HomeMy WebLinkAbout08/20/1991, C-3 - WASTEWATER TREATMENT PLANT IMPROVEMENT (PHASE III): DIGESTER #3 REPAIR, CITY PLAN NO. P38S. �}IIUII�tlIIIII��I III MEETING DATE: IIID ctvJ o San tuts oBtspo Aug. Zo, 1991 COUNCIL AGENDA REPORT I'E"''NUMBER: FROM: Dave Romero, Director of Public Works William Hetland, Utilities Director U Prepared by: Barbara Lynch, Engineering Assistant SUBJECT: Wastewater Treatment Plant Improvement (Phase III) : Digester #3 Repair, City Plan No. P38S. CAO RECOMMENDATION: By motion, approve plans and specifications for Wastewater Treatment Plant Improvement (Phase III) : Digester #3 Repair, City Plan No. P38S, authorize soliciting of bids and contract award by CAO if the lowest responsible bid is within the Engineer's estimate. DISCUSSION: The existing digester has recently been cleaned as part of this project. The interior surfaces must now be sandblasted and coated. The previously installed rising steel dome, which moved in response to changing levels in the digester, has ceased to operate properly and is now to be fixed in place. In addition the project will seal the digester to prevent leakage of gases into the air and provide some additional safety equipment. CONCURRANCES: The Utilities Department has reviewed plans and specifications and concurs with staff recommendations. FISCAL IMPACT: The engineer's estimate for this project is $53 , 000. The CIP for 1990/91 (page H-16) includes $70,000 for the Repair of Anaerobic Digester No. 3 . ALTERNATIVES: 1) Proceed with the final stage of cleaning and repair of the digester. 2) Do not proceed with the repairs at this time and put the digester back in service. This would result in severe operational problems and possible discharge violations. p:\barbara\p38sadv.wp d-43-1