HomeMy WebLinkAbout01/05/1993, C-3 - CONTRACT CHANGE ORDER NO. 1 FOR TRAFFIC SIGNAL UPGRADE: SANTA ROSA AT MONTEREY, SANTA ROSA AT PALM, AND SANTA ROSA AT MILL - CITY PLAN NO. T-14C��u�i►�IIII���A city of sar, _JIs OBlspo COUNCIL AGENDA REPORT FROM: Wayne A. Peterson, Acting Public Works Dire PREPARED BY: John Rawles, Engineering Assistant /Traffic MEQ1NG'1TE 1993 Jan. , ITEM NUMBER: SUBJECT: Contract Change Order No. 1 for Traffic Signal Upgrade: Santa Rosa at Monterey, Santa Rosa at Palm,. and Santa Rosa at Mill - City Plan No. T -14C CAO RECOMMENDATION: By motion: 1) Approve Contract Change Order No. 1 in the amount of $10,781.35 to Lee Wilson Electric Company, and 2) Approve the budget amendment request transferring $4,600 from the signal upgrade at Madonna / Oceanaire account to the project account. DISCUSSION: Last summer the City received one bid on this project from Lee Wilson Electric Company in the amount of $114,134. Because this bid far exceeded the engineer's cost estimate, the City rejected it and modified the plans and specifications to bring project cost closer to a revised estimate of $80,500. After readvertising, the City again received one bid from Lee Wilson in the amount of $78,970 and awarded the contract. At the pre -job conference, staff discovered that replacement of one signal controller had been inadvertently eliminated from the modified plans, and the contractor's representative claimed he had not included this work in the bid. Contract Change Order No. 1 in the amount of $10,781.35 restores installation of a new controller system to the contract work: Replacing the existing obsolete controller is absolutely necessary to maintain signal operation, because that controller cannot be interconnected to controllers at other intersections and could fail at any time. Further, since the existing controller is no longer manufactured, replacement parts and technical assistance are unavailable. FISCAL IMPACT: Base contract price: $78,970 Change Order No. 1: 10,781 Subtotal: $89,751 Less amount budgeted: - 85,180 Additional budget needed: $ 4,571 Funds for this transaction will be taken from the temporarily deferred signal project upgrade at Oceanaire and Madonna Road, leaving $65,400 in that.project budget. Attachments: 1 - Contract Change order No. 1 jr2/Mc -cco CITY OF SAN LUIS OBISPO, CALIFORNIA CONTRACT CHANGE ORDER Sheet 1 of 1 sheets Project Traffic Signal Upgrade: Santa Rosa Change 0 =der No. 1 at Monterey, Palm 6 Mill, City Plan No. T -14C Date 12 -16 -92 To: Lee Wilson Electric Company , Contractor You are here hereby authorized and directed to make the herein described changes from the plans and specifications, and /or to increase or decrease contract quantities, as follows: As requested by John Rawles Controller /cabinet /adapter assembly, including two type 170 controllers with Bitran type 210 software, and other appurtenances as may be needed for interconnected operation. We, the undersigned contractor, have given careful consideration to the changes proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may be noted above and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. By reason of this proposed change days extension of time will be allowed. Accepted date Z —2 19q Signe : Contractor's Authorized Agent Total cost of change not to exceed: $10,781.35 Submitted by: John Rawles Resident Engineer City Engineer Date approved APPROVED AS TO FORM: C t•.r,