HomeMy WebLinkAbout06/16/1992, C-5 - 1992 STREET CHIP SEAL COAT PROJECT, CITY PLAN NO. S-13A IIIN�IMIIVIIIIII��� MEETING DATE:
�►fUlAl�
City Of sap tins oBIspo June 16 1992
COUNCIL AGENDA REPORT ITEM NUMBER: •S
FROM: Wayne Peterson, Acting Public Works Director
Prepared by: Dennis Cox, Streets Manage37�
George Bradley, Street Projects Coordinator
SUBJECT: 1992 Street Chip Seal Coat Project, City Plan No. S-13A
CAO RECOMMENDATION:
By motion, approve plans and specifications for the 1992 Chip Seal
Coat Project, City Plan No. S-13A and authorize soliciting of bids
and contract award by the CAO, if the lowest responsible bid is
within the Engineer's cost estimate.
DISCUSSION:
The FY 1991-93 Financial Plan provides $177, 000 in the Streets Pavement
Operating Budget for Chip Seal Coats during FY 1992-93 . The project
defined by these specifications proposes to accomplish nine miles of chip
seal coatings and lane line replacement with the funds provided. The
Pavement Management Plan calls for ten miles of street to be chip sealed
each year. By sealing this amount of pavement, the required eight year
frequency will be maintained to provide protection of the pavement from
deterioration by sun, air and water. -
Measuring this project in miles is not the most precise method. Since
the width of streets vary; i.e. , some streets are 32' wide while others
are 64' wide, total project costs would also vary. Measuring this
project in square yards will provide a more accurate assessment of
project size. Ten miles of 32' wide streets would equal 187,733 square
yards, this project proposes 190,276 square yards.
Purchasing Procedure
The provisions of Purchasing Control Manual Section PC-403-3 apply to
this contract.
CONCURRENCES:
E.I.R. exemption request was filed with the County on May 8, 1992; the
twenty one day waiting period will expire on May 29, 1992.
Fiscal Impact•
Project cost $170,000.00
Laboratory material analysis $ 7 . 000.00
Engineer's estimate $177,000.00
Funds Available:
The Financial Plan FY 1991-93 budget provides $177, 000 in the Streets
Pavement Operating Budget (pg. C-20) for this project.
Attachments: Engineers Estimates
Map
List of Streets and Measurements
Note: Plans and Specifications are on file at the City Clerk's Office.
gb\s-13a=r.wp
&
ENGINEER'S COST ESTIMATE
1992 CHIP SEAL
CITY PLAN NO. S-13A
Item Item Unit of Estimated Item Price Total •
No. Measure Quanity (in figures)
1. Traffic Control One Job 1 33,700.00 33,700.00
2. Asphaltic Emulsion Ton 210 220.00 46,200.00
(latex modified)
3. Rock Screenings Ton 1,725 40.00 69,000.00
4. Thermoplastic Traffic Lin. Ft. 20,000 0.40 8,000.00
Striping
5. Thermplastic Pavement Sq. Ft. 5,000 2.25 11,250.00
Markings
6. Paint Green 4° Dash Lin. Ft. 3,500 0.10 350.00
7. Pavement Markers Each 300 5.00 1,5(10.00
Total 170,000.00
GB\S73AEEWP
C4-,5-A
F I ?P ht L'J'°
I I
5
i Q Ow a w7 S�
o `.b
G�� hip �� I• g.(.
i•I � Q\
e
N
< J
lME u 'P
I HOWy O IJ ~ O RAVC-!=L
m
SANDEGOOK ST. 4
I {p h
x _ Y _ 3 RMM• use
1 � a eRsnlcN . ... sr. �--- r
1 I l7 SOJT r ST
�1 • YI
K
►•� � 8
1� = sRID�E W � m wooD DG
i
3 aAU
CDILL ST t corSalnA a
C. J La
�V4J
MITCHELL
1992 CHIP SEAL[
2`
S- 13A 5/26/92
0e • V) p 9
.:MTA J \�
d
jn
�.; �: �: -� ��• I Mfr,
:..0��1 3,..04� :• I
/ N J ~ S7
_u W w LE wvITA CIT
AIp_ RG4Rl7A AVE. V
O
r-
:::::ti:::: is ::i':::i:
.......................: : �i'+ t:iHIR
STREET
:::iY,�v'::::::"::: :i :isisi::::::::::i
99HtP ,Smw IA
STREET LENGTH WID SQ. YDS. ROCK OIL
SANDERCOCK ST. 2,904 37 11,939 107.4 3,104.14
BEEBEE ST. 1,003 37 4,124 37.1 1,072.24
PARKER ST. 950 31 3,274 29.5 851.24
CYPRESS ST. 739 40 3,285 29.6 854.10
HIGH ST. 4,013 37 16,497 148.5 4,289.22
SANTA ROSA ST. 2,059 37 8,466 76.2 2,201.16
OSOS ST. 1,795 40 7,979 71.8 2,074.54
MORRO ST. 2,112 40 9,387 84.5 2,440.62
CHORRO ST. 3,220 37 13,241 119.2 3,442.66
GARDEN ST. 1,954 37 8,031 72.3 2,088.06
NIPOMO ST. 2,006 38 8,471 76.2 2,202.46
UPHAM ST. 1,320 38 5,573 50.2 1,448.98
CHURCH ST. 1,954 37 8,031 72.3 2,088.06
LEFF ST. 1,900 38 8,026 72.2 2,086.76
ISLAY ST. 1,848 37 7,597 68.4 1,975.22
BUCHON ST. 2,323 31 8,002 72.0 2,080.52
PISMO ST. 4,118 33 15,100 135.9 3,926.00
PACIFIC ST. 4,171 34 15,758 141.8 4,097.08
SOUTH ST. 580 37 2,384 21.5 619.84
BROOK ST. 317 31 1,092 9.8 283.92
ROUNDHOUSE AVE. 637 37 2,619 23.6 680.94
EMILY ST. 330 37 1,303 11.7 338.78
MARGARITA AVE. 2,120 36 8,480 76.3 2,204.80
CALLE JAZMIN 634 33 2,325 20.9 604.50
CALLE LUPITA 950 33 3,483 31.3 905.58
CALLE MALVA 634 33 2,325 20.9 604.50
LIRO CT. 158 33 580 5.2 150.80
ESTELITA AVE. 317 33 1,162 10.5 302.12
CAMELLIA CT. 264 33 968 8.7 251.68
ALICITA AVE. 211 33 774 6.9 201.24
TOTALS 47.528 190,276 1,712.2 49 471 76
206.13 TONS OF OIL
ROCK IS FIGURED @ 18# PER SQUARE YARD
OIL IS FIGURED @ 0.26 OF A GALLON PER SQUARE YARD
10 MILES BY 32' WIDE = 187,733 SQUARE YARDS
1� Chip SesAS-13AST2.wp