Loading...
HomeMy WebLinkAbout02/04/1992, C-4 - SPECIFICATIONS AND SOLICITATION OF BIDS FOR SINSHEIMER STADIUM LIGHTS REPLACEMENT, SPECIFICATION NO. CIP S20Y. ����uI�RIIII�IIIII�III�ll�lllMEETING DATE: I��NiI cityo San ' S OBISpo -/ ? RUNG COUNCIL AGENDA REPORT ITEM NUMBER:/1_ FROM: David F. Romero, Public Works Director Lane Wilson, Parks & Buildings Manager Prepared by: Casey J Patterson, Project Assistant SUBJECT: Specifications and solicitation of bids for Sinsheimer Stadium Lights Replacement, Specification No. CIP S20Y. CAO RECOMMENDATION: By motion, approve specifications for "Sinsheimer Stadium Lights Replacement, Specifications No. CIP S20Y11, authorize soliciting of bids, and contract award by the CAO if the lowest responsible bid is within the Engineer's cost estimate. DISCUSSION: The existing luminaire assemblies at the stadium are inefficient which leads to improper lighting conditions for baseball. Measurement of existing light levels at the stadium show they are 33% below recommended levels for the type of baseball games being played (57% below professional baseball standards) . The 21 year old luminaire assemblies are severely corroded which have increased the maintenance of the existing lights. In addition, the new system uses only 70.4 KW of electricity compared to 100 KW now. Staff has considered the shortcomings of the existing lighting system and recommends the use of the specified equipment. This improvement will result in a maintenance and operations cost saving to the City while increasing playab•'_lity to recommended levels for the type of games being played. CONCURRENCES: The Recreation Department is highly supportive of this improvement project. FISCAL IMPACT: The Engineer's total estimated cost: Estimated cost $ 36, 000 Contingencies $ 4 . 000 Total $ 40, 000 FUNDS AVAILABLE: FY 1991-93 CIP Project, Park Renovations include $40, 000 for the replacement light at Sinsheimer Stadium. (Page E-9, FY 91-93 Financial Plan & Approved 91-92 Budget) - 4 ii'��►�►;►�illllllllp�►igl�l'�I city osan_' _ is oBispo MUMB COUNCL AGENDA REPORT Solicitation of bids - CIP-S20Y Page two ALTERNATIVE: The existing fixtures do not perform to the minimum required levels for games being played, if no action is taken then the quality of the game will be degraded with the possibility of injuries. The existing light fixtures are highly corroded and to replace them in a piecemeal fashion, would cost $63,240.00 (60 existing fixtures at $1054 each, including labor and materials) . This cost does not consider the time value of money. i Specifications are available in Council office for review. j i I