Loading...
HomeMy WebLinkAbout06/04/1991, C-7 - SANTA ROSA FIELD RESTROOM REPLACEMENT p IIMEETING DATE: city Of San WIS OBISp0 6/4/91 COUNCIL AGENDA R PORT STEM NJC�is EERV'1 FROM: Jim Stockton, Recreation Directo , PREPARED BY: L. Fitzgerald, Recreation Siftperviso SUBJECT: Santa Rosa Field Restroom Replacement CAO RECOMMENDATION: By motion, approve purchase and installation of pre-fabricated restrooms from Restroom Facilities Corporation as a single source supply purchase to replace existing structure at Santa Rosa Park softball field. DISCUSSION: The restroom facilities at Santa Rosa Park softball field are one of most heavily used within the City's park system. For eight months of the year, the restroom is opened for public use seven days a week for adult softball and youth baseball activities. Over 250 people per day utilize the restrooms during softball and youth baseball game times. During weekend softball tournaments, from 500-750 participants and spectators per day are present for activities with the restrooms open for twelve hours each day. Facilities are opened only during scheduled recreational activities with staff present, making the Santa Rosa softball restrooms relatively secure and free from problems plaguing other City restrooms. The existing structure is over 40 years old and has extensive termite damage. Access for the handicap is non-existent. Replacement fixtures will meet the City's requirement for low flow toilets. Restroom Facilities Corporation, from Reno, Nevada, specializes in pre- fabricated restroom structures. Their fixtures meet all building and fire codes with an emphasis on energy efficiency, vandal-resistance and low maintenance. Their facilities are site specific; architectural services are provided and on-site construction is completed by the manufacturer in ten days. Restroom Facilities Corporation's service is unique as the building and method of construction are patented. The Purchasing Control Manual, Section 201-1, provides for a single source purchase if the product is unique and certain patent or proprietary rights indicate superior features. Other restroom facilities furnished by this corporation are located at Port San Luis near Avila Beach and in Las Positas Park in Santa Barbara. CONCURRENCES: Public Works Department, Recreation Department and the Parks and Recreation Commission are in agreement that this facility needs to be replaced. Community support from the San Luis Obispo Softball Players Association and the San Luis Obispo Girls Softball Association has been received for the project. The City Attorney's office has determined that the Restroom Facilities Corporation product is a "single source" item. ����h�l��ll�lyl�l�llll�u!N+IIIIIIII "J f - MEETING/ATE: C� ` u � Sad �U�$ �Blsp� 6/4/91 COUNCIL AGENDA REPORT 'TEM NUMBER: Santa Rosa Field Restroom Replacement page 2 This project was submitted to the Community Development Director for minor and incidental review. Project was approved as submitted on May 16, 1991. FISCAL IMPACT: EXISTING APPROPRIATION IS ADEQUATE A preliminary estimate of $50,015 has been presented by Restroom Facilities Corporation to demolish the existing structure and to design and construct a new facility at the Santa Rosa Park softball field. $53,000 has been budgeted in the 1989-1991 Capital Improvement Plan (page E-11 of the 1989-1991 Financial Plan) for design, construction and contingencies .for the Santa Rosa Park softball field restkooms. Staff time for project management and inspection has been estimated at 50 hours. Project would be scheduled so that construction does not create an inconvenience to the facility users during the softball/baseball season now underway. Work previously completed to support this project includes: 1. Sewer line reconstruction 2. Installation of underground electric conduit 3. New water service to site ALTERNATIVES: 1. Approve purchase and installation of pre-fabricated restrooms from Restroom Facilities Corporation, a single source supplier, for Santa Rosa Park Softball Field. This action would provide for a cleaner, safer and more accessible facility for adult softball, youth baseball participants and spectators. 2. Deny recommended action at this time as an alternative. The Santa Rosa Softball field restrooms will remain in its current location and continue to deteriorate. Additional staff time from Public Works will be required to maintain, repair or piecemeal fixtures to keep the restrooms operational. Eventual closure may result due to health concerns. Replacement of the restrooms will become more costly if action is delayed. Attachments: "A" - Letter from Community Development Director approving plans "B" - Proposal from Restroom Facilities Corporation "C" - Floor Plan of proposed facility ATTACHMENT "A" ail!► i i;i I III i i I��!�NRi���'►II Ihl I I ��I I i - _ city of sAn lum s oBiispo a 990 Palm Street/Post Office Box 8100 • San Luis Obispo, CA 93403.8100 16 May 1991 Jim Stockton, Recreation Director City of San Luis Obispo P.O. Box 8100 San Luis Obispo, CA 93403 SUBJECT: 1220 Montalban Street ARC 91-36mi Dear Jim: I have reviewed your plans for restrooms at 1220 Montalban Street and have determined that the project is minor. Consequently, it will not require review by the Architectural Review Commission. Your project is approved as submitted. My action is final unless appealed within 10 days of the date of this letter. Anyone may appeal the action by submitting a letter to the Community Development Department within the time specified. Appeals will be scheduled for the first available Architectural Review Commission meeting date. If an appeal is filed, you will be notified by mail of the date and time of the hearing. Keep in mind that you still need to secure necessary building permits prior to construction. If you have any questions, please call Judith Lautner at 549-7166. S]�nce, ly, �\ Arnold B. Jonas, i.rector Community Dever ent cc: Architectural Review Commission Chairman ATTACHMENT "B" vti • ® ®rr : PROPOSA- CORPORATION CITY OF SAN LUIS OBISPO SCOPE OF WORK OWNER Budget Estimate Proposal Final Price Proposal OF SAN LUIS OBISPO P GUSTOntER 3 Building ❑ Building SAN LUIS OBISPO, CA ® Sitework ❑ sitework PROJECT LOCATION 3 Supervision/Extended Warranty ❑ SupervisidivFr t ded We= SANTA ROSA PARK ® Transportation ❑ Transportation PROJECT NAbtE 890300 PROJECT s Definitions Oefinitlons 12/5/89 CEK A BUDGET ESTIMATE is a prelimi. AFINAL PRICE isafirmofferfor! nary estimate tiny and should not be for the written products altered DATE 13y used for Gnat budget costs or procure- the aPtiana,and shall be valid fat mens purposes. Customers often re. Order receifedwithin 30days from This Guate is good for 30 days only.Terms and Conditions quest changes in specticattons and date of this proposal, Of Sale and Terms of Paymeritforthe Proposal are listed on finishes which may require adjust- the other side of this farm. menta to this proposaL This Cuotation is based upon plans and specs dated 12/1 3/89 9A7E eU1LDIr1G MODEL x 890300—A 890300 13 COSTS — SASE 9UILDING 31 ,160.00 31 ,160.00 EU1LDING OPTIOPIS HAND DRYERS (TWO) INCL. INCL. DRINKING FOUNTAIN INCL. INCL. STORAGE (EXPANDED 6' CHASE) NIQ INCL. DEMOLITION OF EXISTING BUILDING INCL. INCL. 1. Subtotal(Building a Opttpns).. ______. 34,396.00 34,696.00 2. Sates Ta:@ o(If apytcable) NIQ _NIQ 3. Sitawo Opoonafl Non-taraatel.._.__....._....—_._—.._._._.__ 14,309.00 14,309.00 4• Sitowork SupervrmorvE:tnnaoo Warranty(Cucto)., NIQ NIQ S. Carw,eapon fees.,en peen 350.00 — 9n ng.bonds(Circle if applicable).. 350.00 6. MiscellaneousB ( W&V permits.required licenses)(Circle) . N/s —N/A 7. TOTAL_ : 49.055.00 49,355.00 8. Transadrraao"(COD)_ 660.00 660.00 7111 S.Yrgieis.Suite 0.1,Rana.NV 89511 STANDARD TERMS AND CONDITIONS OI .LE NOTE:These S Imparts Term and Contalprtg dr Sale gpap agony arta taint a Dan of the TERMS FOR ACCEPTANCE OF V RQPOSAL:tlnf GOphDarty a Otter to Sad arld Sugarcane as Other e+Dreiiltl Or wrom ld tang earisacum arra shalt exwre in accordance men me Cam .,S pr p srlSile guild heIlef ifkf miff ro SM Supereeary ere previous Cigr audratiyq irxp i PURCHASE ORDER ACCEPTANCE: p r s roposaf,vaucn is arfacneo neeta farness accepted pr attends!ynr macho. was rpt'^°to Ir err Nevada Aff r CE:An Purchase Orders and be accepted Or The COMOtarly only al P O.Bar 3DDa'2.Rlrep,Nevada B9S2omiCCQlOanC! orders are sfuaecl to,",ew W the Company n accordance min Inv Company s cuff to sell Doty&foal acceptance is autnahaed. �iltAtl7!Laws or I DELIVERY: eSta� of avw rm Except c omff�ae soecn,cdmtne atlacneo otlw aeuve.rwnldwFOB nomtnfmanuueture T,m.o,CPI-w.v.sanesumateomvana,sdas O albn^ d:arpnt o rhe cc a; man m n OeiaysrntrartsParalwnormocurem S nevem oauapferyeerayscausadDvfr COfapnmm.rece., procurement of^faferals a causes of am knO cevo In as.ahs of Goa:str.Kes,ucor u:uculees_Aels of t+uvlrnm.mr of rm„nar PRICES:auyicrsexenrdesate.useaeeueation n ria °ComOar'l's'r"111eOWecpmrdl nem_r,pn cerfK�aleisfurrnsned or lOCCUOa i e.ertlse and Syne.fames,nrescect of manufaaue.sale use wePllvP.v amm w"'Cle% e$ utress staled m tine sea m me Lamdarev s I,tocasar w 'CfO De avd ev Company s Otte to sen,witcrl is arlacnea nereta.Ay aces are arb tot 30 a s from dale rn�I owlnm^I.r.and darn lees are n °OY`�'"�s a oroo� h contract Of rewsec Vince ti rn mfr m In st• C:ontov+vs.,,1eosar.wn,cn,santacneeo--. td. Company CREDIT:ioeodsu and Prowess Pavmemsl c uruess wonceoe A 161UPROPAL AND FEDERAL GOVERNMENT AGENCIES Orders may recur!Ce003,13 or prowess cavemen's,f me aooronnate cow an drdo esat,s checked'n Denver s lmanoa Sdwtlan fu rhes.such actwn,the Cymoaf e,max at us erection rlroude payment.n advance dr wncPf re orae as to any„nKM•peed,tem am r cancellation chases. If Ina delver delays csa era e■d mkoemon f manufine eve my me m smdm�nt Ina Company small redu,re Vavm.nr 2CCw*md to me oercenrand s ompl tion Ee wnemdr ew tar paver snau oa at d enure oarmPm fn ufyner s lees,COSTS.and expenses. a deuuu at me punt.me Company snap Santana the lua amount due and pe courted a as yea cnaDu CyneaB.GZ%ERAL CONTRACTORS:Aa Orders redare eeopslls or advance cavmem as well as prowess payments Suprect fa me owe.s Credit wytmmess m nv s adgr�m a Sem[ppticiei.dream or FREIGHT: am D livery terms San C%directly wu payment anaror prepayment of[me patience of me contract. accordance wsn ine Fierce sou S paw ru vie astomia mit delivery via Vann rnefa plrectly ro the treldnI Carrier umesS Ory written autnonzaiton is apdroved by me Comically TITLE ArtO LIEN RIGHTS:au srruenrres and emaomem rema,nnne oescnaf oraceriv or me Comdam wnem.r or not Whim to am diner rear crdeerly or structure unto me once unuuano any notes Given mererdref at me eduioment has peen fully Dalo n casn. roe company$man.n me event of me purchaser s default.nave me r t Premises and repossess such structures and ewrdmdayem wherever a may ere located. PATErt7ltttRlNGEhtENT:If o erner upon any Ironama Dromempfafnvoumrsneoueutea5ate tpaemo�eeGmu,pmemerrenvpan neCreml ua y eh o��R tm�^�aomehif aiffwe@yamsfree oeaaaescunt cruse Ora "'am" assistance t:pnsfrucnon,ymamrranure speemeowdna prro natuw won'me eusromartand win day an damages and costsawardep�y. compeferncourtman u shad nave nag napde amp are Oppprttrrnry 10 defend alwasn a und" y SfAt Irlfasaere Geoerrofwnlm LACHES:Fainae of me Camoanv is!+ares!env Liam o remedy under this CpnTract snau not be deemed a waver or sato horn[,nor snau any een y mina Ulf T I^rairad dry inches or m any manna an oy airy act w lanw to act- as sell ULS17LT1 a F IASIUTY: Unca ro rlgmptmeCotibany0e "Vey Qr Q L roc mfstarrees. unleig stated m cpnsr__•enhiar s=emaf damaees.loss of I:ror ri bss pi ordetK::on.delay m to erod.•ass m wspuRrsmall n w�ernl, rwaf mid prom ere ays,n enwerv.cerrom+anee.oreaa or warranty. ave any eaamly for 6duidated Oamaaes. for collateral. Crams err or Ceaxeern manufacture or otnerwlse.Ine adereaate twat tiaailfly of ineoffer Comoam unser me eoneraeT,whether far orearn of waeamv or otherwise snap In no even! ewceeo the Contract Price.Suver agrees to r�mGtify ano neo reareeness me Ccmdarty rrdrih iL ci7uni Oy mud eutfes wrnCn eatlnp aevOnp me f C:.T--amv i naauax fuegmng mNhazwni an me LLTeC v me Q sacern t I Norte ttf me Terms Andrea ov me7 cam in m tmi du Moon may Oe added to.machined.SUDerCeCed or OtnerkrKe eherep Bxeni ov a wnnen rnstrumMt 5�..la.l Ce Ore3rCem y Ina Cpr.•:Panv imp aemTreO Dv me Csmpanv Id me paver,and earn snnpment to Dove from me CG.C::CS CamameO n This dater to SlU.nOtwrnsnrfamd am Terms dna Ca ouver. mit may hi COmameO m ctrl s"Tpamy small Ce ceemea to ce Only under me rerms area snroT.efll,acceptance Of payment or suraw act at me Company. y Ofarmlase Order dr O:hN term pt me Dfam.Itpiwunsanmrlg me WARRANTY;Aa StructuesumOuced Theme Cohroany are warranteed to me Ounce aserip deltas tram eefecis In material.workmanship and title.When the Comone"v oaPomOalei m S"NIC i Instal:a11,02%of shewom suoerwvcn.me CmTOanv we-'replace or recall.at Its capon,defects in worrmanshro of any Cart wreem IS woven Cel Celwerr Yin"- fine Cumcanv does not participate In sitemant Or sttewOfK supervision,ine Company well tefLace at repair.at Its COtipn.defects m Proven Cemecave minin One rear tram dei,my.This warranty applies way where me Company as peen notified _ rants period are wreffyearRam e`=_-- ffm nas Ceen atonally operated and mamlamed In accwcance win me Cpmoanv s insl 'n r"A10fp•cit Ire erect w.lnm rn wrrmanenlo arami earl ire m Is Storate.rnaCOR-Marlyassimsanyandanwarrantiesfortirf manful ct'me Corncarw nava n r e r ecu e.neci ctor ancr cer fries.acolfances.and eau:omentm a d esodnvomry bit noose.hediec[ nconstetule nrordaer me se.e nao.wv w tree L4maanv and Ina safe remeov ro me purchaser.Company s warranties asset iff"f form in this diners b saidaon inner manwactand Ina breppin !.ere::v waives.an Oma warranties,addressed Or irnouea.Including wino d ilntllallm.any Implfee warrantiesrat merman aa:.wn are exciusiva dna are in lieu p4 amp purchaser SITE::4110 eirceec Is an estimate aniv and 15 cased'upon normal site COnmlwns andror CaseO upon Inspection of sna ahoy and I:tnegs. C:aht rapt to exceed cost oI a-nour hnrrlmurrf al Sd0.00 Der moue SOn tests.conditions as tau Cw+cr... Nit to exceed cost Of S:S.Oyyara for a.s:3CCO PSI fpr 5 varo mmimfun. Edcava:,ah-Sons stnhaole for excavation min 5 Ion paeand,won one day maximum,mclumnd travel trine ano Vacate at Sao Cer leper ly 8•naur lent Fc=rm UeCwConerete Oase:wtemarr COST Is based upon 18"lowered depth maximum twin m a nomal Sfao and 5 x s'S,Cewa,K. M,sca..areduS:A%sumed in case is a clear site:unmsuaeed or 95%cdmoacted sou at I CCD L"aief ro e:ean up:and access to site from improved roadways to allow 14 0-x I*x=5_0-len , Le:em resistance:a dao prepared iter. or existing grade wlln Ills roan 5:variation:ava,upie SITEsrORK O:SCLSAatER:The CCmdanv its a manufacturer and may not ere a Ceheraf contractor in r e S ale w e e Ina ormect is located.lit site ere IfUnt lea by an independent Conuaclor for me COmeany Ina Company S role winI. work Or Installation its afterea.it win oe to coordinate[no on-site Portion of Ine dialect min Ina nno e0efwen[cemir Cid SCHEDULE OF PAYMENT STRUCTURE SERVICE OR PROGRESS SCHEDULE f: 10% CeDOSIt Amount(Due with Purchase Order) S 10A PregressPayment On COmoleti0n Of Shnn drawino.s s 90n Prgar - -Payment no ification of building ready, nor shioment S PrOOress Payment S Progress Payment SITE1.7CRKISUPERVISION EXTENDED WARRANTY S L O e - 0eeaslt Amount(Due with Purchase Order) Ir Ba 1 ante Payment 1 II on nom Payment 2 Payment 3 ACCeatels or cueM Dale FREIGHT Tam C__��� ATTACHMENT ,C,, 131-01 - I v I I m I I I •r I I �O L Z ------ � � M m a I I < I n I AA z Z i � I I I I I {; r _ o • fit ca tO a m of rn ' 11 1