Loading...
HomeMy WebLinkAbout08/31/1993, 1 - CONSIDERATION OF REQUESTS (PD/TR 220-92) TO CREATE AN OFFICE/INDUSTRIAL PARK ON AN 11.75 ACRE PARCEL ON PROPERTY LOCATED ON THE SOUTH SIDE OF ORCUTT ROAD, WEST OF THE S.P.R.R. TRACKS (953 ORCUTT RD.) INCLUDING: IIIN^IyIIII�IIIIIII� II � � MEETING DATE: Il p h ����� c� o San Luis OBISPO } _ , COUNCIL AGENDA REPORT ITEM NUMBER: FROM: Arnold B. Jonas, Director of Community Development PREPARED BY: Ronald Whisenand, Development Review Manager SUBJECT: Consideration of requests (PD/TR 220-92) to create an office/industrial park on an 11.75 acre parcel on property located on the south side of Orcutt Road, west of the S.P.R.R. tracks (953 Orcutt Rd.) including: A. Planned Development Rezoning - To change the zoning from M (Manufacturing) to M- PD (Manufacturing - Planned Development) including the extension of Sacramento Drive to intersect with Orcutt Road. B. Tract 2134 (City File No. TR 220-92) - A Vesting Tentative Map creating seven lots from two lots. CAO RECOMMENDATION: A. Introduce an ordinance approving the planned development overlay zoning and preliminary development plan with conditions, as recommended by the Planning - Commission; and B. Adopt a resolution approving the Vesting Tentative Map with conditions, as recommended by the Planning Commission and clarified by staff. BACKGROUND This matter was originally heard at the Council's August 17, 1993 meeting. Due to potential split decisions on key project features and the Council's need for additional information, the matter was continued to a special hearing on August 31, 1993. Discussion at the initial hearing focused on several issues that were raised by the applicant and Council. The purpose of this report is to provide additional background and clarification to aid the Council in reaching consensus on those key issues. DISCUSSION A. Area-wide Circulation Issues (i.e. should Sacramento extend throu¢h to Orcutt Rd): The main issue discussed at the August 17, 1993 hearing was whether Sacramento Drive should be extended to Orcutt Road. As all development-related City departments have recommended that the extension be made, this issue requires significant discussion. The following are some of the factors that led staff to our conclusion that Sacramento Drive should be extended: 1. City Council adopted policy which stated that neighborhoods should not be disconnected from each other, that pedestrians, cyclists, and vehicles should be allowed access /- 1 ������i�N��IIIIIIIfIIi° ���►II city of San LUIS OBISp0 Hij! COUNCIL AGENDA REPORT Staff Report - PD/TR 220-92 Page 2 from one portion of the City to the other. 2. In 1991, the Council stated a preference to have Sacramento Drive extended across the existing creek with a cul-de-sac just prior to Orcutt Road. This was in relation to Orcutt Road access and at that time, Council felt that this particular piece of property should not have access to Orcutt Road. Therefore, staff concluded that the City Council did not have extraordinary mitigation problems in crossing the creek by extending Sacramento Drive. 3. The City Council approved the Broad Street Annexation and the Broad Street Annexation EIR. In the Broad Street Annexation EIR, an assumption was made that Sacramento Drive would extend from its existing location to Orcutt Road. This extension was included in the EIR as a traffic mitigation measure to allow the Broad Street Annexation to proceed. The EIR showed that Sacramento Drive would carry approximately 4,000 vehicles per day and would operate during the peak hour at a level of service of C-D. It would reduce traffic on Broad Street by 3,000 vehicles per day. This would leave approximately 71,000 vehicles per day on Broad Street. These 3,000 vehicles would not use the intersection of Broad and Orcutt and would not be on Broad Street; they would be using Sacramento to gain access to Orcutt and Laurel and Johnson. Thus, the extension of Sacramento Drive would relieve approximately 3,000 turning movements per day at the intersection of Broad and Orcutt. Without the extension of Sacramento Drive, the same 3,000 vehicles per day will use Broad Street/Orcutt/Laurel/Johnson. The net effect of the extension is to decrease turning movements and congestion at the intersection of Orcutt Road and Broad Street. 4. The Draft Circulation Element EIR contains a recommendation, based upon early feedback by the Department of Fish and Game against the extension of Sacramento Drive. Since that time, the Department of Fish and Game has recommended mitigation measures which they feel will address their environmental concerns in crossing the creek by the extension of Sacramento Drive. As a result, the staff report to the Draft Circulation Element EIR now recommends the extension of Sacramento Drive. 5. Due to the fact that the Council adopted the Broad Street Annexation EIR, mitigation measures and mitigation fees for the payment of the extension of Sacramento Drive have begun to be collected. The Marigold Shopping Center project has been assessed mitigation fees on the basis of the EIR to pay for a portion of the road extension. 6. Existing City standards for cul-de-sac length would be exceeded if Sacramento Drive extension were not implemented. City standards for cul-de-sac length are developed due to the impacts of extra long streets upon circulation in general and specifically emergency vehicle ingress and egress. Additionally, not making the connection would set precedent for �►um��u►�uIIIIIIUIh ���ll City or San LUIS OBISp0 COUNCIL AGENDA REPORT Staff Report - PD/TR 220-92 Page 3 other streets in the city to exceed or ignore existing City design standards. In conclusion, staff recommends that Sacramento Drive be extended as the Department of Fish and Game feels that adequate environmental mitigation measures can be achieved for the creek crossing; traffic circulation will be enhanced; emergency access will be provided; and existing City design standards shall prevail. Should Council not wish to have Sacramento Drive extend through at this time, staff would recommend that the applicant provide suitable right-of-way dedication for possible extension in the future. Should the Council wish to approve the project without an extension of Sacramento Drive, the project should be conditioned to provide a suitable turnaround at the terminus of the on-site access road. If this is the case, the Council should direct that the final development plan reflect the desired on-site circulation pattern and that the Tract Map to be revised showing the revised roadway and lot configuration. In addition, the following modifications should be proposed to the project conditions: PD Condition No. 1. Delete Condition PD Condition No. 6. Delete Condition PD Condition No. 14, Delete Condition Tract Man Condition No. 4. The extended public street will be named Saefamente eve l : ncan>Ra . Tract Map Condition No. 10. The proposed public street shall be designed as a 60' R/W with 44' curb to curb, 8' parkways with 6' wide integral sidewalks. Pavement/base section shall be designed with a TI=8 (decorative pavement in the public R/W will not be permitted). be pfehibited eft the west side e f the The street profile and building sites shall be designed to accommodate the existing grades of Orcutt Rd. and the future grade changes required for the railroad overpass. Tract Map Condition No. 17. SaenimeRte Dr-i,,,e sewer- main must eeeer- as pan ef phase 1 ef the fneW ..............,:...;:;.: `seer>main:strait be deli t ether gravity flab towardsacr2�inento`bnve cn,pump tti Qrcutt Road to �������NI�IIIIIIuIII IIUllI MY Of San tuts OBISPO COUNCIL AGENDA REPORT Staff Report - PD/TR 220-92 Page 4 CeSatSf2tCto10the :i.:.. IIae Tract Mag Condition No. 24. Delete Condition Tract Mag Condition No, 32. Delete Condition B. Impact Fees and Financing: 1. Traffic Fees The applicant has requested that the City waive traffic fees for two signals and a portion of the construction cost of the future overpass. This request is based upon an understanding between the previous owner and a previous Community Development manager. As stated at the City Council meeting of August 17, 1993, there is no written dialogue which would substantiate this statement. Further, only the City Council has the authority to waive fees. All other developments in the City pay traffic fees based upon their relative proportion of their circulation impacts to adjacent streets. Staff recommends that this property be treated in a like manner with all other properties and developments within the City, (i.e. the developer should pay traffic fees as outlined in the staff report). 2. Applicability of 1988 Development Fees The applicant has proposed that his project be allowed to pay development fees which were in effect in July 1988. This is the date at which his project was first submitted. It is tradition for the City to charge development fees at the time that the building permit is issued. The City has not previously charged development fees based upon the time of first project submittal. Approval of this request would set precedent for all other projects submitted in the City. Approval of this request would establish a new Council policy which would not serve the best interests of the City. Fees and charges vary over time due to the needs of the City. Those needs are reflected by current fee schedules to develop those facilities which benefit the existing residents of the City. Staff does not recommend approval of the request to allow fees in place as of July 1988 to be applied to this project. 3. Underground Utility Costs Councilman Romero requested that the developer be relieved of his responsibility to underground fronting overhead utilities. Existing Council Policy 3.68.030 adopted by Resolution 3752, January 16, 1979, clearly states that "the City will require the developer of any private land project which includes widening of abutting streets to underground all existing utilities which ������►rN�lllllll�in ��l�li city of San LUIS OBISpo COUNCIL AGENDA REPORT Staff Report - PD/TR 220-92 Page 5 are located above ground in the area of widening." The only provision for waiver of this policy is for those projects which do not exceed 500' in length. This project does exceed 500' in length. A secondary issue arose with the question, "Does all of the Orcutt II property have frontage" onto Orcutt Road? The answer is affirmative. Orcutt Road is the City owned right-of-way from the northerly property line to the southerly property line. It is irrelevant that a portion of the right-of-way for Orcutt Road is held in public trust for the future construction of an overpass. The existing overhead utilities are currently located approximately 29' north of the existing southerly right-of-way line from Broad Street to 300' easterly of the Orcutt II property line. Thereafter, the distance from the existing overhead utility lines to the property lines increases as the right-of-way likewise increases for future widening. When a road is to be widened, the existing utilities must be moved to allow the road widening to take place. Policy 3.68.030 recognized that fact and stated that rather than having the existing overhead utilities relocated during the construction in widening of a road, the utilities were to be placed underground. Orcutt Road will be widened with this project and future projects, and now is the appropriate time for these facilities to be undergrounded. When, in the future, the overpass is constructed the utilities will have been undergrounded in their permanent location according to the correct placement for the overpass project. As it is the intent of Council policy to underground existing facilities when road widening takes place and create an aesthetically pleasing environment for the citizens of the City, staff recommends enforcement of existing City policy. 4. Assessment Districts The applicant has requested City assistance in the preparation of an assessment district to help finance the public improvements of the project. There are a number of different forms of assessment districts which can be created to install public improvements which act to reduce developer "front end" costs and make commercial and industrial projects competitive in the market place. Staff is willing to work with applicant on the details of establishing such a district, and recommends Council support of this request. However, implicit in applicant's request is city participation in funding the required improvements. Such participation is not usual city practice, and is not recommended in this case. Whatever method of payment is finally determined to be appropriate, the full financial responsibility should be that of the applicant, and perhaps other properties which are required to share in the cost of benifits received. C. Appropriate Building Setbacks: The applicant has requested a 0 foot setback for buildings 8 and 9. The normal setback in the 1-5 01N�►b►►►�IIIII�II�jlldlll city of San LUIS OBISPO COUNCIL AGENDA REPORT , Staff Report - PD/TR 220-92 Page 6 industrial zoning district would be 15 feet. Exceptions to the setback standards can be granted as part of the Planned Development rezoning. The applicant is requesting a 0 foot setback because of the extra wide right-of-way for Orcutt Road in this location. The Planning Commission reviewed the applicant's exception request and recommended that the setback be reduced to no less than 10 feet. Staff recognizes that the width of the right-of-way provides additional buffering from traffic on Orcutt Road. However, this right-of-way is needed to accommodate the slopes associated with the planned Orcutt Road railroad over-crossing. It is expected that the toe of the slope will extend to the property line. A 10 foot setback from the . toe of the slope would allow for proper grading, drainage, landscaping, and building maintenance. Staff would therefore recommend that a 10 foot setback be maintained consistent with the Planning Commission recommendation. If a lesser setback is desired, the Council must modify PD condition No. 16. D. Landscaping of the City's Orcutt Road Right-of-Way: Paragraph 4 of the applicant's August 17, 1993 letter requests the City proceed to landscape the 2.03 acres held in reserve for the future overpass construction of Orcutt Road. This issue was previously discussed at the Council meeting of August 3, 1993. At that meeting, staff received informal direction from the City Council to prepare a proposed capital improvement project to landscape this area as requested by Mr. Beko. However, the Council was clear that the project would be considered along with all other proposed projects. Staff does not recommend that the Council approve this request, but.acknowledge that the project will be proposed and will be considered along with all other capital improvement projects as to community benefit and need. E. Biological Impacts: I 1. Creek-side Impact Issues: Two branches of Acacia Creek form the westerly and southerly boundaries of the site. These are indicated in the Draft Open Space Element as "perennial creeks with degraded riparian corridor, but able to be restored/repaired". A third, centrally located channel is listed as a. drainage ditch. The southerly and westerly channels support pockets of riparian vegetation, but the central channel has virtually no riparian vegetation, due to extensive grazing and lack of water during summer months. The Sacramento extension will affect portions of the southerly and central channels, and Orcutt widening will affect the westerly channel. The project itself will effect portions of the central City of San tins OBISp0 Mii% COUNCIL AGENDA REPORT Staff Report - PD/TR 220-92 Page 7 channel and buildings will be sited adjacent to the two main branches. Plans for the Parkside project include a schematic plan for mitigating the project's impacts on all three channels, based on the State Department of Fish and Game's (DFG) policy to insure that there is no net loss in amount or quality of wetland habitat. The schematic mitigation plan has been approved by the DFG's wildlife biologist(see attached letter); and is discussed in more detail in the initial study. Based on mitigation measures contained in the project negative declaration, the Planning Commission recommended that buildings and parking areas maintain a minimum 20 foot setback from the westerly and southerly creeks. The buildings and parking areas shall be sited no closer than 20 feet from the top of bank or the edge of riparian vegetation which ever is greater. The Council heard from Mr. Phil Ashley at the August 17, 1993 hearing who expressed his desire to have the setback language read "the 20 foot setback shall be measured from the top of bank or edge of riparian vegetation which ever is greater." This alternative language would provide more restrictive setbacks than recommended by staff, Fish and Game, and the Planning Commission. Should the Council wish to have this alternative setback applied, PD condition No.l l (b) should be revised accordingly. No building setbacks were required adjoining the central drainage ditch. However, wetland habitat loses in this area still required mitigation per Fish and Game recommendations. PD condition No. 11 requires a mitigation plan that will ensure no net loss of all riparian/wetland habitat areas. In order to ensure long term protection, the applicant proposes to dedicate an open space easement over the creek and setback areas, in accordance with City policy. 2. Eucalyptus Tree Removal: The applicant has stated that he is unable to remove Eucalyptus trees that are not located on his property. The Eucalyptus trees in question are located along the western property line adjacent to the creek. The project initial study has indicated that "the leaves dropped by this exotic tree species interfere with the establishment of native riparian species, by providing dense cover over the soil and exuding oils which are toxic to other plants. While the mature Eucalyptus trees provide roosting places for some bird species, their overall effect is to reduce the diversity and productivity of plant and animal communities." Staff and the Department of Fish and Game have therefore recommended that the negative effects of this tree species be mitigated as part of the riparian enhancement program. The easiest way to mitigate the effects of the trees would be to remove them. However, some of the Eucalyptus trees are located on adjacent property not under the applicant's control. I- 7 "����i�H►�IIIII[I�Jin +��I�I► MY Of San WIS OBISPO NiS COUNCIL AGENDA REPORT Staff Report - PD/TR 220-92 Page 8 Should the applicant not be able to obtain approval from the adjacent land owner to remove them, a plan calling for raking the soil under the trees and importing top soil to the mitigation sites can be proposed in order to ensure the success of the program. Planned Development Condition No. 11 (f) states that "The plan mU provide for limited removal of on-site Eucalyptus trees, as determined necessary to allow re-establishment of native plant and animal species. The specific details as to which trees need to be removed and other measures that need to be taken will be addressed in the mitigation plan. F. Demolition of Existing Single-Family Residence: As pointed out in the previous Council report, the project calls for the demolition of an existing wood frame house located adjacent to Orcutt Road. The Cultural heritage Committee reviewed the structure and determined that it was significant. Although it is unfortunate to demolish any significant structure, there appears to be no practical alternative to demolition or relocation. The house encroaches into the Council approved Orcutt Road right-of-way by approximately six feet. Therefore even if the structure were to be retained on-site, it would need to be moved. The applicant has indicated that the structure has extensive rot which could present problems if it were to be moved. As of the writing of this report, the Building Department has not been able to arrange through the applicant an inspection of the residence to confirm the applicant's statements. The applicant has also indicated that he no longer has the reports from the movers recommending against the relocation efforts. Staff still recommends PD condition No. 20 that allows for relocation of the residence to another site within the City if it can be accomplished. If the owner is unsuccessful, the structure can be demolished provided photographic and architectural documentation is preformed to the satisfaction of the Community Development Director. G. Revised Conditions: Councilman Romero has proposed modification to draft project conditions (see August 19, 1993 memo, attached). An analysis of these proposed changes is as follows: Comment No. 1: There appears to be duplication in PD Condition Nos. 8 and 9 regarding grading and drainage. Response: Agree. Recommend modification as follows: i I-� ����►����uiluluilp ��Upl MY of San LUIS OBISp0 COUNCIL AGENDA REPORT Staff Report - PD/TR 220-92 Page 9 8. The appheant shell pre-vide the Gity Engineer- with a det6led gfading and dfainage pi Delete Condition 9. The subdivider shall provide the City Engineer with a detailedgrading and drainage an #9 hydraulic analysis which indicates the effects of the proposed development on adjacent and downstream properties. ����►�►�►i�ullllll�l�nlllllll city of San tins OBISpo Nij% COUNCIL AGENDA REPORT Staff Report - PD/TR 220-92 Page 10 The analysis must address the existing public and private drainage facilities and creek capacities in order to meet City standards, and to avoid increased potential flooding downstream. Otherwise, detention facilities may be required as a condition of building permits, to the satisfaction of the City Engineer in accordance with the County Airport Area Specific Plan & Drainage Master Plan. The analysis shall also identify any areas within the project subject to inundation during a 100-yr storm. Any lots subject to flooding during a 100-yr storm shall be graded to provide minimum pad elevations at least 1 foot above the 100-yr storm elevation, to the satisfaction of the City Engineer. The areas subject to flooding shall be noted on the final map. If the hydrology study identifies areas subject to flooding which are not shown on the current Flood Insurance Rate Map, or, are in conflict with said map, the subdivider shall process and complete a Federal Emergency. Management Agency Letter of Map Amendment (LOMA), or, Letter of Map Revision (LOMR) prior to final acceptance of the development, to the satisfaction of the City Engineer. I Comment No. 2: PD Condition No. 10 refers to Environmental Protection Agency (EPA) permit requirement. What is this permit for? Response: Condition No. 10 requires that the applicant obtain a "General Construction Activity Storm Water Permit" from EPA. The basis for this condition is a new piece of federal legislation that is intended to eliminate pollution from construction sites and from storm water runoff. The legislation requires that any development or construction project disturbing five acres or more to be covered by a National Pollutant Discharge Elimination System (NPDES) permit. The permit will ensure that the development incorporates measures that will reduce pollution to the maximum extent practicable. The new legislation applies to new construction projects that are initiated after October 01, 1992. Comment No. 3: PD Condition No. 11 should be amended to clarify the measurement of the riparian setback area. Response: Agree. Staff recommends the following language modification. 11. Applicant shall expand and enhance existing riparian habitat areas found on the site, in accordance with a plan approved by the State Department of Fish and Game, the City Engineer, and the Community Development Director. The plan shall be prepared by a landscape architect or biologist experienced in the area of riparian habitat restoration, and shall include the following measures: ���H�► ��IIIlIIUlpi�u�u�+��NIII City Of San LUIS OBISPO i11ftia COUNCIL AGENDA REPORT Staff Report - PD/TR 220-92 Page 11 a. The plan shall provide for no net loss of extent or quality of riparian habitat on the project site and adjoining sites affected by off-site improvements for the project. b. The plan shall establish a minimum creek setback line for the westerly and southerly channels. The setback line shall correspond to the edge of the riparian _ , ......................................................... vegetation or feet from the top of bank ss w ever is greater_ bc. Native riparian plant species shall be used whenever possible. ed. Plants shall be used which are large enough to establish wildlife habitat as quickly as possible. d+e. Planting areas shall be located appropriately to avoid the need for long-term irrigation or other maintenance. e#. The plan shall include monitoring and maintenance provisions which ensure that replacement planting areas are properly established and are not subsequently removed without further environmental review. €g.. The plan may provide for limited removal of on-site Eucalyptus trees, as determined necessary to allow re-establishment of native plant and animal species. g . A plan for all removal and replacement zones for all phases of the project shall be completed prior to recording the final tract map or approval of the PD final development plan. Final grading plans and landscape planting plans and construction drawings for each phase shall be reviewed and approved by the Department of Fish and Game prior to issuance of building permits for that phase of the project. Plans for construction of street and drainage improvements within public right of way area shall also be reviewed and approved by DFG staff prior to beginning construction. #i. Department of Fish and Game staff shall review and approve grading stakes in the field prior to initiation of grading for each phase. Comment No. 4: PD Condition No. 14 may no longer be applicable if Sacramento Drive is not extended. — � I ►►��►i�u►�IIIII[UIII°�u'q�Blll city Of san LUIS OBI SPO = COUNCIL AGENDA REPORT Staff Report - PD/TR 220-92 Page 12 Response: Agree. See Section A (above) for recommended modifications to project conditions should the Council decide that Sacramento Drive should not extend to Orcutt Road. Comment No. 5: Tract Map Condition No. 6 as modified at the August 17 meeting does not provide sufficient clarification as to City/developer improvement obligations. a. Will. the developer be required to bring the intervening ground up to grade? By intervening ground, staff assumes that Mr. Romero is discussing the area between the newly placed curb and gutter and the existing street. The answer to this question is "no". Staff plans to use this area for compaction of road base which becomes available from various City projects; and b. Will he be required to compact the road fill, install a base, construct a bike lane, construct right and left turn lanes in an out of the subdivision at Sacramento Drive? Per the staff recommendation as revised on August 17, 1993, the developer will not be required to construct a base, construct a bike lane in the intervening area between the curb and gutter and the existing street. The developer will be required to construct additional roadway widening at the intersection of Sacramento/Duncan and Orcutt Road. The additional widening will allow left hand turns from Orcutt to Sacramento and Duncan to occur. Developer will not be required to construct left and right turn lanes on Sacramento Drive. Staff anticipates construction of a standard asphaltic concrete driveway from existing Orcutt Road to the frontage of the subdivision. Thus, a single lane into the subdivision and a single lane out of the subdivision should be sufficient for the phased construction of the subdivision. No separate left or right hand turn lanes exiting the subdivision are proposed. C. Will a cost sharing program be assumed for the paveout of the south side of the road? The City Public Works Department Policies and Procedures, Procedure #708.2, adopted in May 1987, required the property owner of the subdivision which is to be developed to dedicate all required right-of-way and install all improvements required by subdivision regulations. This requires that the subdivider completely build the entire street and to match grade to any existing street. Thus by existing procedure, the subdivider is responsible for the complete cost of paveout from curb face to existing pavement. Both Sacramento Drive and Orcutt Road are based on a design traffic index of 8, as adopted in the Municipal Code, Section 16.36.140. bl '��H�i�►►►�IIIII��h �I���► MY Of San LUIS OBISPO COUNCIL AGENDA REPORT Staff Report - PD/TR 220-92 Page 13 d. Should installation of curb, gutter and sidewalk along the portion of Orcutt Road between Sacramento Drive and the railroad not be required at this time? Installation of the curb, gutter, and sidewalk will provide a firm "hard edge" to allow on-site landscaping to take place and to begin the maturation process. Further, the Council has requested a proposed capital improvement project to provide landscaping of the City lands behind the future curb, gutter, and sidewalk which will further require some form of hard edge treatment. Additionally, there is a current capital improvement project scheduled for application of grant funding to provide a rubberized railroad crossing at this location. In combination with the rubberized railroad crossing, pedestrian access along the south side of the street would be-facilitated and is deemed appropriate. With the installation of the rubberized crossing, pressure will surely mount to construct the City portion of the at-grade widening project between Orcutt to and Bullock Lane/Laurel Lane. With that project will occur the installation of the deferred pavement of the Orcutt II project. Finally, the project itself will generate pedestrians which should have access to a sidewalk to allow them to walk to residential areas east of the railroads tracks or the recreational opportunities provided at Sinsheimer Park. Therefore, the improvements should be placed at this time. As Councilman Romero points out, the south edge of the curb and gutter is some distance from the existing roadway. That distance is necessitated by the 22' wide landscaped median. If that median were not planned, extra pave-out between centerline of the road and existing concrete street is estimated at 4 additional feet. Thus the developer would be normally responsible for an additional 4' of paving for the length of the project by existing policy. Therefore, There is no apparent reason to enter into an agreement with the developer to share costs of roadway widening. The recommended language, as modified by staff memo dated August 17, 1993 is as follows: 6. ' full street pm,ement, signing, stfiping, Lrmsitien ever- FaRmad lfaeks, bmTtieades, ete.—..) shaH be eeastmeted in aeeerdmee with the Fe%,ised widening established by the G4Y . ..:?'{:::i::.":. :2:<.'.:.::::.'.:..•.y, :.%::%"".2::...':::^s•::a:;:::: �srs:':u:'•:<:<y.::<::..;...:. :::.>'>:.:'..:...»:..;:.::>:.;:.>':.::s:.::.; :.. ,::.>,:, ;'<.,...::::..r::'::;.:.;.:.>�.....�::.�'.>.::.r::.s::.: uladtvrder shall ;nstall the required : rcptt Road frorstage imprnvetnents(t rubs; gutters; I-13 city of San LUIS OBISPO COUNCIL AGENDA REPORT Staff Report - PD/TR 220-92 Page 14 ... .........I.X. X xy ................ tuw aCgnment established k eftY bu.n c -;olhq satisfa cti ;o theCity X: d, accommodate teff .......stuping...........d. tu-M As as bout !. ii �::i tot G�:� �a Wto the.$a $0di tiler... ......... .... ... ........ . j "D.. &.....1....b...i. ..d...1p.a.W........ emeni t ... . Included future:Clv prglect}, to .. .................. the satisfaction i did G.M. E�n n: j:!.:on .................... In addition to the above five comments, staff recommends that the Council consider the following tract map condition modifications as presented at the August 17 hearing: 18. The pf;epesed en site iewer- main wi4l be pr-iwftly owned emd FnainWned by the prepeft ewftef9s asseeiftfiefl. Ani sewer ..................... ............ -W. di dedicated��:P.qbl 6 te.,V�bwne �i�an mam: �p .1 d ..... .. dmriya ................. ....... .... ... ........ .......... ... ... . ........ propel.N.: ..W.A MAW. W .. ass o.C!4.6 0.. .................... 21. The subdivider. shall dediewe eA easement feF a publie water- system e%,er- all pafldng *rem (inehiding planter-s emd faised fnediems) within lets 3 7, to the satisfeetien ef The subdivider City Engineer and Utilities Engineef. .............l dethcte an<easemtt for the. .......... . ..... ....... Wt f tng awn JUM Irated. . .. ... ........... .....;Oppp ... ....... City Engineer aid >Otlhtes Engineer ........... ........ ALTERNATIVES A. Approve the applications as recommended by the Planning Commission (CAO Recommendation). B. Deny the requests, if findings are made that the proposed rezone and tentative map are inconsistent with the City's General Plan or Zoning Regulations. ILL �����►�N►�IIIIIIuIp ll�Ill MY of San 611S OBISPO UNGe COUNCIL AGENDA REPORT Staff Report - PD/TR 220-92 Page 15 ATTACBAlENTS A. Draft resolution and ordinance approving the -PD rezoning and tentative tract map. B. Draft resolution "B" denying the vesting tentative tract map. C. Department of Fish and Game Response Letter D. Maps and Exhibits , E. Planning Commission Minutes. F. Planning Commission staff report and attachments. G. Bicycle Lane Background Memos. I - 15 RESOLUTION NO. (1993 Series) A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN LUIS OBISPO GRANTING APPROVAL OF VESTING TENTATIVE TRACT NO. 2134 LOCATED AT 953 ORCUTT ROAD BE IT RESOLVED by the Council of the City of San Luis Obispo as follows: SECTION 1. Findings. That this council, after consideration of the tentative map of Tract 2134 and the Planning Commission's recommendations, staff recommendations, and reports thereof, makes the following findings: 1. The design of the subdivision and proposed improvements are consistent with the general plan. 2. The site is physically suited for the type and density of development allowed in the M-PD zone. 3. The design of the subdivision is not likely to cause serious health problems, substantial environmental damage or substantially and unavoidably injure fish or wildlife or their habitat. 4. The design of the subdivision will not conflict with easements for access through (or use of property within) the proposed subdivision. 5. The proposed project has been granted a negative declaration of environmental impact based on various mitigation measures being incorporated into the project, as identified in the ordinance approving Planned Development Rezoning PD 220-92. SECTION 2. Conditions. The approval of the tentative map for Tract 2134 is subject to the following conditions: 1. Subdivider shall obtain approval of rezoning application PD 220-92. 2. This vesting map shall confer a vested right to proceed with development in accordance with the ordinances, policies and standards described in Section 66474.2 of the Subdivision Map Act, and including all provisions of the ordinance approving Planned Development Rezoning PD 220-92. Environmental impact mitigation measures identified in the ordinance approving Planned Development Rezoning PD 220-92 shall be conditions of approval of this vesting tentative map. Resolution No. (1993 Series) Tract 2134 Page 2 3. Phase II of the development will require the public street to extend to at least the southerly driveway serving building ##4. This is subject to change if the developer changes the phasing proposed. 4. The extended public street will be named Sacramento Drive. 5. A common driveway/maintenance agreement is necessary for common parking areas. Frontage Improvements 6. Subdivider shall install the required Orcutt Road frontage improvements (curbs, gutters, 4' detached sidewalk, including culverts and parkway landscaping, at the ultimate alignment established by the City Council (110 ft R/W), to the satisfaction of the City Engineer. Subdivider shall install necessary pavement, signing and striping to accommodate left turn pockets for both directions and necessary transitions at both ends of his project, to the satisfaction of the City Engineer. Subdivider shall pay to the City, the cost of additional remaining Orcutt Road pavement to accommodate the ultimate street section (to be included in a future City project), to the satisfaction of the City Engineer. 7. City will pay for additional Orcutt Rd. R/W dedication (indicated on the tentative map). The amount shall be negotiated between the property owner (or his representative) and the City and shall be based on fair market value. 8. Access rights along Orcutt Rd. shall be dedicated to the City. 9. The subdivider shall dedicate a 10' wide (minimum) public utility easement and 10' wide street tree easement along all public street frontages, to the satisfaction of the City Engineer and public utility companies. 10. The proposed public street shall be designed as a 60' R/W with 44' curb to curb, 8' parkways with 6' wide integral sidewalks. Pavement/base section shall be designed with a TI=8 (decorative pavement in the public R/W will not be permitted). Upon connection to Sacramento Dr., the 44' roadway shall transition to meet the existing curb alignment of Sacramento Dr., to the satisfaction of the City Engineer. A bicycle lane shall be provided on each side of the street, and parking shall be prohibited on 1 - 17 Resolution No. (1993 Series) Tract 2134 Page 3 the west side of the street.The street profile and building sites shall be designed to accommodate the existing grades of Orcutt Rd. and the future grade changes required for the railroad overpass. 11. A median island in the new street will not be permitted. 12. Phasing of the construction of the public street shall provide for the ultimate street section and pavement life (per the City's Pavement Management Plan) at the end of the phase III. The subdivider's engineer shall include this requirement in the public improvement plans, to the satisfaction of the City Engineer. 13. Driveway ramps (or alley-type entrances with minimum radii of 30') shall be constructed per City standards in lieu of the street type driveways proposed, to the satisfaction of the City Engineer. 14. The subdivider shall construct a bus stop on Orcutt Rd (shelter, signing, trash receptacle, etc...), on the southerly side of Orcutt Rd and westerly of the new street, to the satisfaction of the City Engineer. 15. The subdivider shall install street lighting per City standards, including off-site street lighting along roadways leading to and from the proposed development, to the satisfaction of the City Engineer. Street Trees 16. Street trees are required to be planted per City Standards (the number of trees are determined by one tree required for each 35 linear feet of street frontage) at the time of lot developments. An exception shall be for any trees required as part of mitigation measures established by the Dept. of Fish & Game. In no case, shall any tree be planted in a location which may be in conflict with any earth fill, retaining walls, etc...associated with a future railroad overpass. Species: As determined by the City Arborist. Water, Sewer & Utilities 17. Construction of the public sewer main through to the Sacramento Drive sewer main must occur as part of phase I of the development (including any necessary improvements required to cross the creeks). 1� �g Resolution No. (1993 Series) Tract 2134 Page 4 18. Any sewer mains outside of dedicated public right-of-way shall be privately owned and maintained by the property owner's association. 19. Sewer lift station charges are required to be paid prior to recordation of the final map as determined by the City Engineer and Utilities Engineer. ($4,143.83) 20. The final grades and alignments of all public water, sewer and storm drains (including service laterals and meters) are subject to change to the satisfaction of the City Engineer and Utilities Engineer. 21. The subdivider shall dedicate an easement for the public water system over all parking areas (including planters and raised medians) within lots 3-7, to the satisfaction of the City Engineer and Utilities Engineer. The easement is for operation, maintenance, repair, and replacement of the public water distribution system. 22. The proposed looped on-site water main, service laterals and meters (serving lots 3 - 6) shall be an extension of the public water system. The 8" dead-end water line between lot 5 and lot 6 shall be privately owned and maintained. 23. The public water main may be phased with the approval of the Fire Department with regards to required fire flows. The City will participate in any line upsizing of public water mains (increases above the size required to provide fire flow or the City's 8" minimum, whichever is larger). 24. The public street must be constructed through to Sacramento Drive as part of phase 3. 25. Water services, water meters and fire lines serving lot 7 shall be connected to the water main in the new public street, not from the on-site water main. 26. The subdivider shall underground all existing overhead utilities along the southerly property frontage of Orcutt Rd, to the satisfaction of the City Engineer and utility companies. Site, Grading & Drainage 27. All bridging, culverting and modifications to the existing creek channels must be in compliance with the City's Flood Management Policy Book (specifically regarding clear spanning of creeks, etc...) and approved by the City Engineer, Corp of Engineers and Fish & Game and must meet City standards and policies. Resolution No. (1993 Series) Tract 2134 Page 5 28. Clearing of existing creek and drainage channels, including any tree pruning or removals, and any necessary erosion repairs shall be to the satisfaction of the City Engineer and the Dept. of Fish & Game. 29. All lots shall be graded, to preclude cross-lot drainage, or, appropriate easements and drainage facilities shall be provided, to the satisfaction of the City Engineer. Traffic 30. Traffic impact fees listed as a condition in the Ordinance rezoning the property to M- PD (PD 220-92) shall be paid prior to issuance of building permits for Phase I. 31. The City is expected to adopt a new traffic impact fee ordinance sometime in 1993. That ordinance may impose additional traffic fees, and/or may allow credit for fees itemized above. 32. The subdivider shall be entitled to reimbursement for excessive costs incurred to install the major bridge (or culvert, and water main within the bridge/culvert limits at the southwest comer of the tract in order to extend Sacramento Drive to Orcutt Road. The reimbursement will be based on costs in excess of the developer's responsibility of 20/60 (33.33%) of the final cost for the work, excluding base, pavement, sidewalks and railings, water main within the area of the bridge/culvert and other utilities, in accordance with provisions of Municipal Code Section 16.44.091. Such reimbursements shall be paid to the subdivider only when and if prorated shares are collected from the developers of new projects which benefit from this improvement, as determined by the City Engineer, and subject to an agreement, as prescribed in said regulations. Other 33. All boundary monuments, lot corners and centerline intersections, BC's, EC's, etc..., shall be tied to the City's control network. At least two control points shall be used and a tabulation of the coordinates shall be submitted with the final map or parcel map. A 5-1/4" diameter computer floppy disk, containing the appropriate data for use in autocad for Geographic Information System (GIS) purposes, is also required to be submitted to the City Engineer. Resolution No. (1993 Series) Tract 2134 Page 6 On motion of , seconded by , and on the following roll call vote: AYES: NOES: ABSENT: the foregoing resolution was passed and adopted this day of 1993. Mayor ATTEST: City Clerk APPROVED: it to y ORDINANCE NO. (1993 SERIES) AN ORDINANCE OF THE CITY OF SAN LUIS OBISPO AMENDING THE ZONING REGULATIONS MAP TO CREATE AN OFFICE/INDUSTRIAL PARK ON AN 11.75 ACRE PARCEL ON THE SOUTH SIDE OF ORCUTT ROAD, WEST OF THE SOUTHERN PACIFIC RAILROAD RIGHT- OF-WAY FROM M TO M-PD (APPLICATION PD 220-92) WHEREAS, the City Council has held a hearing to consider the planned development request PD 220-92; and WHEREAS, the City Council makes the following findings; 1. The planned development will provide facilities or amenities suited to a particular occupancy group which would not be feasible under conventional zoning, specifically an office/industrial park incorporating auxiliary uses. 2. Features of the proposed design achieve the intent of conventional standards (privacy, usable open space, adequate parking, compatibility with neighborhood character, and so on) as well as or better than the standards themselves. 3. The project will be compatible with existing and allowed land uses in the area. 4. The project will not direct traffic to residential areas. 5. The project will provide adequate mitigation to address potential impacts related to noise, light and glare, and loss of privacy, among others, imposed by commercial activities oil nearby residential areas. 6. The project does not preclude industrial or service commercial uses in areas especially suited for such uses when compared with offices. 7. The project does not create a shortage of C-S and M zoned land available for service commercial or industrial development. BE IT ORDAINED by the Council of the City of San Luis Obispo as follows: SECTION 1. The Planned Development preliminary map PD 220-92 is hereby approved subject to the following conditions: (*Indicates environmental impact mitigation measure) i-ate Ordinance No. (1993 Series) Planned Development Rezoning PD 220-92 Page 2 1.* Applicant shall dedicate on-site portions of right of way for Sacramento Drive extension in conjunction with first phase of the project. 2.* Emergency access shall be provided to each building in accordance with City standards and to the approval of the Fire Marshal. 3.* Applicant shall pay fees to fund pro-rata shares of the following off-site traffic mitigation measures: a. Orcutt Road/Southern Pacific Railroad over-crossing: $63,320. b. Orcutt Road/Laurel Lane traffic signal and intersection modifications: $3,835. C. Broad Street/Capitolio Way traffic signal: $7,127. 4.* The applicant shall prepare and implement a trip reduction plan approved by the Community Development Director. The applicant shall create a property owners' association which shall be empowered and required to implement the plan on a continuing basis. 5*. Trip reduction measures shall include provision of facilities for the use of employees who commute by bicycle, to the approval of the Community Development Director. At a minimum, facilities shall include: - Secure weatherproof bicycle storage. - Plumbing stub-outs for shower and locker room facilities at each building. 6.* Building 3 shall not be included in a phase which precedes construction of the Sacramento Drive extension to Orcutt Road. 7.* Applicant shall complete all site grading and other construction activities in accordance with a particulate emission mitigation plan, to the approval of the APCD and Community Development Director. 8.* The subdivider shall provide the City Engineer with a detailed grading and drainage plan and hydraulic analysis which indicates the effects of the proposed development on adjacent and downstream properties. Ordinance No. (1993 Series) Planned Development Rezoning PD 220-92 Page 3 The analysis must address the existing public and private drainage facilities and creek capacities in order to meet City standards, and to avoid increased potential flooding downstream. Otherwise, detention facilities may be required as a condition of building permits, to the satisfaction of the City Engineer in accordance with the County Airport Area Specific Plan & Drainage Master Plan. The analysis shall also identify any areas within the project subject to inundation during a 100-yr storm. Any lots subject to flooding during a 100-yr storm shall be graded to provide minimum pad elevations at least 1 foot above the 100-yr storm elevation, to the satisfaction of the City Engineer. The areas subject to flooding shall be noted on the final map. If the hydrology study identifies areas subject to flooding which are not shown on the current Flood Insurance Rate Map, or, are in conflict with said map, the subdivider shall process and complete a Federal Emergency Management Agency Letter of Map Amendment (LOMA), or, Letter of Map Revision (LOMR) prior to final acceptance of the development, to the satisfaction of the City Engineer. 9.* The applicant shall obtain the General Construction Activity Storm Water Permit required by the Environmental Protection Agency, and shall comply with all requirements of that permit. Applicant shall comply with all requirements of City grading regulations regarding erosion control measures. 10.* Applicant shall expand and enhance existing riparian habitat areas found on the site, in accordance with a plan approved by the State Department of Fish and Game, the City Engineer, and the Community Development Director. The plan shall be prepared by a landscape architect or biologist experienced in the area of riparian habitat restoration, and shall include the following measures: a. The plan shall provide for no net loss of extent or quality of riparian habitat on the project site and adjoining sites affected by off-site improvements for the project. b. The plan shall establish a minimum creek setback line for the westerly and southerly channels. The setback line shall correspond to the edge of existing riparian vegetation or 20 feet from the top of bank, which ever is greater, as deemed appropriate by the Community Development Director. C. Native riparian plant species shall be used whenever possible. Ordinance No. (1993 Series) Planned Development Rezoning PD 220-92 Page 4 d. Plants shall be used which are large enough to establish wildlife habitat as quickly as possible. e. Planting areas shall be located appropriately to avoid the need for long-term irrigation or other maintenance. f. The plan shall include monitoring and maintenance provisions which ensure that replacement planting areas are properly established and are not subsequently removed without further environmental review. g. The plan may provide for limited removal of on-site Eucalyptus trees, as determined necessary to allow re-establishment of native plant and animal species. h. A plan for all removal and replacement zones for all phases of the project shall be completed prior to recording the final tract map or approval of the PD final development plan. Final grading plans and landscape planting plans and construction drawings for each phase shall be reviewed and approved by the Department of Fish and Game prior to issuance of building permits for that phase of the project. Plans for construction of street and drainage improvements within public right of way areas shall also be reviewed and approved by DFG staff prior to beginning construction. i. Department of Fish and Game staff shall review and approve grading stakes in the field prior to initiation of grading for each phase. 11.* Applicant shall comply with the Interim Archaeological Survey Procedures prepared by the City's Cultural Heritage Committee (attached) prior to and during the construction phase of the project. These guidelines require: a. Completion of a surface survey by a qualified archaeologist approved by the Community Development Director prior to commencing construction activities on the site. b. Halting of construction activities if archaeological resources are discovered during construction. C. Implementation of a preservation plan prepared by a qualified archaeologist and approved by the Community Development Director if significant archaeological resources are discovered. Ordinance No. (1993 Series) Planned Development Rezoning PD 220-92 Page 5 12. Applicant shall provide sand and oil interceptors in parking lot drainage systems, to the approval of the City Engineer. 13. Applicant shall exhaust all avenues available to implement dedication of off-site right of way needed for extension of Sacramento Drive from its present terminus, to connect to Orcutt Road. Dedication shall include sufficient land or easement area to include "Wetland Habitat Replacement Zone 4", as shown on the preliminary development plan. The City Council will lend the subdivider its powers of condemnation to acquire the off- site R/W and/or easement dedication (Government Code 66462.5). If condemnation is required, the subdivider shall pay all costs associated with the off-site R/W acquisition (including attorneys and court costs). 14. The following uses shall be allowed within the Planned Development, and with the type of use permit review indicated: A = Allowed; D = Director's approval required PC = Planning Commission approval required; * Indicates use subject to square footage and other limitations per Zoning Regulations Section 17.22.010, footnote 10: No single tenant space less than 2,500 square feet, banks, real estate offices, financial institutions, medical clinics, doctor's offices, and lawyer's offices prohibited. A Advertising and related services D Antennas (Commercial broadcasting) A Broadcast studios A Computer services D Day care centers A Laboratories (medical, analytical) A Manufacturing - food, beverages; ice; apparel; electronic, optical, instrumentation products; jewelry; musical instruments; sporting goods; art materials. PC Manufacturing - basic metals, chemicals, building materials, fabricated metals, textiles, paper and cardboard; machinery, transportation equipment. A* Offices (Contractors) A* Offices (Engineers and industrial design) A* Offices (Technical and scientific research) A Photocopy services; quick printers A Photofinishing - Wholesale; and blueprinting and microfilming service A Printing and publishing A Repair services Ordinance No. (1993 Series) Planned Development Rezoning PD 220-92 Page 6 D Restaurants, sandwich shops, take-out food; as an auxiliary use primarily serving employees and clients of uses located within the planned development. D Retail sales - groceries, liquor and specialized foods; as an auxiliary use primarily serving employees and clients of uses located within the planned development. D Schools - Business, trade, recreational, or other specialized schools. 15. An exception to standard setback requirements is hereby approved, allowing a ten-foot setback from Orcutt Road where a fifteen-foot setback would otherwise be required, for Buildings 8 and 9. This condition does not preclude other exceptions, if approved by variance or administrative use permit. 16. Parking shall be provided at a minimum rate of one space per 400 square feet of gross building area for each phase. 17. Parking shall be provided for each tenant at a rate of 90% of the requirement stated in the Zoning Regulations. Parking requirements may be further modified by approval of an administrative use permit, upon a finding that the traffic reduction plan for the planned development has effectively reduced the demand for parking. 18. Development of the site shall be in substantial compliance with the building envelopes and other features shown on the approved preliminary development plan. Actual building design, landscaping, etc., shall be to the approval of the Architectural Review Commission. 19. Applicant shall attempt to provide for relocation within the city, of the existing house on currently located on the site. If necessary, the applicant shall offer the structure free of charge to any responsible party who will relocate it. If the structure cannot be relocated within the city, the applicant may relocate it outside the city or demolish it, after providing photographic and architectural documentation to the approval of the Community Development Director. 20. If demolition of the existing house occurs, applicant shall recycle and salvage building materials to the extent feasible. Applicant shall submit a plan for recycling/salvage to the Community Development Director for approval prior to issuance of the demolition permit. 21. Applicant shall recycle building materials during construction of the project, in accordance with a plan approved by the Community Development Director. P.C. Minutes July 14, 1993 Page 6 Commr. Whittlesey expressed concern about the possibility of future height exceptions. Greg Smith said the height limit for a 3-story building in the M zone was 35 feet. Mr. Barasch said he had recently built 3-story building on Prado Road that was under 35 feet. Commr. Whittlesey asked about bike lanes. Wayne Peterson explained that a bike lane was being proposed on Orcutt Road, along the railroad right-of-way and along Bullock Lane. He said no bike lanes were being proposed for the Sacramento Drive extension. He explained to the south on Sacramento, on-street parking is already being utilized and it would not be appropriate to extend the bike lane south. Mr. Barasch said there would be truck traffic on the Sacramento Drive extension and it might not be appropriate for bicyclists. Commr. Whittlesey said if bike lanes are being provided along Orcutt, bike lanes should be specified on the Sacramento Street extension to provide access into this project. She asked Mr. Barasch ff he had talked with the adjacent property owner about the Eucalyptus trees. Mr. Barasch said he had not talked with the adjacent property owner, but he felt it was a good idea. Commr. Whittlesey felt that because part of the riparian area had deteriorated, the test fox no net loss was not adequate. She felt riparian improvements were needed. She suggested a few parking spaces be eliminated to provide an additional buffer. Mr. Barasch said the riparian replacement exceeded state standards and additional conditions could push the project over the edge of making economic sense to build. Commr. Cross asked staff to explain comments on page 10 of the staff report about the site not being unified. Greg Smith explained that staff was concerned that paving would be more prominent that desirable and the view of the creek would be screened by buildings. He said staff would prefer buildings to be clustered in the center of the property. He felt the design was attractive enough to get by, but it could be improved. H13 P.C. Minutes July 14, 1993 Page 5 Commr. Cross wanted the applicant to know he would be concerned about setbacks when site plans are proposed. Mr. Barasch said traditional setbacks aren't as critical on this site as in other manufacturing zones because this was a planned development with shared uses. He added that if the railroad track was elevated in the future, the setback would be meaningless. Greg Smith said the City's preliminary plan shows an.earthen slope bank, not elevated train tracks. Ron Whisenand advised the Planning Commission it could specify a setback requirement with knowledge of the elevated earth along the tracks providing additional buffering, but it should be specific about the setback from the property line. Commr. Sigurdson mentioned that the 1992 draft Land Use Element states that Sacramento Street should not be extended across the creek because it would have a significant effect on riparian habitat. Greg Smith said staff did not believe the street extension would have a significant adverse impact if the riparian replacement zone shown on the plan was done when the extension is constructed. Mr. Barasch said the Fre Department was mandating a second access, and the Public Works department was mandating the sewer connection. Commr. Whittlesey asked Mr. Barasch what he was basing his opinion on that the project was overparked. Mr. Barasch explained it was hard to predict who would occupy research parks, but typically tenants such as computer specialists, often work late at night when parking is not a problem. He said from his experience in other areas of California and Texas, 2 parking spaces per 1,000 square feet was adequate. He said loading docks were somewhat under provided for in the plans but more warehouse users occupied the building, but the plan provided flexibility to provide more loading docks. Commr. Whittlesey expressed concern that the individual buildings would not appear to be a cohesive unit_ She asked what the theme was? Mr. Barasch said CC&R's had been written in a draft form and design guidelines had been established. 1 -4-a P.C. Minutes July 14, 1993 Page 4 project was designed to be sensitive to creeks and existing trees and that existing wetlands would be replaced at a 3 to 1 ratio and exceed state guidelines. He said the Eucalyptus trees would not be removed but might have to be trimmed. He explained the applicant did not have adequate time to review several public works conditions, but found them generally acceptable and he would be meeting with public works representatives to make minor changes. Commr. Senn asked if there had been discussions with the City about parking. Mr. Barasch said there wasn't a comparable industrial park in the City to look at parking, but he felt the project was overparked. Commr. Sigurdson thought shaded textured walkways were reasonable to encourage walking, but the environment report stated decorative walkways were not allowed along public streets. Mr. Barasch said it could be done on private streets and there could be negotiations with the City about public right of ways. Wayne Peterson said public works would be opposed to textured or painted crosswalks in the streets. He explained crosswalks were considered a hazard because they give people a false sense of security and textured or painted walkways increase the cost of maintenance. Commr. Cross asked what benefit there was to the City in obtaining the Sacramento extension and being responsible for maintenance. Wayne Peterson said it would provide circulation for the entire area up to Industrial Way. He explained for a street to provide public access, it had to be a public street, but the cost of maintenance could be provided by an assessment district. In answer to a question by Commr. Cross, Greg Smith explained that staff was not recommending approval of the applicant's request for the setback exceptions on page 9 of the staff report because staff was concerned about vegetative screening of the buildings. Mr. Barasch said a more recent plan maintains 10 feet adjacent to the property line. He explained that a large amount of the property had already been taken by the City, and an additional setback for the Sacramento Drive extension will also be taken. He said further setbacks would not make the project financially feasible. He added this was not a precise plan. /-4/ P.C. Minutes July 14, 1993 Page 3 Ron Whisenand explained the Department of Fish and Game often uses the 3 to 1 ratio as a rule of thumb, but its main concern is no net loss. Commr. Cross expressed concern that the setbacks were from the top of bank and not from the edge of riparian vegetation, which could extend beyond 20 feet from the top of bank. Greg Smith said in a few places willows might be beyond the setback. Commr. Whittlesey expressed concern that part of the riparian habitat had deteriorated and a test for no net loss might not be enough. She said vegetation could be required to be improved. She asked staff if the parking requirement could be modified later when the applicant applied for a use permit. Greg Smith explained that parking needs were being estimated at this stage at 1 parking space per 400 square-feet, and later, if the applicant's parking management plan was adequate, he would be able to allocate 90 percent of the normally required spaces to individual tenants under a use permit. He said City staff would look at stakes placed by the applicant's surveyor and determine if top of bank determinations were accurate. Commr. Sigurdson asked why bike lanes, showers and daycare facilities were not recommended as a requirement. Greg Smith said staff was reluctant to recommend conditions where City Ordinance does not state it should be required. Ron Whisenand said daycare was included in the draft Land Use Element. Chairman Karleskint opened the public hearing. Steve Barasch, 225 Prado Road, Suite H, applicant's representative, said the project had been in the works for about 7 years and had been before the City Council at least four times. He said by supporting this project, the Planning Commission could convey to the City Council that San Luis Obispo welcomes clean industry and is concerned about creating meaningful jobs. He explained that the buildings would accommodate high technology users and would be utilized day and night. He said pairs of buildings would allow companies to expand easily. The Fire Department would only allow Buildings 1, 2, 8, and 9 to be built in the first phase before the Sacramento Drive extension was completed because of limited emergency access. He explained parking would be allocated for tenants on the basis of need, van pools would be encouraged, and outside picnic areas were planned to encourage employees to remain on the site. He said the 1— L) P.C. Minutes July 14, 1993 Page 2 The motion passed. Item 1. Actions Relating to Property at 953 Orcutt Road. Requests to approve a subdivision and planned development rezoning to create an office/industrial park on an 11.75 acre parcel on the south side of Orcutt Road, west of the Southern Pacific Railroad right-of-way; M zone; Parkside Research Center Associates, applicant. A. Planned Development Rezoning PD 220-92. A request to approve a planned development rezoning to change the zoning from M(Manufacturing)to M-PD(Manufacturing-Planned Development and the extension of Sacramento Drive to intersect with Orcutt Road. B. Tract 2134 (City File No. TR 220-92). A request to seven lots from two lots. Greg Smith presented the staff report and explained research and office uses would be allowed under the rezoning. He said the project would be constructed in five phases. He used the overhead projector to illustrate proposed buildings and extension of Sacramento Drive. He explained a provision requiring compensatory riparian habitat improvements. He said the Architectural Review Commission (ARC) will review the buildings on the site after the rezoning. He recommended the Commission consider the request in two steps, with the first step limited to an understanding of what the applicant was proposing by focusing on five questions: 1. Is the proposed land use consistent with City Policy; 2. Should Sacramento Drive be extended to Orcutt Road; 3. Is the proposed level of riparian mitigation adequate; 4. Is the site plan appropriate; and 5. What should the minimum parking requirement be? He said staff believed the answers to the first three questions was yes, the answer to question 4 Was yes with reservations, and the answer to question 5 was to allow a 10 percent reduction of the normal minimum parking requirement because of the manufacturing use proposed for the site. Commr. Senn asked staff if the applicant had indicated he would be agreeable to any road width determined by the City Council. Greg Smith said yes, and explained the plans being submitted show the widest road width previously discussed by the City Council. Commr. Cross expressed concern about staff's recommendation for a 1.7 riparian mitigation ratio instead of 3 to 1. Greg Smith explained that the State Department of Fish and Game biologist based his determined on a test that there would be no net loss of the extent or quality of riparian habitat on the site. He said he was unaware of a precedent for a 3 to 1 ratio. ~ 5q II 11, II� ill •-- -- Z iii v � , 1. oc ri) m mm w m Q Cc m m ui l Lu w ; a C c > m ca tw 03 t C 0 CL c ac Q m a Q o ! • il � 1211 v ' \ ? W i. In ji Wk cc ' 1 O ZI 4 I e I I}e - 1 iia� � � :: , `� •, C �. —EF ca I� '��• ��� vai f 9 \ li. ..I t � Q 'y O �r�r•+ ., �..`-__`` � ,,��' ...Lam_- . � I • ,i cc j I I S7 Q m 14 j�! � i I �`l F" ..1�_, jl •Is;iill�f;; . :��.'i..a�;+\ .,+:.. `\ \ `1':� _ - I � OJ � j'7� i I'E I I,�I. :raef ..S' �\ I \ \\�\ '' I ••I .'l..Sr W m V f.L All cc N V Chi cr I n i pies \?,' i' U a epcr `iii ;Is I Q x LL 'y 4 fn a W N m � Lu Q) m a Zn- E o I ; III 1 i i i•I � f l�e.l7 io I � 111 11 1 1 j l j F.I NI S iijil W1:.=i 1} :,,'i i .i,{;�a� i s 1'a: : i� lj i:��',t.i{ = •• • O - .1'•.q!ia;l;l l j!_1;�:[!l�l: i!ii o: ........ ?i a._ � I 1-37 m..umau....ay.,nnaa bmg0 gM NB '.N30 H3kfV3S3tl 3415)itlYd -- OW. 1 •..e=..Ir=..tl r....Imre ti I sn a id30N00 3dVOSONVImi uni../,�. ►i.. I -- 9 'a:�. f Ff _ iif sj• I.� : li,iiiilll�f•j �•v , �. r �� (r•�� a ±,! ;'! Fit f .' '.. 21. INN i ••/.i.. e�. �I I. ')• `� !ii?i '��� 3i7�1 �1 ill liiil i k 1 a 1:•' � l i Ili �j . � •-' �s..<J �. `.,~, ! iii! :! II9 • r `�� 1��).' �aJ�„ 4•.i'`•?'' 'sf is �i}i j: e11� ,fli 1�,11i v $` ..,_„J '''"�,✓ •• \ v a 1• Iitj :F' 1;"t }I eli1F� 3 �) � �; i.. .t . ` e< .F it ! •f� '� ei F"•�� .a L• t. x�' ,' e si i;:.l '+t 5li� 1 ilii U.1 i� iiliit fir♦ 99a��1�- p i. i _ am a .y q of -.." IF Is I 1 1` n •i e3 L I a Cc LU X cc �Z�zz • cc CC E 1Y in ..... ..... 1 t4k, .... ....... Cc 111...... 40 CA Q I CC 42 Vk CT V) co ra Mi I:'1!�9 -'� �.9` �. ��'iill'� ,��lil�li s��`�\� �'� '" `'�Y��f�A W Lu cc tn cc Q. LAJ z (I cc Q %7 Q m %A I a 2-d 0 Lu 0 CL cx Q) cr CL n r r ar CL ;!M!S LW tu LU u Cc , }r u 1 z i 5 - _ 3 z u = o z i - u _ ` J _ kcy .^�.•s\POS.. . \•'.\: .' U °_ '.1 0 silt Ll,IWC L' ,bl / I v , 'O• �• � / �/�,A \�pp) `�( ��\.a�.. \\']yam a 42 111 3'I ii d, l -�. 1 � \ ,�• .r awry`. d' t I;�• �.�., .p ,-c p:: ;. a ia. �ryn0 • 1 � ':_'!.1�D..q,1 � '' 1 .. .�• 1 .o, r I, m G l9 s. I I„—r i Sr 4w.e/.• y Q • r` w O� Q G 1 ECL fc r / --N1 :a ' • F9 v>. o o. i ���� i.�1N, f r ppb -P,. ... ��.� •- `�i � _ 'c , � I- � Q' ISI,L ii v'� '.,�••� i• F1 2 7 �•\. \ r /. ♦ .\'`C.w�1 FI Iq�fj=7 ;�' , i1r.�� .•f nkl i 1,. � �.:.°. �� `\ G a: ., - "ti's.-,r�_�. ? .L' ;�/' �1 m �i [ �• , r a __•. •\ ,'� \ is - ¢. 'm. � II a.�`021�� 1 i yln�el [[pl- W „+ N�lfz All �iser•u�eo y. - ..~Y•S•1•.4`7,� �:��i a'� _ ,; •• ¢ a x: zz- 'r 1_•_i , .l«i'.,, .moi f�� ..v�: "'a• . •1:��`a�! !. Uj CC 1� 5�5 k' a,t a W ' CL CL m >'_1 o W W W W W 4i _ '” '" p z `� L = ¢ 61 ¢ Q. Q ¢ Ul to 4 ¢ O. a rL a a r/7 e;- a •�'1: '` �'I: :I i < •i '. W ,u `m . d z 3 u..uu ululu u u u Q. o l?. z oil ^l 7 Z � 3 • BS Uj li 1 Q �F 10' r I �Ia a Dome ° m ° el'es N ¢ LU W N N C ,;m„ ,� u„ v a'e - `1 .°. AKS i ash r ` b• Iii�:�: ,� �' _ 2 i i J •Q .j C I] "ISS k• LIQ .n a , 1 IN ��i,i r,�j 1 _ N ` � 1 �� I .: I !,1✓ Pkv i /, Ly CC Y04 �•� ROBERTO .� ,�\•;�� j 1. _. , ..�1:�." M >':✓-= ' Ln ; V. I I I 1 i•: � I \ J G v - :�r:3fi; ,�� °��r. ::ter. 'ri• ,J'.f y v •\ i .� _ «..«. or avca nrv�nina �?i�ri?,;�;�i-�� = ��, ..:r ::•-� ',�:: � ':' ,�O N r,..« •. ,.. :« :•.: ;: :r j � , ! cam;'•- ':.�^ �:Yi. �:::. •:•;::��:�� �c ,%'C• I 1' ' 1: '1•• w•• ••'� I � i I: •rT«Z:: _ I Lo �•ti 1.?:rG, ; I _ I t.: '•':e:«:3. jcr: � :d i`'c3e a f? ..............�ei= i I Fp 1 \ ^ al Q I, ILI G ' 7F, S ia� .i v. N%f-I llw=w F I; IPI i' U - - IOL i \\ LL ' U ............................. ��' ' •t`I N •`. •F• ! f ::Ilv' 47 /- 3a STATE OF CALIFORNIA—THE RESOURCES AGEN-r- PETE WILSON. Go.rmc, DEPARTMENT OF FISH AND GAME San Luis Obispo Wildlife Unit =. t' Post Office Box 6360 =w Los Osos, CA 93412-6360 (805) 528-0782 R E C E I August 18, 1993 VE Mr. Ron Whisenand AUG 1 91993 City of San Luis Obispo P. O. Box 8100 CITY OF SAN LUIS O81SPo San Luis Obispo, CA 93403-8100 COMMUNrrrOEVELOPWP'- Parkside Research Center Mitigation plan Dear Mr. Whisenand: After several meetings with City staff and the applicant and his representatives, I believe that the mitigation plans proposed at our meeting on June 3, 1993 area adequate and appropriate for the expected impacts caused by this project. If you have any further questions, please feel free to call on me, and I will do whatever I can to clarify or provide further information. Sincerely, James L. Lidberg Associate Biologist (Wildlife) San Luis Obispo Wildlife Unit cc: DFG files RESOLUTION NO. (1993 Series) A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN LUIS OBISPO DENYING VESTING TENTATIVE TRACT NO. 2134 (APPLICATION NO. TR 220- 92) LOCATED AT 953 ORCUTT ROAD BE IT RESOLVED by the Council of the City of San Luis Obispo as follows: SECTION 1. Findings. That this Council, after consideration of the vesting tentative map of tract 2134 and the Planning Commission's recommendations, staff recommendations, public testimony, and reports thereof, makes the following findings: (Council specifies findings to be used) SECTION 2. Denial. The request for approval of the vesting tentative map of Tract 2134 is hereby denied. On motion of , seconded by and on the following roll call vote: AYES: NOES: ABSENT: the foregoing resolution was passed and adopted this day of 1993. Mayor ATTEST: City Clerk APPROVED: 4 Att rn 1-30 Ordinance No. (1993 Series) Planned Development Rezoning PD 220-92 Page 8 INTRODUCED AND PASSED TO PRINT by the Council of the City of San Luis Obispo at its meeting held on the day of 1993, on motion of seconded by , and on the following roll call vote: AYES: NOES: ABSENT: Mayor ATTEST: City Clerk APPROVED: QA�14 it tto e Ordinance No. (1993 Series) Planned Development Rezoning PD 220-92 Page 7 22. Applicant shall provide adequate facilities within each phase of the project to accommodate recycling. Facilities shall be designed in consultation with local recycling agencies, and to the approval of the Community Development Director. 23. Applicant shall comply with conditions of approval of Tract 2134 (City File No. TR 220- 92). SECTION 2. A synopsis of this ordinance, approved by the City Attorney, together with the names of councilmembers voting for and against, shall be published once in full, at least (5) days prior to its final passage, in the Telegram-Tribune, a newspaper published and circulated in this city. This ordinance shall go into effect at the expiration of thirty (30) days after its final passage. �-as PD 220-92 Page 20 39. The subdivider shall pay the pro-rata share of the Orcutt-Laurel traffic signal and intersection modifications based on traffic generation vs current volumes, prior to recordation of the final map. ($3 , 835) 40. The subdivider shall pay the pro-rata share of the Broad-Capitolio traffic signal based on traffic generation vs current volumes, prior to recordation of the final map. ($7 , 127) 41. Traffic impact fees listed above shall be paid prior to issuance of building permits for Phase I. 42. The City is expected to adopt a new traffic impact fee ordinance sometime in 1993 . That ordinance may impose additional traffic fees, and/or may allow credit for fees itemized above. Other 43 . All boundary monuments, lot corners and centerline intersections, BC's, EC's, etc. . . , shall be tied to the City's control network. At least two control points shall be used and a tabulation of the coordinates shall be submitted with the final map or parcel map. A 5-1/4" diameter computer floppy disk, containing the appropriate data for use in autocad for Geographic Information System (GIS) purposes, is also required to be submitted to the City Engineer. Attachments: Vicinity Map Site Plan Tentative Map Applicant's Statements Initial Study Summary of Fees gtsL:PD22092 .PC l- 7! PD 220-92 Page 19 Specific Plan & Drainage Master Plan . The analysis shall also identify any areas within the project subject to inundation during a 100-yr storm. Any lots subject to flooding during a 100-yr storm shall be graded to provide minimum pad elevations at least 1 foot above the 100-yr storm elevation, to the satisfaction of the City Engineer. The areas subject to flooding shall be noted on the final map. If the hydrology study identifies areas subject to flooding which are not shown on the current Flood Insurance Rate Map, or, are in conflict with said map, the subdivider shall process and complete a Federal Emergency Management Agency Letter of Map Amendment (LOMA) , or, Letter of Map Revision (LOMR) prior to final acceptance of the development, to the satisfaction of the City Engineer. 34 . All bridging, culverting and modifications to the existing creek channels must be in compliance with the City's Flood Management Policy Book (specifically regarding clear spanning of creeks, etc. . . ) and approved by the City Engineer, Corp of Engineers and Fish & Game and must meet City standards and policies. 35. Clearing of existing creek and drainage channels, including any tree pruning or removals, and any necessary erosion repairs shall be to the satisfaction of the City Engineer and the Dept. of Fish & Game. 36. All lots shall be graded to preclude cross-lot drainage, or, appropriate easements and drainage facilities shall be provided, to the satisfaction of the City Engineer. 37 . EPA Requirement: General Construction Activity Storm Water Permits are required for all storm water discharges associated with a construction activity where clearing, grading and excavation results in land disturbance of five or more acres. Storm water discharges from less than five acres, but which is part of a larger common plan of development or sale, also require a permit. Permits are required to be maintained until the construction is complete. To be covered by a General Construction Activity Permit, the owner(s) of land where construction activity occurs must submit a completed "Notice of Intent" (NOI) form, with the appropriate fee, to the State Water Board prior to any approvals of the public improvement plans. A copy of the required permit shall be submitted to the City Engineer prior to commencement of any grading activities. Traffic 38 . The subdivider shall pay the pro-rata share (based on projected traffic generation) of the Orcutt/SPRR overpass (grade separation) prior to recordation of the final map, as determined by the City Engineer. ($631320) /. 70 PO 220-92 Page 18 23 . Construction of the public sewer main through to the Sacramento Drive sewer main must occur as part of phase I of the development (including any necessary improvements required to cross the creeks) . 24 . The proposed on-site sewer main will be privately owned and maintained by the property owner's association. 25. Sewer lift station charges are required to be paid prior to recordation of the final map as determined by the City Engineer and Utilities Engineer. ($4 , 143 . 83) 26. The final grades and alignments of all public water, sewer and storm drains (including service laterals and meters) are subject to change to the satisfaction of the City Engineer and Utilities Engineer. 27 . The subdivider shall dedicate an easement for a public water system over all parking areas (including planters and raised medians) within lots 3 - 7 , to the satisfaction of the City Engineer and Utilities Engineer. 28. The proposed looped on-site water main, service laterals and meters (serving lots 3 - 6) shall be an extension of the public water system. The 8" dead-end waterline between lot 5 and lot 6 shall be privately owned and maintained. 29. The public water main may be phased with the approval of the Fire Department with regards to required fire flows. The City will participate in any line upsizing of public water mains (increases above the size required to provide fire flow or the City's 8" minimum, whichever is larger) . 30. The public street must be constructed through to Sacramento Drive as part of phase 3 . 31. Water services, water meters and firelines serving lot 7 shall be connected to the water main•in the new public street, not from the on-site water main. 32 . The subdivider shall underground all existing overhead utilities along the southerly property frontage of Orcutt Rd, to the satisfaction of the City Engineer and utility companies. Site, Grading & Drainage 33 . The subdivider shall provide the City Engineer with a detailed hydraulic analysis which indicates the effects of the proposed development on adjacent and downstream properties. The analysis must address the existing public and private drainage facilities and creek capacities in order to meet City standards. The proposed development cannot create a situation which increases flooding potential downstream. Otherwise, detention facilities may be required as a condition of building permits, to the satisfaction of the City Engineer in accordance with the County Airport Area 1-�q PD 220-92 Page 17 on the tentative map) . The amount shall be negotiated between the property owner (or his representative) and the City and shall be based on fair market value. 14 . Access rights along Orcutt Rd. shall be dedicated to the City. 15. The subdivider shall dedicate a 10' wide (minimum) public utility easement and 10' wide street tree easement along all public street frontages, to the satisfaction of the City Engineer and public utility companies. 16. The proposed public street shall be designed as a 60' R/W with 44 ' curb to curb, 8' parkways with 6' wide integral sidewalks. Pavement/base section shall be designed with a TI=8 (decorative pavement in the public R/W will not be permitted) . Upon connection to Sacramento Dr. , the 44' roadway shall transition to meet the existing curb alignment of Sacramento Dr. , to the satisfaction of the City Engineer. The street profile and building sites shall be designed to accommodate the existing grades of Orcutt Rd. and the future grade changes required for the railroad overpass. 17 . A median island in the new street will not be permitted. 18. Phasing of the construction of the public street shall provide for the ultimate street section and pavement life (per the City's Pavement Management Plan) at the end of the phase III . The subdivider's engineer shall include this requirement in the public improvement plans, to the satisfaction of the City Engineer. 19. Driveway ramps (or alley-type entrances with minimum radii of 301 ) shall be constructed per City standards in lieu of the street type driveways proposed, to the satisfaction of the City Engineer. 20. The subdivider shall construct a bus stop on Orcutt Rd (shelter, signing, trash receptacle, etc. . . ) , on the southerly side of Orcutt Rd and westerly of the new street, to the satisfaction of the City Engineer. 21. The subdivider shall install street lighting per City standards, including off-site street lighting along roadways leading to and from the proposed development, to the satisfaction of the City Engineer. Street Trees 22 . Street trees are required to be planted per City Standards (the number of trees are determined by one tree required for each 35 linear feet of street frontage) at the time of lot developments. An exception shall be for any trees required as part of mitigation measures established by the Dept. of Fish & Game. In no case, shall any tree be planted in a location which may be in conflict with any earth fill, retaining walls, etc. . .associated with a future railroad overpass. Species: As determined by the City Arborist. Water, Sewer & Utilities 1-fig PD 220-92 Page 16 �.., Tentative Map Conditions 1. Subdivider shall obtain approval of rezoning application PD 220-92. 2. This vesting map shall confer a vested right to proceed with development in accordance with the ordinances, policies and standards described in Section 66474.2 of the Subdivision Map Act, and including all provisions of the ordinance approving Planned Development Rezoning PD 220-92. Environmental impact mitigation measures identified in the ordinance approving Planned Development Rezoning PD 220-92 shall be conditions of approval of this vesting tentative map. 3. Construction of the public sewer main through to the Sacramento Drive sewer main must occur as part of phase I of the development (including any necessary improvements required to cross the creeks). 4. The public water main may be phased with the approval of the Fire Department with regards to required fire flows. The City will participate in any line upsizing of public water mains (increases above the size required to provide fire flow or the City's 8" minimum, whichever is larger). 5. Phase II of the development will require the public street to extend to at least the southerly driveway serving building #4. This is subject to change if the developer changes the phasing proposed. 6. The public street must be constructed through to Sacramento Drive as part of phase 3. 7. City will pay for additional Orcutt Rd. R/W dedication (indicated on the tentative map). The amount shall be negotiated between the property owner (or his representative) and the City and shall be based on fair market value. 8. The extended public street will be named Sacramento Drive. 9. A common driveway/maintenance agreement is necessary for common parking areas. Frontage Improvements 10. Off-site dedication of property for public R/W purposes is required to facilitate a through street from Orcutt Rd. to Sacramento Dr. The subdivider shall exhaust all avenues available to acquire said public R/W dedication. 12 . Orcutt Rd. improvements (curbs, gutters, 4' detached sidewalks along the southerly side, full street pavement, signing, striping, transition over railroad tracks, barricades, etc. . . ) shall be constructed in accordance with the revised widening established by the City Council to the satisfaction of the City Engineer and in accordance with City regulations, Standard Engineering Details and Standard Specifications. The creek culvert must be extended to accommodate the new, widened location of frontage improvements. 13 . City will pay for additional Orcutt Rd. R/W dedication (indicated /-(107 PD 220-92 Page 15 D Schools - Business, trade, recreational, or other specialized schools. 15. An exception to standard setback requirements is hereby approved, allowing a ten-foot setback from Orcutt Road where a fifteen-foot setback would otherwise be required, for Buildings 8 and 9. 16. Parking shall be provided at a minimum rate of one space per 400 square feet of gross building area for each phase. 17. Parking shall be provided for each tenant at a rate of 90% of the requirement stated in the Zoning Regulations. Parking requirements may be further modified by approval of an administrative use permit, upon a finding that the traffic reduction plan for the planned development has effectively reduced the demand for parking. 18. Development of the site shall be in substantial compliance with the building envelopes and other features shown on the approved preliminary development plan. Actual building design, landscaping, etc., shall be to the approval of the Architectural Review Commission. 19. Applicant shall attempt to provide for relocation within the city, of the existing house on currently located on the site. If necessary, the applicant shall offer the structure free of charge to any responsible party who will relocate it. If the structure cannot be relocated within the city, the applicant may relocate it outside the city or demolish it, after providing photographic and architectural documentation to the approval of the Community Development Director. 20. Applicant shall comply with conditions of approval of Tract 2134 (City File No. TR 220-92). B. Vesting Tentative Map TR 2134 (City File No. TR 220-92) Tentative Map Findings 1. The design of the subdivision and proposed improvements are consistent with the general plan. 2. The site is physically suited for the type and density of development allowed in the M-PD zone. 3. The design of the subdivision is not likely to cause serious health problems, substantial environmental damage or substantially and unavoidably injure fish or wildlife or their habitat. 4. The design of the subdivision will not conflict with easements for access through (or use of property within) the proposed subdivision. 5. The proposed project has been granted a negative declaration of environmental impact based on various mitigation measures being incorporated into the project, as identified in the ordinance approving Planned Development Rezoning PD 220-92. / -' o PD 220-92 Page 14 construction. C. Implementation of a preservation plan prepared by a qualified archaeologist and approved by the Community Development Director if significant archaeological resources are discovered. 12. Applicant shall provide sand and oil interceptors in parking lot drainage systems, to the approval of the City Engineer. 13. Applicant shall exhaust all avenues available to implement dedication of off-site right of way needed for extension of Sacramento Drive from its present terminus, to connect to Orcutt Road. The City Council will lend the subdivider its powers of condemnation to acquire the off-site R/W dedication, including any necessary drainage easements associated with the creek crossing. If condemnation is required, the subdivider shall pay all costs associated with the off-site R/W acquisition (including attorneys and court costs). 14. The following uses shall be allowed within the Planned Development, and with the type of use permit review indicated: A = Allowed; D = Director's approval required; PC = Planning Commission approval required; * Indicates use subject to square footage and other limitations per Zoning Regulations Section 17.22.010, footnote 10: No single tenant space less than 2,500 square feet, banks, real estate offices, financial institutions, medical clinics, doctor's offices, and lawyer's offices prohibited. A Advertising and related services D Antennas (Commercial broadcasting) A Broadcast studios A Computer services D Day care centers A Laboratories (medical, analytical) A Manufacturing - food, beverages; ice; apparel; electronic, optical, instrumentation products; jewelry; musical instruments; sporting goods; art materials. PC Manufacturing - basic metals, chemicals, building materials, fabricated metals, textiles, paper and cardboard; machinery, transportation equipment. A* Offices (Contractors) A* Offices (Engineers and industrial design) A* Offices (Technical and scientific research) A Photocopy services; quick printers A Photofinishing - Wholesale; and blueprinting and microfilming service A Printing and publishing A Repair services D Restaurants, sandwich shops, take-out food; as an auxiliary use primarily serving employees and clients of uses located within the planned development. D Retail sales - groceries, liquor and specialized foods; as an auxiliary use primarily serving employees and clients of uses located within the planned development. _65 PD 220-92 Page 13 permit. Applicant shall comply with all requirements of City grading regulations regarding erosion control measures. 10.* Applicant shall expand and enhance existing riparian habitat areas found on the site, in accordance with a plan approved by the State Department of Fish and Game, the City Engineer, and the Community Development Director. The plan shall be prepared by a landscape architect or biologist experienced in the area of riparian habitat restoration, and shall include the following measures: a. The plan shall provide for no net loss of extent or quality of riparian habitat on the project site and adjoining sites affected by off-site improvements for the project. b. Native riparian plant species shall be used whenever possible. C. Plants shall be used which are large enough to establish wildlife habitat as quickly as possible. d. Planting areas shall be located appropriately to avoid the need for long-term irrigation or other maintenance. e. The plan shall include monitoring and maintenance provisions which ensure that replacement planting areas are properly established and are not subsequently removed without further environmental review. f. The plan may provide for limited removal of on-site Eucalyptus trees, as determined necessary to allow re-establishment of native plant and animal species. g. A plan for all removal and replacement zones for all phases of the project shall be completed prior to recording the final tract map or approval of the PD final development plan. Final grading plans and landscape planting plans and construction drawings for each phase shall be reviewed and approved by the Department of Fish and Game prior to issuance of building permits for that phase of the project. Plans for construction of street and drainage improvements within public right of way areas shall also be reviewed and approved by DFG staff prior to beginning construction. h. Department of Fish and Game staff shall review and approve grading stakes in the field prior to initiation of grading for each phase. 11.* Applicant shall comply with the Interim Archaeological Survey Procedures prepared by the City's Cultural Heritage Committee (attached) prior to and during the construction phase of the project. These guidelines require: a. Completion of a surface survey by a qualified archaeologist approved by the Community Development Director prior to commencing construction activities on the site. b. Halting of construction activities if archaeological resources are discovered during /_6! PD 220-92 Page 12 6. The project will provide adequate mitigation to address potential impacts related to noise, light and glare, and loss of privacy, among others, imposed by commercial activities on nearby residential areas. 7. The project does not preclude industrial or service commercial uses in areas especially suited for such uses when compared with offices. 8. The project does not create a shortage of C-S and M zoned land available for service commercial or industrial development. PD Conditions (*Indicates environmental impact mitigation measure) 1.* Applicant shall dedicate on-site portions of right of way for Sacramento Drive extension in conjunction with first phase of the project. 2.* Emergency access shall be provided to each building in accordance with City standards and to the approval of the Fire Marshal. 3.* Applicant shall pay fees to fund pro-rata shares of the following off-site traffic mitigation. measures: a. Orcutt Road/Southern Pacific Railroad overcrossing: $63,320. b. Orcutt Road/Laurel Lane traffic signal and intersection modifications: $3,835. C. Broad Street/Capitolio Way traffic signal: $7,127. 4.* The applicant shall prepare and implement a trip reduction plan approved by the Community Development Director. The applicant shall create a property owners' association which shall be empowered and required to implement the plan on a continuing basis. 5.* Building 3 shall not be included in a phase which precedes construction of the Sacramento Drive extension to Orcutt Road. 6.* Applicant shall complete all site grading and other construction activities in accordance with a particulate emission mitigation plan, to the approval of the APCD and Community Development Director. 7.* The applicant shall provide the City Engineer with-a detailed grading and drainage plan and hydraulic analysis which indicates the effects of the proposed development on adjacent and downstream properties. 8.* Detention facilities shall be provided if determined necessary by the City Engineer to eliminate potential downstream flooding. 9.* The applicant shall obtain the General Construction Activity Storm Water Permit required by the Environmental Protection Agency, and shall comply with all requirements of that l-�3 PD 220-92 Page 11 affect provision of parking spaces and/or landscaping. 5.5 Completion of Spill Cleanup. A spill of toxic liquids on the property across Orcutt Road from the site occurred ten years ago. The Parkside site has been monitored since that time to insure that no residual contamination remains. Appropriate certification from the State will be required prior to issuance of building permits. OTHER DEPARTMENT COMMENTS The Chief Building Official notes that the proximity of lot lines to building walls will limit the types and locations of openings allowed. Staff of the Utilities Department notes that phasing of utilities must be in accordance with a plan to their approval. Additional comments are discussed in previous sections of this report, and reflected in recommended conditions of approval. ALTERNATIVES The Commission may deny either or both applications, or recommend approval subject to alternative conditions. The Commission may continue action on the PD application, but nay not continue the tentative map without the subdivider's consent. RECOMMENDATION The Commission should recommend Council approval of Planned Development Application PD 220-92, and of vesting tentative tract map TR 220-92, subject to the following findings and conditions: A. Planned Development Application PD 220-92 PD Findings 1. The planned development will provides facilities or amenities suited to a particular occupancy group which would not be feasible under conventional zoning, specifically an office/industrial park incorporating auxiliary uses. 2. Features of the proposed design achieve the intent of conventional standards (privacy, usable open space, adequate parking, compatibility with neighborhood character, and so on) as well as or better than the standards themselves. 3. The planned development incorporates features which result in consumption of less materials, energy or water than conventional development. 4. The project will be compatible with existing and allowed land uses in the area. 5. The project will not direct traffic to residential areas. /-6a PD 220-92 Page 10 applicant can demonstrate that further reductions are warranted. 4.3 Compliance with Subdivision Standards. Lots 4 and 5 do not have any frontage on a public street, nor do they meet standards for flag lots. However, the Subdivision Regulations state that "lots which are approved in conjunction with a development plan as provided in the Zoning Regulations may have any size or shape consistent with the structures and improvements shown in the development plan." Staff believes that this special finding can be supported for the Parkside planned development. 5.0 Other Site Planning Issues Staff has identified several site planning issues which the Commission should evaluate in reviewing the Parkside application: 5.1 Site Planning Concept. Development of the site is constrained by its irregular shape, creek concerns, and street widening and extension. As noted above, the site plan is schematic, showing primarily building footprints and the number of stories. Although the project appears to comply with most minimum requirements of the Zoning Regulations, staff suggests that the plan would be improved significantly by placing additional emphasis on the following factors: - Use of a unifying site development concept for orientation of buildings, private roads and major landscape features. - Use of buildings, landscaped areas, and/or creek areas as focal points. - Use of additional landscaped areas to break up large paved areas. Many of these factors will be addressed through the Architectural Review process, although the extent of modifications to the site plan will be limited by the PD and tentative map approvals. 5.3 House Demolition. The plans call for demolition of an existing wood frame house located on the site. The Cultural Heritage Committee reviewed the structure in 1989, and determined that it was significant. Although it is unfortunate to demolish any significant structure, there appears to be no practical alternative to demolition or relocation. Depending upon the final decision regarding the street width for Orcutt Road, the house would be adjacent to, or encroaching into, the right of way. Staff recommends that the demolition be approved subject to requirements that the owner make reasonable attempts to allow for its relocation. If it cannot be relocated, photographic and architectural documentation should be provided prior to demolition. 5.4 Loading Zones. Only one loading zone is provided for most buildings. Although this complies with the minimum requirements of the Zoning Regulations, staff questions whether it will be adequate to accommodate the extent of manufacturing uses expected. The Commission ON may wish to review this issue with the applicant, since provision of additional loading zones will —to PD 220-92 Page 9 the site (Section 1.1 above), several setback exceptions are proposed: a. Building 1: 5-foot setback from Orcutt Road where 15-foot setback required. b. Building 1: 10-foot setback from Sacramento Drive where 15-foot setback required. C. Parking area, Lot No. 2: 0-foot setback from Sacramento Drive where 5-foot setback required. d. Loading Zone, Lot No. 7: 2-foot setback from Sacramento Drive where 5-foot setback required. e. Building 8: 10-foot setback from Orcutt Road where 15-foot setback required. f. Building 9: 5-foot setback from Orcutt Road where 15-foot setback required. Staff believes an exception to allow a 10-foot setback for Buildings 8 and 9 is appropriate, since it may be some time before the overpass project is constructed. A 10-foot setback will allow for planting of trees on the Parkside project site, to provide some screening of the back of the building. Staff does not support the other reductions shown on the plans. The required setbacks in the M zone are the minimum possible to provide an attractive streetscape and permit landscape screening of parking areas. Minor adjustments to the site plan and building envelopes would be needed to reflect disapproval of the reductions. 4.2 Parking Reduction. The minimum parking requirement for office uses is one space per 300 square feet of gross building area. The requirement for manufacturing uses varies between one space per 300 square feet and one space per 500 square feet, depending on employment characteristics, as determined by the Director. If the Parkside project were occupied by one-half office uses (one space per 300 square feet), and one-half manufacturing uses (assume an average of one space per 400 square feet), the parking requirement would be one space per 350 square feet. The overall ratio proposed by the applicant is one space per 428 square feet, a reduction of about 18% less than the 1:350 rate. The Zoning Regulations allow a reduction of up to 20%, based on a finding that various uses on the same site do not have concurrent peak parking demands. Also, the Parkside project will also have a trip reduction plan. It is difficult to predict the amount of parking reduction which would be justified by those two factors, particularly for the initial phases. Staff suggests that a slight reduction be approved, based primarily on the provision of a trip reduction plan: - A minimum of one space per 400 square feet be provided at the time of construction of each phase. - Parking requirements for individual tenants be based on 90% of the standard rate. These criteria could be subject to modification by approval of an administrative use permit,/if the PD 220-92 - Page 8 3.0 Creeks and Flooding The site is subject to shallow flooding.under 100 year design storms or greater. This should not be a significant factor in site design; structures will be raised one foot above existing grade. A much more significant factor is the presence of the creek channels and riparian habitat, as described below. 3.1 Riparian Mitigation Plan Two branches of Acacia Creek form the westerly and southerly boundaries of the site. These are indicated in the Draft Open Space Element as "perennial creek with degraded riparian corridor, but able to be restored/repaired". A third, centrally located channel is listed as a drainage ditch. The southerly and westerly channels support pockets of riparian vegetation, but the central channel has virtually no riparian vegetation, due to extensive grazing and lack of water during summer months. The Sacramento extension will affect portions of the southerly and central channels, and Orcutt widening will affect the westerly channel. Plans for the Parkside project include a schematic plan for mitigating the project's impacts, based on the State Department of Fish and Game's (DFG) policy to insure that there is no net loss in amount or quality of wetland habitat. The schematic mitigation plan has been approved by the DFG's wildlife biologist; it is discussed in more detail in the initial study. One notable feature of the plan is approval of a wetland replacement ratio of 1.7:1 for habitat enhancement/replacement areas vs. removal areas. This is less than the 3:1 ratio often required. Acceptance of the lower ratio is based on intensive planting and careful monitoring. 3.2 Creek Area Setbacks and Trails. Most of the building envelopes and paved areas are set back 20 feet or more from the top of bank of the southerly and westerly channels. Although the location of 20-foot setback line shown on the site plan is approximate, it appears that a portion of Building 7 and up to 17 parking spaces may need to be shifted. City staff will review setback stakes in the field prior to construction, to establish the precise location of the setback line. The applicant proposes to dedicate an open space easement over the creek and setback area, in accordance with City policy. The Planning staff has reviewed the site for potential locations for public 'creekside trails. Although there have been conceptual discussions of a trail along Acacia Creek, no plans have been prepared. There appear to be physical obstacles to providing such a trail along the creeks on the Parkside site: steep creek banks, streets, and culverts would all affect the feasibility of a trail linkage across the site. In addition, a wider creek setback area would be needed to avoid impacts on existing and/or proposed riparian habitat areas. 4.0 Proposed Modifications to Zoning and Subdivision Standards The PD application and tentative map include several exceptions to normal City standards. 4.1 Exceptions to Zoning Regulations. In addition to the changes in uses to be allowed at /�9 PD 220-92 Page 7 be needed for mitigation of impacts on riparian habitat. In 1988, King indicated willingness to dedicate the right of way needed for extension of Sacramento, subject to being allowed access to the street. Provision of access of access would require an additional creek crossing, however, and may not be feasible or desirable. It would result in further disruption of existing riparian vegetation, and would reduce or eliminate the riparian mitigation area proposed by the Parkside project. Note that King also owns an adjoining parcel which provides access to Broad Street, so his property would not be landlocked without Sacramento access. The alignment of the Sacramento extension could be modified to avoid the King property. That would affect portions of two lots on the east side of Sacramento, including a narrow strip of one which has already been developed. Regardless of which alignment is used, or whether access is provided to the King property, the City may need to lend its powers of condemnation to the Parkside developer to implement the extension. If the Parkside developer is unable to negotiate for the needed right of way, the City would acquire the land through court action. The price would be set by the court, and the Parkside developer would reimburse the City for all costs. 2.4 Off-site Mitigation Projects/Fees. Since the traffic generated by the Parkside project will contribute to cumulative significant impacts on circulation in the vicinity, payment of a pro rata share of the costs of several nearby improvement projects is recommended as a mitigation measure: Orcutt Railroad Overpass: $63,320 Orcutt/Laurel signals and intersection modification: $3,835 Broad Capitolio signal: 7,127 TOTAL: $74,282 The City Engineer recommends that the Parkside developer receive credit for the value of right of way acquired for widening Orcutt which is beyond the adopted plarr line. The Engineer also recommends that the Parkside developer be reimbursed for 50% of the construction cost for the culvert or bridge across the southerly channel for the Sacramento extension, since it will be relatively costly and will benefit other properties. Reimbursement would occur as mitigation fees are collected from other projects. Note that a $56,000 contribution has been required from the Marigold Center project for traffic mitigation measures, including the Sacramento extension. 2.5 Emergency Access. The City's Fire Prevention regulations require that all construction be within 300 feet of an approved public or private access road. For the Parkside project, Orcutt Road provides the only acceptable access until construction of the complete Sacramento extension with Phase 3. Buildings 1, 2, 8 and 9 meet this standard, but Building 3 will have to be shifted from Phase I to Phase III or later. /_58 PD 220-92 Page 6 Several studies of traffic in the southern sections of the city have shown that development of vacant land along the Broad Street corridor and in the airport area, along with community growth in general, will result in significant, cumulative impacts on traffic in the southern section of the City. Those studies recommend various street improvement projects as mitigation measures, including several which directly affect development of the Parkside project. 2.1 Orcutt Road Widening and Overcrossing. The adopted Circulation Element includes construction of an overcrossing where Orcutt crosses the railroad, and the City has already purchased right of way several years ago to accommodate that project (shown on site plan as "City of San Luis Obispo Dedication"). Since the overcrossing project will depend on supplemental funding from the State, it may be some time before it is constructed. The site plan for the Parkside project, as submitted for Commission review, reflects the right of way width discussed by the Council in January, 1992. The width shown would accommodate a wide landscaped median strip, detached bikeway and parkway planting strip. The Council will consider plans for the "ultimate" road design between Broad Street and the overcrossing on July 20, 1993, and their action will affect the dedication and/or purchase of additional right of way along the Parkside project's frontage. 2.2 Sacramento Drive Extension. The plans for the Parkside project show Sacramento Drive extended from the existing dead end near the southerly corner of the site, to intersect with Orcutt Road at Duncan Lane. This option would improve emergency access for the Parkside site and the Sacramento/Capitolio area. It would also divert some traffic from the Broad/Orcutt intersection, which will be severely impacted by cumulative traffic increases. The City has not established a clear policy regarding the extension. The adopted Circulation Element (March, 1982) does not address the issue. The administrative draft of the Circulation Element (April, 1992) shows northward extension of Sacramento as a cul de sac into the Parkside site, without access to Orcutt. In July, 1992, the Council approved an ordinance prezoning the Broad Street Annexation Area which included a specific reference to extension of Sacramento to connect to Orcutt. Action by the Commission and Council on the Parkside project will establish the policy, since a decision on the PD application will precede formal action on the Circulation Element. Extension to Orcutt is the alternative supported by Community Development and Public Works staffs, Caltrans and consultants who have prepared traffic studies for previous projects proposed in the vicinity. The draft EIR for the 1992 Land Use/Circulation Element Updates recommends that the City find that extension of Sacramento across the creek channel at the southerly edge of the site constitutes a significant adverse effect. As reflected in the mitigated negative declaration prepared by the Director, staff believes that impacts of the creek crossing can be reduced to a level of insignificance by expanding and enhancing riparian habitat near the crossing. 2.3 Off-site Right of Way Acquisition. Extension of Sacramento Drive will require acquisition of right of way across property which is not a part of the project site. The proposed alignment would cross undeveloped property owned by John King. A portion of the property would also PD 220-92 Page 5 of parking and setback reductions are discussed in Section 4 below. 5. Incorporates features which result in consumption of less materials, energy or water than conventional development. The applicant cites potential energy savings due to use of site-cast concrete construction and provision of an efficient utility layout. Staff has not researched this issue. 6. The proposed project provides exceptional public benefits such as parking, open space, landscaping, public art, and other special amenities which would not be feasible under conventional development standards. The project would conserve a significant amount of open space associated with the various creek channels on the site. The PD rezoning is not a major factor in the amount of space preserved, however. In summary, it appears that general PD findings Nos. 1, 4, and 5 could be supported. 1.3 Office PD Findings Section 17.62.040 requires compliance with each of five additional findings for approval of large office PD's: 1. The project will be compatible with existing and allowed land uses in the area. Proposed office/industrial uses will not adversely affect - or be affected by - surrounding uses. The creeks, railroad, and Orcutt Road provide a noise and visual buffer surrounding the site. The Council determined that the site was not suited to residential uses during review of the previous rezoning application, due to proximity of industrial uses. 2. The project [does not]...direct traffic to...residential areas. Access to the project will be via commercial collector and arterial streets. 3. The project will provide adequate mitigation to address potential impacts related to noise, light and glare, and loss of privacy, among others, imposed by commercial activities on nearby residential areas, by using methods such as setbacks, landscaping, berming, and fencing. The closest residential area is located east of the site, across the railroad tracks and Bullock Lane, more than 250 feet away from the closest proposed office building. Review of site lighting by the ARC should ensure that no impacts occur. 4. The project does not preclude industrial or service commercial uses in areas especially suited for such uses when compared with offices. The project will accommodate both office and industrial uses. 5. The project does not create a shortage of C-S and M zoned land available for service commercial or industrial development. As noted above, the project is designed to accommodate a significant amount of industrial development. All of the special findings required for large office PD's can be supported. 2.0 Traffic and Circulation This section summarizes issues related to traffic generation, circulation and access. Refer to the attached initial study of environmental impact for additional detail. l-S� PO 220-92 Page 4 in all M zones, and are consistent with the Land Use Element and Zoning Regulations. - Large offices (greater than 2,500 square feet per tenant) related to research and development. Large offices of this type are consistent with the Land Use Element and Zoning Regulations, if special PD findings discussed below are made. - Certain auxiliary uses, such as day care and food service for convenience of on-site employees. Day care centers are allowed in the M zone subject to approval of an administrative use permit. Restaurants and retail sales of food are not allowed in the M zone. Note the distinction between"auxiliary uses" and "accessory uses". Accessory uses must be "subordinate or incidental and directly related to" a permitted use. A cafeteria operated for the sole use of its employees would be an accessory use; a small, independently owned restaurant would be an auxiliary use. Planned Development regulations state that "any use or combination of uses which conform to the general plan may be established in the PD zone." The Land Use Element states that "retail activities...not directly associated with permitted commercial or industrial uses should be discouraged." Auxiliary restaurant and food retail uses could be considered consistent with these policies if they are "directly associated" with permitted office or industrial uses. Limits on the size and type of food service operations are appropriate to insure that consistency with Land Use Element policies is maintained. Note that the provision of on-site services should help to reduce air pollution and traffic. Staff suggests broadening the list of allowed uses, consistent with uses allowed in the M zone and with the applicant's development concept. Refer to the recommended PD conditions at the end of this report. 1.2 General PD Findings. Section 17.62.040 establishes special findings for approval of PD zoning proposals. At least one of the following findings must be supported, to justify the modifications proposed to allowed uses and property development standards: 1. Provides facilities or amenities suited to a particular occupancy group (such as the elderly or families with children) which would not be feasible under conventional zoning. Either PD or Mixed Use zoning is required to accommodate the proposed mix of office, industrial, and auxiliary uses. 2. Transfers allowable development, within a site, from areas of greater environmental sensitivity or hazard to areas of less sensitivity or hazard. Although the proposed site plan generally sets back from the sensitive creek areas of the site, it is not clear that PD zoning is a is a significant factor in that aspect of the site plan. 3. Provides more affordable housing than would be possible.with conventional development. Not applicable. 4. Features of the particular design achieve the intent of conventional standards (privacy, usable open space, adequate parking, compatibility with neighborhood character, and so on) as well as or better than the standards themselves. The project complies with minimum standards, or exceeds them, in most cases. Staff concerns regarding the extent /�S PO 220-92 Page 3 creek channel. - Compensatory riparian habitat improvements. The applicant proposes to establish dense plantings of native riparian vegetation in various creek channel locations on the site which have been degraded by grazing and other activities. The riparian habitat enhancement is intended to mitigate the loss of potential habitat area due to the effects of the various road construction projects associated with the project. - Demolition of a wood frame house constructed in 1906. - Installation of public and private underground utility lines within the street extension and on private portions of the site. The project approval process involves several discretionary approvals by the City, and one by the State: Rezoning (Application PD 220-92). Approval of rezoning from Manufacturing (M) to Manufacturing - Planned Development, including the project's preliminary development plan. The rezoning is reviewed by the Planning Commission, which makes a recommendation for final action by the Council. Subdivision (Application TR 220-92). Approval of a tentative tract map crating seven lots and 50 commercial condominium ownership units. Reviewed by Planning Commission, approval by Council. Architectural Review (future application). The ARC has jurisdiction over building design, landscaping and site planning details. Although design drawings have not been submitted, that aspect of the project review will not require further review by the Planning Commission or Council, as long as the plans are consistent with the PD preliminary plan and conditions of approval. Streambed Modification Permit (future application). Modifications to the channels which cross the site will require approval of a permit by the State Department of Fish and Game, and may require approval of a permit by the Corps of Engineers. City staff will also review the plans to ensure consistency with the preliminary development plan and approved mitigation measures. EVALUATION The following sections of this report address issues related to land use policy, traffic and circulation, creeks and flooding, and other site planning concerns. 1.0 LAND USE POLICY 1.1 LUE/Zoning Consistency. The applicant proposes that several types of use be allowed in the complex: - Light manufacturing, including accessory office and storage space. These uses are allowed �—S�- PD 220-92 Page 2 Environmental Status: Mitigated negative declaration approved by Director Project Action Deadline: Tentative tract map - July 14, 1993 PD rezoning - No time limit applicable for rezoning applications Site Description The project site is an 11.75 acre parcel on the south side of Orcutt road, west of the Southern Pacific Railroad right of way. The site is bounded by Orcutt Road to the north, the railroad to the east, and creek channels to the south and west. The perimeter creek channels are tributaries to Acacia Creek. They are identified in the draft Open Space Element as "perennial creeks with degraded riparian corridor, but able to be restored". A third channel is located on the site. It is a minor channel with seasonal flow. It supports minimal wetland plant vegetation, and has been severely impacted by grazing. Numerous mature trees are found on the site. These include willow, Eucalyptus and other species along the westerly creek channel; willow and other species along the southerly channel; Pepper trees along the minor channel; and Pepper and Elm trees along Orcutt Road. Project Description The proposed project involves construction of a research/industrial park on an 11.75 acre parcel on the south side of Orcutt Road, west of the Southern Pacific Railroad right of way. The following physical changes to the site and nearby properties are included in the proposed project. The changes to the site will be completed in up to five phases, with construction to commence in late 1993 and projected completion of the final phase in 1999. The site plan is schematic; building envelopes are shown, but not exact footprints. - Construction of nine buildings with a total gross building area of approximately 192,400 square feet. The buildings would be one to three stories in height. The buildings would be used for office, research, and light industrial purposes. - Extension of Sacramento Drive from its present terminus at the southerly property line to connect to Orcutt Road, which forms the northerly boundary of the project site. The road extension would involve construction of bridges or culverts in three locations where it would cross creeks. A portion of the extension would cross an adjoining parcel not owned by the project applicant, at the southerly corner of the site. - Widening of Orcutt Road will be completed in conjunction with the proposed project. The widening will be 30 to 50 feet along much of the project site's frontage, depending on median width, etc. In addition to street widening and frontage improvements, this will involve extension of the culvert for the creek which flows along the westerly edge of the project site, by a distance corresponding to the road widening. The culvert for minor drainage channel near the middle of the site will also be extended, to accommodate the widening and Sacramento extension, by approximately 100 feet. - Paved parking lots and access roads. One of the access roads crosses the central 1-53 CITY OF SAN LUIS OBISPO PLANNING COMMISSION STAFF REPORT ITEM # 1 BY: Greg Smith, Associate Planner MEETING DATE: FILE NUMBER: PD 220-92; TR 220-92 (County No. TR 2134) PROJECT ADDRESS: 953 Orcutt Road SUBJECT: Requests to approve a subdivision and planned development rezoning to create an office/industrial park on an 11.75 acre parcel on property located on the south side of Orcutt Road, west of the Southern Pacific Railroad tracks: A. Planned Development Rezoning PD 22-92. A request to approve a planned development rezoning to change the zoning from M (Manufacturing) to M- PD (Manufacturing - Planned Development) and the extension of Sacramento Drive to intersect with Orcutt Road. B. Tract 2134 (City File No. TR 220-92). Tentative map creating seven lots from two lots. SUMMARY RECOMMENDATION Recommend that the Council approve rezoning application PD 220-92, and tentative tract map application TR 220-93, subject to findings and conditions as noted below. BACKGROUND Situation The applicant proposes to develop an office/light manufacturing complex, and has submitted applications for rezoning and tentative tract map approval. Both applications will be reviewed by the Planning Commission prior to final action by the City Council. The project also involves extension of Sacramento Drive to intersect with Orcutt Road at Duncan Lane, and demolition of an old ranch house located on the site. The applicant has not filed an Architectural Review Commission application; an ARC application will be filed for each phase as the project progresses. The project site was the subject of an industrial tract map application (TR 1633) filed in July 1988, and which was withdrawn in October 1988, prior to formal action by the City. A subsequent application to rezone the site for Medium-high Density Residential use (GP/R 1464, Orcutt II Rezoning) was filed in October 1989 and denied by the Council in November 1990. Data Summary Address: 953 Orcutt Road Applicant: Parkside Research Centre Associates Representative: Stephen B. Barasch, A.I.A., A.P.A Existing Zoning: Manufacturing (M) Proposed Zoning: Manufacturing - Planned Development (M-PD) General Plan: Service Commercial/Light Industrial /-5 a, P.C. Minutes July 14, 1993 Page 14 Commr. Whittlesey amended her motion as follows: to approve staff's recommendation to approve PD 220-92 and vesting tract map TR 220-92 subject to the findings and conditions recommended by staff including items A, B, C, and D in staff's memo, with the elimination of PD finding 3, and the following changes and additions to PD conditions: that a new condition 4-a state 'That each building shall provide stubbing for employee shower facilities and that shower and locker facilities and secure waterproof storage be provided for bicycles at the discretion of the Community Development Director; that condition 10-a be amended to state that 'The plan shall provide for a minimum setback to the edge of existing riparian vegetation or 20 feet from the top of bank, more or less as deemed appropriate by staff for the westerly and southerly channels"; that Government Code 66462.5 be referenced in condition 13; that a sentence be added to condition 15 stating 'This condition does not preclude other setback exceptions by subsequent use permit or variance as provided for by zoning regulations"; that a condition stating that the applicant or subdivider shall provide a plan for recycling all recyclable discarded building materials during construction; that a condition be added stating that the applicant or subdivider shall consult with local recyclers regarding the appropriate size and location of areas on site dedicated to on-site storage of recyclable material and trash enclosures; that a condition be added stating that the applicant or subdivider shall make all reasonable attempts to recycle materials from the existing building on the site, should it need to be demolished; and that Tentative Map Condition 16 be amended to state that 'The proposed public street shall be designed as a 60' R/W with 44' curb to curb, 5' bike lanes on both sides of the street, an 8' parkway on only the east side of the street, with 6' wide integral sidewalks." Commr. Williams agreed to the amended motion. VOTING: AYES - Commrs. Whittlesey, Williams, Cross, Sigurdson, Senn and Karleskint. NOES - None. ASSENT - Commr. Hoffman. The motion passed. COMMENT AND DISCUSSION Ron Whisenand said Item 2 on tonight's agenda, Rezoning R 72-43 and Use Permit U 72- 93, was tentatively scheduled for the next meeting on July 28, 1993. I-� I P.C. Minutes July 14, 1993 Page 13 the condition as it is written unless it wanted to specify parking standards for specific uses. Commr. Cross said he did not see the impact on the surrounding area that would result if the project was underparked because it was not in a residential area. Commr. Whittlesey asked if any of the Commissioners had considered limiting the size of an auxiliary restaurant in condition 14. Commr. Cross said a zoning change had been made and restaurants are now allowed in M zones. Ron Whisenand said a director's use permit was needed for restaurants in an M zone. Commr. Cross suggested condition 16 be changed to provide bike lanes on both sides of the street and parking only on one side of the street. Commr. Senn felt a bike lane would not be needed until Sacramento Drive was extended. Commr. Karleskint said once parking is allowed, it is hard to eliminate later. He said he supported the bike lane to provide access to the project from Orcutt Road. Commrs. Whittlesey and Williams agreed to change Tentative Map Condition 16 to provide for bike lanes on both sides of public street and prohibit parking on the west side of the street. Commr. Whittlesey asked staff about a condition that would allow staff to make changes in mitigation. Greg Smith said a general condition is sometimes included for projects that are long term which allows staff to prepare a mitigation program which could include changes to mitigation measures if monitoring shows they are not effective. Ron Whisenand advised against putting language in conditions that allow too much flexibility. Cindy Clemens explained the purpose of a vesting tentative map was to get guarantees as to what is required. The Commission decided not to include the generic condition. P.C. Minutes July 14, 1993 Page 12 Commr. Cross felt creek setbacks were most appropriately addressed in Condition 10-a. Commr. Williams read the addition of a second sentence to condition 10-a previously discussed by the Commission. 'The plan shall provide for a minimum setback from the creek of 20 feet or as deemed appropriate by staff for the westerly and southerly channels." Commr. Cross asked if staff would consider making the setback 20 feet from significant riparian vegetation if it existed farther than 20 feet from the top. Greg Smith explained staff looks at the edge of existing vegetation or 20 feet from the top of bank, whichever is greater. He suggested condition 10-a could state 'The plan shall provide for a minimum setback to the edge existing riparian vegetation, or 20 feet from the top of bank, whichever is greater." Commr. Senn said that was not what he intended. He felt because it was an irregular creek bank, there might be an area where 17 feet is sufficient, and another area where 24 feet was needed. Commr. Williams suggested the following language for condition 10-a: 'The plan shall provide for a minimum setback to the edge of existing riparian vegetation of 20 feet from the top of bank, more or less as deemed appropriate by staff for the westerly and southerly channels." Commr. Senn asked Commr. Whittlesey if she would add the words "or as otherwise approved by the ARC" to condition 15. . Greg Smith suggested delegating approval of the setbacks in condition 15 to the administrative hearing officer. He suggested adding the following sentence: "This condition does not preclude other setback exceptions by subsequent use permit or variance as provided for by zoning regulations." He said the ARC does not have the authority to adjust setbacks. Commr. Cross said he preferred parking in condition 16 be changed from one space per 400 square feet to one per 500 square feet. Wayne Peterson said there are several projects that were recently approved but are now under parked, and they had caused problems. Ron Whisenand pointed out that parking would be determined again when the building is rented to tenants on the basis of the type of use. He suggested the Commission leave P.C. Minutes July 14, 1993 Page 11 Commr. Whittlesey said at the minimum the Commission should mandate stubbing. She amended her motion to include a Condition 4-a stating: 'That each building shall provide stubbing for employee shower facilities and that shower and locker facilities shall be required at the discretion of the Community Development Director." She felt because bicycle racks were already included, it would not be necessary to require bike lockers. Commr. Cross felt bike lockers provided a real incentive for people to ride bicycles to work because of their security. Arnold Jonas suggested the Condition recommend "secure waterproof storage" rather than bike lockers. Commr. Cross said secure bicycle storage and showers were a reasonable trade off for the reduction in the parking standard. Commr. Whittlesey said the Commission could require that there be no parking on one side of the Sacramento Street extension to encourage a bike lane. Commr. Senn said that a statement could be added stating that at the time Sacramento Street is extended, there be adequate provisions for bicycle traffic. Commr. Karleskint said Government Code 66462.5 needed to be referenced in condition 13. Commr. Sigurdson felt it was important that daycare centers be required, not be just a permitted use. She said phase one wasn't the best time to mandate daycare, but that eventually it would be needed. Ron Whisenand said standards regulating daycare centers had not been adopted by City ordinance. He explained that if the Commission felt there was a direct link between the traffic mitigation measures and a daycare center, it could mandate a daycare center. He said staff would like to consult with the City attorney's office on whether or not daycare centers could be part of a vesting tentative map. Cindy Clemens said unless the Commission believed daycare was a Health, Safety, or Welfare concern, or if the Commission felt daycare centers were directly linked to a mitigation measure in the environmental document, she did not recommend mandating daycare because there are currently no City standards. The Commission decided not to require a daycare center by condition. P.C. Minutes July 14, 1993 Page 10 Commr. Cross agreed with Commr. Whittlesey. Commr. Whittlesey moved to approve staff's recommendation to approve PD 220-92 and vesting tract map TR 220-92 subject to the finding and conditions, as well as the additional conditions presented tonight, including a condition stating that the applicant or subdivider shall provide a plan for recycling all recyclable discarded building materials during construction; a condition stating that the applicant or subdivider shall consult with local recyclers regarding the appropriate size and location of areas on site dedicated to on-site storage of recyclable material and trash enclosures; and a condition that the applicant or subdivider shall make all reasonable attempts to recycle materials from the existing building on the site, should it need to be demolished. Commr. Williams seconded the motion. Greg Smith asked if the motion included items A, B, C, and D in staffs memo. Commr. Whittlesey said yes. Commr. Cross asked if the motion included eliminated finding 3. Commrs. Whittlesey and Williams agreed to amend the motion to eliminate finding 3. Commr. Cross felt the Commission should require a minimum of four shower and locker facilities, 1 per 50,000 square feet, for employees in Condition 4. He said if the rest of the Commission supported only stubbing, he would agree. Commr. Sigurdson said she supported showers, not just stubbing, and also bike lockers. Wayne Peterson said the Bicycle Plan had a recommendation of how many bike lockers should be included, but it had not been approved. Arnold Jonas said it would be appropriate to have the number of bike lockers subject to approval by the Community Development Department. Commr. Williams felt some type of secure storage was needed, but not necessarily bike lockers. Commr. Senn suggested adding to Condition 4 that there be adequate shower and bicycle facilities on site as determined by the Community Development Director. He felt this approach was appropriate because it is uncertain when the development would occur or what the policy would be at that time. 1-47 P.C. Minutes July 14, 1993 Page 9 relocate it. She said the area was not very scenic and hoped this project would create aesthetic value. Commr. Whittlesey said she agreed with Commr. Williams about the project's consistency with city policy and the proposed extension of Sacramento Drive, but felt somewhat uncomfortable about the 1.7 riparian replacement. She felt the replacement should improve the quality of vegetation currently on the site. She expressed concern that a least a 10-foot setback be required because it was unknown when and if the railroad would be elevated. She said she could agree to one parking space per 400 square feet and could also support a reduction in that requirement to encourage transportation alternatives. She said she hoped the ARC would examine night lighting because there area across the railroad tracks was a residential area. She suggested that if the house currently on the property is demolished, every effort be made to recycle all materials possible, so that the wood and hardware do not go into a landfill. She requested a condition be added requiring the applicant or subdivider to provide a plan for recycling discarded concrete, sheetrock, wood, flashings and wire during the construction process. She requested another added condition requiring the applicant or subdivider to consult with local recyclers regarding the size and location of areas needed for on-site storage of recyclable materials and trash enclosures. Commr. Cross asked staff if the creek setbacks were specified in the conditions. Greg Smith said that a second sentence could be added to condition 10 stating that The plan shall provide for a minimum setback from top of bank of 20 feet." He also suggested specifying the westerly and southerly channels and not include the smaller centrally located channel. Commr. Senn suggested the added sentence state a "minimum setback of 20 feet or as deemed appropriate by staff' because the creek bank was irregular regarding the riparian habitat value. Commr. Whittlesey asked Wayne Peterson about rubberized asphalt. Wayne Peterson said the City did not have specifications for rubberized asphalt. He said the up-front cost was significantly higher than regular asphalt. Cindy Clemens recommended that Government Code 66462.5 be reference in condition 13. Commr. Whittlesey felt that finding 3 was not supported in the stagy report. P.C. Minutes July 14, 1993 Page 8 Commr. Senn said in the near future, businesses that employ more than a certain number of people would be required to provide shower and locker facilities under the Clean Air Act. Commr. Sigurdson felt that because the applicant believed the project is overparked, perhaps shower and lockers could be constructed in exchange for a parking reduction. Commr. Cross pointed out it was hard to retrofit buildings for showers and felt it should be required with the development. Commr. Karleskint suggested requiring stub outs for showers. Commr. Sigurdson agreed with Commr. Whittlesey about a bike lane on at least one side of Sacramento Drive. Commr. Cross asked if the right-of-way was wide enough for bike lanes on both sides of Sacramento Drive if parking was only permitted on one side of the street. Wayne Peterson said yes. He suggested that if parking was prohibited on one side of Sacramento Drive, it should be the west side of the street because there was no development on that side of the street until Capitolio and a continuous bike lane could later be constructed. Commr. Senn felt a bike lane was not practical because it would end at the end of this project. Commr. Cross said it was difficult to put in bike lanes after roads were constructed. Commr. Williams felt the project was consistent with land use policies and appropriate for the site. She favored the extension of Sacramento Drive for better emergency access and general circulation. She felt the 1.7 replacement for riparian habitat would be adequate because she understood 3 to 1 replacement was usually required, but it was not a standard. She expressed concern about a monitoring program for the replacement. Greg Smith explained the tract map would include an agreement for inspection and monitoring by the Community Development staff. Commr. Williams said she would agree to staff's recommendation of one parking space for each 400 square-feet. She agreed with requiring stubbing out for.showers. She said she did not have a problem with the removal of the house on Orcutt Road because she did not believe it was architecturally significant, but felt an attempt should be made to 1-� P.C. Minutes July 14, 1993 Page 7 Mr. Barasch said rear yards and side yards were eliminated from the project to prevent rear yards from becoming trash collection sites. By providing only front yards, he believed the landscaping would be better cared for. He said the City of San Luis Obispo did not have a model for this type of project. He showed a picture of a research project he built in Camarillo that won an award. In answer to a question by Commr. Karleskint, Mr. Barasch said the applicant was agreeable to all the conditions except the public. works conditions, which needed to be discussed with public works. Marilyn Stickler, 1266 Miralest, explained that she owned the adjoining property to the west of the project, Orcutt I. She said she was happy to see development on that land, but asked the Commissioners to be aware that what affects Orcutt II, would also affect Orcutt I. Chairman Karleskint closed the public hearing. Commr. Cross expressed surprise that staff hadn't recommended showers, locker facilities, and bike lockers. He felt four would be appropriate. He said he could agree to reduced parking because excess parking encourages people to drive to work. Commr. Senn asked if staff felt this site could proceed without being integrated with Orcutt I. Greg Smith said yes. In answer to a question by Commr. Senn, Wayne Peterson said the City did not know when or if it would have the money needed to complete the proposed overpass. Commr. Senn asked about land on adjoining properties being condemned to extend Sacramento Drive, if the city had a policy for requiring a 20-foot setback from the top of bank, and if a stop light was planned for the intersection of Sacramento Drive and Orcutt Road. Greg Smith said the city would have to obtain additional property for the extension, but efforts are always made to avoid condemnation. He said staffs recommendation for a 20-foot setback from top of bank and a larger setback where riparian vegetation extends beyond that distance was based on a policy memo reviewed by the City Council. He said there were no definite plans for a stop light, and staff felt a stop sign would be sufficient at this time. MEETING AGENDA L ! ,z�-9 ITEM # COIM 1M August 20, 1993 Ef Sp NCIL Rf CDD DIR Ipl� ❑ FIN DIR =3TORNEY ❑ FIRE CHIEF MEMORANDUM 0 P DIR CLERKI�RIG ❑ POLICE CHF TO: Council Colleagues ❑ MGMT TEAM ❑ REC DIR ❑ E�1 FI ❑ urlL DIR FROM: Mayor Peg Pinard ��Q Cjr I ❑ PERS DIR SUBJECT: MARGARITA EXPANSV/IJON AREA Recently, at their request, I have met with several different property owners in the Margarita area. These property owners are interested in proceeding with annexation to the City as they are already covered under the existing Land Use Element. The staffs recollection is that the last formal action by the City Council was to defer processing of this expansion area until completion of the new Land Use Element. I believe it is appropriate to reconsider and to clarify the status of the Margarita Area. I am asking for Council concurrence to place this matter on the next agenda for considera- tion. A brief staff report will suffice as the options regarding the area are limited and fairly clearcut. The next step, in my understanding, is to get the process underway with LAFCO. Because the Margarita area is shown in the urban reserve area in both the existing and draft LUE, Council policy regarding the ultimate inclusion of this area within the City is already clear and has been in place for many years. Therefore, what remains unresolved is the uses and kind of development to be allowed within the area,which will be addressed concurrent with the LUE update and an eventual Specific Plan. However, revising the City boundary line to include this area does not necessarily have to await these other actions. PP:ss c: Diane Gladwell John Dunn Jeff Jorgensen h:margxpan ME' ,. ::1G AGENDA kA- ITEM #—' 1 August 20, 1993 COMMUNICATION ITEM TO: Council Colleagues FROM: Peg Pinard G�r SUBJECT: TIME LIMITS ON "Going out of Business" SALES I believe the City should take action to control the professional liquidators who sponsor/supply continuous "going-out-of-business" sales. From my discussions with others, I see such sales activity as detracting from the retail activity of existing legitimate businesses, as detrimental to the character of the downtown and our shopping centers, and harmful to a healthy business atmosphere in our City. Many other cities (including Santa Maria) have ordinances of this nature. They limit such sales to existing businesses, and to the sale being conducted within 30 days of the closing date. This should be a relatively easy matter to investigate and to "borrow the best" from those cities who have dealt with this problem. Thank you. PP:ss h:sales Axys 2 0 1993 SpWCIL DD DIR CIS'!COUNCIL t? FIN DIR SAN LUIS OBISPO' CA C A ❑ FIRE CHIEF OIKUORNEY ❑ PW DIR p,dLERKjORIG ❑ POLICE CHF ❑ MGMT TEAM ❑ REC DIR ❑ C'READ FILE ❑ UTIL DIR I — 0 PERS DIR Comments on Orcutt Road Subdivison Page 2 Applicant Request The following list is presented merely to facilitate our deliberations during the Council meeting. Mr. Becko suggested that City delays on this project have resulted in great additional costs for him and that the City should provide some relief. If the Council wishes to consider this argument, I suggest that rather than waiving fees, we consider the following alternatives: 1) Delay the installation of the crossing of south creek with the extension of Sacramento Drive until one of the last stages of development. 2) Fund the crossing of south creek by means of an assessment district whereby all benefiting property would pay a proportionate share. 3) Approve the crossing of south creek by means of a culvert or arch-culvert with an open floor rather than a free-span bridge, thus resulting in considerable cost savings. 4) Participate with Mr. Becko in the costs of under-grounding the overhead utility lines (three poles) along the Orcutt Road frontage of the property. An argument could be made that the City, and not Mr. Becko, owns the property adjacent to this portion of Orcutt Road. 5) Do not require the installation of the curb, gutter and sidewalk along the frontage of Orcutt Road from Sacramento Drive to the SPRR until a very late stage of development of this project. This very wide portion of street will serve no useful purpose until the remainder of Orcutt Road from Broad Street and the railroad crossing, are widened. 6) Agree to City payment of 1/2 the cost of the roadway improvement of Orcutt Road (exclusive of curb, gutter and sidewalk). The basis for this would be, a) the heavy structural section is required for traffic generated in this whole area of the City and, b) the widening being primarily on the south side was dictated by physical conditions at the site. 7). Eliminate condition 31, the imposition of future traffic impact fees. This future condition creates an uncertainty which must be reflected in funding of the entire project. DR:ss h:orcuttrd.dav V TING` ✓ °O ' AGENDA T_ DmELZZ-93 ITEM # August 20, 1993il� l� FW DD DIR AUG 2 � 19:CA ❑ FIN DIR MEMORANDUM CITY COUNCIL ❑ FI HIEF SAN LUIS OBISPO, W DI{;TO: Council Colleagues ❑ POLICE CHF❑ REC DIR FROM: Council Member Dave Romero ❑ UTIL DIR ❑ PERS DIR SUBJECT: COMMENTS ON ORCUTT ROAD SUBDIVISION At the August 17, 1993 meeting, Council requested that I forward my concerns regarding the rezoning and tentative map for the Orcutt Road subdivision. Technical concerns that clarify, but do not change, the meaning of conditions were forwarded to staff separately. The following memo is intended ,to deal with issues which require Council decision. Sacramento Drive We spent a great deal of time discussion the extension of Sacramento Drive across "south creek,"with many concerns expressed regarding preservation of the riparian habitat. If you haven't visited the site, I suggest you drive to the end of Sacramento Drive to view the existing situation. As of today, there is no water in the creek, there are a number of weeds, some berry vines and a couple of small trees on the north bank,where they would not shade the creek itself. It is extremely difficult for me to find that this particular portion of the creek is in any way special or merits retention in its current condition. City creek crossing policy calls for roads to "free-span" the creek, thus the bridge structure for crossing at this point could be approxi- mately 60 ft. wide and 60 ft. long, with virtually no change in the main body of the creek. The City could also use a culvert (approximately 5 ft. in diameter), or a pipe arch with an open floor and cut the crossing costs to a fraction of the cost of a free-span bridge. I am confident that any of the alternatives will be a fraction of the $400,000 cost mentioned by Mr. Becko. There will be similar but lesser effects on the creek habitat under alternatives for provision of fire access or a bike crossing. Bike Lanes (Condition 10. Pg. 1-14) Do we really want to restrict parking on one side of the street and provide bike lanes on Sacramento Drive? The draft Bicycle Transportation Plan shows Sacramento Drive as a Bike Route requiring only signing. 08-26-1993 01:50PM FROM COTTONWOOD CANYON WINERY TO 7017109 P.05 ty City of San Luis Obispo 6 April 1993 page 2 3-to-1 multiplier effect, the economic support services will generate $48,000,000! In other words, this can, if approved and if successful, have a major financial impact on the City's revenue for every future year! On the assumption that our analysis is accurate and the City does need this kind of "appropriate and clean" service related industries, establishing a fee increase that will not generate an immediate solution to the City, might be best not to be imposed. For example, imposing an increase in traffic mitigation fees for the Parkside Research Centre, if adopted as recommended, for an overpass that will not be constructed until the year 2020 will alone increase our costs beyond the marketability of the Park. I also believe that the City should absorb some responsibility for these delays. our project should then be given credit for its past contribution plus allow the project fees to be based upon the fee structure in 1988-89. I hope that you review this letter in the fairness that it has been presented. Since I am not a developer by trade, but a successful business man who has brought some of these revenue accomplishments to the County, I wish to emphasize that the ability to survive in this highly competitive. marketplace is only a result of being able to offer a product that the market can absorb because it fills a need and is positioned to provide an economic return to the tenant. Thank you for taking the time to evaluate this project in more detail. I sincerely believe that it is in the City's best interest to reach a realistic compromise on the matter of fees. very cerely, Orman J. Beko . The/SLO Partners cc: Hr. Stephen B. Barasch r. !� 08-26-1993 01:58PM FROM COTTONWOOD CANYON WINERY TO 7017109 P.04 6 April 1993 Mayor, City Council, City Manager, City Attorney and Staff City of San Luis Obispo 990 Palm Street San Luis Obispo, Ca 93403-8100 Re: Parkside Research Centre(Orcutt 11) Ladies and Gentlemen: As you know, I have been attempting since 1988 to obtain approval to develop a research project on the subject property. During this process several salient occurrences have developed which should be discussed due to their relative significance to us and the City. Specifically, the City obtained the 22' from us at no charge and we sold additional land below my cost in exchange for the specific concession of not to be responsible for any costs for the Orcutt Road widening or for any of the costs to construct the railroad overpass. These were co-ordinated with Mike Multari, Community Development Director and Dave Romero, who is obviously now a council member of the City Council. In addition, through the specific efforts of the City Community Development Department, I was directed to develop a detailed plan of converting the project from industrial to residential, at substantial personal cost, only to be rejected by the City Council at a public hearing. She are now. re-submitting our third. design, a PD for a research park at. a time when the City requires a substantial increase in revenue for it to conduct its business. The purpose of this letter is to express my concern for these potential fee increases since they can, as proposed, have a serious impact on the overall development costs and to ask for a reduction or elimination of duplicate and triplicate fees that I have already paid. Regarding the latter repetitious fee payments, I have paid the Planning Application fees and the Tract. Map fees, I beleive each time I have submitted the three different maps. Is this fair since I should have only paid once? Let me briefly discuss the probable impact on our community should our project reach a completion by the year 2000. Property tax revenue will exceed $250,000 a year; payroll will exceed $16,000,000. a. year; gross sales of the projected computer software and bio-tech companies will exceed $45,000,000, a year; assuming a 08-26-1993 01:57PM FROM COTTONWOOD CANYON WINERY TO 7817109 P.03 IRE ` hu JUR 1 9 aw ����I I�IAifll111�1111 IIIIIII�IIII NI�'11�'1lf1�' !�� cityo sAn lollS oasI �� � SOON990 Palm Street/Post Office'Box 8100 • San Luis Obispo.CA 934038100 June 11. 1987 Norman Becko Graphic Resources Corporation 4330 Santa Fe Road San Luis Obispo. CA 93401 Subject: Connection of Sacramento Drive to Orcutt Road I have recently received a submittal which provides acceptable intersections and alignment for a future street connecting Orcutt Road at Duncan to Sacramento Drive. I am interested in seeing that the street alignment meets the needs of all parties concerned with the development of this property and have, therefore, set up a meeting for 1:30 p.m. , Tuesday, June 16, in the Public Works Conference Room for a discussion of this road alignment. It is my hope that we can mutually agree and commit to an alignment at this time, so as to minimize problems with construction of this road as the adjacent properties are developed. Very truly yours, David F. Romero, Director Public Works Department dco- c: Mike Multari . CDD ell Jerry Kenny, Engr. _ Mid-State Engineering c. sactodr/dfrt5 pr �1 y 00-26-1993 01:57PM FROM COTTONWOOD CANYON WINERY TO 7017109 P.02 MEETING `S..'P'AGENDA DATEITEM K. September 23, 1988 Mr. Mike Muttari Mr. Dave Ramero City Of San Luis Obispo 990 Palm Street San Luis Obispo, CA. 93403-8100 RE: Tract 1633 - Orcutt Road Dear Mike &Dave: In the published summary of the Public Hearing on 14 September, a reference was made that the city may impose fees to pay for im- provements . In a meeting with Greg and Jerry, this was further confirmed in that they recommended this step. Since the 28 September meeting is soon, I would like to do- cument and clarify that our- previous agreements - our selling and gifting of road easement to the city - would negate any improve- ment or assessment charges to Don or I . I would appreciate your intercession on the present suggested fee imposition prior to our 28 September meeting for the purpose of maintaining our verbal agreements, not .to .impose any. improvement fees . In addition, we have discussed and agreed on the cost sharing of the Sacramento extension road and bridge to those effected by this addition. We generalized that it would be reasonable that new tennants with: likely� access , would share. in these costs . With the tentative approval of the large Williams Bros . expansion plus Southern California Gas, the traffic increase on the Sacramento extension will undoubtedly be more than "occasional" . I would like to enter into formal discussion with the City and the above re- ferenced developers for the purpose of•' defining a cost sharing program as soon as possible . Any time in Mid-Uctober would be acceptable to my schedule. Thank you for your assistance on both of these matters . Sincerely, Ur COUNCIL ErtDD DIR 1!rCAO 0 FIN DIR Norman Beko la'ACAO ❑ FIRE CHIEF ECATTORNEY 2(PW DIR Cc: Dan Lloyd AUG 2 6 1993 Iff CLERKIORIG ❑ POLICE CHF ❑ IMIGMT TE!M ❑ AG DIR CITY CLERK ❑ C RgAD FILE_ feUTIL DIR CAN LUIS OBISPO.CA 0 PERSDIR Technical Modifications to Pa;e 2 Conditions for Orcutt Road II Subdivision There should be some condition addressing the sharing of pave-out costs that will be assigned to the south side. Since most of the widening will take place on that side, will the developer pay for most of it, or will the City assume a portion? I assume the basis for negotiations will be a T.I. of 8. The staff may wish to reconsider whether it should require at this time the installation of curb, gutter and sidewalk on the portion of Orcutt Road between Sacramento Drive and the railroad. These improvements will be remote from the roadway and difficult to make practical use of. DR:ss h:OrcuttRd �-9l 1��t J August 19, 1993 i\1EA10RANDUM TO: John Dunn FROM: Council Member Dave Romero SUBJECT: TECHNICAL MODIFICATIONS TO CONDITIONS FOR ORCL= ROAD II SUBDIVISION Page 1-6. Conditions 8 & 9 Duplicate wording. I suggest that Condition 8 be modified to strike out everything after the words "drainage plan." Page 1-7. Condition 10 The question on my part is, "Will EPA issue such a permit?" This is news to me. Page 1-7. Condition 1I.b Should be reworded to call for the setback to be 20 ft. from existing top of bank or clear of the riparian vegetation, whichever is greater. Please note that there are two conditions 11.b. They should be renumbered. Page 1-9. Condition 14 Depending on the alternative chosen in the method of construction on Sacramento Drive, there may be no need for a wetland habitat replacement in the west creek. This eventuality could be covered by adding the words, "if needed." Page 1-14, Condition 6 Staff rewording of this condition has helped somewhat, but is simply not sufficient to give a clear picture of the relative obligations and costs of the City and developer. As rewritten, the condition requires the installation of curb, gutter and sidewalk in the field beyond the currently fenced and graded right of way for Orcutt Road. Will the developer be required to bring the intervening ground up to grade ? Will he be required to compact the road fill, install a base, construct a bikelane, construct right and left turns in and out of the subdivision at Sacramento Drive? I-9a ��il!!II!;!! 111!!!I!illl ! � II�11111 Ilill�!! ail !��,� Iinnglll�flll�llll!I �� II II I' city of sAn tuis oBispo 955 Morro Street • San Luis Obispo, CA 93401 July 28, 1993 TO: Ronald Whisenand, Development Review Manager From: Terry Sanville, Principal Transportation Planner SUBJECT: Bicycle Lanes as Part of the Parkside Research Center Project This memo is a followup to my previous memorandum concerning bicycle facilities and the Parkside Research Center Project. The Bicycle Committee has recommended that Class I facilities be installed adjacent to the east side of Acatia Creek (beyond the area needed to project riparian vegetation) between Orcutt Road and Broad Street. As a second choice for bikeways, staff notes that Class II facilities (as recommended by the Planning Commission) would also provide bike path connections via Sacramento Drive and Industrial Way to important neighborhood facilities such as the recently-approved Marigold Center. Therefore, if the Council rejects the Bicycle Committee's recommendation, the Planning Commission's recommendations should be considered. If I can answer any question, feel free to give me a call at (805) 781-7178. TS:ts cc Mike McCluskey 1-8-7 e Li 100} G0 . 00 ELS V p GT.J� ��p •o Id G tee\- ■ lop 0. .. cl1 3 a� m rn C • m m m m e--•—rte � c . . m 1-88 • The Class I bicycle path would cross the creek on the bridge that would be constructed to extend Sacramento Drive north of its current terminus. From the bridge south, the path would extend to Broad Street where it would go under Route 227 to connect with Class I paths west of the highway. • Bike lanes would also be installed along portions of Sacramento Drive and Capitolio Way which would enable southbound cyclists from the Johnson Avenue neighborhood to access Route 227 at stop controlled intersections at Capitolio Drive or Industrial Way. The Bicycle Committee felt that a Class I path was a good idea because it would provide a convenient route for northbound cyclists that wished to access areas east of the railroad and avoid the hill, the busy Broad/Orcutt intersection, and congested segments of Orcutt Road. Since the site of the proposed Class I path is largely undeveloped, the creekside environment can provide an attractive and enjoyable setting for cyclists traveling through the area or accessing employment sites within the Parkside tract. The Bicycle Committee's recommendations do not address the issue of extending Sacramento Drive to Orcutt Road. Whether the extension of Sacramento Drive occurs or not, a Class I bike path was felt to be superior to on-street bike lanes along the northern most segment of Sacramento Drive. Timing of Council Consideration It is our understanding that the City Council will consider the issue of extending Sacramento Drive on August 3, 1993 and is tentatively scheduled to consider the Planning Commission's recommendations for the Parkside project on August 17, 1993. The Bicycle Committee's recommendations should be included in the information received by the Council. The City Council is scheduled to consider the Bicycle Plan, including recommendations for Sacramento Drive, at its August 31, 1993 meeting. If you have any questions, feel free to contact me at Ex. 178. TS:ts Attachment �i!!ii�iil!!!!III I III;,!I�IIIL��II III IIIA! II I li city of sAn toBispo - 955 Morro Street • San Luis Obispo, CA 93401 July 22, 1993 TO: Ronald Whisenand, Development Review Manager VIA: Wayne Peterson, City Engineer FROM: Terry Sanville, Principal Transportation Plannert`' SUBJECT: Bicycle Lanes through the Parkside Research Center Project The Situation On July 14, 1993 the Planning Commission considered the Parkside Research Center Project and forwarded recommendations to the City Council. These recommendations include the installation of bicycle lanes along the proposed new section of Sacramento Drive south of Orcutt Road. It is our understanding that the Commission recommended that parking be restricted along the west side of the new street section and that a bike lane be installed against the curb. Parking would be retained along the east side of the street and a bicycle lane installed on the outside of the parking bay. Bicycle Committee Actions The Bicycle Committee is formulating recommendations for the City Council's adoption of a "Bicycle Transportation Plan." The Plan will prescribe the location of bicycle paths and lanes throughout San Luis Obispo. On July 19, 1993 the Committee considered the Planning Commission's recommendations for bicycle lanes on Sacramento Drive. The Committee recommended the following system of bike lanes and paths (see attached map): • A Class I bicycle path should extend along the eastern edge of Acatia Creek from Orcutt Road to Broad Street (Route 227). The path would be located beyond setbacks required to protect creekside vegetation. �-8� ER 220-92 Page 17 Replacement Zone #4 . This zone is located where Sacramento would cross the southerly creek, and is approximately 4 , 900 square feet. This zone includes areas where significant riparian vegetation is already established. Replacement Zone #5. Although not indicated on the plans, the secondary channel could be utilized as a replacement zone, where it connects with the westerly creek channel. The area of this zone could be up to 5, 000 square feet. SUMMARY The replacement ratio as calculated using the data indicated on the plans would be approximately 3 : 1. Replacement taking Orcutt widening into account, and including replacement zone #5, would be approximately A1.7: 1. W ER 220-92 Page 16 ANALYSIS OF WETLAND REPLACEMENT/REMOVAL ZONES Parkside Center - 953 Orcutt Road Data based on plans dated 5/19/93 Removal Zone #1. Private access road crossing minor interior channel, approximately 1, 500 square feet. Very little riparian vegetation present, due to grazing. Removal Zone #2 . Sacramento Drive crossing secondary channel, approximately 4, 200 square feet. One mature Pepper tree may have to be removed. Degraded habitat. Removal Zone #3 . Sacramento Drive crossing creek channel at south property line, including off-site portion of southerly creek. Indicated on the map as 2 , 100 square feet, may be slightly larger due to area needed for headwalls, etc. Significant riparian vegetation is present, primarily willows. Removal Zone #4 . Orcutt road widening and culvert extension for westerly creek channel; not shown on applicant's plans. Up to 3 , 500 square feet of riparian vegetation to be eliminated, depending on final dicisions regarding ultimate road width. Road widening will involve removal of several mature Pepper and Elm Trees. Removal Zone #5. Extension of culvert for minor drainage channel near the middle of the site; not shown on applicant's plans. Approximately 1, 500 square feet of channel to be filled. Minimal habitat value due to grazing. Replacement zone #1. Located at northwesterly corner of site. Area as shown on plans is 3 , 900 square feet. Actual square footage, taking Oructt Road widening into account, is estimated to be 2 , 400 square feet. Existing vegetation in this zone is open field type with introduced grasses predominating. Because the ground level is approximately ten feet higher than the flow line of the creek, soils are dry for most of the year. Grading to lower the ground level, or permanent irrigation, will be required to establish and maintain riparian vegetation. Replacement Zone #2 . Located along the top of bank of the westerly creek channel near proposed Building 2 . Approximately 10, 000 square feet. Portions of this zone already support dense shrubs and trees. Replacement Zone #3 . Located along the top of bank immediately south of zone #2 . 4 , 800 square feet. No plan for grading in this area has been submitted. Much of this area is affected by leaf litter from Eucalyptus trees, most of which grow on the adjoining site, which will make it difficult to establish significant new vegetation in this zone. Special measures, including removal of leaf litter and supplemental irrigation, will be required. - ER 220-92 Page 15 grading plans and landscape planting plans and construction drawings for each phase shall be reviewed and approved by the Department of Fish and Game prior to issuance of building permits for that phase of the project. Plans for construction of street and drainage improvements within public right of way areas shall also be reviewed and approved by DFG staff prior to beginning construction. h. Department of Fish and Game staff shall review and approve grading stakes in the field prior to initiation of grading for each phase. 11. Applicant shall comply with the Interim Archaeological Survey Procedures prepared by the City's Cultural Heritage Committee (attached) prior to and during the construction phase of the project. These guidelines require: a. Completion of a surface survey by a qualified archaeologist approved by the Community Development Director prior to commencing construction activities on the site. b. Halting of construction activities if archaeological resources are discovered during construction. C. Implementation of a preservation plan prepared by a qualified archaeologist and approved by the Community Development Director if significant archaeological resources are discovered G:ER19192 .wp 1-83 ER 220-92 Page 14 empowered and required to implement the plan on a continuing basis. 5. Do not include Building 3 in a phase which precedes construction of the Sacramento Drive extension to Orcutt Road. 6. Applicant shall complete all site grading and other construction activities in accordance with a particulate emission mitigation plan, to the approval of the APCD and Community Development Director. 7. The applicant shall provide the City Engineer with a detailed grading and drainage plan and hydraulic analysis which indicates the effects of the proposed development on adjacent and downstream properties. 8 . Detention facilities shall be provided if determined necessary by the City Engineer to eliminate potential downstream flooding. 9 . The applicant shall obtain the General Construction Activity Storm Water Permit required by the Environmental Protection Agency, and shall comply with all requirements of that permit. Applicant shall comply with all requirements of City grading regulations regarding erosion control measures. 10. Applicant shall expand and enhance existing riparian habitat areas found on the site, in accordance with a plan approved by the State Department of Fish and Game, the City Engineer, and the Community Development Director. The plan shall be prepared by a landscape architect or biologist experienced in the area of riparian habitat restoration, and shall include the following measures: a. The plan shall provide for no net loss of extent or quality of riparian habitat on the project site and adjoining sites affected by off-site improvements for the project. b. Native riparian plant species shall be used whenever possible. C. Plants shall be used which are large enough to establish wildlife habitat as quickly as possible. d. Planting areas shall be located appropriately to avoid the need for long-term irrigation or other maintenance. e. The plan shall include monitoring and maintenance provisions which ensure that replacement planting areas are properly established and are not subsequently removed without further environmental review. f. The plan may provide for limited removal of on-site Eucalyptus trees, as determined necessary to allow re-establishment of native plant and animal species. g. A plan for all removal and replacement zones for all phases of the project shall be completed prior to recording the final tract map or approval of the PD final development plan. Final ER 220-92 Page 13 Halting of construction activities if archaeological resources are discovered during construction. - Implementation of a preservation plan prepared by a qualified archaeologist and approved by the Community Development Director if significant archaeological resources are discovered N. Aesthetic The proposed project will permanently change the visual characteristics of what is now a scenic open area. Since the site has no unique scenic characteristics, and since much of the scenic open space adjoining the creeks will be preserved, the change will not constitute a significant effect. Refer also to the EIR for the 1977 Land Use Element for discussion of cumulative impacts of urban development consistent with that plan. Potentially Significant Effects - Short Term None. Potentially Significant Effects - Long Term and/or Cumulative None. Recommended Mitigation Measures None. III. STAFF RECOMMENDATION Staff recommends approval of a mitigated negative declaration. The following mitigation measures should be incorporated into the project description to avoid potentially significant effects, or reduce effects to levels which are less than significant: 1. Dedication of on-site portions of right of way for Sacramento Drive extension in conjunction with first phase of the project. 2 . Provide emergency access to each building in accordance with City standards and to the approval of the Fire Marshal. 3 . Payment of fees to fund pro-rata shares of the following off-site traffic mitigation measures: a. Orcutt Road/Southern Pacific Railroad overcrossing: $63 , 320 . b. Orcutt Road/Laurel Lane traffic signal and intersection modifications: $3 , 835. C. Broad Street/Capitolio Way traffic signal: $7 , 127 . 4 . The applicant shall prepare and implement a trip reduction plan approved by the Community Development Director. The applicant shall create a property owners' association which shall be ER 220-92 Page 12 within public right of way areas shall also be reviewed and approved by DFG staff prior to beginning construction. h. Department of Fish and Game staff shall review and approve grading stakes in the field prior to initiation of grading for each phase. M. Archaeological/Historical Previous archaeological surveys of sites adjoining creeks within the City have identified Chumash occupation sites. A visual study of the area which would be affected by the railroad planned Orcutt Road/SPRR overcrossing was performed by archaeologist Charles Dills, apparently in the mid-1970's. That survey did not show any evidence of archaeological resources. Planning staff is not aware of any other surveys in the immediate vicinity of this site. The site and nearby area was occupied and used for farming and ranching at least since the early 1900's. The wood frame ranch house located on the site is proposed to be demolished to accommodate the widening of Orcutt Road and the construction of Building 1. It was built in 1906-1907, according to a letter filed with the City's Cultural Heritage Committee (CHC) , and was occupied by various members of the McMillan family, whose name was given to a nearby street. Although the site has not been included on any formal list of significant structures, the CHC reviewed a demolition request at a meeting on August 4 , 1988 . The CHC recommended that a finding of significance be made. Although demolition of the house would have an adverse effect on the availability of historic resources to the community, the effect is judged to be less than significant. Relocation of the structure, and/or formal documentation, may be appropriate under City guidelines for historic preservation, but are not warranted as required mitigation measures under CEQA. Potentially Significant Effects - Short Term Construction activities proposed for the site would destroy or reduce the value of any archaeological resources which may be present on the site. Potentially Significant Effects - Long Term and/or Cumulative See above. Recommended Mitigation Measures Applicant shall comply with the Interim Archaeological Survey Procedures prepared by the City's Cultural Heritage Committee (attached) prior to and during the construction phase of the project. These guidelines require: - Completion of a surface survey by a qualified archaeologist approved by the Community Development Director prior to commencing construction activities on the site. ER 220-92 Page 11 and productivity of plant and animal communities. It will not be feasible to remove all of the trees which affect the site's riparian areas, since many of the trees grow on the adjoining property to the west. Potentially Sicinificant Effects - Short Term Temporary reduction of riparian habitat value will occur at four locations on the site where public or private roads cross the creeks on the project site. The temporary loss of habitat on the site is not judged to constitute a significant effect. Potentially Significant Effects - Long Term and/or Cumulative The proposed project could result in long-term loss of riparian habitat, unless mitigation measures noted below are implemented. Recommended Mitigation Measures Applicant shall expand and enhance existing riparian habitat areas found on the site, in accordance with a plan approved by the State Department of Fish and Game, the City Engineer, and the Community Development Director. The plan shall be prepared by a landscape architect or biologist experienced in the area of riparian habitat restoration, and shall include the following measures: a. The plan shall provide for no net loss of extent or quality of riparian habitat on the project site and adjoining sites affected by off-site improvements for the project. b. Native riparian plant species shall be used whenever possible. C. Plants shall be used which are large enough to establish wildlife habitat as quickly as possible. d. Planting areas shall be located appropriately to avoid the need for long-term irrigation or other maintenance. e. The plan shall include monitoring and maintenance provisions which ensure that replacement planting areas are properly established and are not subsequently removed without further environmental review. f. The plan may provide for limited removal of on-site Eucalyptus trees and/or special soil preparation techniques as determined necessary to allow re-establishment of native plant and animal species. g. A plan for all removal and replacement zones for all phases of the project shall be completed prior to recording the final tract map or approval of the PD final development plan. Final grading plans and landscape planting plans and construction drawings for each phase shall be reviewed and approved by the Department of Fish and Game prior to issuance of building permits for that phase of the project. Plans for construction ER 220-92 Page 10 - The applicant shall obtain the General Construction Activity Storm Water Permit required by the Environmental Protection Agency, and shall comply with all requirements of that permit. Applicant shall comply with all requirements of City grading regulations regarding erosion control measures. R. Plant Life Refer to section II .L below for discussion of impacts on riparian plant and animal habitat. L. Animal Life Most of the site development proposed would be located outside of the portions of the site where significant riparian vegetation is found. Exceptions would occur where Orcutt Road would be widened at the north edge of the site, and where the Sacramento Drive crosses the creek at the project site's southerly corner. Sacramento Drive also crosses the secondary creek channel near the middle of the site, as does the private road providing access to Lots 3- 7 . The secondary channel has been degraded by persistent grazing, with minimal riparian vegetation present. As mitigation for elimination of existing and potential riparian habitat areas, the applicant proposes to create new riparian habitat areas, and enhance the quality of other existing areas. In all, three "wetland removal zones" and four "wetland replacement zones" are identified. Two additional wetland removal zones, associated with the Orcutt Road widening project along the north edge of the site and the proposed Sacramento/Orcutt intersection, are not identified on the plans. Each of the zones is briefly discussed in the attached "Analysis of Wetland Replacement and Removal Zones" , including a potential fifth replacement zone. A wildlife biologist from the State Department of Fish and Game (DFG) has reviewed the mitigation proposal, and has determined that it is feasible to comply with the department' s policy to maintain no net loss in area or quality of riparian habitat. It is usually necessary to provide replacement planting areas at a ratio of 3 : 1 for removal areas, to ensure that adequate habitat value is maintained during the time required for new vegetation to mature. The biologist has indicated that the no net loss standard can be achieved on this site with a ratio lower than 3 : 1, if the compensatory planting plan includes special measures to achieve earlier maturity. Riparian habitat mitigation measures are listed below. Of special note is the possible removal of mature Eucalyptus trees found on the westerly edge of the project site. Leaves dropped by this exotic tree species interfere with the establishment of native riparian species, by providing dense cover over the soil and exuding oils which are toxic to other plants. While the mature Eucalyptus trees provide roosting places for some bird species, their overall effect is to reduce the diversity 1 - 7S' ER 220-92 Page 9 are potentially significant. Potentially Significant Effects - Long Term and/or Cumulative Traffic related emissions from the project would contribute to levels which are considered cumulatively significant. Refer to Section II .D above for mitigation measures. Recommended Mitigation Measures - Applicant shall complete all site grading and other construction activities in accordance with a particulate emission mitigation plan, to the approval of the APCD and Community Development Director. J. Surface Water Flow and Ouality Portions of the site are subject to flooding of a depth of less than one foot during 100-year design storm conditions, according to the Flood Insurance Rate Map. Additionally, cumulative impacts on flooding of Acacia Creek and other waterways in the southern portion of the city have been identified as a potentially significant impact by the BSAEIR. The City Engineer recommends that a detailed hydraulic analysis b completed in conjunction with the design of the on-site drainage facilities for the project, prior to recording of the final map. This study would determine whether on-site detention basins or other measures would be necessary to avoid impacts on downstream properties. Discharge of storm drainage from the site could affect water quality in creeks which cross the site. Compliance with the General Construction Activity Storm Water Permit required by the Environmental Protection Agency, and with City grading regulations, are expected to insure that construction activities will not result in significant short term impacts. Mitigation of long term impacts will require construction of sand and grease interceptors at each point where discharge from storm drains enters the creek. Potentially Significant Effects - Short Term The project may slightly increase flooding of adjoining and downstream properties. Short-term impacts are not expected to be significant. Potentially Significant Effects - Long Term and/or Cumulative Cumulative increases in the amount of storm runoff discharged to area creeks, or decreases in the time of concentration of runoff, have been determined to be a significant cumulative impact. Recommended Mitigation Measures - The applicant shall provide the City Engineer with a detailed grading and drainage plan and hydraulic analysis which indicates the effects of the proposed development on adjacent and downstream properties. Detention facilities shall be provided if determined necessary by the City Engineer to eliminate potential downstream flooding. 1 r�� ER 220-92 Page s Potentially Significant Effects - Lona Term and/or Cumulative Retrofitting requirements of City Water Allocation Regulations will ensure mitigation of potentially significant cumulative impact on water usage. Recommended Mitigation Measures No additional mitigation measures required. G. Noise Levels The average noise levels are estimated to be between 70 and 75 dBA (Ldn) for much of the site, due to noise generated by Orcutt Road traffic and the railroad. This level of noise is normally acceptable for office uses, according to standards in the adopted and draft General Plan Noise Elements. Peak noise levels from railroad operations, including use of locomotive horns at the nearby crossing, may reach significantly higher levels than the average. Fairly typical commercial construction methods will provide appropriate interior noise levels for most types of office and industrial use, Specialized research activities which are sensitive to noise levels or ground vibrations may be affected by railroad operations unless special construction techniques are utilized. Effects on specialized operations are not judged to constitute a significant effect. Potentially Significant Effects - Short Term None. Potentially Significant Effects - Lona Term and/or Cumulative None. Recommended Mitigation Measures None. I. Air Ouality and Wind Conditions The grading and construction operations will require approval of a plan for mitigation of particulate emissions by the APCD. Compliance with the approved plan will insure that impacts are reduced to a level which is considered to be insignificant. The cumulative effect of additional development throughout the City is addressed in the EIR for the 1977 Land Use Element. Consistent with the findings approving that document, the site-specific mitigation measures noted above in Section II.D are determined to be adequate to reduce traffic-related emissions to a level of insignificance. Potentially Significant Effects - Short Term Particulate emissions due to grading and other construction activities 1 -774o ER 220-92 Page 7 site is included in the description of the proposed project. ) - Provision of shower and locker facilities for employees. -Reduction in the number of parking spaces provided on site. E. Public Services The City will be able to provide public services to the site in accordance with adopted City standards, with one exception. The location of Building 3 exceeds the standard established by the City's Fire Prevention Code for access to buildings. The standard for emergency response requires that no portion of a building be beyond the reach of a 300-foot hose connected to a fire truck stopped on the nearest accepted access road. For this project, orcutt Road provides the only acceptable access until construction of the complete Sacramento extension with Phase 3 . Only a small portion of Building 3 structure would be within 300 feet of the proposed Orcutt Road right of way. It should be planned for Phase 3 or later. Potentially Significant Effects - Short Term Construction of . Building 3 in the first phase of the project, as proposed, could expose the structure and occupants to higher risks from fire and other emergencies than is consistent with City standards. Potentially Significant Effects - Long Term and/or Cumulative None, after construction of proposed Sacramento Drive extension. Recommended Mitigation Measures Provide emrgency access to each building in accordance with City standards and to the approval of the Fire Marshal. F. Utilities The proposed project includes construction of sewer and water mains in accordance with City standards for commercial uses, and for fire protection. The City's safe annual water supply from all sources is not adequate to meet the normal annual needs of users already connected to the municipal water supply system. However, the City has adopted mandatory conservation regulations which are intended to mitigate the effects of new development on water use. Among other provisions, new water users are required to offset their projected use of water by retrofitting existing facilities within the city with water conservation devices. Potentially Significant Effects - Short Term None. /-75 75 ER 220-92 Page 2 I. DESCRIPTION OF PROJECT AND ENVIRONMENTAL SETTING A. Site Description The project site is an 11. 75 acre parcel on the south side of Orcutt road, west of the Southern Pacific Railroad right of way. The site is bounded by Orcutt Road to the north, the railroad to the east, and creek channels to the south and west. The perimeter creek channels are tributaries to Acacia Creek. They are identified in the draft Open Space Element as "perennial creeks with degraded riparian corridor, but able to be restored" . A third channel is located on the site. It is a minor channel with seasonal flow. It supports minimal wetland plant vegetation, and has been severely impacted by grazing. Numerous mature trees are found on the site. These include willow, Eucalyptus and other species along the westerly creek channel; willow and other species along the southerly channel; Pepper trees along the minor channel; and Pepper and Elm trees along Orcutt Road. B. Proiect Description The proposed project involves construction of a research/industrial park on an 11.75 acre parcel on the south side of Orcutt Road, west of the Southern Pacific Railroad right of way. The following physical changes to the site and nearby properties are included in the proposed project. The changes to the site will be completed in up to five phases, with construction to commence in late 1993 and projected completion of the final phase in 1999 . - Construction of nine buildings with a total gross building area of approximately 192 , 400 square feet. The buildings would be one to three stories in height. The buildings would be used for office, research, and light industrial purposes. - Extension of Sacramento Drive from its present terminus at the southerly property line to connect to Orcutt Road, which forms the northerly boundary of the project site. The road extension would involve construction of bridges or culverts in three locations where it would cross creeks. A portion of the extension would cross an adjoining parcel not owned by the project applicant, at the southerly corner of the site. - Widening of Orcutt Road will be completed in conjunction with the proposed project. The widening will be 30 to 50 feet along much of the project site's frontage, depending on median width, etc. In addition to street widening and frontage improvements, this will involve extension of the culvert for the creek which flows along the westerly edge of the project site, by a distance corresponding to the road widening. The culvert for minor drainage channel near the middle of the site will also be extended, to accommodate the widening and Sacramento extension, by approximately 100 feet. city of San IDIS OBISpo •� INITIAL STUDY OF ENVIRONMENTAL IMPACT SITE LOCATION 953 Orcutt Road APPLICATION NO. ER AjDgc2 PROJECT DESCRIPTION Rezoning of 11.75 acre parcel from M -tp;M-PD, approval of plans for 192 , 400 sq. ft. office/industrial park in 10 buildings. Extension of Sacramento Drive to intersect with Orcutt Road. APPLICANT Parkside Research Center Associates STAFF RECOMMENDATION: X NEGATIVE DECLARATION X MITIGATION INCLUDED EXPANDED INITIAL STUDY REQUIRED ENVIRONMENTAL IMPACT REPORT REQUIRED PREPARED BY Greg Smith, Associate Planner DATE June 11, 1993 COMMUNITY DEVEL PMENT DIRECTOR'S ACTION: DATE sk UL -)J 0i SUMMARY OF INITIAL STUDY FINDINGS 1.DESCRIPTION OF PROJECT AND ENVIRONMENTAL SETTING II.POTENTIAL IMPACT REVIEW POSSIBLE ADVERSE EFFECTS A. COMMUNITY PLANS AND GOALS ........................... . . ...................... NONE B. POPULATION DISTRIBUTION AND GROWTH.................. .. ................ .... .. NONE NONE C. LAND USE .................'...................................................... D. TRANSPORTATION AND CIRCULATION ...................... .......... .............. YES* E. PUBLIC SERVICES ................................................................ YES* NONE* F. UTILITIES............................................... ......... ........... .... . G. NOISE LEVELS ................................................................... NONE H. GEOLOGIC&SEISMIC HAZARDS&TOPOGRAPHIC MODIFICATIONS .................... NONE I. AIR QUALITY AND WIND CONDITIONS............................................... YES* J. SURFACE WATER FLOW AND QUALITY ..... ............... . .. ....................... YES* K. PLANT LIFE...................................................................... YES* LANIMAL LIFE............... .. . .. ........ . ..... . ...... .. . . . . ....................... YES* M. ARCHAEOLOGICAL/HISTORICAL ................................................... YES* N. AESTHETIC'...................................................................... NONE O. ENERGYIRESOURCEUSE .......................................................... NONE P. OTHER .................. ........................................................ NONE III.STAFF RECOMMENDATION 'SEE ATTACHED REPORT 1-13 sa-as SUMMARY Of CURRENT PUBLIC WORKS DEPARTMENT FEES 1. Map Check: $11, 137 (To be paid prior to checking of final map) 2 . Improvement Plan Check: $206 + 1.5% of const cost (To be paid prior to checking of improvement plans) 3 . Construction Inspection: $516 + 2 .5% of const cost (To be paid prior to start of any construction) 4 . Sewer Lift Station: $4, 143 .83 (To be paid prior to recordation of the Final Map) 5. Traffic Mitigation Contributions: $74,282 (To be paid prior to recordation of the Final Map) 6. Proposed Traffic Impact: $4315/1000 sqft of office bldg. $1246/1000 sqft of industrial bldg. (The Traffic Impact fees indicated are only estimates as indicated in a proposed ordinance and, if passed by the City Council, will probably be based on the final building plans and may possibly consider the traffic fees stated in ?5 to be credited on a pro-rata basis) File: TR2134-2.rev Address: 953 Orcutt