HomeMy WebLinkAbout02/16/1993, C-3 - ""BIKE LANE/STREET RESURFACING PROJECT, SANTA ROSA AND SANTA BARBARA STREETS, CITY PLAN NO. S-41A."""illl�IQ�a��� city of San Is OBISpo . NIEE'C1Vir:
NiiS COUNCIL AGENDA REPORT ITlE�M1NU /9M3_
FROM: J
Wayne A. Peterson, Acting Director of Public Works
Prepared by: Bridget O. Fraser, Engineering Assistant
SUBJECT:
"Bike Lane /Street Resurfacing Project, Santa Rosa and Santa Barbara
Streets, City Plan No. S -41A."
CAO RECOMMENDATION:
By Motion, Approve Plans and Specifications for "Bike Lane /Street
Resurfacing Project, Santa Rosa and Santa Barbara Streets, City Plan
No. S -41A11; Authorize Staff to Advertise for Bids, and Authorize CAO
to Award a Contract if Lowest Responsible Bid is Within Engineerfs
Estimate.
DISCUSSION:
The project includes the resurfacing and restriping of Santa Rosa and
Santa Barbara streets to provide for bike lanes. The Bike Committee
Report, adopted by the City Council on May 5, 1992, Resolution 8010,
identifies a need for bike lanes on both Santa Rosa Street, between
Walnut and Murray Streets (Project 4) and Santa Barbara Street between
Leff and Broad (Project 7). The Council Agenda Report for that item
contained an extensive dicussion of the issues involved with the
individual projects.
The Planning Department has given this project a categorical exemption.
FISCAL IMPACT:
The 1991 -1993 Capital Improvement Program identifies $400,000 for
bicycle projects of which $280,000 is budgeted for bike lanes and bike
lane improvements. The Bike Committee Report called for $90,000 to be
spent on Santa Rosa Street. On September 1, 1992, Council authorized
the mayor to sign a Cooperative Agreement with Caltrans in which
Caltrans agrees to participate in the cost of improvements on Santa
Rosa Street up to a maximum of $48,400.
The Bike Committee Report did not specify monies to be spent for the
resurfacing.and striping of Santa Barbara, but instead indicated that
as it was scheduled for the 192 -193 Street Reconstruction Project, the
work should be funded through those means. Approximately $6000 of
additional costs will be incurred by the installation of bike lane
markings.
The FY 1992 -93 CIP Budget identified $700,000 for Street Reconstruction
and Resurfacing (page E -8 of the FY 1991 -93 Financial Plan). The
current balance is $623,718.88. The City has applied for funds from
the State -Local Transportation Partnership Program (SB300) but has not
received a response yet. Funds from SB300 for this project are
estimated to be $25,000. The engineer's estimate for the project is
$187f560. /J p
��u���►�►iilulllllll���° ��d�ll city o f San I 3 OBISpo
COUNCIL AGENDA REPORT
Although at the meeting of May 30, 1992, Council listed the 192 -193
street reconstruction as a potential deferral, the balance of bikeway
projects was given the go ahead (See attached Exhibit B.1 & B.2).
The available project funds are as follows:
Caltrans SB300
Caltrans Cooperative Agreement
Bike Committee Report
Street Reconstruction
approx. $ 25,000
up to $ 48,400
up to S 90.000
S 24.160
TOTAL: $ 157,560
The Utilities Department will be contributing a small amount for the
upgrade of some of their facilities.
ATTACHMENTS:
Exhibit B.1
Exhibit B.2
g:staftrpt\s41 a -sr.wp
=3
EXhibiL�'_s .
General Fund Car 1 Project Deferrals
PROJECTS RECOMIMENDED FOR IM:IIEDIATE DEFERRAL
Public Safety
Fire Station No. 2 Storage
S 65,000
Transportation
205,000
Bikeway Projects
99,000
• Offsetting grant from State (540,000)
700,000
• Higuera - South to Madonna (519,000)
100,000
• Orcutt - Broad to Bullock (540,000)
Murray /Broad Circulation Improvements
107 000
Other Neighborhood Traffic Improvements
100,000
Grand Avenue Medians ,
1232000
Leisure, Cultural & Social Services
6003000
Swim Center Improvements
99,000
• Multi Purpose Room Improvements (585,000)
49,000
• Landscaping (514,000)
64,900
Picnic Table Replacements - various park sites
19,000
Meadow Park Improvements (parking lot improvements, etc.)
28,000
Santa Rosa Park Improvements - Campfire Area
12,000
Sinsheimer Park Improvements
81,000
• Park Fencing (515,000)
• Outfield Drainage (516,000)
• Backstop Renovation (550,000)
Laguna Lake Dredging Equipment
2002000
General Government
Corporation Yard Bulk Storage & Composting Area
120,000
Radio Transmission Facilities (Phase II)
39,000
Total Immediate Deferrals
$1,092,000
POTENTIAL PROJECT DEFERRALS
Public Safety
Fire Heavy Rescue Trailer
S 15,000
Fire Training Facility
205,000
Transportation
Street Reconstruction Program (1992 -93)
700,000
Traffic Signal Upgrade Projects
100,000
Madonna @ Oceanaire (570,000)
Johnson @ Lizzie ($30,000)
Laguna Lake Sediment Removal (Zone 9 flood control project)
1302000
Leisure, Cultural & Social Services
Open Space Acquisition (from $1.5 million total budget)
6003000
Santa Rosa Park Softball Field Restrooms
539000
Johnson Park Irrigation Project
49,000
Public Art Projects
64,900
General Govenment
Corporation Yard Trash Transfer and Drainage Improvements
502000
Corporation Yard Landscape
30.000
Total Potential Deferrals
$19996,900
92-93BUDGET \2DEFERALS.YP
r
Exhibitl—Z
General Fund Capital Projects that Should Go Forward
I
Public Safety
Police station HVAC impry
Fire station T 1 repkcement
Underground tank monitoring
& removal
Transportation
Orcutt read widening
Traffic signal upgrades
?Monterey @ Santa Rosa
Palm @ Santa Rosa
Mill @ Santa Rosa
Elk's lane bridge
Nipomo street bridge
Balance of B3:ewayprojects
Street reconstruction — 91192
Leisure, Cultural & Social Sery
Recreation admin facility
Playground improvements
French park — final phase
Mission playlot
Park sand & edging replcmnt
Parks irrigation telemetryss
Sinsheimer park energy impry
Stadium lights
Tennis court lights
Swim center filter replacement
Golf course irrigation project
Balance of open space funding
Performing arts center
Mission plaza improvements
General Government
Energy impn tnenu— City bldgs
Seismic safely corrections
City Hall fire alarm replacement
Information system inpry
Notes
I
x
x
Criteria for Retatntn tb�e Pio
x
X ::
: z
Longstanding
x
x
x
Outside
Design
Contractural
Sim ificrnt
Maint
I
Public
Funding
Substantially
or Policy
Operating
of Existing
Safety
Available
Underway
Commitment
S2Ninrs
F207ities
. .........
............ ....
x
x
I
x
x
x
x
x
X ::
: z
'z
x
x
x
x
x
x
x
z::
x
x
x
I
x
z
z
x
x
x
x
'z
x
x
x
x
x I x
z.....
z
1. It is recommended that CJPprojects funded tbrou =b the enterprise and agency funds (eater, sewer, parling,
transit, and xhale rock-) also go forward based on tbeir independent funding from the General Fund
2. Detai7project descriptions asprepared during the budget review process are at2t7able upon request from
Me Department of Finance.
z
x
...
............_
x
'z
x
x I x
z.....
z
1. It is recommended that CJPprojects funded tbrou =b the enterprise and agency funds (eater, sewer, parling,
transit, and xhale rock-) also go forward based on tbeir independent funding from the General Fund
2. Detai7project descriptions asprepared during the budget review process are at2t7able upon request from
Me Department of Finance.
z
x
x
x
z:
z
x I x
z.....
z
1. It is recommended that CJPprojects funded tbrou =b the enterprise and agency funds (eater, sewer, parling,
transit, and xhale rock-) also go forward based on tbeir independent funding from the General Fund
2. Detai7project descriptions asprepared during the budget review process are at2t7able upon request from
Me Department of Finance.
z
x I x
z.....
z
1. It is recommended that CJPprojects funded tbrou =b the enterprise and agency funds (eater, sewer, parling,
transit, and xhale rock-) also go forward based on tbeir independent funding from the General Fund
2. Detai7project descriptions asprepared during the budget review process are at2t7able upon request from
Me Department of Finance.