Loading...
HomeMy WebLinkAbout11/01/1988, C-4 - AWARD OF CONTRACT FOR ""STENNER CANYON RESERVOIR NO. 2 - CHLORINE BUILDING - CITY PLAN NO. L-22M."""m MEETING DATE: city of san IUIS oBiSpo November 1 1988 aftra COUNCIL AGENDA REPORT MM NUMeffrZ� 10 From: William T. Hetland W Prepared by: Allen Short 'Utilities Director Water Treatment Plant Supervisor Subject: Award of Contract for "Stenner Canyon Reservoir No. 2 - Chlorine Building - City Plan No. L -22M." CAO Recommendation: Adopt Resolution Awarding the Contract and Authorizing the Transfer of Funds. Background: The existing chlorine building at Stenner Canyon is approximately 40 years old, and is in a deter which requires major repair to insure structural addition safety concerns with regard to chlorine and storage must be addressed and improved. The of replacement of the old chlorine building with building. Reservdir No. 2 Lorated condition integrity. In handling, feeding, project consists a new 400 sq. ft. The installation of the new chlorine building is an extension of Reservoir No. 2's refurbishment project. The project consisted of covering and lining the reservoir, modifying the influent and effluent piping, and the installation of a new chlorine building. On August 16, 1988, the City Council approved plans and specifications and authorized staff to advertise for bids. Bids were opened on September 29, 1988, the results of which are shown on the attached Bid Summary Sheet. Vernon Edwards was the low bider with a bid of $27,991.00. The Engineer's Estimate was $50,000. Status: Because this project is not within the City limits, all required building permits which are requested by the County Planning Department have been obtained. SIGNIFICANT IMPACT: Base Estimate $ 27,991.00 E &C - 10% $ 2.799.10 Total : $ 30,790.10 r �u�u�IBll VA141�111 city of san Luis osispo COUNCIL AGENDA REPORT Chlorine Page Two Financial Plan: ! The covering and lining portion of the project was over budget, therefore, additional funding is required. To accommodate this project, the McCollum Street Project which is listed in the 1988 -89 Capital Reinvestment Plan will be rebudgeted or funded through savings from other water distribution projects. Therefore, the money for this project must be transferred from the Water Fund Capital Reinvestment appropriation. CONSEQUENCE OF NOT TAKING ACTION: The substandard condition will remain and the project may be more expensive to construct at a later date. ACTION RECOMMENDED: Adopt resolution authorizing the transfer of money and awarding the contract for "Sterner Canyon Reservoir No. 2 - Chlorine Building - City Plan No. L -22M.° RESOLUTION NO. (1988 Ser__o) A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN LUIS OBISPO ACCEPTING BID AND AWARDING A CONTRACT WHEREAS, the Council hereby accepts the bid and authorizes the Mayor to sign a contract on behalf of the City for the following: PROJECT: STENNER CANYON RESERVOIR NO. 2 CITY PLAN NO.: L -22M CHLORINE BUILDING ESTIMATE: $509000.00 FUND NO.: 050 -9724- 091 -572 BIDDER: VERNON EDWARDS BID AMOUNT: $279991.00 NOW THEREFORE BE IT RESOLVED, that the City Clerk is directed to prepare the appropriate documents.for signature by the successful bidder and the Mayor. On motion of seconded by and on the.following roll call vote: AYES: NOES: ABSENT: the foregoing Resolution was passed and adopted this day of 1988. MAYOR ATTEST: CITY CLERK •• w w w w+ M APPROVED: V� City Administrat a Officer I:i17i47 YIA&�=_�' FinanEW Director L) t ut�.....� . Utilities Director lib3 /bid C!.y -3 U n. „4 8 • II G) _I p N (D W O G C) -< u o Z r i cn 0 0 �..� L CO --I It "j —< V —q T �mz z 0 0 r �^ N 1+ � i 3 N 0 w N 8 N CN oy 11OZ aN W r o d N z vw 0 I 6 m U) Pa 2 z fir � Ut z �. m m O liiuia N �� o >m o m vi gill r zm< A _9 p 17 jg il i8 gill O N . ^ r (P 0� . gill I 2 .� �• z r 4+ ME r- I LA O r . � 1 y Ig (fit t!N Z n= NA r Div 2 • II G) _I p N (D W O G C) -< u o Z r i cn 0 0 �..� L CO --I It "j —< V —q T �mz z 0 0 r �^ N 1+ � i 3 N 0 w N 8 oa_ mo z G) CD . W .D O N O Oo 3 0, n -�C O v z cmi r c (n 4 (1) �> 0 }� L ?` —I -< N� ru im> z No p m C N r B N � 4 11OZ aN W r o d N z vw 0 6 m U) Pa 2 z fir � Ut z �. m m O N �� o >m o m vi r zm< A _9 p 17 jg i8 O N . ^ r (P 0� 2 .� �• z r 4+ r- NZ LA O r . � 1 y Ig (fit t!N Z n= NA r Div 2 oa_ mo z G) CD . W .D O N O Oo 3 0, n -�C O v z cmi r c (n 4 (1) �> 0 }� L ?` —I -< N� ru im> z No p m C N r B N � 4