Loading...
HomeMy WebLinkAbout10/04/1988, C-10 - CITY-WIDE TELEMETRY SYSTEM COMMUNICATION LINK T. ���lllluljowl l Clty Of SM IDIS OBISPO ucto�e�° 1988 Aft COUNCIL AGENDA REPORT FROM William T. Hetlandf , � Prepared by Allen Short ''. Utilities Director Water Treatment Plant Supervisor. SUBJECT: City-wide Telemetry System Communication Link RECOMMENDATION: By motion, approve the specifications and authorize staff to advertise for bids. BACKGROUND The City by prior approval is in the process of purchasing hardware for the city-wide telemetry system. Once the hardware has become operational there must be a means of communication between the remote units and the masters. Staff has reviewed the communication link options. In accordance with the telemetry master plan it is our recommendation that the city-wide telemetry system communicate by means of a radio link. The use of radio provides the City with a number of advantages: Elimination of phone line installations where required. Elimination of lease line costs. Improved system reliability. System independence and control. The use of the communication link will provide operational personnel with a mechanism to talk to the entire system from a central location and to obtain information at a moments notice. It will also allow personnel to turn pumps on/off to effect a change in reservoir elevations from a central location. PHASES The telemetry system project has been divided into three (3) major phases. Phase one was the purchase of the telemetry hardware and has been approved and is in progress. Phase two is this project, Telemetry System Communication Link, and consists of the identification and purchase of the communication link for the water treatment plant, sewer collection system, Whale Rock Reservoir, and selected reservoirs within the distribution system. Due to the scope of the project and the numerous components required for purchase and installation, staff will return to you for approval of plans and specifications for the following phase: Phase three consists of authorization to proceed with the remainder of the water distribution system, hardware, communication link and installation (2/89) C 1111p lig city Of San tins OBISPO nia COUNCIL. AGENDA REPORT Page 2 ALTERNATIVES 1. Do not undertake this portion of the project. 2. Consider other communication alternatives. Pros 1. Savings to the City of previously allocated funds if project is not undertaken. Cons 1. Continuation of inefficient and ineffective system operation if communication link is not undertaken. 2. Other methods of communication are not cost effective. FISCAL IMPACT The telemetry project has been identified in the Water Management Plan and is an integral part of the water treatment plant and distribution system improvements. * Funding for the water t=eatment plant improvements project ($1.44 million) is identified in the Water Management Plan under the section of water treatment plant improvements and in the two year capital reinvestment ylan on page E-5 of the 1987-89 Financial Plan and Approved 1987-1988 Budget. The cost of the telemetry project, phase two is estimated to be $55, 000. The purchase of all components of the communication link will be in accordance with purchasing control procedure 401-3. ��l�ll� city of San WIS OBISPO ftaftwowaswo COUNCIL AGENDA REPORT Page 3 RECOMMENDATION Approve specifications and authorize staff to advertise for bids for the communication link of the City's telemetry system. MAYOR RON DUNIN ATTEST: CITY CLERK PAM VOGES Approved: ITY AD_,OINISTRATIVE OFFICER CITY ATT EY 9LA- L Finance Director Utilities Director