= COUNCIL AGENDA REPORT *6C_1
FROM: Bob Neumann, Fire Chief PREPARED BY: Viv R. Dilts
SUBJECT: Invitation to Bid: Headquarters Fire Station, 2160 Santa Barbara Street
CAO RECOMMENDATIONS
1) Approve plans and specifications for "Headquarters Fire Station, Specification No. 95-19B"
2) Authorize staff to advertise for bids on a construction contract
3) Authorize the CAO to award the construction contract if the lowest responsive, responsible bid
is within the cost estimate
DISCUSSION
Background
In late 1992, escrow closed and title was received for the Emerson School site. In early 1993, the
architectural firm of Ross Levin MacIntyre and Varner (RLMV) was selected to design the facility
on this site. Shortly after this contract was signed, the Southern Pacific Gas Company site at 2160
Santa Barbara Street became available. As this was the more desirable location, based upon its
location and existing maintenance facility, negotiations were begun to acquire it. This site was
purchased in June of 1993, and the project design phase began. After approximately one year of
design work, in August of 1994, RLMV notified Council that it would not be able to complete the
project due to financial bankruptcy. Upon the receipt of this information, the architectural firm of
Richmond Rossi and Montgomery was selected and the City entered into a renegotiated contract.
The architect and staff on February 28, 1994 provided the City Council with a detailed briefing
concerning design and project.
Proposed Nest Steps
The plans and specifications for the Headquarters Fire Station, to be located at 2160 Santa Barbara
Street, are complete and ready to advertise for construction bids. This project encompasses a
16,000 sq. ft. main story building designed with administrative offices, crews' living quarters, and
four drive-through apparatus bays. An existing on-site 1,600 sq. ft. maintenance facility, which
comes equipped with hydraulic lifts and associated vehicle-servicing equipment, will be rehabilitated
to meet currant code and seismic standards. In addition, a three-story block training tower will be
built for the northeast corner of the lot.
If Council approves the staff recommendation, the CAO may award the contract approximately one
month later, but no later than May 159 1995. It should be noted that the City has applied for
partial funding for this project, from the State Earthquake Retro Fit Bond Act of 1992. The City
will be awarded $611,000 for this project, if the contract is awarded by May 15, 1995. Construction
is expected to begin in June or July.
������i ►�IIIII���►A►���N city of San Luis OBISp0
COUNCIL AGENDA REPORT
CONCURRENCES
In September of 1994, the Planning Commission approved a use permit for this project. The
following month, the project received the Architectural Review Commission's approval for
schematic design and a mitigate negative declaration of environmental impacts.
FISCAL DIPACT
On February 28, 1994 the Council was given a status report outlining the current project scope and
budget estimation. As the fiscal analysis for this project has not changed since this information was
presented, "The Summary of Headquarters Fire Station Costs% should be referred to for further
information. Additionally, it should again be emphasized that the true cost of this project will be
established only upon bid opening.
While no specific financing plan is recommended at this time, there are several options available to
us which we will be further evaluated over the next several months as we prepare the 1995-97
Financial Plan. These include sale of existing Headquarters Fire Station site, debt financing, and
the use of general fund balances.
ATTACHMENT
Excerpt from February 28, 1995 Council Agenda Report discussing project costs and fiscal impacts.
On file in Council Office - Plans and Specifications for Headquarters Fire Station, No. 95-19B.
city of San tui S OBISPO
COUNCIL AGENDA REPORT
A 10
■ Staff is recommending that a 59antingency fund of$ 2,100 be established or misc us
omissions and change orders a
,ythey develop in cons ction.
Staff has scaled the project bacVand reduced costs to hat we consider the 'mumacre le
range for a project of this scpPe. Changing locatio s, delays and the associ rise in struction
costs over six years, the bankruptcy of the origin architectural firm, the mplexity of a new
site, changing the City's le in design and con ction management; ha a all facto missing
the original budget Mr.
In summary, the project is now estimated be some $672,900 over a estimated udget of 1989
and some $444, over the amount rted to Council in June, 94. This inc des
approximately $3 0,000 that was nev factored in for the tower, misc sous
furnishings/eq ' ment, and 5% con ' gency.
Staff recom ends and the projec consultant, (VAIVIR Cons ction) and rh project architect (RRM
Design G up), concur that Co cil should move forward ith the project establishing the suggested
budget. t is important to no that these figures are only est estimates. The true costs will be
estabh/hed only when the bi are received.
FISCAL IMPACT
If the recommended project scope and design is approved by the Council, funding the $672,900 gap
between the currently adopted budget and the revised cost estimate will be a major issue in
developing the 1995-97 Financial Plan. Pending the receipt of bids and development of a final
financing plan tailored to actual project costs, no formal action amending the project budget or
approving a specific funding plan is recommended at this time.
While no specific financing plan is recommended at this time, there are several options available to
us which we will be further evaluating over the next several months as we prepare the 1995-97
Financial Plan:
■ Sale of the wdsting Headquarters Fire Station site. Once the new Headquarters Fire Station
is built, the current site will become available for another use. Revenue estimates from the sale
of this site range from $500,000 to $800,000 depending on market and site conditiona at that
time: in the past, sales prices estimates have been significantly higher if it is assumed that the
existing structure is demolished and the site is marketed as a vacant property. Pending a
comprehensive evaluation of possible City uses in the future and market value of the site, this
appears to be a very viable option for funding the supplemental cost of the new station.
■ Debt financing. Under our Financial Plan policies and debt management criteria, the entire
cost of this project would be an excellent candidate for debt financing: it has a life in excess of
10 years, limited cash resources are available, it is immediately required to meet capacity
needs, and the project securing the financing (in conjunction with the City's fiscal condition and
management capabilities) will support an investment grade rating. In fact, when design for this
project was initially approved as part of the 1989-91 Financial Plan and construction approved
as part of the 1991-93 Financial Plan, funding plans envisioned debt financing all of the
tn�"
11 city of San La1S OBISp0
93196 COUNCIL AGENDA REPORT
construction costs of this project. However, the budget balancing strategy adopted by the Council in
the 1993-95 Financial Plan called for paying for this project (as well as the Performing Arts Center,
which was also previously planned to be debt-financed) primarily through existing fund balances -
which were about $8 million at that time - rather than debt financing. This strategy effectively used
our fund balances in reducing future year debt service costs by about $500,000 annually. While
most of the costs of these two projects are now funded on a "pay-as-you-go" basis, the 1993-95
Financial Plan still provides for about $1.7 million of these project costs to be funded through debt
financing. This could be increased to cover the funding shortfall, resulting in increased annual debt
service costs of about $55,000. Depending our on our projected fiscal condition as we finalize the
1995-97 Financial Plan, this may also be an extremely attractive option.
■ Find balance. At this point, we project ending 1994-95 with General Fund balances of about
$4.0 million, which is right on target with our policy of maintaining fund balances that are
20% of operating expenditures. This policy is maintained for a reason: to provide the City with
financial strength in addressing important but unforeseen circumstances. In this context,
building the Headquarters Fire Station - which is a "one-time" expense - may be an appropriate
use of fund balances below this 20% level. Under this approach, all other things being equal,
the General Fund balance would fall to about $3.3 million, or 16% of operating expenditures.
Before selecting these (or any other options) it is important that we fully identify the cost of going
forward with this project - which we will not know until bids are received in mid-May - and are
further along in the 1995-97 Financial Plan process. However, it is important to note that because
of our past policies and actions, we have the fiscal strength to fund this project under a number of
financing options.
Summary of Headquarters Fire Station Costs 2116195
Erdades site acquisition costs and iaz2rdous materials abatement
Proiect Bud et Variance
C urrenfly Estimate at
Estimate at June 1994 to
Proiect Phase Adonted' June 1994 Februa 1995 February 1995
• The budget for design costs was approved in 1989;The budget fOr=st=tion was approved in 1991
Q Stn anti 276 OQQ:
design 1:�: P.
Fire station 430,000 269,000 299,000 30,000
Training faciltity 7,000 7,000 0
Off—site improvements L 24,000 24,000
4:1
58,000 02,0061
&tes. A.
ta 58;700. 183,500:: 218,500 35,000
On—site inspection 75,000 "':0,
Testing 50,000 50,0 00 0
Construction management 58 700 58,5001 58,500 0
(Y. 91,6001L 416001
Signals 40,000 50,000 10,000
Storm drains and sidewalks 10 000 41,60011 31.6001
8001
..0
2,=51
:ZX8 0
Fire station/maintenance facility 2,218,100 2,136,400
400
, 1 2,324,500 188,100
Training facility 89 87 000 400
VS.Owner.—,
Furnishings 60,000 60,000 0
Centrex phone line installation 13,000 13,000
Generator 25,000 25,000
Emergency operations center(EOQ 40,000 40000
106 ........
...... 132,I00
.M
•
so cfoffate mprommenM c=Ltuction equipment=Is
TOTAL 2,706,8001 2,935,3001 3,379,7001 44=,400
VARIANCES
• Adopted Pudge t vs June 1994 estimate 228,SOO
400
• Jun e 1994 estim te vs Fe brua ry 1995 es tima te 4AKgj
00
• Adopted budget vs February 1995 estimate 167jZ900
MCOSM