Loading...
HomeMy WebLinkAbout02/18/1992, C-2 - SEWERMAIN IMPROVEMENT: JOHNSON, PISMO TO MARSH, CITY PLAN NO. S08R. I�VuI�Ap�Wllll�llllll`II�INMI I�I 'y/ (� MEETING DATE: u_uu C�`"'JJ Qr S� LU�S QB�SpQ Feb. 18 1992 COUNCIL AGENDA REPORT NUMBBa:/1 FROM: Dave Romero, Director of Public Works William Hetland, Utilities Director Prepared by: Barbara Lynch, Engineering Assistant-_,�-Ir---`� SUBJECT: Sewermain Improvement: Johnson, Pismo to Marsh, City Plan No. S08R. CAO RECOMMENDATION: By motion, approve plans and specifications for Sewermain Improvement: Johnson, Pismo to Marsh, City Plan No. S08R, authorize soliciting of bids and contract award by CAO if the lowest responsible bid is within the Engineer's estimate. DISCUSSION: This portion of sewerline is suspended over San Luis Creek near Pismo Street and hangs below the bottom of the bridge approximately three and a half feet. The line is corroded through and spilled sewage into the creek a couple of years ago. As a result this line was placed on a list of projects to be completed this year. Because the line hangs so low, it is also at risk of being damaged during heavy storming resulting in sewage spills into the creek. The original project included the replacement of the sewerline in Johnson Ave from Pismo Street to the end of the sewerline near the Telegram Tribune. To eliminate the possibility of a sewage spill into the creek in the future, the project has been modified to extend the new line the other way and connect to the sewerline at Marsh street. This will increase the initial construction costs but will eliminate any possible future expenses for cleaning up the creek and repairing a line damaged by storm. The project will remove an additional 400 feet of old pipe, not included in the original project, but which is also damaged. This will reduce maintenance and infiltration. The Public Works Department is in the process of negotiating with the Planning Department to allow night work for the portion of the project where the new line will cross Johnson at Pacific. This portion will require a street closure. CONCURRENCES: The Planning Department has given this project a categorical exemption. FISCAL IMPACT: The original estimate for this project was $26, 000. Concerns regarding the possibility of a sewage spill into San Luis Creek led to a new engineering design requiring additional footage of pipe to be installed. The revised engineering estimate is $80, 000. The 91/93 Financial Plan (Page E-7) identifies $120, 000 for 91/92 sewermain replacement projects. No funds have been spent to date, leaving C a-1 iiIH11�1111�1IIIIIIII��11�1111IIUIII City of San Luis OBlspo Wii% COUNCIL AGENDA REPORT $120, 000 to support this activity. The increased cost of $54 , 000 will come from funds available in the 89/91 sewermain replacement program due to the reprioritizing of sewermain projects. This will reduce the $120,000 by only $26, 000, leaving $94, 000 for the other 91/92 sewermain projects. ALTERNATIVES: 1) Proceed with the replacement of the damaged line, preventing further leakage. 2) Replace the line in its current location, including the creek crossing. 3) Do not proceed with the replacement of the damaged line at this time. p:\barbara\sO8radv.wp Plans and Specifications are Available in the Council Office for Review.