HomeMy WebLinkAbout03/07/1995, C-5 - A. CONTRACT CHANGE ORDER WITH MADONNA CONSTRUCTION TO ADD FIRE SPRINKLER LATERALS TO THE WATERLINE AND SEWERLINE IMPROVEMENT PROJECT-SPECIFICATION NO. 94-12. B. BUDGET AMENDMENT REQUEST TO TRANSFER $57,505.00 FROM THE FIRE SPRINKLER LATE 1111111111001111 city O f San IDIS OBI SPO 3/7/95/7 3/7//G DATE: 1 u 95 COUNCIL AGENDA REPORT ITEM NUMBER: f FROM: Michael McCluskey, Public Wo ks Directo�,�(1� John Moss, Utilities Director Prepared by: Morris Witbeck SUBJECT: A. Contract Change Order with Madonna Construction to add fire sprinkler laterals to the Waterline and Sewerline Improvement Project - Specification No. 94-12. B. Budget amendment request to transfer $57,505.00 from the Fire Sprinkler Lateral Reimbursement Fund to the Project account. CAO RECOMMENDATION A. Approve Contract Change Order No. 3 to add fire sprinkler laterals at specific locations on Marsh and Higuera Streets, as part of the Waterline and Sewerline Improvement Project (Specification No. 94-12). B. Approve transfer $57,505.00.from the Fire Sprinkler Reimbursement Fund to the project account. BACKGROUND The Marsh Street water, sewer and traffic signal project has been expanded to include replacement of fire sprinkler laterals ("firelines") so that the street can be repaved with no further disruption to the downtown area. There is a specific capital improvement project to reimburse downtown owners for costs related to installation of firelines. Currently, there is $83,500 available in this account to support this request. (This CIP is approved for approximately $50,000 a year, but only three requests have been received by the Fire Department and approved to be paid by the Water Fund in the last two years). The Marsh-Higuera street utility project was seen as a unique opportunity to install firelines cost-efficiently for the building owners benefit. The Fire Department approves of this request, as it will provide 35 additional firelines up to the individual property lines. Business owners will still be able to request reimbursement for their remaining costs to connect to the fireline (maximum request is $150 per lineal foot). The original water, sewer and traffic signal project, prior to any change orders, involved replacing those sections of waterlines and sewerline in the downtown area on Marsh and Higuera Streets that were high priority. Due to an upcoming project to repave a portion of Marsh Street, staff resized the project to include replacement of all the city utilities that have limited life expectancy in the area designated to be repaved. Staff also felt that resizing the project would meet the downtown area businesses request for construction at a time and in a manner that would be least disruptive to their business. Marsh-Higuera Waterline (Fire Sprinkler Laterals) Meeting of March 7, 1995 Page Two FISCAL IMPACT This request seeks approval to pay $57,505 for fireline installation to be incurred as part of the Marsh-Higuera waterline and sewerline project. A total of$50,000 a year for downtown sprinkler reimbursement was approved in the Water Fund Capital plan (1993-95 Financial Plan, page E-5). The capital improvement plan identified $50,000 and $100,000 for fiscal years 95/96 and 96/97, respectively. To date, there have been only three reimbursement requests, totalling $16,500. Therefore, $83,500 remains in 500-9085-510-553 to support this activity. Bid Bid+ 10% CCO #1 CCO 12 CCO #3 Total Water $434,150 $477,600 $106,645 --- $57,505 $641,750 Sewer 219,150 241,100 --- --- --- 241,100 Traffic 17.860 19.700 --- (51.1211 --- 18.579 Total $671,160 $738,400 $106,645 ($1,121) $57,505 $901,429 Funds Available $671,160 $738,400 $106,645 $57,505 $9021550 CONCURRENCES The Finance Director concurs with the recommended action. Attachments: 1 - Change Order mwl/94-11CAR CITY OF SAN LUIS OBISPO, CALIFORNIA CONTRACT CHANGE ORDER Sheet _1_ of _1_ sheets Project Waterline, Sewerline, Traffic Change Order No. 3 Signal , Specification No. 94-12 Date 1-5-95 To: Madonna Construction Connany , Contractor You are here hereby authorized and directed to make the herein described changes from the plans and specifications, and/or to increase or decrease contract quantities, as follows: As requested by Richard Fisher Install approximately 35 additional firelines. All work shall be in compliance with city standards and_per attached sheets (2) . 35 locations @ $1, 643 . 00 each = $57, 505. 00 We, the undersigned contractor, have Total cost of change not to given careful consideration to the exceed: $57 , 505. 00 changes proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all Submitted by: R. Fisher materials, except as may be noted above and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. Resident Engineer By reason of this proposed change twelve (12) days extension of time will be allowed. / y Engine r r ='C Accepted date f � �� 19�J / 7A J Date approved Signed: Contrac or's Authorized Agent �-5- 3