Loading...
HomeMy WebLinkAbout12/06/1988, C-3 - AWARD CONTRACT FOR WELL DEVELOPMENT, PHASE I, CITY PLAN NO. M32-L 11111IN1g111JJqamimi��III i ME December DATE Ip�u�l c� o San tins OBISpo December 6, 1988 COUNCIL AGENDA REPORT uM FROM: William T. Hetland Prepared by: Hal Fones Utilities Director Utilities Engineer SUBJECT: Award Contract for Well Development, Phase I, City Plan No. M32-L CAO Recommendation: Adopt Resolution Awarding Contract to R. Baker, Inc. of Arroyo Grande in amount of $73 , 100.00 Background: Groundwater was utilized by the City of San Luis Obispo until 1942. At that time water was first received from the Salinas Reservoir near Santa Margarita. The consumption of groundwater was discontinued due to the superior quality of the Salinas Reservoir. Groundwater is a part of the Draft Water Management Plan and is a Major Objective of the 1987-89 Financial Plan. The Groundwater Location and Development Budget allocated $50,000 for the study phase in 1987-88 and $200, 000 is budgeted for design and construction in 1988-89. This is as requested by the Council at its meeting of February 24, 1987. A contract for the study phase of the Groundwater Location and Development project was awarded to John L. Wallace and Associates which provided for the drilling of test wells as a part of their work. The information obtained from the testing indicates that four of these test wells show promise in providing water for the City of San Luis Obispo. The two best wells for water quality were the Pacific Beach well and the Fire Station #4 well. Both of these wells will be developed under this contract to supplement our domestic water supply. Their anticipated production is 500 acre feet a year. The Mitchell Park well and the Old Reservoir #1 well will be equipped with pumps under this contract. It is anticipated that the Mitchell Park well will be connected to the irrigation system. The mitigation called for under the environmental review was to limit the use of the Mitchell Park well and the Old Reservoir #1 well while studies were conducted to determine their effect on the flow in San Luis Obispo Creek. The Phase IV and Phase V report from John L. Wallace and Associates will provide the City Council with the alternates for further well development. The intent is to return with a Phase II Well Development contract at that time. The environmental review has been completed by the Director of Community Development. Limited use of the Mitchell Park well and the Old Reservoir #1 well were a part of the mitigation. This matter will be addressed in the final reports from John L. Wallace and Associates. ��// P21!1 city of sa, i LUIS osIspo MMI COUNCIL AGENDA REPORT page 2 Fiscal Impact: The Groundwater Location and Development budget has allocated $200, 000 for the design and construction in 1988-89. This first phase is estimated at $75,875, plus engineering and contingencies at 8 percent = $6, 125, for a total of $82,000. Consequences of Not Taking Recommended Action: Water resource development will be delayed. Action Recommended: Award contract to R. Baker, Inc. , of Arroyo Grande, Ca. , in the amount of $73, 100. 00. MAYOR RON DUNIN ATTEST: CITY CLERK PAM VOGES Approved: ity A inistrative Officer Cityt orney — iA Fin'An e D ctor Utilities Director Attachments: Bid Summary Draft Resolution cpM32-L/hal4 7] BID SUMMARY °ace 1 City of SAN LUIS OBISPO Bid Opening: Date: -November 14, 1989 City Plan No. 14-31.1- Time: 3:00 Job Title: Water improvement Project - Well Development Phase I ENGINEER'S I R. BAKER, INC. ;CHRISTOFF TECH. SERV.; DENNIS O'BRIEN ; BID ITEM & DESCRIPTION ESTIMATE ARROYO 6RANDE, CA. ; ORCUTT. CA. ATASCADERO, CA. ; UNIT UNIT UNIT I UNIT ; No. ITER UNIT 9UAN.1 PRICE AMOUNT ; PRICE AMOUNT PRICE AMOUNT ; PRICE AMOUNT Pump, motor 1 and fittings L.S. 1 1 5500.00 51500.00 ; 9400.00 9,400.00 18276.55 8.276.55 ; 9504.00 95504.00 ; I Pump. motor ; 2 and fittings L.S. 1 3500.00 3,500.00 ; 6800.00 61900.00 5728.15 5,728.15 ; 6418.00 6.418.00 ; Punic, motor a and f:�tingr_ �.5. 2500.00 2,5010.0_- 5700.00 ,700.00 : 461..:J 4.6-7.25 ,:..1 5A. 0 J,.JO.CO : PumD, motor ; 4 a..-.d fittings L.S. 1 2500.00 2.500.00 15100.00 5.100.00 ; 3977.85 3,977.85 ; 4886.00 4.888.00 ; W ilorinatours J and f:ttings Ea. 2 lJ000.00 30,000.00 i 5JO0.00 !I,000.00 1!!349.35 22,698.70 112489.00 24,976.00 ; : 6 Electrical service L.S. 1 ; 3000.00 3.000.00 ; 5600.00 5,600.00 1 6026.00 6,026.00 ; 4948.00 4,948.00 1 E:Ectrica! ser.ice L.S. 1 2500.00 2,500.00 0450.00 5,450.00 ; 4715.00 4,715.00 1 4096.00 4,096.00 : 6 Ele�_1�r.;cai service L.S. . 21V0.00 2,1•0O.0 J Jra•rJG.G:I 5,150.00 511:nc.110 5,122.10 4276,00 4,276,00 1 9 Electrical service L.S. 1 1 2000.00 2.000.00 a!JO.OG 5,150.00 ; 3E50.20 3.850.20 ; 5370.00 5.370.00 ; 10 6' Waterline L.F. 30 45.00 1.350.00 ; 25.00 750.00 1 50.00 1,500.00 ; 83.60 29508.00 ; 11 4' Waterline L.F. 80 ; 40.00 3.204.00 ; 30.00 2.400.00 ; 30.00 2,400.00 ; 36.50 21920.00 1 12 6" Gate valve Ea. 1 ; 350.00 350.00 1 750.00 750.00 ; 1100.00 1000.00 ; 350.00 350.00 I R F.C V NOV CATS CLERK 3_ SAN LUIS(1E115PO CA 610 SUMMARY Pride r, City of SAN Lu �Sr is u Did Daeninq_; Date:i.ovember 14, 199: City Plan No. M-32L Time: 3:00 Ooh Title: Water Improvement Project Well Development Phase 1 ENGINEER'S R. BAKER, INC. 1CHRISTOFF TECH. SERV. DENNIS O'BRIEN DID '.TEM & DESCRIPTION' ESTIMATE 1 ARROYO GRANDE, CA. 1 ORCUTT, CA. ATASCADERO, CA. UNIT 1 UNIT UNIT 1 UNIT 1 No. ITEM UNIT OUAv'.1 PRICE AMOUNT PRICE AMOUNT 1 PRICE AMOUNT 1 PRICE AMOUNT 1 1 13 4" bate valve Ea. 1 250.00 250.00 1 650.00 650.00 1 900.00 900.00 1 310.00 310.00 1 Connect to 1 1 1 1 1 14 12" waterline Ea. 2 1 3000.00 6,000.00 1 2100.0:7 4,200.00 1 750.00 1,500.00 1 2013.00 4,026.00 1 guru, gutter , i5 ani sidewalk Sc.Ft. SO 30.C0 2,400.00 I i0.00 800.00 11.25 900.00 1 9.00 720.00 1 1 16 Sidewalk Sq.Ft. 125 1 30.00 3,750.00 1 8.00 1,000.00 10.40 1,300.00 1 9.00 11125.00 1 i7 Driveway Sy.Ft. 60 1 45.00 39600.00 1 15.00 1,200.00 1 27.50 2,200.00 1 17.75 1,420.00 1 1 ID install water meter Ea. 2 150.00 300.00 1 800.00 1,600.00 225.00 450.00 1 100.00 200.00 1 1 19 Install hose bibs Ea. 2 100.00 200.00 1 150.00 300.00 150.00 300.00 1 42.00 64.00 1 1 20 Comply with OSHA L.S. 1 1 975.00 975.00 100.00 100.00 1 2200.00 2.200.00 1 100.00 100.00 , BID TOTAL 1 175,E75.00 1 8731100.00 1 $79,761.80 1 $83.391.00 1 B:D SUMMARY Pace 4r 3 City of SAN LUIS DBISPO Bid Opening: Date: November 14, 19E8 City Plan No. M-32L Time: 3:00 Job Title: Nater Improvement "Project Well Development Phase I ENGINEER'S ; DAVID DE LEON ; BID ITEM 6 DESCRIPTION 1 ESTIMATE SANTA MARGARITA, CA.. UNIT ; UNIT UNIT 1 UNIT No. ITEM UNIT 8L'AN.1 PRICE AMOUNT ; PRICE AMOUNT ; PRICE AMOUNT ; PRICE AMOUNT Pump, motor 1 and fittings L.S. 1 5500.00 5.500.00 112000.00 12,000.00 0.00 ; 0.00 ; Pump, motor 1 2 and fittinas L.S. 1 1 3500.00 3,500.00 ; 8700.00 6.700.00 ; 0.00 ; 0.00 ; ; Puma, malar 3 and fittincs L.S. 1 2500.00 2,500.00 ; 7800.00 7,800.00 0.00 ; 0.00 I Pomo. motor ; 1 4 and fittings L.S. 1 25lJ.VD 2,500.00 ; 8200.00 8,200.00 0.00 C.00 , Chlorinators 5 and fittinas Ea. 2 115000.00 301000.00 ;11000.00 :2,000.00 0.00 ; 0.00 1 6 Electrical service L.S. 1 33000.00 3,000.00 ; 7500.00 7,500.00 ; 0.00 1 0.00 ; 7 Electrical service L.S. 1 ; 2500.00 2.500.00 6000.00 6.000.00 ; 0.00 ; 0.00 8 Electrical service L.S. 1 1 2000.00 2,000.00 ; 6200.00 6,200.00 ; 0.00 0.00 1 9Electrical service L.S. 1 2000.00 2,000.00 1 5450.00 5,450.00 ; 0.00 1 0.00 1 10 6' Waterline L.F. 30 ; 45.00 19350.00 ; 103.33 3,099.90 ; 0.00 1 0.00 ; it 4' Waterline L.F. 80 ; 40.00 31200.00 1 42.50 3,400.00 ; 0.00 ; 0.00 ; 1 12 6' Gate valve Ea. 1 ; 350.00 350.00 ; 750.00 750.00 ; 0.00 0.00 ; � 3-S r GID S"N11 Y Paget4 City of SAS LUIS OBISPO Bid Ooenino: Date.Ncrember 14, 1966 City Plan No. M-32L 'ime: :Go cb TJ1e: water lmprovement Project Well Development Phase I ENGINEER'S DAVID DE LEON ; BID ITEM & DESCRIPTION ; ESTIMATE ; SANTA MARGARITA, CA.; ; UNIT ; UNIT ; UNIT UNIT Nc. I. UNIT QUAN. PRICE AMOUNT ; PR iCE AMOUNT PRICE AMOUNT ; PRICE AMOUNT 13 4° Gate valve Ea. 1 I 250.00 250.00 ; 650.00 650.00 ; 0.00 ; 0.00 Connect to 14 12' waterline Ea. 2 ; 3000.00 61000.00 ; 2950.00 5,900.00 ; 0.00 I 0.00 ; Curb, nutter 15 and sidewalk Sc..Ft. EG ; 30.00 2,400.00 22.50 1,600.00 ; 0.00 I 0.00 ; ; I 16 Sidewalk Sc.Ft. 125 ; 30 Av 3,750.00 ; 13.c 1,:00.00 ; 0.00 0.00 : 17 Driveway 5y.Ft. 6045.00 3,600.00 ; 2E.'S 2,300.00 I 0.00 ; 0.00 ; 16 Instal water meter Ea. 2 150.00 300.00 725.00 1,450.00 0.00 0.00 19 Install hose bibs Ea. 2 100.00 200.00 ; 200.00 400.00 0.00 0.00 20 Comply with OSHA L.S. 1 ; 975.00 975.00 ; 500.00 500.00 I 0.00 0.00 BID TOTAL ; $75,675.00 ; $10:,799.90 ; $0.00 ; $0.00 RESOLUTION NO. (1988 Series) A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN LUIS OBISPO ACCEPTING BID AND AWARDING A CONTRACT WHEREAS, the Council hereby accepts the bid and authorizes the Mayor to sign a contract on behalf of the City for the following: PROJECT: Well Development - Phase I CITY PLAN NO. : M32-L' ESTIMATE: $75,875.00 FUND NO. 050-9743-092-572 BIDDER: R. Baker, Inc. BID AMOUNT: $73,100. NOW THEREFORE BE IT RESOLVED, that the City Clerk is directed to prepare the appropriate documents for signature by the successful bidder and the Mayor. On motion of , seconded by , and on the following roll call vote: AYES: NOES: ABSENT: the foregoing Resolution was passed and adopted this day of , 1988. MAYOR ATTEST: CITY CLERK APPROVED:^ ity inistrativenOfficer Cit torney Fin ce ector Utilities Director lib3/bid