HomeMy WebLinkAbout08/18/1992, C-7 - ""STREET RECONSTRUCTION AND RESURFACING PROJECT - VARIOUS LOCATIONS, CITY PLAN NO. S-12A."""IIINNIq�II�IIIII�III III MEETING DATE: IIIIU city o 1 San- ..Is oBispo Aug. ls, 1992 COUNCIL AGENDA REPORT ITEM NUMBER: FROM: Wayne A. Peterson, Acting Public Works Director a Prepared by: Bridget O. Fraser, Engineering Assistant SUBJECT: "Street Reconstruction and Resurfacing Project - Various Locations, City Plan No.•S -12A." CAO RECOMMENDATION: By Motion, Approve Plans and Specifications for "Street Reconstruction and Resurfacing Project, Various Locations, City Plan No. S -12A11; Authorize Staff to Advertise for Bids, and Authorize CAO to Award a Contract if Lowest Responsible Bid is Within Engineer's Estimate. DISCUSSION: The City Council adopted a Pavement Management Plan on February 16, 1988 by Resolution No. 6398. This plan provides the mechanism to evaluate street pavements and identify projects which are most appropriate for the economical maintenance of the city street system. During the winter of 1990 -91, all street pavements were inspected for defects. Based on this data, a rehabilitation program was prepared. The program was coordinated with underground utilities and conflicting work has been delayed to a future paving program. This project includes the paving work deemed most appropriate for the long -term economical maintenance of city streets. Included in this project is a water vault modification on Peach Street, westerly of North Broad. This water vault houses the pressure valves which regulate the downtown. The existing vault access is undersized, making it impossible to service the valves, it was therefore necessary to reconstruct the roof to facilitate removal of the valves for maintenance and repairs. FISCAL IMPACT: The FY 1991 -92 CIP Budget identifies $675,000 for Street Reconstruction and Resurfacing (page E -8 of the FY 1991 -93 Financial Plan). The Engineer's Estimate is $618,850.00 for the Street Reconstruction and Resurfacing. At the meeting of May 30, 1992, Council authorized this project to go forward according to the following criteria (See attached Exhibit B.2): Outside Funding Available Design Substantially Underway Longstanding Contractual or Policy.Commitment Maintenance of Existing Facilities The City has applied for funds from the State -Local Transportation Partnership Program (SB300). Funds from.SB300 are estimated to be $65,000. n ���i�Vll►I!il I�''q�lllli city of San' s OBISpo COUNCIL AGENDA REPORT The FY 1992 -93 CIP budget identifies a total of $600,000 to for Water I Distribution System Improvements (page E -7 of the FY 1991 -93 Financial i Plan). No funds have been expended to date, leaving $600,000 available j for funding the recommended Peach Street Vault improvements and utility! well upgrading. The Engineer's Estimate for the vault and utility well improvements is $26,150.00. The estimated costs are as follows: Base bid: $645,500.00 Contingencies: 24,500.00 Total: $670,000.00 The available project funds are as follows: Caltrans SB300 $ 65,000.00± Water Distribution 600,000.00 Street Reconstruction 675,000.00 Total: $1,340,000.00 This project has been given an EIR clearance by the Planning Department. Status: Categorical Exemption. PUBLIC ART: Due to this project's dispersed locations in residential neighborhoods,. the Community Development Director believes this project is not appropriate for the inclusion of public art, and the 1% art contribution could be most effectively used for other City art projects. After the bid opening we will transfer 1% of the bid to the public art fund. CONSEQUENCE OF NOT TAILING RECOMMENDED ACTION: The project may be more expensive to construct at a later date, deterioration of the streets will continue, and the backlog of projects; will increase. i Plans and Specifications are Available in the Council Office for Review bon/s,2a -sr bV Exhibit E' Z General Fund Capital Projects that Should Go Forward Public Safety Police station HVAC impry Fire station # 1 replacement Underground tank monitoring & removal Transportation Orcutt road Widening Traffic signal upgrades Monterey @ Santa Rosa Palm @ Santa Rosa Mill @ Santa Rosa Elk's lane bridge Nipomo street bridge Balance of Bikeway projects Street reconstruction — 91192 Leisure, Cultural & Social Sery Recreation admin facility Playground improvements French park — final phase Mission playlot Park sand & edging replcmnt Parks irrigation telemetry sys Sinsheimer park energy impry Stadium lights Tennis court lights Swim center filter replacement Golf course irrigation project Balance of open space funding Performing arts center Mission plaza improvements General Government Energy impnmtents —City bldgs Seismic safety corrections City Hall fire alarm replacement Information system impry Notes Criteria for Retainine the Pioiect :. Longstanding Outside Design Contractural Significant Maint Public Funding Substantially or Policy Operating of Existing S2fery Available Underwa Committment Savincs I Facilities X::. 1. It is recommended tbat ClPprojects funded through the enterprise andagency funds (water, sewer, parking, transit, and whale rock) also go forward based on their independent funding from the General Fund. 2. Detafl project descriptionsasprepared during the budget retiew•processare available upon request from the Department of Finance. X73 X z z z X X. z: z X z z z X z: z.': X z z X z z X x z z z X z z z X X X z a X X: z z ,z z z X ..;: x X z z x X X z z x a. X x .x z X z z z X z' z X z z x 1. It is recommended tbat ClPprojects funded through the enterprise andagency funds (water, sewer, parking, transit, and whale rock) also go forward based on their independent funding from the General Fund. 2. Detafl project descriptionsasprepared during the budget retiew•processare available upon request from the Department of Finance. X73