COUNCIL AGENDA REPORT ITEM NUIABERe r
FROM: Wayne A. Peterson, Acting Public Works Director
PREPARED BY: David Elliott, Administrative Analys
SUBJECT: Seismic Safety Corrections for Fire ion No. 2
CAO RECOMMENDATIONS:
By motion:
1) Approve plans and specifications for "Seismic Safety
Corrections to the City of San Luis Obispo Fire Station No.
2 - City Plan No. S-34X"
2) Authorize staff to solicit bids on the construction contract
3) Authorize the CAO to award the construction contract if the
lowest responsible bid is within the engineer's estimate.
DISCUSSION:
An engineering survey conducted by H.J. Degenkolb Associates in
1990 found two possible structural deficiencies in Fire Station
No. 2: 1) inadequate lateral bracing across the front of the
building and 2) lack of anchorage between the roof framing and
the masonry walls. The Degenkolb report concluded that the
station might pose a moderate risk to life safety in a major
earthquake. A thorough structural analysis by Howard F. Stup and
Associates in 1991 confirmed the findings of the Degenkolb report
and proposed a design for corrections based on standards for
Seismic Zone 4 of California Administrative Code Title 24.
Construction plans prepared by Stup and Associates call for 1)
installing a steel frame across the apparatus bay door openings
2) attaching this frame to a new reinforced concrete shell on the
inside of the masonry office wall at the front of the building 3)
removing the existing roof and bottom course of sheathing 4)
installing anchors between the roof framing and masonry walls 5)
replacing the sheathing and 6) installing new roofing. These
corrections should ensure that firefighting equipment and
personnel can respond to emergencies after a major earthquake.
FISCAL IMPACT:
The Seismic Safety Corrections project is included in the Capital
Improvement Plan of the 1991/93 Financial Plan on pages E-10 and
E-23. $379, 000 is designated for construction with $90, 000
allocated for Fire Station No. 2 . The engineer's cost estimate
is $71, 000 including contingencies.
At its meeting on June 30, 1992 , the Council decided that this
project should go forward despite impending financial
difficulties. This decision was based on the following criteria:
1) The project improves public safety.
C-5-1
�������►�H►I�II1111111�° ll�Ill MY Of san L"IS OBISPO
COUNCIL AGENDA REPORT
Seismic Safety Corrections for Fire Station No. 2
Page 2
2) Design is completed.
3) There is a policy commitment to correcting seismic safety
problems, particularly with essential services facilities.
4) This project involves maintenance of existing facilities.
Attachment: General Fund Capital Projects that Should Go
Forward
Plans and specs are available for review in the City Council
office.
1
ExhibitE-1-
General Fund Capital Projects that Should Go Forward
Criteria for ReWiling the Proiecf``
Longstanding
Outside Design Contractural Significant Maint
Public Funding Substantially or Policy Operating of Existing
Safety Available Under%%jv Committment Savin¢s Facilities
Public Saiery
Police station HVAC impry z .
Fire station# 1 replacement z x
Underground tank monitoring
&removal z
Transportation
Orcuttroad v6dening
Traffic signal upgrades
Monterey @ Santa Rosa x x x x
Palm @ Santa Rosa x .. X. z: z.
Mill @ Santa Rosa x z z z
Elk's lane bridge x z: X.
Nipomo street bridge x x x
Balance of Bil euay projects z x x .
Street reconstruction — 91/92 z x z x x
Leisure, Cultural& Social Sery
Recreation admin facility z
X.
Playground improvements x x x z z
French park — fmal phase z z:
Mission playlot x x x x
Park sand& edging replcmnt z z
X
Parks irrigation telemetry sss i z
Sinsbeimer park energy impry
Stadium lights z z x' z
.... ........
Tennis court lights z z z.... . ..... __z
Swat center filter replacement z ......' ` z
Golf course irrigation project x x xx
Balance of open space funding a'
Performing arts center x x
Mission plaza improvements
General Government
Energy imprvments—City bidgs X. It.
Seismic safety corrections x x x x V
City Hall fire alarm replacement x x z: .;
Information system impry x x x x
Notes
1. It is recommended that CIPprojectsfunded through the enterprise andagency funds(eater,sewer,paA*z,
transit,and whale Toch)also go fOTR2rd based on tbeir independent funding from the General Fund.
2. Detail project descriptionsasprepared during the budget retiiewprocessare available upon request from
the Department ofFinance.
c-�-3