Loading...
HomeMy WebLinkAbout11/07/1988, Agenda CONSIDER OPTIONS AND ALTERNATIVES RECCOMMENDED IN THE SLO MASTER PLAN AND BEGIN MASTER PLANNING SPECIFIC TO CITY HALL EXPANSION ��INrI� i�IIIIIif�{` MEETING DATE: Inmu�� c� o san tui s oB�spo Nov. 7, 1488 COUNCIL AGENDA REPORT ITEM NUMBER: FROM: Toby Ross, Assistant Administrative Officer _ SUBJECT: Consider options and alternatives recommended in the San Luis Obispo Master Plan and begin master planning phase specific to City Hall expansion. CAO RECOMMENDATION: 1. Accept the Overview and Options phase of the Facilities Master Plan and provide direction on development options. 2. Direct staff to complete the master planning phase of the Facilities Master Plan with limited technical assistance. 3 . Authorize staff to proceed with design and archeological service for city hall expansion. SUMMARY During budget hearings in 1987, the council requested an evaluation of the City's overall space and facility needs and in early 1988 authorized West+Doubledee Architects to prepare a masterplan for City facilities. The architect has completed the Overview and Options phases and the council is being asked to review alternatives, to select solutions and to authorize City Hall development and preparation of the master planning phase. The study focuses on the buildings that house most City employees. Of these, Fire Station No. 1 and City Hall have major deficiencies requiring immediate attention. Recommended options for Fire Station No. 1 would add or retrofit 13,000 to 16,000 square feet at a cost of $1.8 to 3 million. Recommended options for City Hall include alternative phasing, configurations and size ranging from 16,000 to 39,000 square feet at a cost of $2.6 to 6 million. CONSEQUENCES OF NOT TAKING THE RECOMMENDED ACTION Until the Council provides direction to staff on the project options, the master planning phase cannot be completed. If the Council does not authorize staff to proceed with the study and design for a City Hall expansion, the project could be delayed. If the project is not approved, employees will continue to work in inadequate space or find space outside City Hall. O� �,���� I�IIIII�IIp ���l► city of San LUIS OBISp0 Niis COUNCIL AGENDA REPORT BACKGROUND The Capital Facilities Plan recognizes four projects to provide needed space for operations and to insure the safety and productivity of City employees. 1. Fire Station No. 1 (page E-14) 2. Recreation and Parks Department Relocation (page E-15) 3. Corporation Yard Expansion (page E-15) 4. Civic Center improvements (page E-15) During budget hearings in 1987, the Council requested that no projects proceed without further study of the City's overall space and facility needs. A staff committee discussed the need for a master plan and at Council's request, proceeded with an RFP to prepare a plan and to confirm evaluations of the above projects. On February 1, 1988 the City Council authorized the CAO to execute an agreement with West+Doubledee Architects to prepare a Master Plan for City Facilities. The agreement authorized the architect to indentify and prioritize current and future facility needs and to suggest options based on a through analysis. The architect was to then recommend solutions to current and future facility needs. Upon completion of the options phase, the council was to review alternatives, to select the most appropriate solution and to authorize preparation of the master planning phase. The master planning phase will outline the framework for implementation of solutions chosen by the council. A draft of the initial phases was distributed to the Council and made available to the public on October 14, 1988. SUMMARY-SAN LUIS OBISPO CITY FACILITIES MASTER PLAN The first product of the Facilities Master Plan includes the following: Overview The overview section includes documentation of existing organization, staffing patterns and evaluation of existing facilities. Projection of future program demands, staffing patterns, space requirements and anticipated facility needs are also presented. Options The options section includes analysis and economic evaluation of alternative solutions to identified facility needs along with consultant recommendations. w k�lU City of san tuts OBISPO COUNCIL AGENDA REPORT FACILITY ISSUES AND RECOMMENDATIONS The West+Doubledee study emphasizes five facilities that warrant special attention. These facilities, Fire Station No. 1, City Hall, Corporation Yard, Recreation Office, and the Police Station have been identified because they house the majority of the City's employees or because of previously identified issues. The study uses existing City policy as a guide for facility planning and land development using existing documentation where applicable. Organizational interrelationships are examined to assess needs for communication and interaction between departments. Workforce trends for staffing to meet projected city population needs are taken into consideration as well as political, social, economic and environmental influences which could have a significant impact on projected facility needs. The study identifies two facilities, City Hall and Fire Station No. 1, that have major deficiencies which require immediate action. City Hall has more than 80 employees which can efficiently accomodate only 55 to 65. If this facility is not expanded the City will be required to continue sending employees to remote locations. Fire Station No. 1 is an inefficient building that has serious structural and environmental deficiencies which present safety hazzards and threaten response capabilities. Other facilities which are addressed in the study have deficiencies but immediate attention is not imparative. Fire Station No. 1 Fire Station No. 1 has documentated structural, plumbing and electrical deficiences. Termite damage and infestation is evident. The building has inadequate heating, poor ventilation, inferior lighting and a leaky roof. In addition, the facility has a very low percentage of support area because there are too few corridors. Circulation is through office areas which is disruptive and inefficient. There is an existing space deficiency of approximately 6000 square feet as a four bay station. In order to meet projected needs for 1995 through 2010 the study indicates that the facility should be between 13,000 and 16,000 square feet. The condition of the building requires a timely decision about what should be done. Recommendation Construct a new facility on the adjacent site (parking lot #5) to meet 1995 needs with a provision for future expansion. Demolish, abandon or retrofit the existing facility for alternate use. Cost of recommended options: $1.8 to 3.0 million e , ���u��H��lllll���i��u►I� �� city or san Luis osispo Mrms COUNCIL AGENDA REPORT CITY HALL City Hall is currently overcrowded and does not effectively accommodate necessary programs and activities. The building houses over 80 permanent and temporary employees in spaces which can effectively accommodate 55 to 65. The study identifies current space deficiencies of approximately 18,000 square feet in the existing building. That deficiency is projected to crow to 38, 000 square feet by the year 2010. In addition to space deficiencies, environmental problems have been identified which are predominately related to inadequate heating and ventilation systems as well as the quality of work spaces in the basement area. Although parking is not presently a major issue, future facility expansion may generate a parking demand of 112 additional spaces 1995 and 145 by the year 2010. The study made every effort to conform with city policy .which fosters development of the civic center concept and maintain that City Hall remain in the downtown area. Recommendations The study recommends the renovation of City Hall to mitigate existing environmental and functional deficiencies. To construct a full or phased City Hall expansion on the site of the old library building with a provision for facility expansion to meet future needs. This option which requires the demolition of the existing library structure provides for contigious City Hall facilities, does not require site acquisition and maintains adjacent parking area for potential expansion. Cost of recommended options: $2.6 to 6 million *Project can be constructed in phases. CORPORATION YARD The primary deficiency at the corporation yard is the lack of enclosed storage space. The study indicates a current need of 18,000 square feet of storage which may increase to 30, 000 square feet by the year 2010. The existing maintenance building should be adequate to meet needs through 1995 if existing stored materials are transfered to a warehouse facility. The operations building is at capacity now but could accomodate growth to 1995 with reorganization of space. Recommendation The study recommends construction of an 18,000 square foot warehouse and construction of a shelter for ten vehicles both designed to accomodate future expansion. In addition to the expanded storage area, the study calls for future renovation of the administration area to increase capacity for future expansion. Cost: $1.5 to 2 million ���n�►n►►►�Illll�p ��lll My Of san tins OBISPO COUNCIL AGENDA REPORT RECREATION OFFICE The existing 700 square foot office space in the converted residence at 860 Pacific is inefficient and deficient for current needs. It is estimated that an area double this size will be needed by 1995. The facility experiences a large volume of traffic composed of public participants in recreation programs, temporary employees and volunteer workers. This activity and related traffic suggests that the Recreation offices would best be located apart from general city administrative functions. Continued use of this facility is inconsistant with established policies relating to productive work enviornments. energy efficient buildings and a positive city image. The study suggests that the inclusive master plan should address the need for a large recreation facility which would include administrative offices for Recreation. Recommendation The Recreation Department administration should ultimatley be planned as an integral element of a major activity center. The recommendation in the study suggests that offices be temporarily maintined at the present location until an interim location can be provided at the Chorro Street parking structure or at 955 Morro Street as space becomes available. Cost: Nominal (immediate) POLICE STATION In 1983, the Police Station facility underwent a major addition and remodeling. The building is adequate to meet current needs, however, existing deficiencies and functional problems include limited flexibility, poor acoustical privacy, undersized employee lounge, inadequate locker facility and inefficient clerical space. Employee parking is inadequate during shift changes and visitor parking is limited. The internal inflexibility and site limitations make expansion at this site difficult. Ongoing renovations will be required to accomodate short term growth. The facility is projected to reach maximum capacity by 1995. Recommendation The study indicated several options which should be considered in greater depth in the master plan, but, since this facility is adequate for the near future, no immediate action is recommended. As this facility approaches maximum capacity (1995 to 2000) , a detailed analysis of current departmental needs will be necessary to determine the most effective option for providing future facility needs. Cost: None Ma •S00 ��►�h�i�lll�l�ll�����ulli���`I city of San LUIS OBISpo SMSCOUNCIL AGENDA REPORT OPPORTUNITIES FOR SHARED SOLUTIONS TO FACILITY NEEDS The bus transfer point next to city hall on Osos Street disrupts pedestrian and auto cirulation and also prompts complaints from city hall occupants about exhaust fumes. Constructing a new city hall office building with associated site improvements, presents an opportunity to relocate or reconstruct the transfer point and mitigate its problems. The rapidly growing demand for recreational and cultural activities introduces the chance to build a multi-use center for recreation, senior activities, cultural events and offices for parks and recreation department. Laguna Lake Park would provide an assessible location with plenty of undeveloped land for this kind of central community center. Police and fire administration divisions should remain at public safety facilities. They could occupy city hall, but would require provisions for emergency response. Also, separating administration from line divisions might upset chains of command and weaken morale. The Recreation Department should not be located at city hall because its heavy client load would strain parking and circulation in the civic center. COMPLETING THE MASTER PLANNING AND PROGRAMMING PHASES SITUATION Throughout the past several months, staff has worked closely with West+Doubledee, in the process of turning out the final product. This product includes the first two phases of the master plan, 1) the overview and 2) the options phase. Staff concures with the results of the draft and recommends that the Council accept this two phased product in it's entirety. In a report presented to the Council dated February 1, 1988, staff recommended that upon completion of the options phase that the Council review the alternatives, select the most appropriate solutions and authorize preparation of the master planning phase. Based on Council's decisions, it was then recommended that staff negotiate the details and fees of the master planning phase and execute an agreement with West+Doubledee. The master planning phase would outline the framework for implementing the solutions selected by the council and would include phasing and financing. Staff now believes that the master plan is inherent in the first two phases and with Council direction could be completed with additional consultant assistance limited to technical advice and graphics. city or san lues 0131spo AGftZs COUNCIL AGENDA REPORT These additional services would be negotiated within the authority of the CAO (anticipated cost less than $5,000) . Architectural programming would be incorporated as part of the study and design phases of the actual projects. CIVIC CENTER IMPROVEMENTS PROJECT O1tion D of the options phase calls for a full or phased expansion of City Hall on the site of the old library building. This option requires demolition of the old library structure which is scheduled to be vacated between March and June of 1989. The staff report presented to the Council February 1988 recommended that design work should have begun late March or early April of 1988. Due to the delays in completing phase one and two, the project is behind this schedule. Key steps in the project include: 1) The demolition of the Old Library 2) An archeological investigation to be conducted on the site. 3) Architectural design of the city hall annex to be constructed on the old library site. Staff recommends that theses steps be authorized as soon as possible. PROGRAMMING FOR THE CIVIC CENTER IMPROVEMENTS PROJECT The old library is scheduled to be vacated in about six months. Due to the delay of the overview and options phase, design work is currently six months behind schedule. The following proposed schedule would provide for construction to begin summer 1990. 12-88 Award Contract for architectural services Award contract for archeological services 3-89 Award contract for demolition of old library 4-89 Complete archeological reconnaissance Complete draft of master planning phase Structue Capital Facilities Plan financing Complete conceptual design 5-89 Review project with council as part of annual CIP process. Complete schematic plans 6-89 Begin formal ARC review 8-89 Council authorization to prepare final plans 10-89 ARC approval city of San LUIS OBISpo A COUNCIL AGENDA REPORT 4-90 Council approves plans and specifications 5-90 Award bid for construction 6-90 Construction begins Staff has prepared: 1. Specifications for demolition of old library. 2. A request for proposals to investigate the archeology of the old library site. 3. A request for proposals to design a new city hall office building. FISCAL IMPACT The 1988-89 budget provides adequate money for staff or the current consultant to complete the Master Plan. The Captial Facilities Plan provides for the implementation of the demolition and design phases of a City Hall expansion. The Options phase recommends construction or renovation of several facilities. The timing, cost and funding of these facilities will be determined by the Council in the future. ALTERNATIVES-COMPLETION OF MASTER PLAN 1. Council could direct staff to complete the master planning phase of the Facilities Master Plan. 2. Council could authorize staff to negotiate and the CAO award a contract to West+Doubledee to complete the master planning phase. 3. Council could authorize staff to negotiate with a different architectural firm to complete the master planning phase. ALTERNATIVES-CIVIC CENTER DEVELOPMENT 1. Council could authorize staff to proceed with design and archeological services for a City Hall expansion. 2. Council could continue discussion until the completion of the master planning phase or CIP review. 3. Council could determine that expansion is inappropriate at this time and direct staff to seek other alternatives for meeting the space needs of the 1990's. City of San tins OBISp0 COUNCIL AGENDA REPORT ALTERNATIVES-OVERVIEW AND OPTIONS 1. The council could accept the first two phases of the master plan and provide direction for completing the master planning phase. (recommended) 2. The Council could accept the first two phases but decline to complete the master planning. This document would be a guide to facility development through the Capital Improvement Planning process. RECOMMENDATION 1. Accept the Overview and Options phases of the Facilities Master Plan and provide direction on development options. 2. Direct staff to complete the master planning phase of the Facilities Master Plan with limited technical assistance. 3. Authorize staff to proceed with design and archeological services for a City Hall expansion. (CITY FACILITIES MASTER PLAN - "Overview & Options" has already been distributed to Council and staff . )