Loading...
HomeMy WebLinkAbout10/04/1988, C-4 - AWARD OF CONTRACT FOR ""DOWNTOWN SIGNAL UPGRADE, PHASE 2 - CITY PLAN NO. G-07E.""", i M ET A la�I�N!pV {11iI city of san LL.,� oBispo ctING . R, T �9as COUNCIL AGENDA REPORT STEM MB FROM: David F. Romero. Wayne A. Peterson Prepared by: Barbara Lynch Public Works Director City Engineer Engineering Assistant /Traffic SUBJECT: Award of Contract for "Downtown Signal Upgrcde, Phase 2 - City Plan No. G -07E." CAO RECOMMENDATION: Award Contract to Lee Wilson Electric of Arroyo Grande, CA in the amount of $264,558.00. DISCUSSION: All of the traffic signal controllers in the downtown were installed in the 1950's and 19601s. With the exception of those signals upgraded lost year, the older controllers have become an increasing maintenance problem and replacement parts are scarce. New controllers are to be installed which will provide added safety features, versatility, reduced risk of cc.iflicting signal indications, lower maintenance, and standardize our controller, equipment. Visibility of the signal lights will be upgraded to conform with federal guidelines. This will also improve safety at the intersection. The ARC reviewed a preliminary proposal of the �,ork to assist staff in determining controller placement and equipment color. The ARC adopted two colors proposed by Pierre Rademaker to replace the presently used Sorrento Olive, and also adopted a fluted style pole for the most arm signals. They proposed placing the signal controllers in landscaped areas when possible and adjacent to other sidewalk furniture as an alternative. This involves moving the controllers some distance from their existing locations, often at substantial expense. This project has been identified as Minor and Incidental by the Planning Department. Bids were opened on September 15, 1988, the results of which are shown on the attached Bid Summary Sheet. Lee Wilson Electric of Arroyo Grande was the low bidder with o bid of $264,558.00. The Engineer'^ Estimate for the project was $270,000.00. SIGNIFICANT IMPACT: Base Bid: $243,300.00 Fire Dept. Pre - emption: $21,258.00 Contingencies: 36,700.00 Contingencies: 3,742.00 Total: $280,000.00 $25,000.00 4%1; il�!�� N city of san .pis ogispo �,r: !�1r, n�, i MA COUNCIL AGENDA REPORT This project is included in the 1987 -89 Capital Improvement Program, Capital Reinvestment, under Streets /Traffic Signal Improvements. The amount of $160,000.00 was budgeted for this project; however, funds for other signal upgrade work are available to cover increased costs. Using these funds will limit the amount of upgrade work which can be accomplished outside the downtown area. The Fire Department has requested that a pre - emption system be installed at five of the intersections included in this project. This item was not originally budgeted for in this project. The equipment is public safety, not transportation related, so funds for the fire equipment will be provided from Capital Outlay Money. CONSEQUENCE OF NOT TAKING THE RECOMMENDED ACTION: The project will not be built, or will be delayed. Maintenance on existing equipment will remain high, and improvements to safety will not be made. ACTION RECOMMENDED: Award contract to Lee Wilson Electric of Arroyo Grande in the amount of $264,558.00. b16 /g07e -award by RESOLUTION NO. (1988 Series) A RESOLUTION OF THE CITY OF SAN LUIS OBISPO AWARDING THE CONTRACT FOR THE DOWNTOWN SIGNAL UPGRADE, PHASE 2 CITY PLAN NO. G -07E WHEREAS, the City received bids for the Downtown Signal Upgrade Project, Phase 2, City Plan No. G -07E, and WHEREAS, the Engineer's Estimate.was $270,000.00, and WHEREAS, the low bid was received from Lee Wilson Electric of Arroyo Grande in the amount of $264,558.00, and WHEREAS, there are funds available from the Capital Improvement Program for the signal portion of this project, and , WHEREAS, the Fire Department requested pre - emption equipment be included in the project, and the pre - emption equipment was not budgeted for with the original project, NOW THEREFORE BE IT RESOLVED, the following items: 1. Award contract to Lee Wilson Electric of Arroyo Grande. 2. Direct the City Clerk to prepare the appropriate documents for signature by the successful bidder and the Mayor. 3. Authorize the Mayor to execute the contract documents. 4. Authorize the use of Capital Outlay Monies to cover the cost of providing Emergency Vehicle Pre - emption equipment as part of the Downtown Signal Upgrade. On motion of seconded by and on the following roll call vote: AYES: NOES: ABSENT: (4—of -3 the foregoing Resolution was passed and adopted this day of 1988. MAYOR ATTEST: CITY CLERK APPROVED: City Ad inistrative Officer City A torney City Ensoneer Mirector of Finance V. A k Jtzz� �e Lox&j Fire Chief b16 /gO7e -award by e ff 4 0 THE FOLLOWING BIDS WERE RECEIVED IN THE CITY CLERK'S OFFICE FOR "DOWNTOWN TRAFFIC SIGNAL INSTALLATIONS - CITY PLAN NO. 6 -07 E." BIDS WERE OPENED ON SEPTEMBER 15, 1988, AT 3:00 P.M. ENGINEER'S ESTIMATES: $270,000.00 1. Lee Wilson $264,558.00 Arroyo Grande, CA 2. Signal Maint. Co. $282,125.00 3. Collins Electrical $2839965.00 4. Steiny & Co. $296,189.00 Valle Jo, CA