage.
Therefore, the project involves no expansion to the previously approved commercial
building.
The project is also exempt under Section 15332 (In-Fill Development Projects) of the
CEQA Guidelines because it is consistent with the General Plan land use designation,
applicable General Plan policies, and Zoning Regulations; is located on a project site
within City limits that is less than five (5) acres in size (0.56 gross acre); is surrounded by
other urban uses (e.g., existing residential, commercial recreational, light manufacturing,
storage, etc. uses); and is not a habitat for endangered, rare, or threatened species
because the use will operate within the commercial building of a mixed-use development.
Approval of the project will not result in any significant effects related to (a) traffic because
the project is limited to three (3) guest suites, would not exceed the trip threshold (i.e.,
less than 110 daily vehicle trips) anticipated for Small Development Projects per the
CEQA Guidelines, and would be sufficiently served by onsite parking spaces; (b) noise
because the project would comply with exterior and interior noise levels outlined i n
Chapter 9.12 (Noise Control); (c) air quality because construction -related emissions
associated with the required tenant improvements are temporary; or (d) water quality
because the project does not include operations that would impact onsite or offsite creeks
or wetlands. Lastly, the project can be adequately served by all required utilities and public
services. Therefore, the project would not result in a significant effect on the environment.
5.0 DEPARTMENT / DIVISION COMMENTS
The project has been reviewed by the Planning Division, Building Division, Engineering
Division, Fire Department, and Utilities Department. Any applicable conditions from these
departments or divisions have been included in the Planning Commission Resolution for
the project approval. In addition, the project will be reviewed for compliance with relevant
code requirements (e.g., Building Code, Fire Code, etc.) as part of the building permit
review.
Page 13 of 28
Item 4a
USE-0680-2022 (830 Orcutt Road)
Planning Commission Report – March 8, 2023
6.0 ALTERNATIVES
1. Continue project. An action to continue the item should include a detailed list of
additional information or analysis required to make a decision.
2. Deny the project. An action denying the project should include findings that cite the
basis for denial and should referen ce inconsistency with the General Plan, Zoning
Regulations, or other policy documents.
7.0 ATTACHMENTS
A. Draft Resolution (USE-0680-2022)
B. Project Plans (USE-0680-2022)
Page 14 of 28
RESOLUTION NO. PC-XXXX-23
A RESOLUTION OF THE CITY OF SAN LUIS OBISPO PLANNING
COMMISSION APPROVING THE CONDITIONAL USE PERMIT TO
ESTABLISH A HOTEL USE, CONSISTING OF THREE (3) GUEST
SUITES IN A MIXED-USE DEVELOPMENT, THAT OPERATES DAILY
FOR TWENTY-FOUR HOURS A DAY. THE PROJECT IS
CATEGORICALLY EXEMPT FROM ENVIRONMENTAL REVIEW; AS
REPRESENTED IN THE STAFF REPORT AND ATTACHMENTS
DATED MARCH 8, 2023 (830 ORCUTT ROAD; USE-0680-2022)
WHEREAS, the Planning Commission of the City of San Luis Obispo conducted
a public hearing via teleconference on December 9, 2020 and conditionally approved
the mixed-use development at 830 Orcutt Road, pursuant to a proceeding instituted
under ARCH-0764-2019, AFFH-0210-2020, and USE-0209-2020, 830 Orcutt, LLC, the
applicant; and
WHEREAS, the Planning Commission of the City of San Luis Obispo conducted
a public hearing on March 8, 2023, pursuant to a proceeding instituted under USE-
0680-2022, 830 Orcutt, LLC, the applicant; and
WHEREAS, the Planning Commission of the City of San Luis Obispo has duly
considered all evidence, including the testimony of the applicant, interested parties, and
evaluation and recommendations by staff, presented at said hearing; and
WHEREAS, notices of said public hearings were made at the time and in the
manner required by law.
NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of the City
of San Luis Obispo as follows:
SECTION 1. Findings. The Planning Commission hereby grants final approval
to the project (USE-0680-2022), based on the following findings:
1. As conditioned, the project is consistent with the General Plan because it is a
small-scale service that provides a lodging option for those visiting the City
and/or region. The proposed hotel use is conditionally permitted in the Service
Commercial Zone and would be a service that is compatible with, and would not
result in adverse impacts to, surrounding uses, which include residences,
commercial recreation, bar/tavern, light manufacturing, and storage.
2. The proposed hotel use is conditionally permitted within the Service Commercial
Zone and conditioned to comply with applicable provisions of the Zoning
Regulations and Municipal Code.
Page 15 of 28
Resolution No. PC-XXXX-23
830 Orcutt Road, USE-0680-2022
Page 2
3. As conditioned, the design, location, size, and daily, twenty-four-hour operating
characteristics of the project will be compatible with existing and future land uses
in the vicinity because the proposed hotel use is limited to three (3) guest suites,
does not include outdoor amenities or amplified sounds, would be adequately
served by onsite parking, and shall comply with applicable performance
standards related to lighting, noise, air quality, and hours of operation for
nonresidential uses in mixed-use developments.
4. The site is physically suitable in terms of (a) its design, location, size, and
operating characteristics of the project ; (b) traffic generation and the provision of
public and emergency vehicle (e.g., fire and medical access); (c) public
protection services; and (d) the provision of utilities (e.g., potable water, schools,
solid waste collection and disposal, storm drainage , wastewater collection,
treatment, and disposal, etc.). The project is located on and surrounded by other
developed properties with compatible uses, adequately served by onsite parking,
has access to the City’s circulation system, and would be served by City utilities.
The project does not include activities that generate service or utility demands
beyond those anticipated with uses permitted in the vicinity.
5. The establishment and subsequent operation or conduct of the use will not,
because of circumstances and conditions applied in the particular case, be
detrimental to the health, safety, or welfare of the general public or persons
residing or working in the neighborhood of the use, or be detrimental or injurious
to property or improvements in the vicinity of the use because the project is
required to obtain a building permit for the tenant improvements and relevant
code requirements will be reviewed for compliance at the time of building permit
application.
SECTION 2. Environmental Review. The project is categorically exempt from
provisions of the California Environmental Quality Act (CEQA) as described in Sections
15301 (Existing Facilities) and 15332 (In-Fill Development) of the CEQA Guidelines.
The project is exempt under Section 15301 (Existing Facilities) of the CEQA Guidelines
because it includes the operation of a three -room hotel use in, and minor tenant
improvements to, the commercial building of a mixed-use development that was
previously approved and is currently under construction. The Planning Commission’s
review and approval of the mixed-use development (ARCH-0764-2019, AFFH-0210-
2020, and USE-0209-2020) on December 9, 2020 included a deter mination that the
proposed development is categorically exempt. Required construction permits have
since been obtained and the mixed -use development, including the commercial building
that is proposed for hotel use, is under construction. The hotel use doe s not include any
changes to the location of the commercial building or construction of additional square
footage. Therefore, the project involves no expansion to the previously approved
commercial building.
Page 16 of 28
Resolution No. PC-XXXX-23
830 Orcutt Road, USE-0680-2022
Page 3
The project is also exempt under Section 15332 (In-Fill Development Projects) of the
CEQA Guidelines because it is consistent with the General Plan land use designation,
applicable General Plan policies, and Zoning Regulations; is located on a project site
within City limits that is less than five (5) acres in size (0.56 gross acre); is surrounded
by other urban uses (e.g., existing residential, commercial recreational, light
manufacturing, storage, etc. uses); and is not a habitat for endangered, rare, or
threatened species because the use will operate within the commercial building of a
mixed-use development. Approval of the project will not result in any significant effects
related to (a) traffic because the project is limited to three (3) guest suites, would not
exceed the trip threshold (i.e., less than 110 daily vehicle trips) anticipated for Small
Development Projects per the CEQA Guidelines, and would be sufficiently served by
onsite parking spaces; (b) noise because the project would comply with exterior and
interior noise levels outlined in Chapter 9.12 (Noise Control); (c) air quality because
construction-related emissions associated with the required tenant improvements are
temporary; or (d) water quality because the project does not include operations that
would impact onsite or offsite creeks or wetlands. Lastly, the project can be adequately
served by all required utilities and public services. Therefore, the project would not
result in a significant effect on the environment.
SECTION 3. Action. The following conditions of approval do not include
mandatory code requirements. Code compliance will be verified during the plan check
process, which may include additional requirements applicable to the project. The
Planning Commission hereby grants final approval to the project with incorporation of
the following conditions:
Planning Division
1. The Conditional Use Permit shall be reviewed by the Community Development
Director for compliance with conditions of approval, or to determine whether a
modification of the Conditional Use Permit is necessary upon significant change to
the project as represented in the Staff Report dated March 8, 2023, or in the event
of a change in ownership which may result in deviation from the project description
or approved plans.
2. All conditions associated with the Planning Commission’s approval of the mixed -
use development on December 9, 2020 (Resolution No. PC -1028-2020) shall be
incorporated herein as conditions of approval.
3. The hotel shall retain a responsible party that is available via telephone on a 24-
hour basis to respond to emergency maintenance requests and nuisance
complaints. The contact information for the responsible party shall be provided to
hotel guests, prior to and during their stay, and to residents within the mixed -use
development.
Page 17 of 28
Resolution No. PC-XXXX-23
830 Orcutt Road, USE-0680-2022
Page 4
4. Amplified sound is not permitted outdoors. Any noise associated with the hotel shall
not exceed permitted noise levels outlined in Chapter 9.12 (Noise Control) of the
Municipal Code.
5. For each reserved guest suite, one (1) parking space shall be available for use by
the hotel guest(s) between the hours of 4:00 p.m. and 11:00 a.m. for the length of
their stay.
6. This Conditional Use Permit shall be reviewed by the Planning Commission if the
City receives substantiated written complaints from any citizen, Code Enforcement
Officer, or Police Department employee, which contains information and/or
evidence supporting a conclusion that a violation of this Conditional Use Permit, or
of City Ordinances, regulations, or Police Department resources (e.g., calls for
service) applicable to operation of the business has occurred. At the time of the Use
Permit review, to ensure on-going compatibility with nearby uses, conditions of
approval may be added, modified, or removed, or the Conditional Use Permit may
be revoked.
Indemnification
7. The applicant shall defend, indemnify, and hold harmless the City and/or its agents,
officers and employees from any claim, action or proceeding against the City and/or
its agents, officers, or employees to attack, set aside, void or annul, the approval by
the City of this project, and all actions relating thereto, including but not limited to
environmental review (“Indemnified Claims”). The City shall promptly notify the
applicant of any Indemnified Claim upon being presented with the Indemnified
Claim and the City shall fully cooperate in the defense against an Indemnified
Claim.
Page 18 of 28
Resolution No. PC-XXXX-23
830 Orcutt Road, USE-0680-2022
Page 5
Applicable Code Requirements
8. The applicant shall demonstrate compliance with Chapter 4 of the California Fire
Code and Title 19 of the California Code of Regulations, which require Fire Safety
Directors carry out emergency duties outlined in 403.9.1 of the Fire Code.
On motion by Commissioner ________, seconded by Commissioner ________,
and on the following roll call vote:
AYES:
NOES:
REFRAIN:
ABSENT:
The foregoing resolution was passed and adopted this 8th day of March 2023.
___________________________
Tyler Corey, Secretary
Planning Commission
Page 19 of 28
Page 20 of 28
rockvi
e
w
sweeneyperkinsBROA
Dgaribaldimcmillanduncan ORCUTTLAURELmutsuhitolawrence*PROJECT SITE830 ORCUTT ROAD1BRACKET ARCHITECTURE OFFICEORCUTT MIXED USE | HOTEL830 ORCUTT STREET SAN LUIS OBISPO23.0123 CONDITIONAL USE PERMITVICINITY MAPSITE AERIAL830 ORCUTTPROJECT TEAMDEVELOPER | OWNER830 Orcutt, LLC9275 N Forty RoadAtascadero, CA 93422ARCHITECTBracket Architecture OfficePO Box 1810San Luis Obispo, CA 93406Contact: Bryan Ridley | br@bracketao.com | 805 704 0535CIVIL ENGINEERAshley & Vance Engineering, Inc.1413 Monterey StreetSan Luis Obispo, CA 93401Contact: 805 545 0010TABLE OF CONTENTSProject Information, Development Statement + Table of ContentsProject DataApproved Site PlanLandscape PlanPartial Grading and Drainage PlanHotel Floor PlanElevations, Materials + ColorsPAGE1234567-8DEVELOPMENT STATEMENTThis project proposes a three-room boutique hotel use as the commercial use for an approved mixed-use site. No changes are proposed to the project site or residential buildings from previous approvals apart from nominal grading adjustments and individual entrances for each hotel room. All buildings are under construction.PREVIOUS APPROVALSThe prior approvals ARCH-0764-2019, USE-0822-2019 and AFFH-0210-2020 included fifteen multifamily multi-story dwelling units and a single-story commercial use building with an indeterminate use. Affordable housing and Public Art requirements are met as prescribed under those approvals.DESCRIPTION OF PROPOSED HOTEL USEType of Proposed Activities LodgingHours of Operation 24hrs, DailyNumber of Employees Contract maintenance and housekeeping as neededRefer to Parking Summary on sheet 2CEQA STATUSThis environmentally benign project is categorically exempt from CEQA per CEQA guideline 15332 as the project satisfies the conditions of a class 32 in-fill development project.ATTACHMENT BPage 21 of 28
2BRACKET ARCHITECTURE OFFICEORCUTT MIXED USE | HOTEL830 ORCUTT STREET SAN LUIS OBISPO23.0123 CONDITIONAL USE PERMITPREVIOUSLY APPROVED PROJECT DATAAddress 830 Orcutt RoadAPN 053-202-026Zoning C-S Service CommercialAdjacent Zoning C-S (east and west) M (north) R-4-PD and C-C-PD (south across right-of-way)Lot Area 24,920 square feet (0.57 acres)Current Use Single Family ResidentialProposed Use Mixed-Use Site with Residential and Hotel BuildingsGross Building Areas Building A (830) 3,057 sf Garage, 12,974 sf Residential Building B (843) 1,132 sf Garage, 5,002 sf Residential Building C (834) 1,132 sf Garage, 5,002 sf Residential Building D (832) 1,439 sf HotelLot Coverage 75% Allowed 18,690 square feet 46% Proposed 11,436 square feetTotal Area of Landscaping Excluding setbacks 1,075 square feetFloor Area Ratio 1.5 Allowed 37,380 square feet 1.0 Proposed 24,417 square feet [ 29,738 sf total area – 5,321 sf for required parking ]Density Allowed C-S Zone 13.7 density units [ 24 du/ac × 0.57 ac ] Density Bonus 16.48 density units [ 13.7 du × 20% for 10% low income per Table 8-2 ] 17.0 density units when rounded per SLOMC 17.140.040(B)Density Proposed 2 1-bedroom dwelling units 1.32 density units [ 2 x 0.66 du ] 13 2-bedroom dwelling units 13.0 density units [ 13 x 1.0 du ] 15 total dwelling units 14.32 density unitsAffordable Housing Requirement Provide 10% Low Income dwelling units, 1.5 dwelling units [ 15 dwelling units × 10% ] Provided 2 Low Income 1-bedroom dwelling units, Unit 01 and Unit 09Building Height Allowed 20’ at 10’ street yard setback, 35’ at 15’ street yard setback Proposed 20’ maximum at 10’ street yard setback, 35’ maximum at 15’ street yard setbackConstruction Type + Occupancy Type VB Occupancy Townhouses R-2 [ Buildings A-C ], Private Garages U [ Buildings A-C ], and Hotel R-1 [ Building D ]Common Open Space Active Shared Courtyard 640sf Passive Pedestrian Walk 1,240 sf Total 1,880 sfAccessible Dwelling Units Required 2 dwellings [ 15 dwellings × 10%, per CBC 1102A.3.1 at least 10% of the number of multi-story apartments in buildings with no elevator on a site must comply with subsections 1-4 as applicable ] Provided Unit 10 and Unit 11 fulfill accessible dwelling unit requirements with entry level powder room and habitable roomREVISED PARKING SUMMARYVehicle Parking Required 2 1-bedroom dwelling units 1.5 [ 2 × 0.75 per bedroom ] 13 2-bedroom dwelling units 19.5 [ 26 × 0.75 per bedroom ] Guest 3.0 [ 1 per 5 dwellings × 15 dwellings ] Hotel 3.0 [ 1 per room x 3 rooms ] Subtotal 27 spaces Bicycle Reduction 3 spaces [ 1 per 5 bicycles × 15 addition bicycle spaces to reduce commercial and guest parking demand, 10% maximum ] Total after reductions 24 spacesVehicle Parking Provided Standard Spaces in Garages 28 [ 2 per 2-bedroom dwelling, 1 per 1-bedroom dwelling] Surface Parking 3 standard, 1 van accessible Total 32 spacesElectric Vehicle Charging EV Ready 3 [ 10% of 27 required spaces ] EV Capable 15 [ one space for each residential garage provided per CalGreen ]Motorcycle Parking Required 2 [ 1 per 20 parking spaces × 27 spaces required ] Provided 2 accounted for in any of the private garages where there is an excess of 7 parking spaces provided over the requirement of 21 parking spacesBicycle Parking Residential 30 [ 2 per dwelling × 15 dwellings located in garages] Guest 3 [ 1 per 5 dwellings × 15 dwellings ] Hotel 0.3 [ 1 per 10 guest rooms x 3 guest rooms] Subtotal Required 33 bicycle spaces For Parking Reduction 15 [ equivalent to 3 vehicle parking space reduction ] Total Required 48 bicycle spaces [ 30 located in garages, 18 short-term ]ATTACHMENT BPage 22 of 28
UNIT 108 SINGLE-STORYHOTELUNIT 101UNIT 102UNIT 101UNIT 102UNIT 103FIRE ACCESS ROADUNIT 103UNIT 107 UNIT 106 UNIT 105 BUILDING A BUILDING D BUILDING C BUILDING B UNIT 104 UNIT 103 UNIT 102UNIT101UNIT109APPROVED SITE PLAN1” = 20’-0”3BRACKET ARCHITECTURE OFFICEORCUTT MIXED USE | HOTEL830 ORCUTT STREET SAN LUIS OBISPO23.0123 CONDITIONAL USE PERMITSPLIT RAIL FENCESETBACK FROM TOP OF BANK NOTED AT EACH BUILDING CORNERAPPROX. 60’ TO NEAREST STRUCTURE ON ADJACENT PROPERTYAPPROX. 42’ TO NEAREST STRUCTURE ON ADJACENT PROPERTYSITE PRIVACY FENCE AT NORTH PROPERTY LINESINGLE MANEUVER FROM GARAGE (REVERSE)EV READY PARKING(3) REQUIRED10’ SETBACK FOR BUILDINGS< 20’ IN HEIGHTASPHALT DRIVE AISLE50’ SETBACK FOR GROUND LEVEL DWELLING UNITS, DESIGN EXCEPTION PER SLOMC 17.70.130(D)(1)(a)15’ SETBACK FOR BUILDINGS> 20’ IN HEIGHTCONCRETE FLATWORKSTREET LIGHT PER ENGINEERING STANDARDS 7520 + 7910 FIRE RISER ROOM WITH EXTERIOR DOOR ACCESS, FDC AT SOUTH WALLACCESSIBLE ROUTE TO HOTEL ROOMSELECTRIC UTILITY TRANSFORMERDOUBLE-DETECTOR CHECK VALVE SCREENED BY LANDSCAPESHARED OPEN SPACE COURTYARDCOMMON OPEN SPACEPASSIVE PEDESTRIAN WALK5’ SETBACK FOR PARKING LOTS AND SIGNSSITE PRIVACY FENCE + GATEAT WEST PROPERTY LINEFIRE HYDRANT APPROX. 150’ WESTFIRE HYDRANT APPROX. 290’ EAST6’ WIDE PATHWAYS INCLUDING 18” WALKABLE GROUND COVER STRIPIN GROUND PLANTER, SEE LANDSCAPE PLANTRASH, RECYCLING + ORGANICS ENCLOSURE, COVEREDSHORT-TERM BICYCLE PARKING, TYP. OF [18]APPROVED EXCEPTION OF CREEK SETBACKS [ 20’ + 10’ AT UPPER LEVEL ] BYAFFORDABLE HOUSING INCENTIVETOP OF BANK CONTOUR -AND-LINE OF AVERAGED TOP OF BANK PER SITE VISIT WITH NATURAL RESOURCES MANAGER ON JANUARY 13, 2020 [SLOMC 17.70.030(C)]SITE PLAN PROVIDED FOR REFERENCE AND SHALL CONFORM TO THE APPROVED PLANS UNDER PBLDG-0355-20210 5 10 20ATTACHMENT BPage 23 of 28
LANDSCAPE PLAN1” = 20’-0”0 5 10 20BUILDINGBACCENT TREESSCREEN SHRUBSPLIT RAIL FENCEBUILDINGCBUILDINGDBUILDINGA4BRACKET ARCHITECTURE OFFICEORCUTT MIXED USE | HOTEL830 ORCUTT STREET SAN LUIS OBISPO23.0123 CONDITIONAL USE PERMITCONCRETE PADS WITH GROUNDCOVER BETWEENBORDER SHRUBSTREET TREE, TYP OF 5CONCRETE FLATWORKASPHALT DRIVE AISLESHADE TREEMEADOW GRASSESCONCRETE APRONSITE PRIVACY FENCE6’ MAXACCENT TREESGROUNDCOVER EDGE TO 6’ WALKWAYSRAISED PLANTERPLANTING SHALL CONFORM TO THE APPROVED PLANS UNDER PBLDG-0355-2021ATTACHMENT BPage 24 of 28
SDSDSD2192202212202202192192212212214216217218219XXSSSSSSSSSSSSSSSSSSSS215N89°34'33"E 140.28'M22.00'MN89°34'33"E 140.28'MN0°0221.59 FSAshley&VanceG, C1229 Carmel StSan Luis Obispo, CA 93401 (805) 545-0010 (323) 744-0010www.ashleyvance.comC I V I L S T R U C T U R A LGRADING PLANNGRADING SHEET, C-2.1, 10/17/19, Kathleen(219.16) TC(218.79) FLMATCH (E)219.00 TC218.50 FL219.15 FS219.09 FS219.20 FS219.10 FS220.11 TC/FS220.30 FS220.45 FS(219.22) ESMATCH (E)BUILDING DFF = 220.70219.83 FS221.42 FS220.69 TC220.36 FS1.5%4.04%1.5%1.4%219.80 FG1.88%0.7%1.5%220.30 FS219.71 FS4.8%220.21 FS220.21 FS220.45 FS219.57 FL7.1%221.41 FS220.11 TC/FS220.35 TC220.02 FL220.42 TC220.09 FL220.43 FS221.39 FS1.5%221.46 FS221.03 TC220.70 FL3.6%219.83 FL0.4%2.8%1.1%1.6%220.13 TC219.80 FL218.94 FL1.5%221.85 TC221.35 FS221.47 FS220.96 FS221.80 TC221.30 FS221.58 FS221.53 FS1.5%221.68 FS221.68 FS0.5%0.5%220.49 TC220.16 FL24220.30 FS220.30 FS34455SD26667219.81 TG217.81 IE881.5%1.5%1.5%SD19221.43 FS221.58 FS221.58 FS830 ORCUTT RDSAN LUIS OBISPO, CA 93401830 ORCUTT - HOTEL UPDATE010 10 20HORIZONTAL SCALE: 1" = 10' 5ATTACHMENT BPage 25 of 28
GROUND FLOOR1,500 sf6BRACKET ARCHITECTURE OFFICEORCUTT MIXED USE | HOTEL830 ORCUTT STREET SAN LUIS OBISPO23.0123 CONDITIONAL USE PERMITRESTROOMENTRYENTRY ENTRYRESTROOMRESTROOMSUITE 02485 SFSUITE 03394 SFSUITE 01443 SFBUILDING D HOTEL FLOOR PLAN1/8”=1’0”FIRE RISER CLOSETEXTERIOR LIGHTELECTRICAL CLOSETATTACHMENT BPage 26 of 28
BUILDING D SOUTH ELEVATION 1/8”=1’0”7BRACKET ARCHITECTURE OFFICEORCUTT MIXED USE | HOTEL830 ORCUTT STREET SAN LUIS OBISPO23.0123 CONDITIONAL USE PERMIT1276531354627MATERIALS + COLORSLEGEND1 Merlex Stucco Finish Medium Sand Texture - X-50 Crystal White2 Taylor Metal 4.0 Rib Siding - Ash Gray3 Wall Mounted Greenscreen Panels4 Accent Pink - SW6605 Charisma [Exterior Doors]5 Vinyl Window Frames, White6 Light Gray - SW 7660 Earl Grey7 Kichler Wall Mount Exterior Downlighting, Night-Sky CompliantBUILDING D NORTH ELEVATION 1/8”=1’-0”ATTACHMENT BPage 27 of 28
BUILDING D EAST ELEVATION 1/8”=1’0”8BRACKET ARCHITECTURE OFFICEORCUTT MIXED USE | HOTEL830 ORCUTT STREET SAN LUIS OBISPO23.0123 CONDITIONAL USE PERMITBUILDING D WEST ELEVATION 1/8”=1’-0”ATTACHMENT BPage 28 of 28
830 Orcutt Road (USE-0680-2022)
Hotel Use
Request to establish a hotel use, consisting of three (3) guest suites in a
mixed-use development, that operates daily for twenty -four hours a day.
March 8, 2023
Applicant: 830 Orcutt, LLC
Project Description
Hotel Use
Three guest suites
Daily, 24-hour operation
1,500 square foot commercial building in mixed-use development
Contactless hospitality experience
No onsite employees
Contract housekeeping and maintenance services
24-hour hotline for maintenance requests and nuisance complaints
Consistency with General Plan & Zoning Regulations
Services and Manufacturing Land Use Designation and
Commercial Service Zone
Wide range of service uses that meet needs of the City and/or region
Performance standards for commercial uses in mixed -use
developments
Lighting
Noise
Air quality and odors
Hours of operation
Consistency with General Plan & Zoning Regulations
Lighting
Lighting fixtures evaluated at building permit review
Noise
No amplified sounds outdoors, compliance with Noise Ordinance (Condition No. 4)
24-hotline for maintenance requests and nuisance complaints (Condition No. 3)
Air quality and odors
Does not include equipment or operations that would produce pollutants or odors
Hours of operation
24-hotline for maintenance requests and nuisance complaints (Condition No. 3)
Parking management (Condition No. 5)
Revision to Draft Resolution
Finding 3 of Section 1
As conditioned,the design,location,size,and daily,twenty-
four-hour operating characteristics of the project will be
compatible with existing and future land uses in the vicinity
because the proposed hotel use is limited to three (3)guest
suites,does not include outdoor amenities or is prohibited
from having amplified sounds outdoors,would be adequately
served by onsite parking,and shall comply with applicable
performance standards related to lighting,noise,air quality,
and hours of operation for nonresidential uses in mixed-use
developments.
Recommendation
Adopt the Draft Resolution, as revised, approving the
project based on findings and subject to the conditions of
approval.