Iu COUNCIL AGENDA REPORT ITEM NUMBER: �6
From: David F. Romero, Public Works Director .
Prepared by: Lane Wilson, Parks & Buildings Manager T.
Tom Harrington, Energy Coordinator-" °OO���CCC"'"'
Q
Subject: Swim Center Improvement CIP - project priorities, funding,
and Hi-Rate Filtration System plans and specifications.
C.A.O. RECOMMENDATION:
1. By motion, approve Alternative 1 for reprioritization and funding of
CIP Swim Center Improvement Projects, in order to fund the Hi-Rate
Filtration System in FY 1991-92 as previously directed by Council.
2 . By motion, approve plans and specifications for "Swim Center
Improvement Project, Media Hi-Rate Filtration System, " City Plan No.
S-24X, and authorize soliciting of bids and contract award by the
CAO, if the lowest responsible bid is within the Engineer' s cost
estimate.
DISCUSSION
Reprioritization
The CIP Item for "Swim Center Improvements" includes six distinct
projects that were proposed to be constructed in FY 1991-92 (Pool cover
replacement, $15, 000; Alarm system replacement, $36, 000; Tot pool
dressing room $28, 000; and bank stabilization $30, 000) and FY 1993-94
(High-rate sand filtration, $84, 000; and Ozonation equipment $27, 000)
During review of the draft budget, Council indicated that these
projects should be reprioritized to complete the filtration and
ozonation projects earlier than proposed. The funds appropriated for
FY 1991-92 ($109, 000) and planned for FY 1993-94 ($111, 000) did not
reflect changes in priorities.
In response to the comments from City Council the recommended order of
priorities is:
1. Pool cover replacement project $10,948. 08 (completed)
Annual savings are estimated to be $40, 000 per year in water,
natural gas and chemicals
2 . High-rate sand filtration $84, 000
This project is eligible for a PG&E rebate of $6, 077 and will
save $17, 000 annually on the cost of water, electricity,
chemicals, filtering materials and labor. This project is
ready to go to contract.
3 . Alarm system replacement $36, 000
This is an important project in terms of Swim Center Security.
The current alarm system is over 10 years old and is no longer
-/4-tl
�,rx���{villll►,IIIP10 IIIIIII city Of San _.J1S osispo
COUNCIL AGENDA REPORT
Swim Center Improvement
Page 2
I
reliable resulting in numerous false alarms. Design of this
project could be completed by the end of summer.
4 . Ozonation equipment $27, 000
With ozonation Public Health standards can be met with less
chorine. This will improve the quality of water and will
reduce the amount of chlorine needed at the Swim Center.
Ozonation will reduce operating costs approximately $1, 200
annually. Development of plans and specifications is in the
very early stages.
In addition to this project there is a need to modify the Swim
Center to contain a leak within the room or cabinet where the
chlorine is stored. The Uniform Fire Code, 1988 edition, M.C.
15.08.010 was modified since the Swim Center was constructed.
Reducing the amount of chlorine on site will reduce the size of '.
the containment facility. The amount of chlorine needed on
site and the scope of the containment facility will be defined
along with the design on this project. A request to modify
this project or to establish an additional CIP project will be
submitted when the need is defined. The Fire Department
concurs that this project is needed ("the sooner the better") .
5. Tot pool dressing room $28, 000
This project is proposed in order to provide separate changing
areas for parents with very young children. Plans are complete ;
and specifications are about complete.
6. Bank stabilization $30, 000
The banks on which the solar collectors are mounted are not
protected. Although this needs to be accomplished soon, in
order to assure the operation of the collectors, this is the
lowest priority of the six projects. i
This listing gives priority to cost avoidance, safety and security.
Fundinc
After the projects are reprioritized, the funding for each fiscal year
must be established. Either of two alternatives would be appropriate.
I
Alternate 1
The simplest change would be to accept the priorities and use the
existing funding. This does not fully respond to the previous
instructions of Council. The Projects would be scheduled as follows:
1991-92 Pool cover $11, 000
High-rate sand filter 84, 000
design work on some. of
the following projects 3 . 000
$ 98, 000
,I i�'e►ilfillll!�Ij II1u II�U� city of San t. .3 OBISPO
NNGS COUNCIL AGENDA REPORT
Swim Center Improvement
page 3
1993-94 Alarm system replacement $36, 000
Ozonation equipment 27 , 000
Tot pool dressing room 28, 000
Bank stabilization 30, 000
$121. 000
Three Year TOTAL $219, 000
Alternate 2
The priorities would be in the order recommended above. Funding would
be accelerated by an increase of $77, 000 in FY 1992-93 . The FY 1993-
94 CIP program would be reduced by the same amount. This provides
substantial public safety benefits as well as significant operating
cost savings. The schedule would be as follows:
1991-92 Pool cover $111000
High-rate sand filter 84, 000
design work on some of
the following projects 3 , 000
$ 98, 000
1992-93 Alarm system replacement $36, 000
Ozonation equipment 27, 000
Tot pool dressing room 28 , 000
I $ 91, 000
1993-94 Bank stabilization $ 30 , 000
Three Year TOTAL $219, 000
Filtration Proiect
Both alternatives provide for the upgrade of the filtration system
during the current fiscal year. The project is ready to go to bid.
Replacing the diatomaceous earth filters with rapid rate sand filters j
will provide higher levels of filtration at lower costs. The increased
filter capacity is also required to support the ozone system which will
be the second. part of the filtration and sanitization improvements.
The life expectancy of the new filtration system is 20 years.
Operational cost savings and a PG&E rebate are expected to repay the
investment within five years. The savings include:
Electricity savings of 101, 000 KWH per year. The new filters
accomplish the task with fewer hours of operation. ($9, 116
annually, non-escalated 1992 dollars)
A PG&E rebate of $6, 077 . 52 if the project is completed by June 1992 .
Pump repairs will be reduced by $700 per year because pumps will be
operated fewer hours.
Annual replacement of filter elements and media will be eliminated
resulting in a savings of $6, 500 annually.
Cit-3
CI
ty of sar.__ais OBISPO
COUNCIL AGENDA REPORT
Swim Center Improvement
page 4
i
Overtime will be reduced by $300 per year as the new filters can be
cleaned while the pool is in operation.
The final result will be a cleaner pool for less money.
FISCAL IMPACT
Reprioritization
In light of the City's current financial situation, staff recommends
Alternative 1 in order to stay within the funding planned in the FY
1991-93 Financial Plan.
Alternative 2 would spend the $77, 000 one year earlier than projected
in the Financial Plan. Total expenditures between now and the end of
FY 1993-94 would be the same for either alternative.
Filter Replacement Project
Engineer's Cost Estimate 84, 000 without contingencies
Funding in the amount of $84, 000 is included in CIP Swim Center
Improvements (FY 1991-93 Financial Plan pages E-9 and E-20) . The
reprioritization of the six distinct projects within this CIP provides
for funding this project from the $109, 000 appropriated in FY 1991-92 .
PAY BACK
Engineer's Estimate 84, 000
PG&E rebate <6 . 077>
Net Project Cost 77, 923
Annual Savings
labor savings <300>
' material savings <6,500>
energy savings <91116>
reduced repairs <700>
reduced water use <477>
Total <17, 093>
Simple payback 4 . 6 yrs j
Internal rate of return 22%
Attachment: PG&E letter dated July 10, 1991 regarding rebate
Plans and Specifications are available in the City Council office for
review
gcaoswim2.wp
�.go
Paciflc Gas and Electric Company 406 Higuera Street
P.O.Box 592
San Luis Obispo.CA 93406
July 10, 1991
Application # CBV 5316 Account # XBV 86 3710 Copy
Mr. Tom Harrington, Energy Coordinator
City of San Luis Obispo
25 Prado Road
San Luis Obispo, CA 93401
Dear Mr. Harrington:
I am pleased to inform you that PG&E has accepted your application
for the 1990/92 Financial Incentives Program. The maximum rebate you
could receive will be $6077.52 as shown on the enclosed Incentives
Acceptance Form. The Incentives Acceptance Form indicates details
on the project accepted and the completion date required for your
project. This amount may be less if there is a difference between
your actual cost and the estimate in your application, or in the
event. that you do not complete the work as described in your
application.
To enable PG&E to commit for this project, please sign the approval
at the -end of this letter and return one copy to PG&E at the address
below.
Financial Incentives Program
Marketing Department
P.O. Box 592
San Luis Obispo, CA 93406 •
When all work is complete, mail your invoices to the above address.
You will be contacted if on-site inspection or verification is
necessary. All original equipment must be removed (and not re-used
or re-sold) prior to the on-site inspection.
We appreciate your participation in this energy conservation program '
and hope that you will be pleased with the savings you obtain as a
result. If you require specific assistance, or if you have any
questions, please contact me at (805) 595-6324, or your local PG&E
Account Representative.
Sincerely, * * * * * * * * * * * * * * * * * * * * * *
* We agree to complete the project in our
* application by the specified time.
` * Customer:
Steve Spratt
Incentives Coordinator * Approved by:
*
SS:dbk * Date:
Enclosures * * * * * * * * * * * * * * * * * * * * * *
i�-S
INCENTIVES ACCEPTANCE
Account: XBV-86-3710 Date: July 10,1991
Customer: City of San Luis Obispo
Location of Conversion: Augusta Street Pool , San Luis Obispo
PROJECT REBATE ESTIMATED REFUND COMPLETION
UNIT COST DEADLINE
Pool Filter 1012292 $789099.00 $6077.52 6-30-92
Conversion for kwh
Energy
Efficiency
Comments: .06 x 101,292 kWh = $6077.52
Summary of Acceptance Conditions:
* PG&E assumes no liability for the success or technical
performance of the customer's proposed changes.
* Customer certifies that project costs are for the energy-saving
projects described in his application only and do not include
maintenance, in-house labor, or new construction.
* Customer agrees to complete projects by the dates specified
above.
* Customer understands that PG&E's acceptance letter applies only
to the items listed above as described in customer's
application.
* Customer agrees to grant PG&E the right to inspect the projects
for a period of up to seven years from the date of the
acceptance letter. PG&E will provide customer with reasonable
notification before an inspection.
* Once our rebate dollar budget has been met, applications will be
considered on a case-by-case basis.