Loading...
HomeMy WebLinkAbout02/09/1988, I - CAPITAL PROJECT COUNCIL REVIEW �Hiul�g�II�II�I�III��ryI�IIINtJ MEETING DATE' city U� U of sa►n lugs oBispo February 9 1988 Iwo COUNCIL AGENDA REPORT I'BA FROM: David F. Romero Wayne A. Peterson-, Public Works Director Citv En ineer- r" SUBJECT: Capital Project Council Review CAO RECOMMENDATION: Council Should Discuss/Make Comment/Give Direction to Staff as is Appropriate. BACKGROUND: Staff proposes that the Council spend 30-45 minutes discussing the first 3 items, take a 30-45 minute field trip to view them on site, then return to City Hall to discuss the last 4 items. Staff will have exhibits for each item as it is discussed. 1 . Museum projects A. Entry Repair--project complete. This project repaired a sagging foundation and closed up cracks in the entry structure of the building. This work cost $53,085 and was completed in December of 1986. B. Electrical and heating improvement. This project upgraded the electrical system, installed a new heating system, remodeled the lower floor for storage and constructed an elevator shaft for the purpose of allowing handicapped access the the display floor. This work cost $66,915 and will be completed in March 1988. C. Handicapped Elevator system. This project will install an elevator in the shaft currently being constructed. It is estimated to cost $20,000 and should be completed later this spring. D. Handicapped Access Improvements. This project will install ramps and walks to allow handicapped access from the parking lot side of the building adjacent to the elevator. This project would cost $30-50,000 depending on the wall treatment required. Since grant funds are now expended, the Council will apply for an additional grant which, if approved, should be available within one year. 2. Mission Plaza projects Naman project This project will provide additional pedestrian walkways, seating and viewing areas in the space between the arbor and the creek. The project was proposed by the Naman family and is estimated to cost $39,000. The project should be completed this summer. i� I ��►►H�►bI►I(�III{I���1i1����� MY Of sw. i LUIS OBISPO COUNCIL AGENDA REPORT Kiosk This project will provide a place where information about the City can be displayed. The kiosk will be built in the plaza adjacent to the north end of the Warden Bridge. Part of the estimated $10,000 cost will be paid for from donations given to the city for this purpose. The project should be completed this summer. Amphitheater This project will improve the existing amphitheater by improving the stage area, adding seats, and reducing the slope of the turf seating area. The project has not been designed but has been estimated to cost $58,000 and is scheduled for construction during the 88-89 year. Restrooms The project originally was proposed to provide additional facilities at only Mission Plaza. During added evaluation it was apparent that the problem existed only about 15 days a year at this location and that other locations also had a similar need. This project a now being considered will provide additional restroom facilities wherever needed in the community due to special events. The project envisions a mobile restroom that can be brought to various locations and connected to existing sewer and water. The cost of the project is as of now uncertain. Broad Street to Nipomo walk d This project will provide for a two level walkway most of the way between Broad Street and Nipomo Street along the south side of San Luis Obispo Creek. Some of the upper walkways have been widened in cooperation with the adjacent property owners to provide deck areas that are conducive to activities such as dining and viewing the creek. The project is currently under construction and should be completed later this spring. The contract cost for the project is $326,000. 3. City Hall entry project (See attached) This project is being considered with various options. Its primary purpose was to redo the front doors of City Hall to make them work better and to install a vestibule to improve the weatherproofing of the building. In addition the project is also proposed to revise the existing reception facilities used by the City Clerk that are impacted by the door revision. Depending on the options chosen, total cost for the project may range from $13,700 to $45,000. 4. Parking Garage Number 2 This project is designed to provide 278 parking spaces in a structure over a combination of retail and office space on Chorro Street between Marsh Street and Pacific Street. The project has been approved by the Planning Commission and should shortly be approved by the ARC. The architect is preparing plans with a goal of beginning construction this summer. The project should be completed by the following fall. The estimated cost of the structure alone is $3,500,000. In addition the City is entering into a purchase agreement with the current property owner of the Marsh Street frontage which will cost $450,000 plus options to lease the retail space. ti��i�►>I►IIIUIIIIIIIIlI�1° 9��III city of San h,.., OBISPO COUNCIL AGENDA REPORT 5. Santa Rosa-Higuera Street Storm Drain This project involves the construction of 6x8 foot box culvert under Santa Rosa Street from in front of Ski's Shell Station to Higuera Street and than down Higuera Street to San Luis Creek opposite Firestone, about 500 feet altogether. The new culvert will replace an old substandard, and in some places failing, culvert built when property owners culverted the creek through their property at some time in the past. The project is estimated to cost $250,000 and should be completed in the late fall of 1988. 6. Higuera Street-Madonna Road Widening This project will widen Higuera Street from near High Street to just south of Madonna Road. The road will be widened twenty feet on the west side. In addition the intersection of Madonna and Higuera Street will be. reconstructed to improve its capacity and additional lanes provided between Madonna Road and South Street. A small amount of South Street east of Higuera Street will also be widened and improved. In addition to the road work the project also includes the undergrounding of the existing overhead wires, the construction of some additional waterlines to serve the adjacent properties and the installation of street trees along Higuera and Madonna and in the freeway right-of-way on each side of the Madonna Road where the landscaping was disturbed by the recent Madonna Road . project. Some additional work will be done on Caltrans' office property to remedy damage done to the parking lot and access road as a part of the right-of-way acquisition agreement. The project is estimated to cost almost $1 ,000,000 with almost $800,000 being the City's portion. The City has already incurred costs for the right of way needs. 7. Higuera Street widening-High to Marsh. This project has not been worked on because almost none of the right-of-way necessary for the widening is owned by the City. Most of the right-of-way is encumbered by existing buildings which are occupied by businesses. The current plans propose that the street be widened twenty feet on the west side. All of the overhead utilities would also be placed underground. No detailed estimate of the project has been prepared but the total project will probably cost in excess of $2,000,000. wapd/capitalproj �-3 CITY HALL ENTRANCE REMODEL OPTIONS: 1. Relocate and automate doors, construct vestibule $45,700 and new Casework for City Clerk Reception. 2. Relocate and automate doors, construct vestibule $40,200 and modify existing casework for City Clerk Reception. 3. Automate doors in present location $13,700 OPTION 1 Relocate main entry doors and construct a vestibule $45,700 This option will move the existing bronze doors and framework forward two feet and install power assist door openers that are concealed in the vault below the entry area. New bronzed aluminum and glass doors and framework will be installed to form the interior wall of a vestibule and new casework will be constructed for the City Clerk Reception area. The estimated costs are: Relocate and automate the existing bronze doors - $17,000 Construct vestibule of bronzed aluminum and glass - 12,000 Replace casework for City Clerk Reception Area - 61000 Contingencies - 7,000 Design Costs (reimbursement to Operating Budget) - 3.700 TOTAL $45,700 The automation of the doors is proposed in response to continued complaints that the doors are difficult to open. When the wind blows from the soutb, the increased pressure on the doors makes opening them so difficult that some people cannot get the doors open without assistance. The vestibule is proposed in response to an energy audit and to the situation within the building where every time the doors are opened on a windy day there is a. strong draft throughout upstairs offices that have a door open. The offices of the Finance Department and the City Clerk have counter windows or doors that are always open into the entry foyer. The vestibule will reduce fuel costs and will increase employee comfort. The casework is being replaced because the new vestibule will encroach upon the space occupied by the existing reception counter. r-4 OPTION 2 Relocate main entry doors and construct a vestibule $40,200 This option will move the existing bronze doors and framework forward two feet and install power assist door openers that are concealed in the vault below the entry area. New bronzed aluminum and glass doors and framework will be installed to form the interior wall of a vestibule and existing counter for the City Clerk Reception area will receive minimum modifications. The estimated costs are: Relocate and automate the existing bronze doors - $17,000 Construct vestibule of bronzed .aluminum and glass - 12,000 Replace casework for City Clerk Reception Area - 500 Contingencies - 7,000 Design Costs (reimbursement to Operating Budget) - 3.700 TOTAL $40,200 This option differs from OPTION 1 in that the existing counter will have the south east corner cut off approxinately two feeet on a side and will be repaired. This will reduce the space presently occupied by the telephone swithchboard. OPTION 3 Automate the front doors at their present location $13,700 The front doors would be automated at their present location by the installation of operators in the vault beneath the entry. This price includes the present design which can be used for this scope as well. This alternative will provide the power assist needed to permit everyone to open the front doors. Work accomplished under this alternative would little or no value in a future construction of a vestibule that required the relocation of the existing doors. T5 � CAlElvoRK INTERIOR ELEVATION 13�-- (r- _ y.l r f I rl 4- EX�1'ERIOR EI:EV"A�1'ION __ T-60 � � ^IVe�✓ @ast mer�C � .J 1 •J I1 FNACE C qty I C lark PrsrenT '[.araw'�k i 1 Mss eREFRair i i 1 ' 1 REPORT FROM 2/2/88 MEETING �y� III MEETING DATE: I� �II� ��jllUlu aty of San LL. . 0B1Sp0 FEB. 2, 1988 NO COUNCIL AGENDA REP RT I M9 FROM: David F . RomeroL, Lane Wilson Prepared y : - Public Works Director Parks and Buildings ger David P . Pie ce SUBJECT: Mission Plaza - Naman Patio Construction - City Plan No . M02-Y Mission Plaza - Kiosk - City Plan No . M03-Y CAO RECOMMENDATION: Adopt Resolution approving Plans and Specifications , and authorizing staff to advertise for bids . BACKGROUND: The Naman family proposed this modification to Mission Plaza , the Parks and Recreation Committee approved the concept , and on May 6 ,- 1986 , Council authorized staff to pursue the project . On January 6 , 1987 , Council approved an agreement with Dorothy Naman for the easement in which this construction is to take place . The modification incorporates a Kiosk for which the Council accepted a donation of $1 , 471 . 59 in September 1980 , from the Plaza Anniversary Committee . The project has been designed and is ready to go to bid for construction this spring. Coordination : This project received final approval from the ARC on May 4 , 1987 . Community Development filed a Mitigated Negative Declaration on environmental impact on April 29 , 1987 . The mitigation includes erosion control measures in the plantings and irrigation , .a railing to deter pedestrians from entering planted areas within 10 feet of the creek, and limitation of project construction from April 15 through October 15 . Purchasing Control_Procedure : Purchasing Control Procedure 403-3 applies to this contract . Jr— 1 .I!AWW11111>i$p11011111 city of sa Luis oBispo COUNCIL AGENDA REPORT Mission Plaza Page 2 Fiscal Im act : The engineers estimate is $49 , 890 without contingencies . The Capital Reinvestment Plan targeted the following amounts for construction : for the Naman Patio $30 , 000 in FY 1987-88 for the Kiosk _$10t000_ in FY 1988-89 ! TOTAL $40 , 000 As indicated in the attached resolution , the recommendation for the appropriation of funds for these projects will be presented for City Council approval after the bids are received and the actual cost of construction is known . Recommendation : -------------- Adopt Resolution approving Plans and Specifications , and authorizing staff to advertise for bids . g:kioskagd r RESOLUTION NO. (1988 SERIES) A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN LUIS OBISPO APPROVING A PLANS AND SPECIFICATIONS WHEREAS, Council has approved in concept improvements in the Mission Plaza to include a Patio and Walkway as proposed by the Naman Family and an information Kiosk; and WHEREAS, the City has negotiated an easement with the property owner; and WHEREAS, The Capital Improvement Plan includes $30,000 for the Patio and Walkway, and $10,000 for the Kiosk; and WHEREAS, The Architect estimates the construction cost to be $49,890.00; and WHEREAS. The design of the project is complete and was approved by the ARC on May 4, 1987. NOW THEREFORE BE IT RESOLVED by the Council of the City of San Luis Obispo as follows: SECTION 1. Plans and Specifications for City Plan Number M-02Y, Mission Plaza - Naman Patio Construction and City Plan Number M-03Y, Mission Plaza - Kiosk are approved and staff is authorized to advertise for bids. SECTION 2. After the City Clerk has received bids, these projects shall be returned to Council for appropriation of monies. 1 -10 r SECTION 3 The City Clerk shall furnish a copy of this resolution to the Public Works Director and the Finance Director On motion of , seconded by and of the following roll call vote: AYES: NOES: ABSENT: the foregoing Resolution was passed and adopted this day of 1988. MAYOR RON DUNIN _ ATTEST CITY CLERK PAN VOGES APPROVED: City Administrative Officer City torney Finance d1rector Public Works Director s- � r