HomeMy WebLinkAbout07/21/1992, C-4 - LAGUNA LAKE GOLF COURSE IRRIGATION IMPROVEMENTS, CITY PLAN NO. N-03Y ���IIII��IIIIUIIIIIII�II�=I"Illul�l MEETING GATE: A Cl"J or san pais oBIspo July 21, 1992 COUNCIL AGENDA REPORT I NUMBER _ FROM: Wayne A. Peterson, Acting Public Works Direct PREPARED BY: Lane Wilson, Parks and Buildings Manager. David Pierce, Projects Manager s Paul Taylor, Golf Course Supervisor SUBJECT: Laguna Lake Golf Course Irrigation Improvements, City Plan No. N-03Y CAO RECOMMENDATION: By motion, approve plans and specifications for Laguna Lake Golf Course Irrigation Improvements, City Plan No. N-03Y, and authorize soliciting of bids and contract award by the CAO, if the lowest responsible bid is within the Engineer's cost estimate. DISCUSSION: In 1983, a project was designed to install an automatic irrigation system for the entire Laguna Lake Golf Course. Due to budget constraints, less than half of the project was completed at that time. The remainder of the course continues to be irrigated using quick couplers and manually-relocated sprinkler heads. The manual irrigation requires high water flows up to 300 gallons per minute which does not allow effective use of the wells at the Golf Course. This project will automate irrigation for the southeasterly half of the course and for the edge areas of the northeasterly half of the course. The project will provide seven additional satellite controllers and approximately 165 additional automated sprinklers. A previous cost estimate, provided by two landscape contractors, was considered excessive. The project has been modified to reduce the cost. If the bids should happen to be greater than the Engineer's estimate, staff will recommend that the bids be rejected and that the work be accomplished under the direction of the Golf Course Supervisor. To facilitate this option, the bid documents request an alternate bid for a contract that would only install the underground wiring. Completion of this project will: 1. Permit a greater use of well water. With automation of the entire course the water application rates can be better controlled to make maximum use of the water available from the existing well and the well being developed at this time. These two wells can provide 75% of the water needed for the course. 2. Increase staff's ability to reduce water consumption. These improvements will provide better coverage of the golf course and will allow modification of irrigation in response to the need of the turf and the availability of water. C-�-/ o�Hii��u►lulllillllli� ���lll city of San Luis OBISpo Is COUNCIL AGENDA REPORT City Plan No. N-03Y Page 2 Consideration of this project was continued from the June 16, 1992 City Council Meeting. It is included in the list of General Fund Capital Projects that Should Go Forward that was approved by the Council on June 30, 1992 (list attached) . This project will upgrade the sprinkler system, reduce the amount of treated water required for irrigation and allow better use of personnel for maintenance of the Golf Course. CONCURRENCES: The Community Development Department has determined that this project is categorically exempt from further environmental review. FISCAL IMPACT: Engineer's Estimate $75, 000. 00 without contingencies. The FY 1988-89 Capital Improvement Plan includes $75,000 to automate those portions of Golf Course Irrigation System that were not automated in the 1983 project (Golf Course Irrigation Improvements, Page E-9) . Attachement: "General Fund Capital Projects that Should Go Forward, " Exhibit B of June 30, 1992 Agenda Report "State Budget Grag" Plans and Specifications are available for review in the Council office. Exhibit- General Fund Capital Projects that Should Go Forward Criteria for Retaining the Prbiect':: Longstanding Outside Design Contractural Significant Maint Public Funding Substantially or Policy Operating of Existing Safety Available Underway Comminment Savings Facilities Public Safety Police station HVAC impry z z Fire station# 1 replacement x x Underground tank monitoring &removal z Transportation Orcutt roadwidening z z a. Traffic signal upgra des Monterey @ Santa Rosa x x x x Palm @ Santa Rosa z . X. Mill @ Santa Rosa x x x x Elk's lane bridge x z: Nipomo street bridge x x z Balance of Bikeway projects x x. r Street reconstruction — 91/92 x z x x x Leisure, Cultural&Social Sery Recreation admin facility X ..... x>_....:. Playground improvements x x x x x _. French park — fmal phase z Mission playlot x x x z Park sand&edging replcmnt : !,z z: z Parks irrigation telemetry ss k x Sinsheimer park energy impry Stadium lights z x _ Tennis court lights x x x x Swim center filter replacement x z x Gblfaoai e•tr>tyonpz"o�ed.. '' �^� ? w --7 Balance of open space funding z:.. Perforating arts center x z Mission plaza improvements : z General Government Energy imprvments—City bldgs x. Seismic safety corrections x x x x City Hall fire alarm replacement x x z: Information system impry x z x z Notes 1. It is recommended tbat CIPprojects funded through the enterprise and agency funds(uater,sewer,parking, transit,and whale rock)also go forward based on tbeir independent funding from the General Fund. 2. DetaR project descriptlons as prepared during the budget retieu•process are available upon request from the Department of Finance. C -4-3