Loading...
HomeMy WebLinkAbout07/07/1992, C-5 - 1992 STREET CHIP SEAL COAT PROJECT, CITY PLAN NO. S-13A III��IMll�llllllllll�ll�ll� city ATE: of Sdn �.d1S ogiSpo July MEETI G7, 1992 COUNCIL AGENDA REPORT ITEM NUMBER: FROM: Wayne Peterson, Acting Public Works Director Prepared by: Dennis E. Cox, Streets Manager George Bradley, Street Projects Coordinator SUBJECT: 1992 Street Chip Seal Coat Project, City Plan No. S-13A CAO RECOMMENDATION: By motion, approve plans and specifications for the 1992 Chip Seal Coat Project, City Plan No. S-13A and authorize soliciting of bids and contract award by the CAO, if the lowest responsible bid is within the Engineer's cost estimate. DISCUSSION: Chip .Seal is constructed by spraying an asphalt emulsion on the pavement and immediately spreading and rolling a layer of aggregate chips. The chip seal improves skid resistance and retards raveling. The complaints result from dust and from chips loosened by traffic or scattered around the project. Chip retention can be improved by tight control of chip grading and shape, application temperatures and rolling. Dust can be controlled by the application of dust control solutions which we longer use due to problems of reaction with the emulsion. Also dust can be controlled by thorough sweeping on the following day. Complaints and problems are reduced through adequate notice, signing and traffic control. The chip seal is a superior seal and has been used successfully in the City of San Luis Obispo for many years. Temperatures are extremely important for a successful project. Asphaltic emulsion shall not be applied when weather conditions are unsuitable. Seal coats shall not be applied when atmospheric temperature is below 65° F. , or when the pavement temperature is below 80° F. For this reason chip seal should be conducted between the months of June through August. September usually has a morning fog that prevents chip seal from being applied until late morning or even afternoon. The FY 1991-93 Financial Plan provides $177 , 000 in the Streets Pavement operating Budget for Chip Seal Coats during FY 1992-93 . The project defined by these specifications proposes to accomplish nine miles of chip seal coatings and lane line replacement with the funds provided. The Pavement Management Plan calls for ten miles of street to be chip sealed each year. By sealing this amount of pavement, the required eight year frequency will be maintained to provide protection of the pavement from deterioration by sun, air and water. Measuring this project in miles is not the most precise method. Since the width of streets vary; i. e. , some streets are 32 ' wide while others are 64' wide, total project costs would also vary. Measuring this project in square yards will provide a more accurate assessment of project size. Ten miles of 32 ' wide streets would equal 187 , 733 square yards; this project proposes 190, 276 square yards. C�5- � I�»I�►�►►il�illlllllp�' ��U�ll city of San l..gs OBIspo COUNCIL AGENDA REPORT Page 2 (chip seal cont. ) Purchasing Procedure The provisions of Purchasing Control Manual Section PC-403-3 apply to this contract. CONCURRENCES: I E.I.R. exemption request was filed with the County on May 8, 1992 ; the twenty one day waiting. period expired on May 29, 1992 . Fiscal Impact• Project cost $170, 000. 00 Laboratory material analysis $ 7 , 000. 00 Engineer's estimate $177, 000. 00 Funds Available: The Financial Plan FY 1991-93 budget provides $177 , 000 in the Streets Pavement Operating Budget (pg. C-20) for this project. i Attachments: Engineers Estimates Map List of Streets and Measurements Note: Plans and Specifications are on file at the Citv Clerk's Office I i I gb\s-13acar.wp C-�a ENGINEER'S COST ESTIMATE 1992 CHIP SEAL CITY PLAN NO. S-13A Item Item Unit of Estimated Item Price Total s No. Measure Quanity (in figures) 1. Traffic Control One Job 1 33,700.00 33,700.00 2. Asphaltic Emulsion Ton 210 220.00 46,200.00 (latex modified) 3. Rock Screenings Ton 1,725 40.00 69,000.00 4. Thermoplastic Traffic Lin. Ft. 20,000 0:40 8,000.00 Striping 5. Thermplastic Pavement Sq. Ft. 5,000 2.25 11,250.00 Markings 6. Paint Green 4" Dash Lin. Ft. 3,500 0.10 350.00 7. Pavement Markers Each 300 5.00 1,500.00 Total 170,000.00 GB\S13AST?.W P C 53 W ` 2 F I o �gt LY�y O yt OC P I Q erP oO 0t S� �lu \ ti `z I n O„i sZn e �J o ai Q p 5T RACHEL m im F SANDE COCK ;6T. D i Y N Rangy&=4oUSE toBR �— ANQ4 AV r Irl I m SOUT I- sr Fep z X d \ SS 2 n W y t 1 ' BRIDGE W � � a' - m WOOD oG II l COR,R_�On O ❑ CALIDILL ST. . C: f � ST. QWTC 1992 CHIP SEAL Ce DR.'_ S- 13A 5/26/92 r o� ... oJu,i.AR=YL:: I Lf'.•. Li J J ti � W J ` C L! WPITA CIT C V J O W Q u J •�4.,_ �RG4R�7q .nvE, j W u. O r- C S-�' ........................ ..... ........... . ...................... A: ............... ...... .. ..... .. ...... ..... 1992 MR.SEA . ....... ..... . ......... .. . ...... ... ........ . .......... STREET LENGTH WID SQ. YDS. ROCK OIL SANDERCOCK ST. 2,904 37 11,939 107.4 3,104.14 BEEBEE ST. 1,003 37 4,124 37.1 1,072.24 PARKER ST. 950 31 3,274 29.5 851.24 CYPRESS ST. 739 40 3,285 29.6 854.10 HIGH ST. 4,013 37 16,497 148.5 4,289.22 SANTA ROSA ST. 2,059 37 8,466 76.2 2,201.16 OSOS ST. 1,795 40 7,979 71.8 2,074.54 MORRO ST. 2,112 40 9,387 84.5 2,440.62 CHORRO ST. 3,220 37 13,241 119.2 3,442.66 GARDEN ST. 1,954 37 8,031 72.3 2,088.06 NIPOMO ST. 2,006 38 8,471 76.2 2,202.46 UPHAM ST. 1,320 38 5,573 50.2 1,448.98 CHURCH ST. 1,954 37 8,031 72.3 2,088.06 LEFF ST. 1,900 38 8,026 72.2 2,086.76 ISLAY ST. 1,848 37 7,597 68.4 1,975.22 BUCHON ST. 2,323 31 8,002 72.0 2,080.52 PISMO ST. 4,118 . 33 15,100 135.9 3,926.00 PACIFIC ST. 4,171 34 15,758 141.8 4,097.08 SOUTH ST. 580 37 2,384 21.5 619.84 BROOK ST. 317 31 1,092 9.8 283.92 ROUNDHOUSE AVE. 637 37 2,619 23.6 680.94 EMILY ST. 330 37 1,303 11.7 338.78 MARGARITA AVE. 2,120 36 8,480 76.3 2,204.80 CALLE JAZMIN 634 33 2,325 20.9 604.50 CALLE LUPITA 950 33 3,483 31.3 905-58 CALLE MALVA 634 33 2,325 20.9 604.50 LIRO CT. 158 33 580 5.2 150.80 ESTELITA AVE. 317 33 1,162 10.5 302.12 CAMELLIA CT. 264 33 968 8.7 251.68 ALICITA AVE. 211 33 774 6.9 201.24 TOTALS 47,528 190,276 1,712.2 49,471.76 206.13 TONS OF OIL ROCK IS FIGURED @ 18# PER SQUARE YARD OIL IS FIGURED @ 0.26 OF A GALLON PER SQUARE YARD 10 MILES BY 32' WIDE = 187,733 SQUARE YARDS Crup Sea[\S-13AST2.wp C -55